Assessing Technological Readiness and Maturity on the Waste Treatment and Immobilization Plant

There are many challenges in the design and construction of Department of Energy's (DOE) Waste Treatment and Immobilization Plant (WTP) at the Hanford site. The plant is being built to process some 53 million gallons of radioactive waste from 177 underground tanks. Engineering and construction are progressing on this largest project in the DOE complex. The technologies employed to accomplish the waste processing and immobilization have undergone various levels of development over a number of years. In some cases, the treatment approach involves extrapolation or novel applications of existing technologies. Because of the time schedule for the WTP, it is desirable, in some cases, to mature the technologies in parallel with design and construction. From the outset, the project plan has included an assessment and adjustment of the performance and design of the key technologies through an extensive research and testing program. This paper describes two review programs pioneered on WTP to further assess the technical readiness and maturity of the design: an External Flowsheet Review process and a Technology Readiness Assessment process. Although the results of the two reviews have a good degree of similarity, the two approaches differed in a number of ways and therefore allowed some issues to surface in one review and not in the other. It is concluded that the two reviews provide greater confidence to DOE on the readiness to proceed with design, fabrication, and construction and that the facilities will function as performed. (authors)

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Technology Readiness Assessment of Department of Energy Waste Processing Facilities: When is a Technology Ready for Insertion?

This paper will describe a technology readiness assessment process (TRA) that the U.S. Department of Energy (DOE) piloted at Hanford's Waste Treatment and Immobilization Plant (WTP) and has subsequently applied to other projects at Hanford and the Savannah River Site. The methodology used for these TRAs was based upon detailed guidance contained in the U.S. Department of Defense (DoD), Technology Readiness Assessment Desk-book and adapted a technology readiness scale developed by the DOD and National Aeronautics and Space Administration (NASA) to the DOE. This paper will discuss the application of the TRA process to the WTP and the development of a Technology Maturation Plan (TMP) based on the TRA findings. (authors)

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Technology readiness assessment of magnetohydrodynamic stability control

The technology readiness level scale is revised with clear definitions for magnetohydrodynamic stability control technologies for magnetic confinement fusion. The definitions are in the form of a sentence with three dimensions, which are the system complexity, the test environment, and the cost. A clear and simple definition is sought after to make an assessment based on the evidence which is agreeable to the fusion energy development community. A sample technology readiness assessment (TRA) for the electron cyclotron current drive-based control of neoclassical tearing mode for ST Advanced Reactor, using the proposed scale, reveals that the risk of a TRA being misinterpreted is high, which can only be avoided with an understanding of the procedure described in this paper.

70 PLASMA PHYSICS AND FUSION TECHNOLOGY↗

New Developments in the Technology Readiness Assessment Process in US DOE-EM - 13247

A Technology Readiness Assessment (TRA) is a systematic, metric-based process and accompanying report that evaluates the maturity of the technologies used in systems; it is designed to measure technology maturity using the Technology Readiness Level (TRL) scale pioneered by the National Aeronautics and Space Administration (NASA) in the 1980's. More recently, DoD has adopted and provided systematic guidance for performing TRAs and determining TRLs. In 2007 the GAO recommended that the DOE adopt the NASA/DoD methodology for evaluating technology maturity. Earlier, in 2006-2007, DOE-EM had conducted pilot TRAs on a number of projects at Hanford and Savannah River. In March 2008, DOE-EM issued a process guide, which established TRAs as an integral part of DOE-EM's Project Management Critical Decision Process. Since the development of its detailed TRA guidance in 2008, DOE-EM has continued to accumulate experience in the conduct of TRAs and the process for evaluating technology maturity. DOE has developed guidance on TRAs applicable department-wide. DOE-EM's experience with the TRA process, the evaluations that led to recently developed proposed revisions to the DOE-EM TRA/TMP Guide; the content of the proposed changes that incorporate the above lessons learned and insights are described. (authors)

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

RISK REDUCTION THROUGH USE OF EXTERNAL TECHNICAL REVIEWS, TECHNOLOGY READINESS ASSESSMENTS AND TECHNICAL RISK RATINGS - 9174

