Assessment and Commissioning of Electrical Substation Grid Testbed with a Real-Time Simulator and Protective Relays/Power Meters in the Loop

Electrical utility substations are wired with intelligent electronic devices (IEDs), such as protective relays, power meters, and communication switches. Substation engineers commission these IEDs to assess the appropriate measurements for monitoring, control, power system protection, and communication applications. Like real electrical utility substations, complex electrical substation grid testbeds (ESGTs) need to be assessed for measuring current and voltage signals in monitoring, power system protection, control (synchro check), and communication applications that are limited by small measurement percentage errors. In the process of setting an ESGT with real-time simulators and IEDs in the loop, protective relays, power meters, and communication devices must be commissioned before running experiments. In this study, an ESGT with IEDs and distributed ledger technology was developed. The ESGT with a real-time simulator and IEDs in the loop was satisfactorily assessed and commissioned. The commissioning and problem-solving tasks of the testbed are described to define a method with flowcharts to assess possible trouble-shooting in ESGTs. This method was based on comparing the simulations versus IED measurements for the phase current and voltage magnitudes, three-phase phasor diagrams, breaker states, protective relay times with selectivity coordination at electrical faults, communication data points, and time-stamp sources.

Piesciorovsky, Emilio↗

Solid State Power Substations (SSPS): A Multi-Hierarchical Architecture from Substation to Grid Edge

With the growing deployment of distributed generation, or power electronic interfaced renewable energy and storage technologies, the nature and behavior of the grid is changing. Synchronous machine-driven asset contributions to the generation mix are shrinking, leading to concerns regarding grid stability. Furthermore, the scale of smaller distributed PE resources needed for managing the electrical network could dwarf the existing system leading to more complex optimization problems and communication interconnections. This paper introduces the concept of a hierarchal system of controllers that spans the grid edge or the customer end to distribution scale substations or solid-state power substation (SSPS). This concept focuses on minimizing the number of interfaces and optimization considerations in the grid by clustering resources into nodes and hubs. The work validates the concept in a controller hardware-in-the-loop (cHIL) platform.

Chinthavali, Madhu Sudhan↗

Electrical Substation Configuration Effect on Substation Reliability

It is crucial that the U.S. electrical grid be reliable, due to its critical role in the economy and our national defense/security. Many common tasks and industrial operations rely on proper electrical power distribution. In designing new bus systems or evaluating existing ones, the type of configuration employed affects the level of risk, reliability, maintenance, and cost involved. The present work utilizes Systems Analysis Programs for Hands-on Integrated Reliability Evaluations (SAPHIRE) to perform a probabilistic risk assessment (PRA)-based sensitivity study on substation reliability in regard to different bus configurations. This study examines single bus, main and transfer, breaker and a half, double bus/double breaker, and ring bus configurations applied to busses with different numbers of lines. The case variances, methods, and rankings presented herein can help guide bus configurations for electrical grid design/analysis in the future.

24 POWER TRANSMISSION AND DISTRIBUTION↗

Electrical Substation Configuration Effect on Substation Reliability

The nation’s electrical grid must be reliable because of its critical role in the economy, defense, and security of the nation. Many common tasks and industrial operations rely on proper electrical power distribution. In the design of new bus systems or evaluation of existing bus systems, the type of bus configuration affects the risk, reliability, maintenance, and cost of the system. This work utilizes Systems Analysis Programs for Hands-on Integrated Reliability Evaluations (SAPHIRE) to perform a probabilistic risk assessment (PRA) based sensitivity study on the reliability of substations with differing bus configurations. This study examines single bus, main and transfer, breaker and a half, double bus/double breaker, and ring bus configurations applied to busses of varying number of lines. The case variances, methods, and rankings presented can provide a guide for bus configuration for future electrical grid design and analysis.

24 POWER TRANSMISSION AND DISTRIBUTION↗

Assessment of the Electrical Substation-Grid Testbed with Inside/Outside Devices and Distributed Ledger Technology

