Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.

Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.

At least 19 records

Final Technical Report - Autothermal Styrene Manufacturing Process with Net Export of Energy

The overall objectives of the project were to: (a) develop an economically competitive processing technology for styrene monomer (SM) that would reduce process energy requirements by a minimum 25% relative to those of conventional technology while achieving a minimum 10% ROI; and (b) advance the technology towards commercial readiness. This technology is referred to as OMT (Oxymethylation of Toluene). The unique energy savings feature of the OMT technology would be replacement of the conventional benzene and ethylene feedstocks with toluene, methane in natural gas and air or oxygen, the latter of which have much lower specific energy of production values. As an oxidative technology, OMT is a net energy exporter rather than a net energy consumer like the conventional ethylbenzene/styrene (EB/SM) process. OMT plants would ultimately reduce the cost of styrene monomer which in turn will decrease the costs of polystyrene making it perhaps more cost competitive with competing polymers such as polypropylene.

03 NATURAL GAS↗

Mountaineer Commerical Scale Carbon Capture and Storage (CCS) Project

The Final Technical documents all work performed during the award period on the Mountaineer Commercial Scale Carbon Capture & Storage project. This report presents the findings and conclusions produced as a consequence of this work. As identified in the Cooperative Agreement DE-FE0002673, AEP's objective of the Mountaineer Commercial Scale Carbon Capture and Storage (MT CCS II) project is to design, build and operate a commercial scale carbon capture and storage (CCS) system capable of treating a nominal 235 MWe slip stream of flue gas from the outlet duct of the Flue Gas Desulfurization (FGD) system at AEP's Mountaineer Power Plant (Mountaineer Plant), a 1300 MWe coal-fired generating station in New Haven, WV. The CCS system is designed to capture 90% of the CO{sub 2} from the incoming flue gas using the Alstom Chilled Ammonia Process (CAP) and compress, transport, inject and store 1.5 million tonnes per year of the captured CO{sub 2} in deep saline reservoirs. Specific Project Objectives include: (1) Achieve a minimum of 90% carbon capture efficiency during steady-state operations; (2) Demonstrate progress toward capture and storage at less than a 35% increase in cost of electricity (COE); (3) Store CO{sub 2} at a rate of 1.5 million tonnes per year in deep saline reservoirs; and (4) Demonstrate commercial technology readiness of the integrated CO{sub 2} capture and storage system.

29 ENERGY PLANNING, POLICY, AND ECONOMY↗

Prototyping and Manufacturing of Magnetic Gearbox Components using Innovations in Castings

In a previous collaboration with Emrgy (CRADA agreement NFE-17-06532), a housing component of Emrgy’s 10 kW gearbox was casted out of aluminum alloys using impression molds prepared using 3D printed techniques. (Henderson, 2018). After comparison with Emrgy’s existing hardware and material testing, the 3D printed impression molds were verified to represent a valid approach to advance technology readiness and commercialize Emrgy’s technology.

13 HYDRO ENERGY↗

Grid Cost and Total Emissions Reductions Through Mass Deployment of Geothermal Heat Pumps for Building Heating and Cooling Electrification in the United States

This report presents the results of a study on the potential grid impacts of national-scale mass deployment of geothermal heat pumps (GHPs) coupled with weatherization in single-family homes (SFHs) from 2022 to 2050. GHPs are a technology readiness level 10, commercially available technology across the United States. This study is an impact analysis only; installed costs and available land areas for installing GHPs are not accounted for in determining their estimated deployment. The three scenarios studied were (1) continuing to operate the grid as it is today (the Base scenario), (2) a scenario to reach 95% grid emissions reductions by 2035 and 100% clean electricity by 2050 (the Grid Decarbonization scenario), and (3) a scenario in which the Grid Decarbonization scenario is expanded to include the electrification of wide portions of the economy, including building heating (the Electrification Futures Study or EFS scenario). The analysis team modeled each of these three scenarios with and without GHP deployment to a large percentage of US building floor space. In all cases, deployment of approximately 5 million GHPs per year demonstrated system cost savings on the grid, consumer fuel cost savings through eliminated fuel combustion for space heating, and CO 2 emission reductions from avoided on-site fuel combustion—and, in the case of the Base scenario, CO 2 emissions reductions from the electric power sector. GHPs have traditionally been viewed as a building energy technology. The most notable result of this study, however, is the demonstration that GHPs coupled with weatherization in SFHs are primarily a grid cost reduction tool and technology that, when deployed at a national scale, also substantially reduces CO 2 emissions, even in the absence of any other decarbonization policy.

