Engineering PapersSearch

SEARCH · Engineering Papers

Results for “Team-X”

Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.

Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.

The Evolution of Team-X: 25 Years of Concurrent Engineering Design Experience

Established in 1995 in response to NASA’s “Faster, Better, Cheaper” era, Team-X was born from a need to perform rapid space mission design for principal investigator-led competed proposals. The success and sustainability of Team-X over the 25 years that have followed is directly attributable to the Team-X business model and its evolution over time. While dozens of organizations and institutions have emulated the Team-X design process, there are nuances to the Team-X business model that are unique to JPL, and explain why it is different than other concurrent design teams. One of the key components of a business model is the customer segments that are served. Team-X was founded to conduct the Pre-Phase A work necessary to formulate a portfolio of multiple planetary mission concepts, but has since expanded to include the capability to conduct studies for Earth science, astrophysics, and heliophysics missions as well as Human Exploration and Operations missions and space technology development. Team-X delivers value to its clients both in terms of speed and cost. Team-X has also added value by creating teams to enable the development of Instrument and SmallSat Concepts. Value has further been enhanced through a revision of its process for reviews and the addition of pre-design architecting capabilities. Other aspects of the Team-X infrastructure, in addition to study process, have enabled it to succeed for over a quarter century. From our most important resource, the people, our tools, especially for cost estimating, as well as our increasing capable IT infrastructure have contributed to our capability to meet the demands of our clients. The Team-X business model and its evolution over time, position it well for success in the decades to come.

Murphy, Jonathan

Lessons Learned in Remote Participant Concurrent Engineering Concept Development Studies

Team-X was born from a need to perform rapid space mission design for principal investigator-led competed proposals in the mid-1990s. Throughout the last 25 years, Team-X at the Jet Propulsion Laboratory has expanded its application of the collaborative, concurrent study approach into every facet necessary to win competed proposals. The COVID-19 pandemic of 2020 created an immediate and new constraint on these studies – the need to conduct them with remote participants, both on the client side requesting the study, but also on the provider side producing the study. This paper provides lessons learned from dozens of design studies run by Team-X at the Jet Propulsion Laboratory during the COVID-19 pandemic. These lessons span all aspects of the information infrastructure: the people, processes, procedures, methods, tools, and “facilities”. These lessons learned will have applicability post-pandemic, as they have shown how best to incorporate participants, both on the provider side, and on the client side, who cannot travel or otherwise be co-located during collaborative, concurrent study sessions.

