Engineering Papers⌕ Search

SEARCH · Engineering Papers

Results for “Test Pilots”

Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.

Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.

At least 19 records

Pilot testing of CO2 capture from a coal-fired power plant—Part 2: Results from 1-MWe pilot tests

Abstract Using a 1-MWe slipstream pilot plant, solid-sorbent-based post-combustion CO2 capture was tested at a coal-fired power plant. Results from pilot testing were used to develop a preliminary full-scale commercial design. The sorbent selected for pilot-scale evaluation during this project consisted of an ion-exchange resin that incorporated amines covalently bonded to the substrate. A unique temperature-swing-absorption (TSA) process was developed that incorporated a three-stage fluidized-bed adsorber integrated with a single-stage fluidized-bed regenerator. Overall, following start-up and commissioning challenges that are often associated with first-of-a-kind pilots, the pilot plant operated as designed and expected, with a few key exceptions. The two primary exceptions were associated with: (i) handling characteristics of the sorbent, which were sufficiently different at operating temperature than at ambient temperature when design specifications were established with lab-scale testing; and (ii) CO2 adsorption in the transport line between the regenerator and adsorber that preloaded the sorbent with CO2 prior to entering the adsorber. Results from the pilot programme demonstrate that solid-sorbent-based post-combustion capture can be utilized to achieve 90% CO2 capture from coal-fired power plants.

Sjostrom, Sharon↗

Optimization of operational strategies for rich gas enhanced oil recovery based on a pilot test in the Bakken tight oil reservoir

Horizontal well drilling and multistage hydraulic fracturing have been demonstrated as effective approaches for stimulating oil production in the Bakken tight oil reservoir. However, after multiple years of production, primary oil recovery in the Bakken is generally less than 10% of the estimated original oil in place. Gas huff ‘n’ puff (HnP) has been tested in the Bakken Formation as an enhanced oil recovery (EOR) method; however, most field pilot test results showed no significant incremental oil production. One of the factors affecting HnP EOR performance is premature gas breakthrough, which is one of the most critical issues observed in the field because of the presence of interwell fractures. Consequently, injected gas rapidly reaches adjacent production wells without contacting reservoir rock and increasing oil recovery. Proper conformance control is therefore needed to avoid early gas breakthrough and improve EOR performance. In this study, a rich gas EOR pilot in the Bakken was carefully analyzed to collect the essential reservoir and operational data. A simulation model with 16 wells was then developed to reproduce the production history and predict the EOR performance with and without conformance control. EOR operational strategies, including single- and multiple-well HnP, with different gas injection constraints were investigated. The simulation results of single-well HnP without conformance control showed that a rich gas injection rate of at least 10 MMscfd was needed to yield meaningful incremental oil production. The strategy of conformance control via water injection could significantly improve oil production in the HnP well, but injecting an excessive amount of water also leads to water breakthrough and loss of oil production in the offset wells. By analyzing the production performance of the wells individually, the arrangement of wells was optimized for multiple-well HnP EOR. The multiwell results showed that rich gas EOR could improve oil production up to 7.4% by employing conformance control strategies. Furthermore, replacing rich gas with propane as the injection gas could result in 14% of incremental oil production.

02 PETROLEUM↗

Pilot Testing of Amine-Based Solvent at Low-Rank Coal Fired Power System

Conference presentation for the 2023 International Freiberg Conference on Circular Carbon Technologies, Rotterdam, Netherlands, September 24–29, 2023. This presentation describes pilot testing of an amine-based CO₂ capture system at Coal Creek Station, examining solvent performance, system design, and operating conditions for a low-rank coal-fired power plant. The Mitsubishi Heavy Industries KM CDR (KS-1) process is assessed using pilot-scale data to inform capture efficiency, solvent condition, and integration considerations.