15 GEOTHERMAL ENERGY↗

Final Technical Report: Controlled Hydrogen Fleet and Infrastructure Demonstration and Validation Project

This report summarizes the work conducted under U.S. Department of Energy (DOE) under contract DE-FC36-04GO14285 by Mercedes-Benz & Research Development, North America (MBRDNA), Chrysler, Daimler, Mercedes Benz USA (MBUSA), BP, DTE Energy and NextEnergy to validate fuel cell technologies for infrastructure, transportation as well as assess technology and commercial readiness for the market. The Mercedes Team, together with its partners, tested the technology by operating and fueling hydrogen fuel cell vehicles under real world conditions in varying climate, terrain and driving conditions. Vehicle and infrastructure data was collected to monitor the progress toward the hydrogen vehicle and infrastructure performance targets of $2.00 to 3.00/gge hydrogen production cost and 2,000-hour fuel cell durability. Finally, to prepare the public for a hydrogen economy, outreach activities were designed to promote awareness and acceptance of hydrogen technology.

02 PETROLEUM↗

Technology Maintenance Readiness Guide for Zero-Emission Buses: A Guide for Bus Fleet Operators

The National Renewable Energy Laboratory has developed a technology maintenance readiness level (TMRL) guide for advanced technology vehicle fleets to help fleet operators (such as transit agencies) assess their readiness level to maintain new zero-emission buses. This guide mirrors a technology readiness level guide, but it focuses on the ability of the fleet operator to maintain and repair the advanced vehicle technology rather than defining the commercial readiness of the technology itself.

30 DIRECT ENERGY CONVERSION↗

PG&E WaveConnect Program (Final Report)

The PG&E WaveConnect project was intended to demonstrate the technical and economic viability of wave power in the open ocean adjacent to PG&E's service territory. WaveConnect was conceived as a multi-stage development process leading to long-term megawatt-scale wave power production. The first-stage tasks consisted of site selection, permitting, pilot plant design, and assessment of technology and commercial readiness. The second stage would have included development of infrastructure, undersea cabling, and deployment of wave energy conversion devices (WECs). In the third stage, the most promising WEC devices would have been deployed in larger quantities and connected to the grid. This report documents the findings of Stage One. Site Selection: After studying the wave energy potential, grid interconnection and other project infrastructure along the California coast, PG&E selected two sites: one near Eureka, called the Humboldt WaveConnect (HWC) project, and another near Vandenberg Air Force Base, called the Central Coast WaveConnect project (CCWC).

16 TIDAL AND WAVE POWER↗

Ion-Pair Proton Exchange Membrane Fuel Cells for Heavy-duty Transportation

The purpose of this project is to build a fuel cell prototype that demonstrates high temperature proton exchange membrane fuel cell technology (HT PEMFC) commercial readiness. It advances from a technology baseline established in a prior CRADA in which these same Parties collaborated during the years 2020-2024. These efforts are aligned with the intentions of the DOE Hydrogen Fuel Cell Technology Office (HFTO) L’Innovator Pilot Program. Participant observes that its US-based competitive advantage may be improved by further optimizing Laboratory inventions. This CRADA is intended to further improve National Laboratory compositions and to develop commercial HT PEMFC membrane electrode assemblies (MEAs) that perform over a range of operating temperatures and relative humidity, that generate power from both low grade and pure hydrogen, and that are resistant to air impurities. Participant’s goal is to advance the commercial competitiveness of National Laboratory technologies in fuel cell products for heavy-duty truck integrators, for stationary power generation, marine applications, and for emerging interest from commercial aviation. The Parties will collaborate on producing a HT PEMFC MEA that integrates LANL ion pair technology and Brookhaven catalyst technology. The Laboratories plan to research and develop compositions for testing and evaluation. The participant will manufacture multiple MEAs based on the Laboratory compositions and will enable selected customers to validate performance characteristics. The Laboratories will convey to Participant the methods of making the National Laboratory compositions such that Participant may reproduce and then scale Laboratory methods into commercial production. Throughout the project, the Laboratories and Participant will iteratively test and optimize the compositions of materials of the MEAs, intending to optimize characteristics such as power density and lifecycle durability. Participant’s intended customers include fuel cells for large trucks, aviation, power back up, marine, and portable power.

