Engineering Papers⌕ Search

SEARCH · Engineering Papers

Results for “Substation Power Outage”

Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.

Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.

At least 19 records

CCE Case Study: Baltavia Substation Power Outage

In this case study, we will examine a fictional event broadly inspired by the real power outages in Ukraine that took place in December 2015 and December 2016—both the result of cyber-enabled sabotage. The actual events of 2015 and 2016 were well-documented—the adversaries in these attacks gained access to a few power companies’ corporate networks, pivoted to industrial control system (ICS) networks, and created widespread physical effects in the form of power outages.

24 POWER TRANSMISSION AND DISTRIBUTION↗

CCE Case Study: Baltavia Substation Power Outage

In this case study, we will examine a fictional event broadly inspired by the real power outages in Ukraine that took place in December 2015 and December 2016 - both the result of cyber-enabled sabotage. The actual events of 2015 and 2016 were well-documented - the adversaries in these attacks gained access to a few power companies’ corporate networks, pivoted to industrial control system (ICS) networks, and created widespread physical effects in the form of power outages.

24 POWER TRANSMISSION AND DISTRIBUTION↗

Deep Reinforcement Learning for Distribution System Restoration Using Distributed Energy Resources and Tie-Switches

Distributed energy resources (DERs), such as solar PVs and energy storage, can be used to restore distribution system critical loads after the extreme weather events to increase grid resilience. However, coordinating multiple DERs together with tie-switches for multi-step restoration process under renewable uncertainty is challenging. This paper proposes a deep reinforcement learning to control discrete actions of switching on/off tie switches and DERs for critical load restoration. The restoration problem is first cast into the Markov decision process suitable for DRL. Then, the original soft actor critic (SAC) method for continuous actions has been extended to handle discrete and continuous actions. Numerical comparison results with other stochastic optimization-based approaches on the modified IEEE 33-bus system show that the proposed method can achieve fast critical load restoration in the presence of substation power outage while maintaining system voltage limit throughout the restoration process.

active distribution systems↗

Precursor Analysis Report: Industroyer Targeting Ukraine Electric Power Transport Utility (Ukrenergo) 2016

The Industroyer Targeting Ukraine Electric Power Transport Utility (Ukrenergo) 2016 Precursor Analysis Report leverages publicly available information about the December 2016 cyber attack against the Ukrainian Ukrenergo electric transmission utility and catalogs anomalous observables for each technique employed in the attack. This analysis is based upon the methodology of the Cybersecurity for the Operational Technology Environment (CyOTE) program. Industroyer is a modular malware framework designed to deploy several Industrial Control System (ICS) protocol-specific attack payloads to disrupt electricity distribution. Adversaries deployed Industroyer within the target network on a Microsoft Windows endpoint capable of directly manipulating or communicating with ICS. Industroyer abuses the functionality of a targeted ICS’s legitimate control system to achieve its intended impact. Adversaries likely first gained access to Ukrenergo enterprise networks in early 2016 after a successful spearphishing campaign against organizations in the electric power sector. Adversaries then began capturing credentials beginning on 1 December 2016. This allowed access to the ICS environment at the Pivnichna electric transmission substation outside Kyiv through a device dual-homed on the Information Technology (IT) and ICS networks. Adversaries conducted discovery, targeting, and access to this device using information and previously captured credentials from compromised enterprise IT machines. Finally, the adversaries deployed and launched the Industroyer malware just before midnight on 17 December. By midnight, Ukrenergo had lost control of a targeted substation, resulting in electric power outages for over an hour in the city of Kyiv and the Kyiv region. Researchers and analysts identified 31 unique techniques (used in a sequence of 33 steps) utilized during the attack with a total of 846 observables using MITRE ATT&CK® for Industrial Control Systems. The CyOTE program assesses observables accompanying techniques used prior to the triggering event to identify opportunities to detect malicious activity. If observables accompanying the attack techniques are perceived and investigated prior to the triggering event, earlier comprehension of malicious activity can take place. Twenty-nine of the identified techniques used during the Industroyer cyber attack were precursors to the triggering event. Analysis identified 548 observables associated with these precursor techniques, 353 of which were assessed to have an increased likelihood of being perceived in the 300 days preceding the triggering event. The response and comprehension time could have been reduced if the observables had been identified earlier. The information gathered in this report contributes to a library of observables tied to a repository of artifacts, data sources, and technique detection references for practitioners and developers to support the comprehension of indicators of attack. Asset owners and operators can use these products if they experience similar observables or to prepare for comparable scenarios.