01 COAL, LIGNITE, AND PEAT↗

Pilot Test Remediation of a Fractured Bedrock Aquifer at the Maywood Superfund Site, Maywood, New Jersey - 20073

The U.S. Army Corps of Engineers (USACE) and Cabrera Services are conducting a Comprehensive Environmental Response, Compensation and Liability Act (CERCLA) Pilot Test treatment of a fractured bedrock aquifer at the Formerly Utilized Sites Remedial Action Program (FUSRAP) Maywood Superfund Site (FMSS) located in Maywood, New Jersey (NJ), USA. The Maywood Chemical Company Superfund Site in Bergen County, NJ is listed on the United States Environmental Protection Agency (USEPA) Superfund National Priorities List (NPL). The National Superfund Comprehensive Environmental Response, Compensation, and Liability Information System (CERCLIS) identification number is NJD980529762. The Maywood Chemical Company Superfund Site (hereafter referred to as the FMSS) consists of 92 designated properties in the communities of Maywood, Lodi and Rochelle Park, NJ. These are collectively known as FMSS 'Vicinity Properties' and include property owned by the federal government (the Maywood Interim Storage Site, or MISS); the Stepan Company (former location of the Maywood Chemical Works, or MCW); 62 residential properties; three properties owned by the state or federal government; four municipal properties; and 21 commercial properties. The Stepan Company property includes contaminated buildings and three remediated U.S. Nuclear Regulatory Commission (NRC) licensed burial pits; the MISS also includes a contaminated building. Contamination on the FMSS is being addressed under three separate actions coordinated by the lead regulator USEPA Region 2. The USACE is addressing thorium (Th) and other wastes at the site defined as 'FUSRAP waste' in the Soils and Buildings and Groundwater Records of Decision (ROD) for the FMSS. Stepan Company is addressing other chemical wastes (non-FUSRAP waste) at the FMSS. The Groundwater ROD [1] was signed into agreement by USACE Division Commander in June 2012 and USEPA Region 2 Administrator in July 2012 and presents the selected remedial actions for Operable Unit (OU) 2 groundwater at the MISS and adjacent properties. The selected remedial action is removal of non-radiologically contaminated soils on the MISS containing arsenic, lithium, and benzene with concentrations above cleanup levels, and monitored natural attenuation (MNA) of arsenic, lithium, and benzene in groundwater. In situ treatment of arsenic in the overburden aquifer using oxidation reduction (redox) alteration will also be performed if needed to meet the groundwater cleanup levels after the source soil is removed. The need for in situ treatment will be determined during the Groundwater ROD review at least three to four years after the contaminated source soil removal is completed. The third action addressing non-FUSRAP chemical wastes will be the responsibility of the Stepan Company as a primary responsible party in this action. (authors)

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Adaptively Learned Modeling for a Digital Twin of Hydropower Turbines with Application to a Pilot Testing System

In the development of a digital twin (DT) for hydropower turbines, dynamic modeling of the system (e.g., penstock, turbine, speed control) is crucial, along with all the necessary data interface, virtualization, and dashboard designs. Since the DT must mimic the actual dynamics of the hydropower turbine accurately, adaptive learning is required to train these dynamic models online so that the models in the DT can effectively follow the representation of the actual hydropower turbine dynamics accurately and reliably. This study presents an adaptive learning method for obtaining the hydropower turbine models for DT development of hydropower systems using the recursive least squares algorithm. To simplify the formulation, the hydropower turbine under consideration was assumed to operate near a fixed operating point, where the system dynamics can be well represented by a set of linear differential equations with constant parameters. In this context, the well-known six-coefficient model for the Francis turbine was formulated as the starting point to obtain input and output models for the turbine. Then, an adaptive learning mechanism was developed to learn model parameters using real-time data from a hydropower turbine testing system. This led to semi-physical modeling, in which first principles and data-driven modeling are integrated to produce dynamic models for DT development. Applications to a pilot system at the Norwegian University of Science and Technology (NTNU) were made, and the models learned adaptively using the data collected from the university’s pilot system. Desired modeling and validation results were obtained.

13 HYDRO ENERGY↗

Improving anaerobic digestion of sewage sludge to renewable natural gas by the Advanced Pretreatment & Anaerobic Digestion technology (APAD): Pilot testing

