DOE OSTI2020
Monitoring and sampling activities are performed at the E-Tunnel Wastewater Disposal System (ETDS ) in accordance with the requirements of Water Pollution Control (WPC) Permit NEV 96021, Revision 1, which is effective October 1, 2013. Although the end date of the WPC permit is September 30, 2018, the Nevada Division of Environmental Protection (NDEP), in a letter dated September 21, 2018, provided guidance that indicated the WPC Permit NEV 96021, Revision 1, is in effect until NDEP notifies the U.S. Department of Energy, National Nuclear Security Administration Nevada Field Office otherwise. This QMR includes the results of monthly inspections and monitoring for July, August, and September 2020. Monthly inspections and monitoring were conducted on July 21, August 19, and September 16, 2020. Inspections include a visual assessment of the berms, ponding, water levels relative to the overflow pipes, tunneling or burrowing into the berms, soil conditions on and around the berms, erosion or sloughing of the slopes of the berms, seeps at the toe of the berms, deep-rooting botanicals on the berms, and fencing. Monthly monitoring includes measurement s of the instantaneous flow rate, hydrogen ion activity (pH), and specific conductance of the ETDS discharge. The report will be submitted to the State of Nevada.
54 ENVIRONMENTAL SCIENCES↗