The U.S. Department of Energy's Office of Environmental Management (DOE-EM) was established to achieve the safe and compliant disposition of legacy wastes and facilities from defense nuclear applications. A large majority of these wastes and facilities are 'one-of-a-kind' and unique to DOE. Many of the programs to treat these wastes have been 'first-of-a-kind' and unprecedented in scope and complexity. This has meant that many of the technologies needed to successfully disposition these wastes were not yet developed or required significant re-engineering to be adapted for DOE-EM's needs. The DOE-EM program believes strongly in reducing the technical risk of its projects and has initiated several efforts to reduce those risks: (1) Technology Readiness Assessments to reduce the risks of deployment of new technologies; (2) External Technical Reviews as one of several steps to ensure the timely resolution of engineering and technology issues; and (3) Technical Risk Ratings as a means to monitor and communicate information about technical risks. This paper will present examples of how Technology Readiness Assessments, External Technical Reviews, and Technical Risk Ratings are being used by DOE-EM to reduce technical risks.

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

RISK REDUCTION THROUGH USE OF EXTERNAL TECHNICAL REVIEWS, TECHNOLOGY READINESS ASSESSMENTS AND TECHNICAL RISK RATINGS - 9174

The U.S. Department of Energy's Office of Environmental Management (DOE-EM) was established to achieve the safe and compliant disposition of legacy wastes and facilities from defense nuclear applications. A large majority of these wastes and facilities are 'one-of-a-kind' and unique to DOE. Many of the programs to treat these wastes have been 'first-of-a-kind' and unprecedented in scope and complexity. This has meant that many of the technologies needed to successfully disposition these wastes were not yet developed or required significant re-engineering to be adapted for DOE-EM's needs. The DOE-EM program believes strongly in reducing the technical risk of its projects and has initiated several efforts to reduce those risks: (1) Technology Readiness Assessments to reduce the risks of deployment of new technologies; (2) External Technical Reviews as one of several steps to ensure the timely resolution of engineering and technology issues; and (3) Technical Risk Ratings as a means to monitor and communicate information about technical risks. This paper will present examples of how Technology Readiness Assessments, External Technical Reviews, and Technical Risk Ratings are being used by DOE-EM to reduce technical risks.

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

SAVANNAH RIVER SITE TANK 48H WASTE TREATMENT PROJECT TECHNOLOGY READINESS ASSESSMENT

ABSTRACT One of U.S. Department of Energy’s (DOE) primary missions at Savannah River Site (SRS) is to retrieve and treat the high level waste (HLW) remaining in SRS tanks and close the F&H tank farms. At present, a significant impediment to timely completion of this mission is the presence of significant organic chemical contamination in Tank 48H. Tank 48H is a 1.3 million gallon tank with full secondary containment, located and interconnected within the SRS tank system. However, the tank has been isolated from the system and unavailable for use since 1983, because its contents – approximately 250,000 gallons of salt solution containing Cs-137 and other radioisotopes – are contaminated with nearly 22,000 Kg of tetraphenylborate, a material which can release benzene vapor to the tank head space in potentially flammable concentrations. An important element of the DOE SRS mission is to remove, process, and dispose of the contents of Tank 48H, both to eliminate the hazard it presents to the SRS H-Tank Farm and to return Tank 48H to service. Tank 48H must be returned to service to support operation of the Salt Waste Processing Facility, to free up HLW tank space, and to allow orderly tank closures per Federal Facility Agreement commitments. The Washington Savannah River Company (WSRC), the SRS prime contractor, has evaluated alternatives and selected two processes, Wet Air Oxidation (WAO) and Fluidized Steam Bed Reforming (FBSR) as candidates for Tank 48H processing. Over the past year, WSRC has been testing and evaluating these two processes, and DOE is nearing a final technology selection in late 2007. In parallel with WSRC’s ongoing work, DOE convened a team of independent qualified experts to conduct a Technology Readiness Assessment (TRA). The purpose of the TRA was to determine the maturity level of the Tank 48H treatment technology candidates – WAO and FBSR. The methodology used for this TRA is based on detailed guidance for conducting TRAs contained in the Department of Defense (DoD), Technology Readiness Assessment Deskbook. The TRA consists of three parts: • Determination of the Critical Technology Elements (CTEs) for each of the candidate processes. • Evaluation of the Technology Readiness Levels (TRLs) of each CTE for each process. • Defining of the technology testing or engineering work necessary to bring immature technologies to the appropriate maturity levels. The TRA methodology assigns a TRL to a technology based on the lowest TRL assigned to any CTE of that technology. Based on the assessment, the overall TRL for WAO was 2 and the TRL for FBSR was 3. WAO was limited by the current lack of definition for the off-gas treatment system (TRL of 2). The FBSR Product Handling had little or no test work and therefore received the lowest score (TRL of 3) for the FBSR CTEs. In summary, both FBSR and WAO appear to be viable technologies for treatment of Tank 48H legacy waste. FBSR has a higher degree of maturity than WAO, but additional technology development will be required for both technologies. However, the Assessment Team believes that sufficient information is available for DOE to select the preferred or primary technology. Limited testing of the backup technology should be conducted as a risk mitigation strategy.