Conventional anaerobic digestion (AD) of sewage sludge in wastewater treatment facilities suffers from low carbon conversion efficiency (CCE = 40%) and requires costly CO2 removal for injection of the produced CH4 into the natural gas grid. To address these limitations, we developed the Advanced Pretreatment and Anaerobic Digestion (APAD) process. This integrates Advanced Wet Oxidation & Steam Explosion (AWOEx) pretreatment of residual sludge after conventional AD, followed by biogas upgradation using a novel methanogenic strain, Methanothermobacter wolfeii BSEL, converting CO2 with H2 into CH4 or RNG (renewable natural gas). Pilot-scale results demonstrated that AWOEx pretreatment achieved a CCE of 62% for the residual sludge, 68% higher than the conventional AD process. The CH4 production was further increased by 79%. Subsequent biogas upgrading in a trickling bed reactor with H2 further enhanced total methane output by 100% and resulted in a final CO2 concentration of =3%. The integrated APAD process achieved a remarkable overall CCE of 83%, resulting in a 200% increase in RNG output when compared to conventional AD. Techno-economic analysis revealed that AWOEx pretreatment alone reduced sludge treatment costs from $494 to $253 per ton of dry solids. The complete APAD process incurred a higher cost of treatment of $530 per ton, driven by prices for bottled H2. The process did, however, show gains in energy recovery and decarbonization. Renewable H2, which may reduce in price in the near future, can positively improve the economics of biogas upgrading for the APAD process.

Life Cycle Assessment (LCA)↗

Pilot Testing of a Modular Oxygen Production System Using Oxygen Binding Adsorbents (Final Report)

In this project, RTI and Air Liquide have focused on the development of innovative oxygen separation materials and technologies based on reversibly binding of oxygen to enable smaller and cheaper air separations. In alignment with that object the team has had multiple achievements to advance the technology including: Synthesized and characterized novel M-CoSalen (RTIO2Sorb-1) material which showed a dynamic oxygen adsorption capacity in excess of 1wt%. Developed synthesis routes for RTIO2Sorb-1 with commercially relevant techniques and produced batches of 0.25kg and over 4 kg of total synthesis. Synthesized and characterized extrudate forms of the RTIO2Sorb-1 with relevant crush strength and maintained dynamic oxygen adsorption capacity in near 1wt%. Developed techniques for forming structured beds in fiber shapes with conventional materials. Developed a model for O 2 sorption processes to analyze various bed configurations and cycle parameters. Studied classic O 2 solid sorbents reported in the literature to learn oxygen binding mechanisms. Design a 10 kg/day O 2 VPSA pilot system with 2 or 4-bed operation. Completed a techno-economic analysis based on the experimental results and modeling. The overall objective of the project was to design, fabricate, and test a modular O 2 production system and perform a techno-economic analysis (TEA) after testing to determine the cost-benefit of the advanced modular air separation system. The goals of this technology development project were to achieve a bed-size factor (BSF) of less than 600 lb-adsorbent/TPD O 2 (ton/day O 2 ) (as compared with the state-of-the-art BSF of 850), and O 2 -purity greater than 95% at a cost that is projected to be equivalent or lower than the current state of the art (SOTA), commercially available large-scale cryogenic air separation systems. To achieve these goals and objective, the project team executed on (1) oxygen binding adsorbent optimization and scale up, (2) adsorbent material formation process studies to form the adsorbent material into structured beds for rapid pressure swing adsorption (PSA) cycles with low pressure drop, fast mass transfer, and low attrition, (3) cycle development studies to optimize the PSA process, and (4) develop simulation tools for rapid cycle modeling and numerical evaluation/optimization.

20 FOSSIL-FUELED POWER PLANTS↗

Western Sector In-Situ Chemical Oxidation Project: Additional Injection Pilot Testing Supplemental Results (U)

Trichloroethylene (TCE) and tetrachloroethylene (PCE) are persistent at elevated concentrations in the Western Sector of the M-Area Hazardous Waste Management Facility (HWMF) groundwater plume. Migration of these chlorinated ethenes as Dense Non-Aqueous Phase Liquids (DNAPLs) occurred from the M-Area Settling Basin along geologic strata resulting in a high concentration groundwater plume in Western Sector. Pump-and-treat has been active for over 30 years at the M-Area HWMF to hydraulically contain the primary sources of the plume in addition to other remediation strategies throughout the contaminated zone, like soil vapor extraction, dynamic underground stripping, groundwater recirculation wells, and bioremediation. In-situ chemical oxidation (ISCO) has been identified as a viable treatment method for removal of these volatile organic compounds (VOCs) due to the complex lithology and high concentrations in this part of the aquifer. In addition to ISCO, a new recovery well (i.e., RWM018) was also installed in Western Sector to contain the high concentration VOC plume. The ISCO projects have utilized the gradient induced by RWM018 to help plan the injection and monitoring locations. The combination of ISCO and the additional pump and treat in Western Sector with the installation of RWM018 will help to control the plume and maximize remediation efforts.