99 GENERAL AND MISCELLANEOUS↗

EMRALD Technology Advancements for Commercial Grade Dedication Readiness

Event Modeling Risk Assessment using Linked Diagrams (EMRALD) is a software tool developed at Idaho National Laboratory for researching the capabilities of dynamic probabilistic risk assessment. It provides a simple interface to represent complex interactions often seen when developing dynamic models. EMRALD can also interface with other applications by modifying inputs as well as running and using their results within EMRALD for dynamic and integrated assessment. To enable wider industry use cases, collaborative work between Idaho National Laboratory and FPoliSolutions was performed through the technology commercialization fund TCF-20-21448. This report covers the additional features and capabilities developed under this work.

97 MATHEMATICS AND COMPUTING↗

Mixing Waste + Thermal Treatment: A Solution to the Problematic Waste Challenge? - 18366

Credible solutions exist for the management, treatment and disposal of all categories of Problematic Low Level Waste (PLLW); however the wastes are often ill defined and the costs associated tend to be disproportionately high; twenty times greater than that associated with LLW. The challenge posed to the nuclear industry is not one of technology but of economics and characterization. There are many PLLW categories, but the associated waste volumes are small (often < 100 m{sup 3}/category) which represents a poor value proposition to develop and deploy specialist technology for each. To meet the industry challenge, and to balance economics with safety and quality, a technology is required that is adaptable enough to process a large fraction of PLLW categories, present a favorable level of characterization and process in sufficient volumes to reduce cost. One approach is waste mixing which is becoming an accepted technique in waste management; however this does not address issues that make wastes problematic as it does not typically change the physico-chemical characteristics of the waste. Techniques are being developed for the conditioning of PLLW waste categories. Presently these are not commercially ready (low Technology Readiness Level, TRL) or have not met the economic challenge posed. GeoMelt is a thermal treatment technology with a track record over 30 years and capable of providing a viable solution. It has a demonstrated capability to co-process mixed wastes and is able to process wastes that fall into the PLLW category. This paper discusses how GeoMelt can be used to co-process waste economically and provides a feasible characterization strategy to present a viable approach to the conditioning and co-disposal of problematic wastes in the UK. (authors)

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Rotorcraft convertible engine study

The objective of the Rotorcraft Convertible Engine Study was to define future research and technology effort required for commercial development by 1988 of convertible fan/shaft gas turbine engines for unconventional rotorcraft transports. Two rotorcraft and their respective missions were defined: a Fold Tilt Rotor aircraft and an Advancing Blade Concept (ABC) rotorcraft. Sensitivity studies were conducted with these rotorcraft to determine parametrically the influence of propulsion characteristics on aircraft size, mission fuel requirements, and direct operating costs (DOC). The two rotorcraft were flown with conventional propulsion systems (separate lift/cruise engines) and with convertible propulsion systems to determine the benefits to be derived from convertible engines. Trade-off studies were conducted to determine the optimum engine cycle and staging arrangement for a convertible engine. Advanced technology options applicable to convertible engines were studied. Research and technology programs were identified which would ensure technology readiness for commercial development of convertible engines by 1988.

Gill, J. C.↗

CHP Fuel Cell Durability Demonstration - Final Report

Plug Power has managed a demonstration project that has tested multiple units of its high-temperature, PEM fuel cell system in micro-combined heat and power (μ-CHP) applications in California. The specific objective of the demonstration project was to substantiate the durability of GenSys Blue, and, thereby, verify its technology and commercial readiness for the marketplace. In the demonstration project, Plug Power, in partnership with the National Fuel Cell Research Center (NFCRC) at the University of California, Irvine (UCI), and Sempra, will execute two major tasks: • Task 1: Internal durability/reliability fleet testing. Six GenSys Blue units will be built and will undergo an internal test regimen to estimate failure rates. This task was modified to include 3 GenSys Blue units installed in a lab at UCI. • Task 2: External customer testing. Combined heat and power units will be installed and tested in real-world residential and/or light commercial end user locations in California.