Harmon, Harry D↗

SAVANNAH RIVER SITE TANK 48H WASTE TREATMENT PROJECT TECHNOLOGY READINESS ASSESSMENT

One of U.S. Department of Energy's (DOE) primary missions at Savannah River Site (SRS) is to retrieve and treat the high level waste (HLW) remaining in SRS tanks and close the F&H tank farms. At present, a significant impediment to timely completion of this mission is the presence of significant organic chemical contamination in Tank 48H. Tank 48H is a 1.3 million gallon tank with full secondary containment, located and interconnected within the SRS tank system. However, the tank has been isolated from the system and unavailable for use since 1983, because its contents - approximately 250,000 gallons of salt solution containing Cs-137 and other radioisotopes - are contaminated with nearly 22,000 Kg of tetraphenylborate, a material which can release benzene vapor to the tank head space in potentially flammable concentrations. An important element of the DOE SRS mission is to remove, process, and dispose of the contents of Tank 48H, both to eliminate the hazard it presents to the SRS H-Tank Farm and to return Tank 48H to service. Tank 48H must be returned to service to support operation of the Salt Waste Processing Facility, to free up HLW tank space, and to allow orderly tank closures per Federal Facility Agreement commitments. The Washington Savannah River Company (WSRC), the SRS prime contractor, has evaluated alternatives and selected two processes, Wet Air Oxidation (WAO) and Fluidized Steam Bed Reforming (FBSR) as candidates for Tank 48H processing. Over the past year, WSRC has been testing and evaluating these two processes, and DOE is nearing a final technology selection in late 2007. In parallel with WSRC's ongoing work, DOE convened a team of independent qualified experts to conduct a Technology Readiness Assessment (TRA). The purpose of the TRA was to determine the maturity level of the Tank 48H treatment technology candidates - WAO and FBSR. The methodology used for this TRA is based on detailed guidance for conducting TRAs contained in the Department of Defense (DoD), Technology Readiness Assessment Deskbook. The TRA consists of three parts: (1) Determination of the Critical Technology Elements (CTEs) for each of the candidate processes. (2) Evaluation of the Technology Readiness Levels (TRLs) of each CTE for each process. (3) Defining of the technology testing or engineering work necessary to bring immature technologies to the appropriate maturity levels. The TRA methodology assigns a TRL to a technology based on the lowest TRL assigned to any CTE of that technology. Based on the assessment, the overall TRL for WAO was 2 and the TRL for FBSR was 3. WAO was limited by the current lack of definition for the off-gas treatment system (TRL of 2). The FBSR Product Handling had little or no test work and therefore received the lowest score (TRL of 3) for the FBSR CTEs. In summary, both FBSR and WAO appear to be viable technologies for treatment of Tank 48H legacy waste. FBSR has a higher degree of maturity than WAO, but additional technology development will be required for both technologies. However, the Assessment Team believes that sufficient information is available for DOE to select the preferred or primary technology. Limited testing of the backup technology should be conducted as a risk mitigation strategy.

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Savannah River Site Tank 48H Waste Treatment Project Technology Readiness Assessment