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Pilot Test of a Nanoporous, Super-hydrophobic Membrane Contactor Process for Post-combustion CO 2 Capture

GTI Energy and Air Liquide Advanced Separations (ALaS) have been developing a novel hollow fiber membrane contactor (HFMC) technology for post-combustion CO 2 capture. The process combines advantageous features of both absorption and membrane-based separation processes to separate CO 2 from flue gas cost-effectively. The key component of the HFMC technology is the super-hydrophobic, porous hollow fiber, which is made from polyether ether ketone (PEEK). Compared to conventional absorption/desorption technologies, the critical advantage of the HFMC process is the high contact surface area provided by the hollow fibers enabling an increased volumetric mass-transfer rate. In the PEEK HFMC process, the specific surface area has been increased by an order of magnitude over structurally packed or trayed columns, resulting in compact systems with small footprints.

20 FOSSIL-FUELED POWER PLANTS↗

Pilot Testing of a Highly Efficient Pre-combustion Sorbent-based Carbon Capture System

TDA developed and demonstrated a highly efficient pre-combustion carbon capture system. The overall objective of this work was to develop a new sorbent-based pre-combustion carbon capture technology for Integrated Gasification Combined Cycle (IGCC) power plants. In this project our goal was to demonstrate the techno-economic viability of the new technology by 1) demonstrating it in large-scale slipstream tests, and 2) carrying out a high fidelity engineering and cost analysis. TDA’s process used an advanced physical adsorbent that selectively removes CO 2 from coal-derived synthesis gas above the dew point of the gas at temperatures as high as 300°C. The sorbent consists of a mesoporous carbon whose surface was grafted with functional groups that remove CO 2 via a well-known acid-base interaction. As documented in bench-scale experiments and field tests with actual coal gas, the sorbent achieved a very high capacity for CO 2 at temperatures as high as 300°C. The sorbent bound CO 2 more strongly than common physical adsorbents, providing the chemical potential needed for the high temperature operation. However, because CO 2 does not form a true covalent bond with the surface sites (as is the case with chemical absorbents), the sorbent regeneration could be carried out with only a very small energy input. The heat input to regenerate our sorbent was only 4.9 kcal per mol of CO 2 , which is much lower than that for chemical absorbents (e.g., 29.9 kcal/mol CO 2 for sodium carbonate) and was similar to the requirements of physical solvents (e.g., 4 kcal/mol CO 2 for Selexol TM ). Because the sorbent operates above the dew point of the synthesis gas (unlike the Selexol TM process), a higher power cycle efficiency can be achieved. With previous DOE/NETL funding (Contract No. DE-FE-0000469), we demonstrated the techno-economic viability of the technology in bench-scale tests and slipstream demonstrations at the National Carbon Capture Center (NCCC), Wilsonville, Alabama and Wabash River IGCC plant in Terra Haute, Indiana. We demonstrated a stable working CO 2 capacity for over 11,650 cycles with simulated synthesis gas. We also evaluated its performance with actual synthesis gas in two test campaigns at the Wabash River IGCC Plant, Terre Haute, IN and the National Carbon Capture Center (NCCC), Wilsonville, AL. The slipstream tests clearly showed that the actual coal gas constituents and potential contaminants (e.g. trace metals, halides, tars) had no effect on the sorbent’s ability to remove CO 2 (the same sorbent beds were used in both field tests with no sign of deactivation for 2,000 cycles with over 26,750 SCF of gas treated). As expected, due to the high temperature CO 2 removal capability and low energy needed to regenerate the sorbent, the power cycle efficiency with our process was greater than 34% on a higher heating value (HHV) basis; in comparison, the same IGCC plant equipped with the Selexol TM solvent for carbon capture can only achieve 31.4% HHV efficiency. The capital cost for an IGCC system with TDA’s