Engineering Papers⌕ Search

SEARCH · Engineering Papers

Results for “TESTING FACILITY”

Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.

Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.

At least 19 records

RELAP5-3D Assessment Using High Temperature Test Facility Test PG-22

The RELAP5-3D computer code has been assessed using data from Test PG 22 in Oregon State University’s High Temperature Test Facility. Test PG 22 investigated the gas exchange between the primary coolant system helium and the reactor cavity simulation tank nitrogen following a heatup from ambient temperature. The heatup was terminated when the coolant temperature rise across the core reached 125°C. The code generally under predicted coolant and structure temperatures, likely the result of under predicting the core temperature and stored energy during the initial heatup, although there were no measured values to compare with. A full-loop natural circulation flow that occurred in the test was not predicted in any of the simulations.

22 GENERAL STUDIES OF NUCLEAR REACTORS↗

OSU High Temperature Test Facility Test Acceptance Report, PG-28 Low Power (<350kW) Lower Plenum Mixing Test

Test Acceptance Report for Test PG-28 at the Oregon State University High Temperature Test Facility. The purpose of this test is to investigate the impact on Lower Plenum thermal profiles and mixing due to changes in the system mass flow rate in an integral test facility scaled to General Atomics’ Modular High Temperature Gas Reactor (MHTGR) design.

21 SPECIFIC NUCLEAR REACTORS AND ASSOCIATED PLANTS↗

OSU High Temperature Test Facility Test Acceptance Report, PG-29 Low Power (<350kW) Double Ended Inlet-Outlet Crossover Duct Break, Hybrid Heater

Test Acceptance Report for Test PG-29 at the Oregon State University High Temperature Test Facility. The purpose of this test is to examine the progression of the Double Ended Inlet-Outlet Crossover Duct Break transient in an integral test facility scaled to General Atomics’ Modular High Temperature Gas Reactor (MHTGR) design.

21 SPECIFIC NUCLEAR REACTORS AND ASSOCIATED PLANTS↗

OSU High Temperature Test Facility Test Acceptance Report, PG-30 Low Power (<350kW) Lower Plenum Mixing, Constant Temperature Test

Test Acceptance Report for Test PG-30 at the Oregon State University High Temperature Test Facility. The purpose of this test is to investigate the impact on Lower Plenum thermal profiles and mixing due to changes in the system mass flow rate in an integral test facility scaled to General Atomics’ Modular High Temperature Gas Reactor (MHTGR) design.

21 SPECIFIC NUCLEAR REACTORS AND ASSOCIATED PLANTS↗

OSU High Temperature Test Facility Test Acceptance Report, PG-31 Low Power (<350kW) Pressure Vessel Bottom Break with Restored Forced Convection Cooling Test

Test Acceptance Report for Test PG-31 at the Oregon State University High Temperature Test Facility. The purpose of this test is to examine the progression of the Pressure Vessel Bottom Break with Restored Forced Convection Cooling transient in an integral test facility scaled to General Atomics’ Modular High Temperature Gas Reactor (MHTGR) design.

21 SPECIFIC NUCLEAR REACTORS AND ASSOCIATED PLANTS↗

RELAP5-3D Pre-test Prediction for High Temperature Test Facility Test PG-26

The RELAP5-3D computer code has been used to perform a pre-test prediction for Test PG-26 in the High Temperature Test Facility at Oregon State University. Test PG-26 will simulate a pressurized conduction cooldown transient following a trip of the primary coolant system gas circulator. The facility is initialized with a steady-state power of 700 kW and prototypic core inlet and outlet helium coolant temperatures of 259 and 687°C, respectively. Sensitivity calculations addressed the flow coastdown time, the reactor cavity cooling system flow rate and temperature, and decay power.

22 GENERAL STUDIES OF NUCLEAR REACTORS↗

Commissioning and Testing of a new 4.5K Cold Box for JLab Cryogenic Test Facility

A new 4.5K cold box at Jefferson Lab (JLab) Cryogenic Test Facility (CTF) was recently installed and commissioned to upgrade the existing 4.5 K refrigeration system and work in parallel with the existing 4.5 K cold box. This new 4.5 K cold box is equipped with two turbo-expanders and, at its maximum capacity condition, it is expected to support at least 6.6 g/s of helium liquefaction or 650 W of refrigeration at 4.5 K. It can also handle up to 10 g/s 30 K return flow for 2 K refrigeration recovery that supports cryo-module and superconducting cavity testing. Performances of the cold box at its maximum capacity conditions as well as several other operating modes were tested for acceptance. Finally, we will briefly review the new 4.5 K cold box design features and discuss the commissioning and performance testing results.

42 ENGINEERING↗

Spallation Neutron Source Cryogenic Test Facility Horizontal Test Apparatus Operation

The Spallation Neutron Source (SNS) has built Superconducting Radio Frequency (SRF) processing and testing facilities to support improvement programs and future upgrades. The Cryogenic Test Facility (CTF) system is capable of delivering liquid helium at 4.5K to different test apparatus in support of SRF testing. This paper describes the final stages of fabrication, commissioning and the initial operation of the Horizontal Test Apparatus (HTA). The HTA allows for cold testing of single jacketed medium-beta or high-beta SRF cavities. Heat loads, capacities, and other performance data collected during operation will be presented. Cavity testing lifecycle for plasma processing research and development will be discussed. System changes to allow for 2K helium operation in the HTA will also be addressed.