Nash, Alfred

VERNE: Revealing the Mysteries and Histories of Venus

Introduction: The three Venus missions that were recently selected for upcoming flight (VERITAS, DAVINCI+, and EnVision) will be incredibly valuable to our understanding of Venus’ history, geology, and atmosphere. However, even once completed, key gaps in our knowledge of Venus, and more generally the formation and active processes on rocky, Earth-like planets, will still persist. Remaining questions include 1) how global intrinsic magnetic fields might be maintained on rocky worlds, and how they could then go extinct, and 2) what role atmospheric sulfur chemistry plays in climates of Earth-like planets, which is an increasingly timely subject as Earth’s own atmospheric sulfur content is climbing due to human activity. These questions require in-situ observations from Venus’ cloud deck, at the altitudes at which the UV absorber exists. The Venus Environment Research and Novel Exploration (VERNE) mission will address these questions with an aerial platform that will drift around the equatorial region of the planet for 9 days. VERNE will collect data to determine the identity of the mysterious UV absorber, while also taking magnetic field measurements over the tesserae, the regions on Venus that are most likely to retain remanent crustal magnetization, in order to understand the potential role of a past intrinsically-generated global magnetic field on Venus. Mission Objectives: The two major science objectives that drive the VERNE mission are: 1) Determine the identity of the Venusian unknown ultraviolet absorber(s). First observed approximately a century ago [1], the composition of Venus’ ultraviolet (UV) absorber is one of the oldest mysteries in Venus atmospheric chemistry [2,3]. While several candidate UV absorbers (mostly sulfur species) have been proposed, no consensus has been reached on its composition and its specific interactions with the atmosphere. Determining the identity of the UV absorber will aid climate models by showing how and where incident solar energy is absorbed by the atmosphere and make progress towards understanding the chemical and energetic processes taking place above Venus’ upper cloud deck [4]. 2) Determine if Venus retains evidence of a past, internally-generated magnetic field. While Venus does not currently have an intrinsically-generated magnetic field, evidence for the existence of a past field on Venus and a timeline of its decay will fill in a more holistic picture of the evolution of Venus’ geological record and atmosphere. As the oldest geologic units on the surface, Venus’ tesserae may still have remanent crustal magnetization signatures within the rocky composition [5]. In any case, the signatures detected will provide insight into Venus’ past geological and core dynamo activity. Mission Summary: VERNE includes a 3-part flight system made up of 1) an entry system with a HEEET (Heatshield for Extreme Entry Environment Technology) aeroshell, 2) an orbiter for data relay, and 3) an in-situ balloon and gondola. After entry into Venus’ atmosphere, the balloon will be deployed within the upper cloud deck, at an altitude of 62 km, over a tesserae region. The in-situ data collection will last for the duration of 2 full circumnavigations of the planet, which will take ~9 days. Instrumentation Suite: The four instruments that comprise VERNE’s instrument payload will enable the identification of the unknown UV absorber and the detection of remanent crustal magnetization if it exists in the tesserae. The proposed instrument suite cycle during mission operations is shown in Fig. 1. The four instruments are described below: 1) Adams (ion neutral mass spectrometer) has a range of 18-257 AMU and will detect and distinguish the mixing ratios of O₂, H₂O, H₂SO₄, S, S₂, S₃, S₄, S₅, S₆, S₇, S₈, SO, SO₂, OSSO, SO₃, Cl₂, FeCl₃ and other trace sulfur and organic species. The spatial (longitudinal) and temporal (day/night) variations will be observed throughout 2 circumnavigations with a sample cadence of 12 minutes. 2) Shelley (nephelometer) will determine the size distribution of the aerosols (0.4 to 36 um) in the atmosphere. With a size resolution of <0.7 um, it can determine which mode of H2SO4 is present and characterize the large (>30 um) organic particles previously detected by the Venera and Galileo missions [6,7]. 3) Herbert (UV imager) will measure UV radiance at 283 nm (the wavelength of SO2 absorption) and 365 nm (the unknown part of the absorber). UV images will be taken concurrently with the INMS and nephelometer to correlate UV absorption with abundances of the UV absorber species. 4) Vonnegut (magnetometer) has a range of >600 nT and a precision and accuracy of 1 nT. If magnetized by a past field, the crust may have retained a magnetization of up to 3 A/m2 [5]. With a noise floor of 10 nT, the magnetometer will be able to detect RCM from an altitude of 62 km, even if the thickness of the magnetized crust is just 1 km (Fig. 2). Mission Concept Design: VERNE will be launched with a mass of 3300 kg in an intermediate-high performance class vehicle with a 4-m fairing. The 475-day mission includes 466 days for the cruise, coasting, and orbit initialization phases before entry, descent, and balloon deployment. During the 9-day science phase, the aerial platform will make 2 circumnavigations of the planet at an altitude of 62 km. The INMS and the nephelometer will acquire data for 2 hours during the daytime and nighttime during each circumnavigation, while the UV imager will be on for the duration of the daytime, and the magnetometer will be operational throughout the entirety of the science phase. Data will be stored and processed with the JPL-designed Sphinx command and data handling system. Data will be sent from the balloon to the orbiter using an S-band relay link, stored on the orbiter, and then forwarded to Earth where it will be received by the DSN. Conclusion: VERNE will fill key gaps in our understanding of the history and ongoing processes related to the geology and atmosphere of Venus and rocky worlds in general. Even with adequate flight system contingencies and expected costs below the $900M New Frontiers cost cap, VERNE is not without its risks and challenges. Further trade spaces to explore include 1) using solely battery power vs. including solar panels to increase the mission duration and 2) investigating the use of lightweight materials and 3D-printed structures to reduce the gondola mass, among others. Acknowledgments: We would like to thank the JPL Planetary Science Summer School, especially our mentors Troy Hudson, Karl Mitchell, and Leslie Lowes, as well as our Team-X study lead Al Nash and the members of Team-X. We’d additionally like to thank our review panel for asking insightful questions and providing valuable feedback. References: [1] Ross, F. E. (1928) Astrophysical J., 68, 57-92. [2] Rossow, W. B. et al. (1980) J. Geophysical Research, 85, 8107-8128. [3] Pinto, J. P. et al. (2021) Nature Communications, 12, 175. [4] Titov, D. V. et al. (2007) Cosmic Research, 21, 401. [5] O’Rourke, J. et al. (2019) Geophysical Research Lett., 46, 5768–5777. [6] Limaye, S. S. et al. (2018) Astrobiology, 18(9), 1181-1198. [7] Grinspoon, D. H. et al. (2013) Planetary and Space Sci., 41(7), 515-542. [8] Parker, R. L. (2003) J. Geophysical Research, 108, 5006. *The cost information contained in this document is of a budgetary and planning nature and is intended for informational purposes only. It does not constitute a commitment on the part of JPL and/or Caltech.