process is estimated as $2,417/kW e , which is 12% lower than that of the IGCC/ Selexol TM process. The levelized cost for electricity including the transport, storage and monitoring (TS&M) cost for CO 2 was calculated as $\$ $92.9/MWh (lowest reported to our knowledge), which is much better than the $105.2/MWh estimated for the IGCC/ Selexol TM process. In this project (DE-FE0013105), TDA Research, in collaboration with our partners Gas Technology Institute (GTI), Illinois Clean Coal Institute (ICCI), University of California, Irvine (UCI), University of Alberta (UOA), Siemens, NCCC and Sinopec advanced the technical maturity of the technology; scaling it up by a factor of 100. We optimized the reactor design using computational fluid dynamics (CFD); using adsorption modeling we improved the pressure swing adsorption (PSA) cycle sequence. We carried out two field test campaigns with a fully-equipped 0.1 MW e prototype unit (for a total of 844 hours) using actual synthesis gas to prove the viability of the new technology. A successful 30 day (707 hrs) evaluation was completed at NCCC under air blown gasification conditions. We demonstrated 97.3% carbon capture at 1,500 SLPM, 93% carbon capture at 1,800 SLPM, and 90% carbon capture at 2,100 SLPM in the NCCC tests. We also demonstrated the system for 137 hours at a Sinopec petrochemical plant under oxygen blown gasification, demonstrating 86% carbon capture at 2,660 SLPM. In collaboration with University of California, Irvine (UCI), we completed a techno-economic analysis (TEA) for TDA’s warm gas cleanup technology integrated to IGCC power plant. The net plant efficiencies (on a coal HHV basis) for the warm gas cleanup cases were estimated to be 34.0% for E-GasTM gasifier, 34.4% for GE gasifier, 33.4 for the Shell gasifier and 34.2 for the TRIG TM gasifier (Cases 2, 4, 6 and 8 in this study) with a catalytic combustor for CO 2 purification, which are significantly higher than those for the Cold Gas Case, or an increase of as much as 12% in the heat rate for Case 2, 6% for Case 4, 9% for Case 6, and 9% for Case 8. The 1st year cost of electricity with the transport, storage and monitoring (TS&M) costs for the CO 2 included was $\$ $129.2/MWh for the E-GasTM gasifier Warm Gas Cleanup Case, $\$ $131.9/MWh for the GE gasifier Warm Gas Cleanup Case, $\$ $146.8/MWh for the Shell Gasifier Warm Gas Cleanup Case, and $\$ $129.9/MWh for the TRIG TM gasifier Warm Gas Cleanup Case. For comparison, the costs for the baseline Cold Gas CO 2 removal with Selexol for the different gasifiers were: $\$ $146.6/MWh for the E-Gas TM gasifier, $\$ $142.2/MWh for the GE gasifier, $\$ $159.0/MWh for the Shell gasifier and $\$ $144.3/MWh for the TRIG TM gasifier. In summary, the costs for our system were 7 to 12% lower than the corresponding Cold Gas Cleanup cases. The results of this techno-economic analysis suggested that TDA’s high temperature PSA-based Warm Gas Clean-up Technology can make a substantial improvement in the IGCC plant thermal performance for achieving near zero CO 2 emissions for E-Gas TM , GE, Shell and TRIG TM gasifier based IGCC power plants. The capital expenses were estimated to be lower than that of Selexol’s™. Taken together, the higher net plant efficiency and lower capital and operating costs resulted in substantial reduction in the cost of carbon capture for the IGCC plant equipped with TDA’s high temperature PSA-based carbon capture system. Finally, in collaboration with Gas Technology Institute (GTI) we completed the environmental health and safety assessment for TDA’s warm gas carbon capture technology.

01 COAL, LIGNITE, AND PEAT↗

Model-Based Sequential Design of Experiments for Pilot Testing of Novel Water-Lean CO2 Capture Solvent

Poster for the 2024 Fossil Energy and Carbon Management Meeting. It summarizes work done on process modeling and uncertainty quantification in preparation for the test campaign at the National Carbon Capture Center for a general audience. The poster includes sections detailing background on the EEMPA solvent, sequential design of experiments, process modeling (including results from the model), uncertainty quantification, and the goals of the test campaign.