One of U.S. Department of Energy's (DOE) primary missions at Savannah River Site (SRS) is to retrieve and treat the high level waste (HLW) remaining in SRS tanks and close the F and H tank farms. At present, a significant impediment to timely completion of this mission is the presence of significant organic chemical contamination in Tank 48H. Tank 48H is a 1.3 million gallon tank with full secondary containment, located and interconnected within the SRS tank system. However, the tank has been isolated from the system and unavailable for use since 1983, because its contents - approximately 250,000 gallons of salt solution containing Cs-137 and other radioisotopes - are contaminated with nearly 22,000 Kg of tetraphenylborate, a material which can release benzene vapor to the tank head space in potentially flammable concentrations. An important element of the DOE SRS mission is to remove, process, and dispose of the contents of Tank 48H, both to eliminate the hazard it presents to the SRS H-Tank Farm and to return Tank 48H to service. Tank 48H must be returned to service to support operation of the Salt Waste Processing Facility, to free up HLW tank space, and to allow orderly tank closures per Federal Facility Agreement commitments. The Washington Savannah River Company (WSRC), the SRS prime contractor, has evaluated alternatives and selected two processes, Wet Air Oxidation (WAO) and Fluidized Steam Bed Reforming (FBSR) as candidates for Tank 48H processing. Over the past year, WSRC has been testing and evaluating these two processes, and DOE is nearing a final technology selection in late 2007. In parallel with WSRC's ongoing work, DOE convened a team of independent qualified experts to conduct a Technology Readiness Assessment (TRA). The purpose of the TRA was to determine the maturity level of the Tank 48H treatment technology candidates - WAO and FBSR. The methodology used for this TRA is based on detailed guidance for conducting TRAs contained in the Department of Defense (DoD), Technology Readiness Assessment Desk-book. The TRA consists of three parts: - Determination of the Critical Technology Elements (CTEs) for each of the candidate processes. - Evaluation of the Technology Readiness Levels (TRLs) of each CTE for each process. - Defining of the technology testing or engineering work necessary to bring immature technologies to the appropriate maturity levels. The TRA methodology assigns a TRL to a technology based on the lowest TRL assigned to any CTE of that technology. Based on the assessment, the overall TRL for WAO was 2 and the TRL for FBSR was 3. WAO was limited by the current lack of definition for the off-gas treatment system (TRL of 2). The FBSR Product Handling had little or no test work and therefore received the lowest score (TRL of 3) for the FBSR CTEs. In summary, both FBSR and WAO appear to be viable technologies for treatment of Tank 48H legacy waste. FBSR has a higher degree of maturity than WAO, but additional technology development will be required for both technologies. However, the Assessment Team believes that sufficient information is available for DOE to select the preferred or primary technology. Limited testing of the backup technology should be conducted as a risk mitigation strategy. (authors)

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Management of the Cs/Sr Capsule Project at the Hanford Site. Technology Readiness Assessment Report

The Federal Project Director (FPD) for the U.S. Department of Energy (DOE), Richland Operations Office (RL) Waste Management and D&D Division (WMD) requested a Technology Readiness Assessment (TRA) for the Management of the Cesium/Strontium Capsule Storage Project (MCSCP) at the Waste Encapsulation and Storage Facility (WESF) on the Hanford Site in Washington State. The MCSCP CD-1 TRA was performed by a team selected in collaboration between the Office of Environmental Management (EM) Chief Engineer (EM-3.3) and RL, WMD FPD. The TRA Team included subject matter and technical experts having experience in cask storage, process engineering, and system design who were independent of the MCSCP, and the team was led by the Director of Operations and Processes from the EM Chief Engineer's Office (EM-3.32). Movement of the Cs/Sr capsules to dry storage, based on information from the conceptual design, involves (1) capsule packaging, (2) capsule transfer, and (3) capsule storage. The project has developed a conceptual process, described in 30059-R-02, "NAC Conceptual Design Report for the Management of the Cesium and Strontium Capsules Project", which identifies the five major activities in the process to complete the transfer from storage pool to pad-mounted cask storage. The process, shown schematically in Figure 1, is comprised of the following process steps: (1) loading capsules into the UCS; (2) UCS processing; (3) UCS insertion into the TSC Basket; (4) cask transport from WESF to CSA and (5) extended storage at the CSA.

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

A NEA review on innovative structural materials solutions, including advanced manufacturing processes for nuclear applications based on technology readiness assessment

The Nuclear Energy Agency (NEA) Expert Group on Innovative Structural Materials (EGISM) was established in 2008 under the guidance of the Nuclear Science Committee (NSC). Its objectives are to conduct joint and comparative studies to support the development, selection and characterisation of innovative structural materials that can be implemented in advanced nuclear fuel cycles, under long service lifetime and extreme conditions, such as high temperature, high dose/dose rate and corrosive chemical environments. In this context of growing interest and initiatives, the EGISM initiated at the beginning of 2018 an activity among its members to: Identify, in a non-exhaustive way, the currently existing programs on innovative materials and fabrication processes in NEA member countries and China; Establish a first cartography of the activities that are underway on these topics and identify common subjects and thematic; Propose a Technology Readiness Level scale to estimate the maturity of both innovative materials and fabrication processes; Carry out a reflection on what the enablers are to quickly climb this TRL scale, as well as the obstacles, in order to identify solutions to overcome them. This paper first gives definitions shared between the EGISM members on what are considered as advanced structural materials solutions. Next, some international initiatives for the accelerated development of high performance materials are presented both in non-nuclear and nuclear fields. Then, the methodology adopted for technology readiness assessment is explained. A non-exhaustive synthesis of the projects identified among the EGISM members on innovative structural materials and advanced manufacturing solutions such as additive manufacturing is presented. The TRL level of these projects is evaluated. A focus is also made on some of these projects to illustrate and explain the TRLs chosen as well as highlighting enablers or obstacles identified to climbing up the TRL scale.