45 MILITARY TECHNOLOGY, WEAPONRY, AND NATIONAL DEF↗

Cybersecurity Anomaly Detection in SCADA-Assisted OT Networks Using Ensemble-Based State Prediction Model

The cybersecurity threats of power system gradually grow due to the increased sophisticated interactions between Information Technology (IT) and Operational Technology (OT) networks. False data injection attack (FDIA) that aims to compromise the Supervisory Control and Data Acquisition (SCADA) measurement and disturb the system operation is one of such cyber threats. Such attacks can potentially lead to significant operational issues at the control centers and substations, and hence, result in severe physical consequences. To avoid catastrophic failure across the power grid resulting from these attacks, it is essential to arm the OT network with real-time vulnerability assessment tools. To this end, this paper outlines various drawbacks of the Purdue architecture model to defend against cyberattacks in the OT network. Furthermore, a novel ensemble-based state prediction model is proposed to detect cybersecurity anomalies in SCADA assisted OT networks. The proposed model uses control center level generation and load forecasts, scheduled, and forced outages, power flow solutions, and the substation level historical data. The hypothesis of the proposed scheme relies on the fact that additional control center and substation data can hardly be accessed and compromised by attackers. One of the vital features of the proposed scheme is an hour-ahead prediction of the operational feasibility of the SCADA measurement range at the control center and substation in real time helps in detecting anomalies in measurements across both substation and the control center.

24 POWER TRANSMISSION AND DISTRIBUTION↗

MPC4CLR (Model-Predictive-Control-for-Critical-Load-Restoration-in-Power-Distribution-Systems) [SWR-22-24]

Model predictive control (MPC) is a system or process control technique for making decisions under uncertainty via rolling look-ahead optimizations at each control step where only the current step decisions are applied, and the rest are discarded. In this work, we developed an MPC for a critical load restoration (CLR) in power distribution systems to recover system service (electricity delivery) following an extreme event-triggered substation outage. The method considers the problem of controlling distributed energy resources (DERs) of the distribution system with the objective of achieving maximum load pick up while satisfying distribution network flow and voltage constraints. A linearized optimal power flow (OPF) model is employed to represent the physics of the network. The problem formulation is augmented with a ramping (up) reserve product for the DERs to ensure improved and upward monotonic load restoration as time evolves. Simulation analysis and performance tests are performed using a modified IEEE 13-bus test feeder integrated with wind, solar, microturbine, and energy storage battery. The software is developed using various software packages in Julia and Python. The MPC model is implemented using the JuMP optimization language in Julia while the data analytics including renewable generation and load demand forecasts, running the MPC simulation and visualizations is performed in Python.

Eseye, Abinet Tesfaye↗

Feasibility Analyses for the Microgrid of the Mountain in the Cordillera Central Region of Puerto Rico

Distributed energy resource (DER) development can benefit communities through improvement of access to reliable electricity and a resilient energy system. Many place-specific considerations must be accounted for when designing electrical systems with co-located generation and loads. This paper presents an overview of four studies focusing on different aspects for regional DER development in the Cordillera Central region of Puerto Rico, including a grid and load stability study with the introduction of solar energy generation, microgrid design based on the solar resource in the area, resilience considerations during power outage scenarios, and qualitative risk aspects for components in the microgrid. Additionally, a conceptual substation microgrid analysis is conducted using the Microgrid Design Toolkit (MDT) to evaluate trade-offs between cost and energy availability, providing insights into optimal design strategies. A microgrid resilience assessment is performed using the Resilient Nodal Cluster Analysis Tool (ReNCAT) to identify critical loads and evaluates their accessibility during outages, emphasizing the importance of community needs. Finally, a qualitative risk assessment utilizing Hazard and Operability Analysis (HAZOP) methods highlights potential hazards and mitigations for microgrid components, ensuring robust system design and operation.