Hedrick, Katherine↗

Sequential Design of Experiments for Pilot Testing of Novel Solvent System

The CCSI2 program is supporting a six-month test campaign at the National Carbon Capture Center (NCCC) for evaluation of a novel water-lean solvent. This presentation describes CCSI2’s efforts in process modeling of the solvent system for both coal and natural gas-based flue gas sources and initial uncertainty quantification (UQ) work to estimate parametric uncertainty in key sub-models of interest (e.g., thermodynamics, mass transfer, reaction kinetics). Moreover, perspective is provided on how UQ and sequential design of experiments (SDoE) tools are used to assess the impact of model uncertainty on projected process performance, use this information to optimize data collection during the campaign, and refine process models through data collection. This framework is expected to reduce the overall model uncertainty, and thus risk associated with scale-up as the process moves towards commercialization.

Morgan, Joshua↗

Distributed fiber sensing systems for 3D combustion temperature field monitoring in coal-fired boilers using optically generated acoustic waves (Final Report)

In this project, we have developed and tested three kinds of fiber optic sensing systems for real time monitoring of temperature variations within an industrial scale boiler furnace. The fiber optic sensing systems target spatial and temporal distributions of high temperature profiles in a boiler furnace in fossil power plants. The reconstructed temperature profile will provide critical input for the control mechanisms to optimize the combustion process. This temperature profile will address the essential problem for fossil power plants in achieving higher efficiency and fewer pollutant emissions. Acoustic pyrometer systems have been used to reconstruct temperature field of power plant boilers based on measuring TOF (times-of-flight) of sound waves along some straight paths in a 2D cross-section of the boiler. In this project, optically generated acoustic signals from a fiber optic sensing system have replaced the acoustic signals generated from an electrical transducer. A 3D reconstruction algorithm replaced the previous 2D model. In this project, three kinds of fiber optic sensing systems have been developed and tested. They are fiber optic sensing system I, fiber optic sensing system II (Distributed Sensing System I) and fiber optic sensing system III (Distributed Sensing System II). For fiber optic sensing system I, the fiber optic ultrasound generator acts as a signal generator. A microphone, hydrophone or other electronic devices serve as a signal receiver. In this system, there are one generator and one receiver. Distance test, water temperature test, air temperature test, air temperature reconstruction, and GE ISBF pilot test were performed by Fiber optic sensing system I. The fiber optic sensing system I successfully detected temperature in all these tests. We got 2D temperature reconstruction results by using the fiber optic sensing system I and it matched the reference data. The fiber optic sensing system I successfully survived in GE ISBF boiler environment (480 °F). For fiber optic sensing system II (Distributed Sensing System I), it is an all optical ultrasound system. The fiber optic ultrasound generator acts as a signal generator. Fiber Bragg Grating (FBG) and Fabry-Perot (FP) sensor act as a signal receiver. In this system, there is one generator and one receiver. Aluminum plate temperature test, furnace high temperature test, and GE ISBF pilot test were performed by the fiber optic sensing system II. Fiber optic sensing system II successfully detected the temperature in all these tests. The fiber optic sensing system II successfully survived at up to 700 °C furnace environment and 320 °C GE ISBF boiler environment. For fiber optic sensing system III (Distributed Sensing System II), it is also an all optical ultrasound system. The fiber optic ultrasound generator acts as a signal generator. Multiple FP fiber sensors act as signal receivers. In this system, there is one generator and three receivers. Three GE ISBF pilot tests were performed by fiber optic sensing system III. The fiber optic sensing system III survived in the cold flow tests in GE’s ISBF pilot test facility. However, we didn’t get high temperature data by using this system since the nanosecond laser issues. During the period of the project, test trials, data simulation and algorithm optimization was performed successfully. For real time temperature field construction, the sampling rate must be fast enough to capture the field variations. The technology of Code-division multiple access (CDMA) is well studied which could allow parallel multiplexing, even if signals overlap in time or frequencies. Moreover, it has been known that extending the length of signal significantly improves SNR. For acoustic signals, these multiplexing techniques have also been widely used, mainly for sonar and acoustic communications. The CDMA modulation technique has been proposed and studied to guarantee high network throughput, low channel access delay and low energy consumption. We have studied the temperature field reconstruction using Gaussian Radial Basis Functions (GRBF)-based approximation approach. Reconstruction of 3D temperature field using Neural Networks with measured TOF and known propagation paths is feasible. 2D and 3D temperature field reconstruction simulation results are achieved. The milestone status is shown in Table 1. We finished milestone 1-8 and milestone 10. For milestone 9, we did three pilot tests by using the fiber optic sensing system III (Distributed Sensing System II) at GE Power. However, due to the failure of the ns laser, we did not get the temperature results. We conducted some additional tasks that were not originally proposed: 1) We fabricated a fiber optic sensing system I and did a pilot test based on this system. 2) In the proposal, we proposed two pilot tests at GE Power. In reality, we finished at least seven pilot tests at GE Power. GE Power has made a lot of efforts for supporting the pilot tests. 3) We got a simulation results based on CDMA. In summary, most of the tasks have been accomplished. The outcome of this project removed a few barriers that hinder the achievement of the final product of the distributed sensing systems. With the successful accomplishment of this project, a prototype of the fiber optic sensing system can be fabricated to attract more interests from companies and other funding agencies.