36 MATERIALS SCIENCE↗

Comprehensive Technology Readiness Assessment Report for LL20-ML-AIT-NE-1-PD3TB

This document ensures that technologies relevant to LL20-ML-AIT-NE-1-PD3TB “AIT-NEO” have been demonstrated to work as intended and at the appropriate technology readiness level. This assessment is intended to offer management tools for understanding and mitigating programmatic risks associated with new technologies being developed under the AIT-NEO effort.

45 MILITARY TECHNOLOGY, WEAPONRY, AND NATIONAL DEF↗

Delayed Gamma-ray Assay for Nuclear Materials Safeguards. Comprehensive Technology Readiness Assessment

Spectroscopic analysis of beta-delayed gamma-rays emitted from fission products following active interrogation was investigated as a non-destructive assay technique for detection and characterization of nuclear materials in shielded and complex configurations. This measurement technique is expected to be applicable to a variety of applications within the nuclear material safeguards, arms control, and emergency response areas, where active neutron interrogation is acceptable. Potential applications of the delayed gamma-ray assay in the nuclear material safeguards area include characterization of U and Pu isotopic content in spent and unirradiated nuclear fuel, enrichment measurements, verification of bulk material in containers, and the characterization of nuclear wastes. In the arms control area, this method can be used as a part of warhead dismantlement measurements to confirm separation of components, and may be applicable in warhead confirmation. In the context of emergency response, it can be used for detailed diagnostics of an unknown item. At present, the delayed gamma-ray assay technology reliably qualifies for the Technical Readiness Level 3 (TRL 3). The R&D work completed under this project has successfully demonstrated the empirical proof-of-concept for this active interrogation technology for a variety of measurement configurations, neutron sources, and nuclear material samples. A robust first-principles analytical signature modeling methodology was developed, experimentally validated, and can be easily extrapolated to a range of realistic measurement scenarios. Several response analysis methodologies have been implemented and deemed reliable for a variety of active interrogation applications in the areas of nuclear material safeguards, arms control, and emergency response. The initial readiness level before the start of this project was assessed at TRL 0, since only fragmentary records of the signature observations and speculative statements of the relevant non-destructive assay applications existed at that time. The delayed gamma-ray technology readiness can be easily advanced to TRL 4 in a short period, if a certain measurement application is specified and set for a demonstration in a laboratory environment. The critical hardware components of the delayed gamma-ray measurement technology (neutron generators, gamma-ray spectrometers) are readily available as COTS and can be configured for a specific deployment configuration. The primary risk of the delayed gamma-ray assay methodology is defined by the applicationspecific uncertainties. Evaluation of the system performance can be effectively completed once the expected measurement purpose, nuclear material characteristics, dimensions, and radiation exposure constraints are specified. A minor risk can be associated with the delayed gamma-ray response analysis techniques. Several approaches were proposed and demonstrated primarily using the modeled signatures. The observed performance may not be easily transferrable to the conditions of a real measurement setup, and some additional R&D may be required. Overall, the delayed gamma-ray assay technology can be recommended for follow-up demonstrations addressing relevant measurement applications in the areas of nuclear material safeguards, arms control, and emergency response.