H Alpert

Mars Sample Return - studies for a fresh look

Included in the paper are both the themes resulting from the industry studies and the general scope of the focused concepts used to assess the current planning for the Mars Sample Return (MSR) mission and precursor missions. Included in this conference are papers by the four industrial teams, as well as a fifth study by JPL's Team-X to provide further corroboration of study results. The results suggest that a scientifically justifiable mission is possible, and that technology and precursor mission demonstration plans currently in the Mars Program are justified (with some modifications).

Mars Sample Return MSR

NASA's Gravitational-Wave Mission Concept Study

With the conclusion of the NASA/ESA partnership on the Laser interferometer Space Antenna (LISA) Project, NASA initiated a study to explore mission concepts that will accomplish some or all of the LISA science objectives at lower cost. The Gravitational-Wave Mission Concept Study consists of a public Request for Information (RFI), a Core Team of NASA engineers and scientists, a Community Science Team, a Science Task Force, and an open workshop. The RFI yielded 12 mission concepts, 3 instrument concepts and 2 technologies. The responses ranged from concepts that eliminated the drag-free test mass of LISA to concepts that replace the test mass with an atom interferometer. The Core Team reviewed the noise budgets and sensitivity curves, the payload and spacecraft designs and requirements, orbits and trajectories and technical readiness and risk. The Science Task Force assessed the science performance. Three mission concepts have been studied by Team-X, JPL's concurrent design facility, to refine the conceptual design, evaluate key performance parameters, assess risk and estimate cost and schedule. The status of the Study are reported.

Stebbins, Robin

NASA's Gravitational - Wave Mission Concept Study

With the conclusion of the NASA/ESA partnership on the Laser Interferometer Space Antenna (LISA) Project, NASA initiated a study to explore mission concepts that will accomplish some or all of the LISA science objectives at lower cost. The Gravitational-Wave Mission Concept Study consisted of a public Request for Information (RFI), a Core Team of NASA engineers and scientists, a Community Science Team, a Science Task Force, and an open workshop. The RFI yielded were 12 mission concepts, 3 instrument concepts and 2 technologies. The responses ranged from concepts that eliminated the drag-free test mass of LISA to concepts that replace the test mass with an atom interferometer. The Core Team reviewed the noise budgets and sensitivity curves, the payload and spacecraft designs and requirements, orbits and trajectories and technical readiness and risk. The Science Task Force assessed the science performance by calculating the horizons. the detection rates and the accuracy of astrophysical parameter estimation for massive black hole mergers, stellar-mass compact objects inspiraling into central engines. and close compact binary systems. Three mission concepts have been studied by Team-X, JPL's concurrent design facility. to define a conceptual design evaluate kt,y performance parameters. assess risk and estimate cost and schedule. The Study results are summarized.