47 OTHER INSTRUMENTATION↗

Pilot Scale Testing of Lignite Adsorption Capability and the Benefits for the Recovery of Rare Earth Elements from Dilute Leach Solutions

Naturally occurring organic materials containing humic acids show a strong affinity towards rare earth elements (REE) and other critical elements. Leaching experiments on lignite coal waste produced from construction sand production revealed that the contained REEs were associated with the organic matter. Furthermore, adsorption studies revealed that the lignite waste was capable of extracting REEs from a model solution and increased the REE content of the lignite waste by more than 100%. As such, this study aimed to utilize the lignite waste to adsorb REEs from pregnant leach solutions and acid mine drainage sources having low REE concentrations and subsequently leach the lignite material to produce pregnant leach solutions containing relatively high amounts of REEs, which benefits the performance and economic viability of downstream separation and purification processes. An integrated flowsheet was developed based on this concept and tested at a pilot scale. The pregnant leachate solution (PLS) was generated from a heap leach pad containing 2000 tons of Baker seam coarse refuse. The pilot scale circuit was comprised of aluminum precipitation, adsorption using the waste lignite, and rare earth-critical metal (RE-CM) precipitation stages in succession. The results indicated that the aluminum precipitation stage removed over 88% and 99% of the Al and Fe, respectively. The adsorption stage increased the REE content associated with the waste lignite from 457 ppm to 1065 ppm on a whole mass basis. Furthermore, the heavy REE (HREE) content in the feedstock increased by approximately 250%, which raised the percentage of HREE in the REE distribution by 19 absolute percentage points. In addition to the REEs, concentrations of other critical elements such as Mn, Ni, and Zn also improved by 75%, 37%, and 250%, respectively. Bench-scale tests revealed that increasing the solids concentration in the waste lignite and PLS mix from 1% to 20% by weight enhanced the adsorption efficiency from 32.0% to 99.5%, respectively. As such, a new flowsheet was proposed which provides significantly higher REE concentrations in the PLS that can be fed directly to solvent extraction and/or oxalic acid precipitation and, thereby, enhancing process efficiency and economics.

58 GEOSCIENCES↗

Recovery of Rare Earth Element from Acid Mine Drainage Using Organo-Phosphorus Extractants and Ionic Liquids

Acid mine drainage is a legacy environmental issue and one of the largest pollutants in many mining districts throughout the world. In prior work, the authors have developed a process for the recovery of critical materials, including the rare earth elements, from acid mine drainage using a preconcentration step followed by solvent extraction as a concentration and purification technology. As part of the downstream technology development efforts, we have synthesized a suite of ionic liquid extractants that facilitate greater separation factors leading to lower capital costs and reduced environmental impacts. This article provides a comparison of the conventional extractants D2EHPA, EHEHPA and C572 with their respective ionic liquids [c101][D2EHP,c101][EHEHP] and [c101][C572] for the recovery of rare earth elements from acid mine drainage. In the study, laboratory-scale, multi-contact solvent extraction tests were conducted at high and low extractant/dosages. The results show that the ionic liquids varied in performance, with [c101][D2EHP] and [c101][EHEHP] performing poorer than their conventional counterparts and [c101][c572] performing better. Recommendations for further study on [c101][c572] include stripping tests, continuous pilot testing, and techno-economic analysis.

37 INORGANIC, ORGANIC, PHYSICAL, AND ANALYTICAL CH↗