Petrecky, James↗

RePED 250: A Revolutionary, High Drilling Rate, High-T Geothermal Drilling System and Companion Power Electronics

Geothermal drilling in the United States is drastically slower and more costly than Oil and Gas (O&G) drilling, primarily due to the additional challenges in geothermal wells: hard rock types and high temperatures. The Repetitive Pulsed Electric Drill (250°C) (RePED-250), developed by Tetra Corporation has the potential to change this with a novel electro-crushing technology. RePED-250 releases pulses of electricity through the rock, which causes it to break in tension, instead of compression like conventional rotary drilling. The tensile strength of hard rocks like granite is only ~5% of their compressive strength, requiring less energy, time, and wear on the bit compared to conventional drilling. The RePED drill bit has no moving parts, uses drilling mud to remove rock fragments, and uses standard drill pipe, enabling a direct transition from conventional drilling systems. The objective of this project is to move RePED technology towards commercial readiness for high-temperature geothermal applications. This involves: 1) Creating high-temperature, high power electronic components for the RePED drill capable of operating at the high temperatures of a geothermal well. The target is a 250°C ambient environment. Specifically, capacitors, high voltage switches, and a downhole generator capable of generating the necessary power. 2) Demonstrating RePED’s effectiveness drilling through hard rock (granite) and examining its pathway to commercialization and effect on the US geothermal market. Work on this project has led to significant improvement over the state-of-the-art for all the examined electronics, through design, modeling, and testing of these novel components, though some additional development is still needed to deploy these high-temperature parts in a geothermal well. Besides their use in RePED-250, each component has applications in other industries where the stability of electronics at high-temperature is needed. To address the second barrier to commercialization, a 9” hole was drilled through a sample block of granite, demonstrating the tool’s effectiveness in hard rock. The team investigated RePED-250’s effect on well cost and the geothermal industry, through various techno-economic models described in the report.

15 GEOTHERMAL ENERGY↗

RePED 250: A Revolutionary, High Drilling Rate, High-T Geothermal Drilling System and Companion Power Electronics (Final Report)

Geothermal drilling in the United States is drastically slower and more costly than Oil and Gas drilling, primarily due to the additional challenges in geothermal wells: hard rock types and high temperatures. The Repetitive Pulsed Electric Drill (250 degrees C) (RePED-250), developed by Tetra Corporation has the potential to change this with a novel electro-crushing technology. RePED-250 releases pulses of electricity through the rock, which causes it to break in tension, instead of compression like conventional rotary drilling. The tensile strength of hard rocks like granite is only ~5% of their compressive strength, requiring less energy, time, and wear on the bit than conventional drilling. The RePED drill bit has no moving parts, uses drilling mud to remove rock fragments, and standard drill pipe, enabling a direct transition from conventional drilling systems. The objective of this project is to move RePED technology towards commercial readiness for high-temperature geothermal applications. This involves: 1) Creating high-temperature, high power electronic components for the RePED drill capable of operating at the high temperatures of a geothermal well. The target is a 250 degrees C ambient environment. Specifically, capacitors, high voltage switches, and a downhole generator capable of generating the necessary power. 2) Demonstrating RePED's effectiveness drilling through hard rock (granite) and examining its pathway to commercialization and effect on the US geothermal market. Work on this project has led to significant improvement over the state-of-the-art for all the examined electronics, through design, modeling, and testing of these novel components, though some additional development is still needed to deploy these high-temperature parts in a geothermal well. Besides their use in RePED-250, each component has applications in other industries where the stability of electronics at high-temperature is needed. To address the second barrier to commercialization, a 9" hole was drilled through a sample block of granite, demonstrating the tool's effectiveness in hard rock. The team investigated RePED-250's effect on well cost, and the geothermal industry, through various models described in the report.

15 GEOTHERMAL ENERGY↗

Development of Robotic Inspection Systems for In-situ Characterisation Prior to Decommissioning - 20306

The University of Bristol's South West Nuclear Hub is part of two large UK academic research collaborations aiming to reduce the costs of nuclear power by trialing innovative solutions to major decommissioning challenges. Robotics and Artificial Intelligence in Nuclear (RAIN) and the National Centre for Nuclear Robotics (NCNR) are the two collaborations tasked by the UK research councils to coordinate this activity, for the benefit of the nuclear industry. This paper presents a summary of Bristol's research aimed at generating and demonstrating a series of technologies ready for commercialization. (authors)

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

DOE EiR at Oakridge National Lab 2008/09

This project placed an experienced technology entrepreneur at Oak Ridge National Lab, one of DOE's premier laboratories undertaking cutting edge research in a variety of fields, including energy technologies. With the goal of accelerating the commercialization of advanced energy technologies, the task was to review available technologies at the lab and identify those that qualify for licensing and commercialization by a private startup company, backed by private venture capital. During the project, more than 1,500 inventions filed at the lab were reviewed over a 1 year period; a successively smaller number was selected for more detailed review, ultimately resulting in five, and then 1 technology, being reviewed for immediate commercialization. The chosen technology, consisting in computational chemistry based approached to optimization of enzymes, was tested in lab experiments, paid for by funds raised by ORNL for the purpose of proving out the effectiveness of the technology and readiness for commercialization. The experiments proved out that the technology worked however it's performance proved not yet mature enough to qualify for private venture capital funded commercialization in a high tech startup. As a consequence, the project did not result in a new startup company being formed, as originally intended.