Stebbins, Robin

Mars Ascent Vehicle Development Status

The Mars robotic sample return mission has been a potential flagship mission for NASA s science mission directorate for decades. The Mars Exploration Program and the planetary science decadal survey have highlighted both the science value of the Mars Sample Return (MSR) mission, but also the need for risk reduction through technology development. One of the critical elements of the MSR mission is the Mars Ascent Vehicle (MAV), which must launch the sample cache from the surface of Mars and place it into low Mars orbit. The MAV has significant challenges to overcome due to tight constraints on the MAV s mass and volume, as well as environmental challenges associated with long duration storage on the Martian surface and during Entry Descent and Landing (EDL). In the fall of 2010, NASA selected three industrial partners for study phase contracts to develop MAV system concepts, identify technology needs, and recommend technology developments plans for follow-on work. In addition to the contractor recommendations, JPL s Team-X was used for a comparative assessment of the three vehicle concepts to understand relative strengths, weaknesses, and sensitivity to system growth. The GRC COMPASS team independently evaluated MAV system solutions using liquid bipropellant, solid rocket motors, and an advanced monopropellant option. The results of the study phase contracts and comparative assessment is provided herein.

Dankanich, John W.

AVIATR - Aerial Vehicle for In-situ and Airborne Titan Reconnaissance A Titan Airplane Mission Concept

We describe a mission concept for a stand-alone Titan airplane mission: Aerial Vehicle for In-situ and Airborne Titan Reconnaissance (AVIATR). With independent delivery and direct-to-Earth communications, AVIATR could contribute to Titan science either alone or as part of a sustained Titan Exploration Program. As a focused mission, AVIATR as we have envisioned it would concentrate on the science that an airplane can do best: exploration of Titan's global diversity. We focus on surface geology/hydrology and lower-atmospheric structure and dynamics. With a carefully chosen set of seven instruments-2 near-IR cameras, 1 near-IR spectrometer, a RADAR altimeter, an atmospheric structure suite, a haze sensor, and a raindrop detector-AVIATR could accomplish a significant subset of the scientific objectives of the aerial element of flagship studies. The AVIATR spacecraft stack is composed of a Space Vehicle (SV) for cruise, an Entry Vehicle (EV) for entry and descent, and the Air Vehicle (AV) to fly in Titan's atmosphere. Using an Earth-Jupiter gravity assist trajectory delivers the spacecraft to Titan in 7.5 years, after which the AVIATR AV would operate for a 1-Earth-year nominal mission. We propose a novel 'gravity battery' climb-then-glide strategy to store energy for optimal use during telecommunications sessions. We would optimize our science by using the flexibility of the airplane platform, generating context data and stereo pairs by flying and banking the AV instead of using gimbaled cameras. AVIATR would climb up to 14 km altitude and descend down to 3.5 km altitude once per Earth day, allowing for repeated atmospheric structure and wind measurements all over the globe. An initial Team-X run at JPL priced the AVIATR mission at FY10 $715M based on the rules stipulated in the recent Discovery announcement of opportunity. Hence we find that a standalone Titan airplane mission can achieve important science building on Cassini's discoveries and can likely do so within a New Frontiers budget.

UAV

Efficient Trade Space Exploration

This paper describes the process and tools that have led to a factor of nine improvement in the efficiency of trade space exploration of space systems in Team-X at the Jet Propulsion Laboratory.

Nash, Alfred E

Efficient Trade Space Exploration

Two of the principal challenges in efficient trade space exploration are (1) quickly evaluating options, and (2) quickly obtaining stakeholder understanding of the results of the evaluation. This presentation describes the processes & methodology that have led to a factor of nine improvement in the efficiency of trade space exploration of space systems in Team-X at the Jet Propulsion Laboratory. The principal method that has enabled this increase in efficiency is the separation of the exploration figures of merit into two distinct types, which are then addressed in an efficient order. The figures of merit in a trade space exploration of N subsystems either scale with the number of interactions between the subsystems and the external constraints, O(N), or with the number of interactions between subsystems, O(N2-N).

Nash, Alfred