24 POWER TRANSMISSION AND DISTRIBUTION↗

Resilient Operation of Power Distribution Systems Using MPC-Based Critical Service Restoration

Power distribution systems are more prone to disruptions and cause most power system outages. We propose a service restoration technique to recover the system service (electricity delivery) following an extreme event-triggered substation outage. The proposed technique considers the problem of controlling distributed energy resources (DERs) of a distribution system with the objective of achieving maximum load pick up while satisfying network flow and voltage constraints. The problem is formulated as a model predictive control (MPC), where a linearized optimal power flow (OPF) model is employed to describe the network. The formulation is augmented with a ramping (up) reserve product for the DERs to ensure an upward monotonic load restoration as time evolves. We perform simulations considering the IEEE 13-bus test feeder integrated with wind, solar, microturbine, and energy storage devices. We demonstrate the efficacy of the devised technique in restoring the system loads monotonically, without shedding previously restored loads. We also show the benefit of co-optimization of power and reserve products for DERs on service restoration. In addition, the capability of the technique in regulating nodal voltages and reducing renewable power curtailment is demonstrated.

70 PLASMA PHYSICS AND FUSION TECHNOLOGY↗

Resilient Operation of Power Distribution Systems Using MPC-Based Critical Service Restoration: Preprint

Power distribution systems are more prone to disruptions and cause most power system outages. We propose a service restoration technique to recover the system service (electricity delivery) following an extreme event-triggered substation outage. The proposed technique considers the problem of controlling distributed energy resources (DERs) of a distribution system with the objective of achieving maximum load pick up while satisfying network flow and voltage constraints. The problem is formulated as a model predictive control (MPC), where a linearized optimal power flow (OPF) model is employed to describe the network. The formulation is augmented with a ramping (up) reserve product for the DERs to ensure an upward monotonic load restoration as time evolves. We perform simulations considering the IEEE 13-bus test feeder integrated with wind, solar, microturbine, and energy storage devices. We demonstrate the efficacy of the devised technique in restoring the system loads monotonically, without shedding previously restored loads. We also show the benefit of co-optimization of power and reserve products for DERs on service restoration. In addition, the capability of the technique in regulating nodal voltages and reducing renewable power curtailment is demonstrated.

61 RADIATION PROTECTION AND DOSIMETRY↗

Resilient Operation of Power Distribution Systems Using MPC-Based Critical Service Restoration

Power distribution systems are more prone to disruptions and cause most power system outages. We propose a service restoration technique to recover the system service (electricity delivery) following an extreme event-triggered substation outage. The proposed technique considers the problem of controlling distributed energy resources (DERs) of a distribution system with the objective of achieving maximum load pick up while satisfying network flow and voltage constraints. The problem is formulated as a model predictive control (MPC), where a linearized optimal power flow (OPF) model is employed to describe the network. The formulation is augmented with a ramping (up) reserve product for the DERs to ensure an upward monotonic load restoration as time evolves. We perform simulations considering the IEEE 13-bus test feeder integrated with wind, solar, microturbine, and energy storage devices. We demonstrate the efficacy of the devised technique in restoring the system loads monotonically, without shedding previously restored loads. We also show the benefit of co-optimization of power and reserve products for DERs on service restoration. In addition, the capability of the technique in regulating nodal voltages and reducing renewable power curtailment is demonstrated.

61 RADIATION PROTECTION AND DOSIMETRY↗

Wildfire-Power Grid Interactions: Feedback, Impacts, Monitoring, Modeling, and Mitigation Strategies

Wildfires are increasingly interacting with electric power systems through a two-way hazard chain: fires damage grid assets and trigger cascading outages, while grid faults can ignite new fires under hot, dry, and windy conditions. This review synthesizes the state of knowledge across five domains: (i) physical impacts of flames, heat, and smoke on lines, towers, insulators, and substations; (ii) power-infrastructure-initiated ignitions via conductor clash, high-impedance faults, and corona discharge; (iii) widespread blackouts and disproportionate societal impacts; (iv) multi-scale monitoring spanning laboratory tests, in-situ and grid-integrated sensors, and Earth observation; (v) coupled modeling that links fire behavior with grid operations; and (vi) technological and strategic mitigation pathways spanning prevention, response, and recovery. We integrate these domains into a novel 'feedback-aware' socio-technical framework. Through a longitudinal analysis (2005-2025) of global incidents, we identify that while vegetation contact remains the most frequent ignition source, aging infrastructure failure has emerged as a critical driver of catastrophic 'mega-fires'. We further identify persistent gaps, including limited interoperability of high-frequency grid and environmental data, scarce real-time data assimilation, and under-developed equity metrics for outage management. We conclude by outlining a research agenda to (1) deploy interoperable sensing architectures, (2) advance feedback-coupled fire-grid simulations, and (3) evaluate mitigation portfolios through techno-economic and fairness lenses. Recognizing wildfire-grid interactions as coupled socio-technical systems is essential for protecting infrastructure and communities and for ensuring reliable, sustainable electricity in a changing world.