99 GENERAL AND MISCELLANEOUS↗

Modular, Crushed-Rock Thermal Energy Storage Pilot Design (Final Report)

The goal of this project was to design a next-step pilot to advance near-term energy storage integrated with a fossil plant to provide a facility capable of being viable and effective in a market with growing penetration of variable renewable energy (VRE). Thermal energy storage (TES) represents an ideal technology for this purpose. The completed effort included a feasibility study to prepare for the Phase II pre-front end engineering design (pre-FEED) for implementing a crushed-rock TES system integrated with a natural gas combined cycle (NGCC) plant. The crushed rock storage technology, which is being developed by Brenmiller Energy, is a modular TES system termed bGen™, which can accommodate both thermal and electrical inputs and output steam, hot water, or hot air. For this application, the estimated efficiency is 80% thermal to thermal. For the feasibility study, the Brenmiller technology was designed to operate on a slipstream from NYPA’s Eugene W. Zeltmann Power Project (Zeltmann) NGCC plant in Astoria, New York. The projected size of the system will be up to 4 MWe with at least 4 hours of storage duration, or 16 MWh-e total. The study also included a techno-economic evaluation of a 200 MWh commercial-scale demonstration. Prior to this project, EPRI had reviewed Brenmiller’s technology, which is being built to demonstrate bGen™ at 1.7 MWe on a solar plant (Rotem) and has been designed for an NGCC facility in Italy, assessing it at technology readiness level (TRL) 5. Brenmiller is also conducting a separate 1-MWth pilot with NYPA that pairs a bGen™ module with a microturbine for a combined-heat-and-power (CHP) application to improve efficiency and provide flexibility. The next-step pilot being designed as part of this project would represent a 5-fold increase in scale, versus Rotem, and would show the technology’s ability to provide effective and economical energy storage, bringing the technology to TRL 6. This pilot would represent the next-to-last demonstration scale before the technology could be commercial ready at GWh-e scales in the 2030 timeframe. The main objective of the work completed by the Electric Power Research Institute, Inc. (EPRI), Brenmiller Energy (Brenmiller), New York Power Authority (NYPA), and United E&C (formerly AECOM) was to perform a Phase I feasibility study on the integration of a crushed-rock thermal energy storage (TES) with a fossil plant. Under this project, the EPRI-led team successfully completed a feasibility study to prepare for the potential future Phase II pre-front end engineering design (pre-FEED) to implement a crushed-rock TES system integrated with a natural gas combined cycle (NGCC) plant. Specific deliverables under this project included the Technology Maturation Plan, Conceptual Study, Techno-Economic Assessment, Technology Gap Assessment, Project Plan for Phase II (submitted as Phase II Renewal Application), Commercialization Plan, and the Final Report (this document). This Final Report includes a compilation of the various summary reports that were prepared during the 12-month schedule of the Phase I project execution under award DE-FE0032017.

03 NATURAL GAS↗

Technology and Manufacturing Readiness of Early Market Motive and Non-Motive Hydrogen Storage Technologies for Fuel Cell Applications

PNNL’s objective in this report is to provide DOE with a technology and manufacturing readiness assessment to identify hydrogen storage technologies’ maturity levels for early market motive and non-motive applications and to provide a path forward toward commercialization. PNNL’s Technology Readiness Assessment (TRA) is based on a combination of Technology Readiness Level (TRL) and Manufacturing Readiness Level (MRL) designations that enable evaluation of hydrogen storage technologies in varying levels of development. This approach provides a logical methodology and roadmap to enable the identification of hydrogen storage technologies, their advantages/disadvantages, gaps and R&D needs on an unbiased and transparent scale that is easily communicated to interagency partners. The TRA report documents the process used to conduct the TRA, reports the TRL and MRL for each assessed technology and provides recommendations based on the findings.

08 HYDROGEN↗