Afanador, Ralph↗

RELAP5-3D Modeling of High Temperature Test Facility (HTTF) Test PG-26

The High Temperature Test Facility (HTTF) at Oregon State University (OSU) is a scaled integral effects experiment designed to investigate transient behavior in high-temperature gas-cooled nuclear reactors with prismatic fuel and reflector blocks. Several tests have been completed, and more are still planned to at the HTTF, including depressurized conduction cooldown (DCC) and pressurized conduction cooldown (PCC) transients. This report analyses test PG-26, a progression of the Double Ended Inlet-Outlet Crossover Duct Break transient that is referred to as a DCC. PG-26 has been performed at the HTTF between May 30 and June 30, 2019. Core initial conditions (i.e., before the DCC started) have been met using low power (<100 kW) and two of ten available electric heaters. The DCC transient was initiated during the 50 th hour of the test. The break valves were opened, and hot helium from the core and cold helium from the reactor cavity simulation tank (RCST) started mixing. The gases flowed in a countercurrent fashion, where the top half of the hot duct contained hot helium that flowed in one direction and cold helium that flowed in the other direction in the bottom half of the duct. After the pressure and density reached equilibrium, the event entered a diffusion mode. The onset of a reverse natural circulation was not observed during the DCC period of the test. Version 4.4.2ie of the RELAP5-3D computer code has been used to model the HTTF PG-26 test, and results have been compared to available high-quality measured data. The model used in this study is the quality-controlled HTTF RELAP5-3D model (HTTF base 2018-04-19 QA), originally developed by P. Bayless. The report includes RELAP5-3D results of the “base calculations” as well as some sensitivities to important uncertain model inputs, such as primary helium mass flow rate, core ceramic thermal properties, as well as heat evacuation and loop friction models. Using the base RELAP5-3D model predicts a countercurrent helium flow in the hot duct observed at the beginning of the DCC, but instead of going into a molecular diffusion mode, the model predicts the onset of natural convection. Increasing friction in the core and hot duct prevents the natural convection from happening in some of the simulations. Although some temperatures are well predicted (and even overpredicted), the general tendency is to underpredict the ceramic and helium temperatures and heat removal rates during the DCC, resulting in many of the assessment findings being in minimal or insufficient agreement with the data. It is worth noting that the described discrepancies between measured data and RELAP5-3D predictions are not RELAP5-3D code limitations. More so, they reflect limitations in boundary condition and thermal property knowledge. While the RELAP5-3D calculations of the test provide some insights into what happens during the transient, and point to missing or potentially uncertain data to which the experimenters can direct their attention, the principal conclusion is that the PG-26 test data are insufficient for a system code assessment.

11 NUCLEAR FUEL CYCLE AND FUEL MATERIALS↗

A Proposed Beam-Beam Test Facility COMBINE

The COmpact Machine for Beam-beam Interactions in Non-Equilibrium systems (COMBINE) is a proposed, dedicated, beam-beam test facility. This is currently a joint effort between Jefferson Lab and Old Dominion University to create a small, low energy pair of collider rings that would be used to study beam-beam interactions, as well as act as a teaching tool for students. The base design would make use of a pair of identical rings (2.5 meters per side) one rotated 180 degrees from the other, meeting at their common interaction point. These would be fed by an electron gun producing up to 125 keV electrons. The low energy will allow for beam-beam tune shifts commensurate with existing colliders, and will also allow for an exploration of the predicted effects of gear-changing, which would be performed using a variable pathlength scheme. Finally, this machine can also test linac-ring type systems.

Nissen, Edith↗

High Temperature Test Facility At Scale Testing, Validation, and Demonstration

Theses slides will be used to brief the Tribal DOE and Council Chairman for the project listed below. The High Temperature Test Facility (HTTF) is a demonstration-scale high temperature electrolysis (HTE) system that provides the ability to produce, process, store, and dispense electrolytically produced hydrogen. The system will be designed to accommodate electrolysis systems from various industry partners. The HTTF will be supplied up to 10 MW of power for electrolysis at 5 separate test article locations, each up to 2MW. The system will include post-processing and compression, storage, and capabilities to provide hydrogen for consumption by future end users. The HTTF will also provide the ability to test and demonstrate an HTE system in a configuration that would simulate the use of a nuclear generated steam supply for the high temperature heat source. The HTTF will be located at the Central Facilities Area (CFA) adjacent to CFA-686 on the INL site, 45 miles west of Idaho Falls.

08 HYDROGEN↗

Cryogenic System for the Cryomodule Test Facility at Fermilab

This paper provides an overview of the current progress and near-future plans for the cryogenic system at the new Cryomodule Test Facility (CMTF) at Fermilab, which includes the helium compressors, refrigerators, warm vacuum compressors, gas and liquid storage, and a distribution system. CMTF will house the Project X Injector Experiment (PXIE), which is the front end of the proposed Project X. PXIE includes one 162.5 MHz half wave resonator (HWR) cryomodule and one 325 MHz single spoke resonator (SSR) cryomodule. Both cryomodules contain superconducting radio-frequency (SRF) cavities and superconducting magnets operated at 2.0 K. CMTF will also support the Advanced Superconducting Test Accelerator (ASTA), which is located in the adjacent New Muon Lab (NML) building. A cryomodule test stand (CMTS1) located at CMTF will be used to test 1.3 GHz cryomodules before they are installed in the ASTA cryomodule string. A liquid helium pump and transfer line will be used to provide supplemental liquid helium to ASTA.

White, Michael↗