24 POWER TRANSMISSION AND DISTRIBUTION↗

Consumer safety-oriented scheduling of rotating power outages during heat waves

Extreme heat events have widespread effects on power systems, reducing available generation capacity, limiting transmission capabilities, and causing unusual demand patterns on the consumer side. As these combined effects expose bulk transmission systems to potential large-scale blackouts, utilities may be required to schedule and apply rotating outages, by temporarily and alternately disconnecting distribution substations to reduce overload. However, utilities lack mechanisms to inform these events, exacerbating the negative effects of heat waves on affected communities. This paper introduces a novel framework for scheduling rotating outages during heat waves while considering impacts on consumers’ safety. Instead of random sequential load shedding, we propose a methodology to rotate power outages considering a metric that quantifies the indoor overheating risk of groups of consumers during a power outage. The overheating risk is derived from a detailed building simulation using CityBES, where the buildings are modeled based on available data—use type, year built, floor area, number of stories, location—while presence of air conditioning and occupancy are calibrated from smart meter data. Based on the metric, an algorithm to schedule the rotating outages is applied to prioritize feeders for disconnection at each hour according to their overheating risk to meet a utility load reduction target. Applied to two substations and seven feeders in the Portland General Electric territory, the results show that this approach effectively leads to the lowest overheating risk during the resulting outage schedules, with an average 10.1% lower overheating compared to uninformed schedules.

Building thermal simulation↗

RLC4CLR (Reinforcement Learning Controller for Critical Load Restoration Problems)

RLC4CLR demonstrates using a reinforcement learning controller (RLC) to solve a critical load restoration (CLR) problem, which improves the grid resilience after a substation outage event. RLC4CLR consists of two parts. (1) RL environment: This environment encapsulates the CLR problem to be solved and provides interfacing functions to follow the standard OpenAI Gym format. A power system simulator, i.e., OpenDSS, is included to provide the power flow solution. Controller inputs and outputs (RL state and action) as well as the reward are defined in this environment as well. In summary, the RL environment is the problem formulation from which the RL agent can learn. (2) RL training script: The training script enables the RL agent to learn its control policy by interacting with the RL environment. For RL training, an open-sourced RL library, i.e., RLlib, is leveraged which is based on a distributed computing framework (Ray). The training script is designed to be able to be run on both local machine or the NREL HPC system. Other components of RLC4CLR include input data, e.g., grid model (standard IEEE test feeders), and other files used for results analysis.

Zhang, Xiangyu↗

Random Forest Regressor-Based Approach for Detecting Fault Location and Duration in Power Systems

Power system failures or outages due to short-circuits or “faults” can result in long service interruptions leading to significant socio-economic consequences. It is critical for electrical utilities to quickly ascertain fault characteristics, including location, type, and duration, to reduce the service time of an outage. Existing fault detection mechanisms (relays and digital fault recorders) are slow to communicate the fault characteristics upstream to the substations and control centers for action to be taken quickly. Fortunately, due to availability of high-resolution phasor measurement units (PMUs), more event-driven solutions can be captured in real time. In this paper, we propose a data-driven approach for determining fault characteristics using samples of fault trajectories. A random forest regressor (RFR)-based model is used to detect real-time fault location and its duration simultaneously. This model is based on combining multiple uncorrelated trees with state-of-the-art boosting and aggregating techniques in order to obtain robust generalizations and greater accuracy without overfitting or underfitting. Four cases were studied to evaluate the performance of RFR: 1. Detecting fault location (case 1), 2. Predicting fault duration (case 2), 3. Handling missing data (case 3), and 4. Identifying fault location and length in a real-time streaming environment (case 4). A comparative analysis was conducted between the RFR algorithm and state-of-the-art models, including deep neural network, Hoeffding tree, neural network, support vector machine, decision tree, naive Bayesian, and K-nearest neighborhood. Experiments revealed that RFR consistently outperformed the other models in detection accuracy, prediction error, and processing time.