The electrical substation-grid testbed was created to integrate the GOOSE and/or DNP (Distributed Network Protocol) messages with time synchronized sources and Distributed Ledger Technology (DLT). The objective was to study the impact of faults and cyber-events at an electrical substation with inside (protective relays) and outside (power meters) substation devices. The electrical substation-grid testbed was based on the design of a 34.5/ 12.47 kV electrical substation (sectionalized bus configuration) with two power transformers, connected to radial power lines and load feeders. The electrical substation-grid testbed was installed at 252 lab space (Advanced Power System Protection), Grid Research Integration and Deployment Center (GRID-C), Oak Ridge National Laboratory. This testbed was created for Task 5, DarkNet project. The electrical substation-grid testbed was created to simulate fault and/or cyber events that could potentially result in damage to the electrical infrastructure. In addition, tests were run that are usually not allowed to be performed in an operational electrical power grid, because these test scenarios could trip breakers and/or generate fault situations that could potentially damage equipment. The number of tests performed in the electrical substation-grid testbed were executed in a better way than in a real electrical substation and/or power grid, because multiple tests could be run in a short period of time, and complex permits, and safety/ schedule restrictions like in a real electrical substation environment were not needed. The electrical substation-grid testbed was created using real measurement, communication, and protection devices that are used by electrical utilities, to have same conditions that we could observe in a real power grid or electrical substation. The electrical substation-grid testbed was based on using a real time simulator and expansion box with amplifiers that were wired to electrical substation-grid devices. This hardware-in-the-loop (HIL) was provided by protective relays, power meters, ethernet switches, remote terminal units, synchronized timing network clock, DLT devices, workstations, and servers. This report includes the design, installation, and assessment of the electrical substation-grid testbed that was similar to an operational electrical substation, integrating the power system protection, communication, and control systems. The results for the electrical substation-grid testbed were based on:• verifying the analog signals for protective relays and power meters, • observing the synchronized time source frame at devices, • authenticating the GOOSE (IEC 61850) and DNP messages from power meters and protective relays, and • verifying the trip conditions of protective relays at fault tests with the power system fault event detection, using DLT devices. For future work, the electrical substation-grid testbed with protective relays and power meters, using DLT and synchronized time source from DarkNet, will be used to study the impact of cyber-events at inside and outside substation devices. Advanced algorithms for detecting cyber-events produced by non-desired protective relay settings will be studied, to improve the detection and reliability of protection, control, and communication systems at power grids.

24 POWER TRANSMISSION AND DISTRIBUTION↗

Securing against malicious control of circuit breakers in electrical substations

An example method for detecting and mitigating attacks on electric power substations comprises detecting a command to open or close a circuit breaker in the electric power substation. A modified extended substation model for the electric power substation is generated, based on the detected command and based on measurements in substation, where the modified extended substation model is a power flow model for the substation and for one or more directly connected neighboring substations. A power flow analysis is performed, using the modified extended substation model, to generate a predicted voltage for each of a plurality of nodes in the substation and in the one or more directly connected neighboring substations. Each predicted voltage is compared to a corresponding allowable voltage range, and execution of the command is blocked in response to determining that one or more of the voltages is outside the corresponding allowable voltage range.

97 MATHEMATICS AND COMPUTING↗

Substation Secondary Asset Health Monitoring and Management System (SSHM)

Electric Power Group, LLC (EPG) was awarded DOE OE0000850 to design, develop, and demonstrate a real-time software application for substation secondary equipment health monitoring and management at host utility American Electric Power (AEP), a cost share partner. This project addresses the need for monitoring substation equipment health and providing operators with tools to identify and take pre-emptive action to avoid catastrophic equipment failure. By monitoring synchrophasor data in real time, data anomalies that indicate potential asset failure can be detected and alerts can be sent to operators in time to take corrective actions. EPG developed two data driven algorithms to identify abnormal equipment signature patterns as well as a method using substation linear state estimation (SLSE). The software has been deployed on hardened PC’s and tested and validated for cost share partner AEP’s substations - 138kV and 765 kV. The SSHM software has been accepted by AEP and final demonstration of DOE - OE0000850 for AEP and DOE was successfully completed on March 17th, 2020. EPG developed the Substation Secondary Asset Health Monitoring (SSHM) Platform to analyze equipment failure signatures in PMU data and alert substation personnel when pre-emptive inspection, repairs and other actions are warranted to prevent potential catastrophic failures. This is the first system that automatically monitors the health of substation secondary assets and alerts users to emerging failures using synchrophasor measurements. SSHM uses high resolution PMU data from PTs, CTs, and CCVTs to analyze equipment signatures and identify anomalies that are precursor indicators of potential equipment failure. When an anomaly is detected, there is a likelihood of potential failure of monitored equipment, the system alerts the user with visual alarms including alarm trend charts and indicator lights on a oneline diagram of the substation.

24 POWER TRANSMISSION AND DISTRIBUTION↗

HEMP Testing of Substation Yard Circuit Breaker Control and Protective Relay Circuits

There are concerns about the effects of High-Altitude Electromagnetic Pulses (HEMP) on the electric power grid. Activities to date tested and analyzed vulnerability of digital protective relays (DPRs) used in power substations, but the effect of HEMP on the greater substation environment is not well known. This work establishes a method of testing the vulnerability of circuit breaker control and protective relay circuits to the radiated E1 pulse associated with HEMP based on coupling to the cables in a substation yard. Two DPRs from Schweitzer Engineering Laboratories, Inc. were independently tested. The test setup also included a typical cable in a substation yard with return plane to emulate the ground grid and other ground conductors near the yard cable, cabinetry housing the installed DPRs, station battery and battery charger, terminal block elements, and a breaker simulator to emulate a substation yard configuration. The DPRs were powered from the station battery and the transformer inputs energized with a three-phase source to maintain typical operating conditions during the tests. Vulnerability testing consisted of a conducted E1 pulse injected into the center of the yard cable of the DPR circuits. Current measurements on the yard cable and DPR inputs indicated significant attenuation of the conducted pulse arriving at the control house equipment from the emulated substation yard. This reduction was quantified with respect to the equivalent open-circuit voltage on the yard cable. No equipment damage or undesired operation occurred on the tested circuits for values below 180 kV, which is significantly higher than the anticipated coupling to a substation yard cable.