73 NUCLEAR PHYSICS AND RADIATION PHYSICS↗

Technology Readiness Assessment of Department of Energy Waste Processing Facilities: Lessons Learned, Next Steps

In an effort to improve its oversight of major waste treatment construction projects DOE has piloted a Technical Readiness Assessment/Technology Maturation Plan (TRA/TMP) process based on similar processes employed by the United States Department of Defense (DoD) and the National Aeronautics and Space Administration (NASA. DOE has carried out TRAs for the Hanford Waste Treatment and Immobilization Plant (WTP), for supplemental treatment technologies that may be employed to process Hanford low activity waste (LAW), for the removal of Hanford K-Basin waste, and for treatment technologies for Savannah River Site's tank 48. This paper describes the TRA/TMP methodology and discusses the findings and lessons learned during its application. The paper also discusses the next steps in the technical assessment of DOE environmental projects. (authors)

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Magnetic Microcalorimeter (MMC) Gamma-Ray Detectors with Ultra-High Energy Resolution. Comprehensive Technology Readiness Assessment

Magnetic Microcalorimeter (MMC) gamma ray detectors have demonstrated very high energy resolution of 38 eV FWHM for gamma ray energies below 100 keV. This is an order or magnitude better than conventional HPGe detector and can remove most line-overlap problems in NDA by gamma spectroscopy below ~130 keV. Unlike superconducting transition edge sensors (TESs), MMCs have a reproducible and almost perfectly linear response, which greatly simplifies adding spectra from different detector pixels and reduces systematic errors in quantitative assays. The instrument is currently at TRL-5 but could advance to TRL-6 by improving the signal processing software and using the system for the quantitative analysis of a safeguards sample provided by e.g. the IAEA. Making MMC detectors commercially viable and used more widely then depends on making the technology more reliable, specifically by increasing the device uniformity and yield, and by developing commercial software. This situation is often only half-jokingly referred to as the “valley of death” and could be addressed though the SBIR program. Our collaborators at STAR Cryoelectronics LLC are well qualified to further advance MMC development, and XIA LLC is well-positioned to develop the data acquisition system and write the software for MMC readout. In addition, the advance to TRL-6 would be desirable to increase the visibility and showcase the value of MMC spectrometers, e.g. by placing one of them into the Safeguards Analytical Laboratory (SAL) at the IAEA, whose NDA experts have recently started to show interest in cryogenic detector technology. As a result of this LCP, we also now have an instrument at LLNL that we will use for various applications of MMCs in nuclear safeguards and science. We are confident that as the number of high-profile results increases, so will the interest in and commercial viability of this technology.

42 ENGINEERING↗

Magnetic Microcalorimeter (MMC) Gamma-Ray Detectors with Ultra-High Energy Resolution. Comprehensive Technology Readiness Assessment

Magnetic Microcalorimeter (MMC) gamma ray detectors have demonstrated very high energy resolution of 38 eV FWHM for gamma ray energies below 100 keV. This is an order or magnitude better than conventional HPGe detector and can remove most line-overlap problems in NDA by gamma spectroscopy below ~130 keV. Unlike superconducting transition edge sensors (TESs), MMCs have a reproducible and almost perfectly linear response, which greatly simplifies adding spectra from different detector pixels and reduces systematic errors in quantitative assays. The instrument is currently at TRL-5 but could advance to TRL-6 by improving the signal processing software and using the system for the quantitative analysis of a safeguards sample provided by e.g. the IAEA. Making MMC detectors commercially viable and used more widely then depends on making the technology more reliable, specifically by increasing the device uniformity and yield, and by developing commercial software. This situation is often only half-jokingly referred to as the “valley of death” and could be addressed though the SBIR program. Our collaborators at STAR Cryoelectronics LLC are well qualified to further advance MMC development, and XIA LLC is well-positioned to develop the data acquisition system and write the software for MMC readout. In addition, the advance to TRL-6 would be desirable to increase the visibility and showcase the value of MMC spectrometers, e.g. by placing one of them into the Safeguards Analytical Laboratory (SAL) at the IAEA, whose NDA experts have recently started to show interest in cryogenic detector technology. As a result of this LCP, we also now have an instrument at LLNL that we will use for various applications of MMCs in nuclear safeguards and science. We are confident that as the number of high-profile results increases, so will the interest in and commercial viability of this technology.

42 ENGINEERING↗

NGNP Risk Management through Assessing Technology Readiness

Throughout the Next Generation Nuclear Plant (NGNP) project life cycle, technical risks are identified, analyzed, and mitigated and decisions are made regarding the design and selection of plant and sub-system configurations, components and their fabrication materials, and operating conditions. Risk resolution and decision making are key elements that help achieve project completion within budget and schedule constraints and desired plant availability. To achieve this objective, a formal decision-making and risk management process was developed for NGNP, based on proven systems engineering principles that have guided aerospace and military applications.