24 POWER TRANSMISSION AND DISTRIBUTION↗

Enabling Realistic Communications Evaluations for ADMS

Increasing penetration levels of inverter-based distributed energy resources (DERs) in distribution systems are creating challenges in system operation. Currently, wired or proprietary wireless communications are used by advanced distribution management systems (ADMS) to detect the state of the system and control the DERs for optimal operation. Wireless communications are an alternative solution that can enable connectivity between the dispersed assets used in distribution system applications. As demand for the seamless integration of distributed energy resources (DERs) continues to increase, proper networking and communications systems are becoming important to support the DER infrastructure. This report summarizes validation of a private wireless LTE network in a laboratory environment. The purpose of this work is to 1) demonstrate the effectiveness of private wireless LTE communication for grid applications and 2) provide a means of evaluating latency and overall performance of wireless communication in grid applications. First, private wireless LTE communication was validated in a direct transfer trip relaying scenario as an example of one-way communications using grid equipment. This study provided a baseline understanding of the variation in latency for seven different kinds of wireless scenarios shown in Figure A below. As expected, weak (attenuated) wireless signal-based communication yielded the widest ranges in latency. When higher priority was set for the trip signal communication, this resulted in lower latency in communication timing. In the final phase of this project, the private wireless LTE network was validated using two-way communications in an advanced distribution management system (ADMS) testbed which was developed in the ESIF at NREL. The purpose of this was to study the impact of wireless communication on grid performance.

24 POWER TRANSMISSION AND DISTRIBUTION↗

Introducing the 9500 Node Distribution Test System to Support Advanced Power Applications: An Operations-Focused Approach

The 9500 Node Test System is a representative section of distribution power system model developed as a part of the GridAPPS-D™ project, an effort funded by DOE as a part of the Grid Modernization Lab Consortium (GMLC) program. The test system was developed to fulfill a growing need to represent the rapidly evolving state of electric distribution systems by combining elements of legacy infrastructure systems, modern feeder topologies, and an anticipated future with smart grid technologies. It also provides a network model capable of supporting the simulation of operational scenarios such as the ones in a utility distribution control center. This test system allows the evaluation of the performance of advanced power applications in real-time, such as one that simulates the operations of an Advanced Distribution Management Systems (ADMS), Distributed Energy Resource Management Systems (DERMS), etc. in a Distribution control center. This model is an extension of the widely used IEEE 8500 Node Test Feeder and is currently being validated to become an IEEE test case to help increase adoption and widespread usage among both academia and industry. It is a full-size model representative of a section of a utility’s distribution system with multiple feeders fed from different substations. The model includes multiple distribution circuits, a sub-transmission system, multiple substations, behind the meter customer rooftop photovoltaics (PV), and multiple utility-scale distributed energy resources. To enable accurate simulations of operational scenarios, the 9500 Node Test System is designed to support procedure-based operations, with the ability to realistically demonstrate switching operations, feeder reconfiguration, adjustment of volt-var control equipment, dispatch of distributed generation, and response to planned and unplanned outages. The 9500 Node Test System includes three radial distribution feeders with 12.3 MVA of average load, consisting of both medium voltage and low voltage equipment each supplied by a different distribution substation. The three distribution feeders are connected to each other through Normally-Open switches which can be closed when needed to simulate restoration scenarios due to a fault. One feeder represents today’s grid with low penetration of customer-side renewables. The second represents a potential future grid with microgrids and 100% renewable penetration. The third has no customer generation resources, a district steam plant, and a utility-scale solar farm. The three diverse circuits were created to allow the simulation of both today’s situation as well as potential future scenarios. All three feeders have customers connected by low-voltage secondary triplex lines. This test system meets all requirements outlined in the report for creating a simulation environment that would enable discussion between key technical stakeholders as well as having the potential to accelerate operational application development and their subsequent testing and integration. The new model is a possible representation of what we believe the distribution grid may look like in the future: a high penetration of renewables, reconfigurable radial and mesh topology, numerous DERs, islanded microgrids, and significantly increased data and measurement density. The system supports both the solution of existing and newer algorithms but also enables the evaluation of applications in a realistic operational environment defined by task oriented procedural steps that represent the interaction between the control center operator and field personnel.

24 POWER TRANSMISSION AND DISTRIBUTION↗

AGGREGATE: dAta-driven modelinG preservinG contRollable dEr for outaGe mAnagemenT and rEsiliency (Final Report)

The AGGREGATE project team successfully developed and validated various modules for outage management. Brief summaries of each module are provided to showcase their strength for outage management and restoration for a distribution system with a high penetration of connected distribution energy resources (DERs). In recent years, inverter-based DERs have been widely deployed in distribution system. A most of behind-the-meter (BTM) solar power generation is not visible to the utility. The data-driven DER and load estimation modules are using machine learning (ML) and artificial intelligence (AI) to manage this issue, which provides an opportunity for distribution system operators (DSOs) to operate systems and make decisions in real-time for a distribution system with a high penetration of DERs deployed. Also, the estimated DER and true load can be further leveraged in network aggregation and cold-load pick up estimation for reducing the computing complexity and providing for fast restoration. After load demand and DER power generations have been estimated, the information will support topology and state estimation (SE). The topology estimation module demonstrated the viability of mixed integer linear programming (MILP) formulation to estimate the most likely operational radial topology and outage sections using power flow measurements, historical/estimated load and DERs data and smart meter ping measurements. Formulation includes continuous (power flow, load and DERs data) and binary measurements (smart meter ping measurements) in a single formulation. Errors in continuous data and binary data are modeled as normal distribution and Bernoulli distribution, respectively. In the future distribution grid, the power injection from controllable DERs will be essential for efficient and resilient grid operation. However, determining the optimal DER injections and restoration actions is dependent on knowledge of the system states. State estimation (SE), already the cornerstone of transmission energy management systems, will become commonplace in distribution management systems as more measurements become available from deployment of automated metering infrastructure (AMI). Observability analysis is the first step in SE, as it determines the sufficiency of the available measurements for accurately estimating the current system states. A new type of pseudo-measurement called a Correlational Measurement (CM) is introduced in this module, to enhance the observability of the system to enable more accurate SE. CMs encapsulate knowledge of correlation between demand patterns for similar classes of loads as well as injection patterns for same-technology renewable DERs. During grid contingency scenarios, DERs have been traditionally disconnected, without any fault ride-through capabilities. However, with new regulations and better technology, it is feasible for these resources to contribute to the grid’s restoration after an adverse event and hence enhance resilience. The controllability module proposes a two-step restoration scheme for the power system restoration process by leveraging additional degrees of freedom in power electronics interfaced DERs for mitigating voltage problems. In a resilience mode without the utility system, the distribution grid relies on DERs to serve critical load. In such a severe event with multiple faults on the distribution feeders, actuation of various protective devices (PDs) divides the distribution system into electrical islands. The undetected actuated PDs due to fault current contributions from DERs can delay the restoration process, thereby reducing the system resilience. The Advanced Outage Management (AOM) and the Advanced Feeder Restoration (AFR) modules developed in this project provide improved system resilience with multiple DERs. AOM identifies the faulted sections and actuated PDs in a distribution system with DERs by incorporating smart meter data. The most credible outage scenario including fault locations, PD actuations, and fault indicator (FI) failures is identified by a set of binary integer linear programming incorporating hypotheses. The AFR module serves to restore a distribution system with available energy resources taking into consideration the availability of utility sources and DERs. By partitioning the system into islands, critical load will be served with the available generation resources within islands based on the solution of a MILP. When the utility systems become available, the optimal path will be determined by a spanning tree search algorithm that reconnects these islands back to substations and restores the remaining load. The transmission and distribution (T&D) co-simulation module was used to validate the effect of a control action performed on the distribution side assets as it propagates to the transmission side. This ensures that the control action performed results in a feasible operating point on both the transmission and the distribution system. In addition to validation, the team used the T&D co-simulation module to demonstrate how distribution system assets can be used to mitigate issues on the transmission system. Specifically, the team demonstrated that appropriate switching operations on the distribution side can alleviate the line overload condition on the transmission side without causing new operational constraint violations.

24 POWER TRANSMISSION AND DISTRIBUTION↗