24 POWER TRANSMISSION AND DISTRIBUTION↗

Cybersecurity Enhancement in Digital Substations: Hidden Markov Model-Based Smart Cyber Switching and Threat Response

The rising incidence of cyber-attacks on critical infrastructure and power grids poses significant threats to the stability and reliability of electrical substations, with potentially devastating consequences such as extended blackouts. This paper introduces an advanced cybersecurity framework aimed at safeguarding IEC 61850-based substations through the integration of software-defined networking (SDN) and digital twin (DT) technologies. The proposed DT-based framework employs smart cyber switching (SCS) for proactive threat mitigation and concurrent intelligent electronic device (CIED) for swift system restoration, thereby maintaining continuous operational integrity and robust cybersecurity defenses. Central to this framework is the adaptive port controller (APC), which enables dynamic port management to adapt to evolving threats, and an intrusion detection system (IDS) designed to detect and neutralize malicious attacks on IEC 61850-based sampled value (SV) and generic object-oriented substation event (GOOSE) messages within the substation’s communication network. Further, novel predictive intrusion detection and response (PIDR) algorithm is implemented on a digital substation (DS) to predict the best route to be taken by the attacker. The efficacy of these comprehensive cybersecurity frameworks is validated through rigorous simulations and a hardware-in-the-loop (HIL) testbed, showcasing the system’s ability to sustain substation operations amidst cyber-attacks.

Digital substation↗

Substation Configuration Survey for Electromagnetic Coupling Analysis

Impacts of a high-altitude electromagnetic pulse (HEMP) on the power grid are a growing concern due to the increased reliance on the power grid. A critical area of research is quantifying power system equipment response to HEMP since this is not known in general. Substation site surveys were performed at seven high voltage substations across the United States to gather substation layout and construction details pertinent to HEMP coupling calculations and component vulnerability assessments. The primary objective for the survey was to gather information on cable layouts and cable construction within substations. Additional information was also gathered on equipment present within the substations and control house layouts. This report provides information gathered from the substation surveys.

24 POWER TRANSMISSION AND DISTRIBUTION↗

Detection of DoS Attacks Using ARFIMA Modeling of GOOSE Communication in IEC 61850 Substations

Integration of Information and Communication Technology (ICT) in modern smart grids (SGs) offers many advantages including the use of renewables and an effective way to protect, control and monitor the energy transmission and distribution. To reach an optimal operation of future energy systems, availability, integrity and confidentiality of data should be guaranteed. Research on the cyber-physical security of electrical substations based on IEC 61850 is still at an early stage. In the present work, we first model the network traffic data in electrical substations, then, we present a statistical Anomaly Detection (AD) method to detect Denial of Service (DoS) attacks against the Generic Object Oriented Substation Event (GOOSE) network communication. According to interpretations on the self-similarity and the Long-Range Dependency (LRD) of the data, an Auto-Regressive Fractionally Integrated Moving Average (ARFIMA) model was shown to describe well the GOOSE communication in the substation process network. Based on this ARFIMA-model and in view of cyber-physical security, an effective model-based AD method is developed and analyzed. Two variants of the statistical AD considering statistical hypothesis testing based on the Generalized Likelihood Ratio Test (GLRT) and the cumulative sum (CUSUM) are presented to detect flooding attacks that might affect the availability of the data. Our work presents a novel AD method, with two different variants, tailored to the specific features of the GOOSE traffic in IEC 61850 substations. The statistical AD is capable of detecting anomalies at unknown change times under the realistic assumption of unknown model parameters. The performance of both variants of the AD method is validated and assessed using data collected from a simulation case study. We perform several Monte-Carlo simulations under different noise variances. The detection delay is provided for each detector and it represents the number of discrete time samples after which an anomaly is detected. In fact, our statistical AD method with both variants (CUSUM and GLRT) has around half the false positive rate and a smaller detection delay when compared with two of the closest works found in the literature. Our AD approach based on the GLRT detector has the smallest false positive rate among all considered approaches. Whereas, our AD approach based on the CUSUM test has the lowest false negative rate thus the best detection rate. Depending on the requirements as well as the costs of false alarms or missed anomalies, both variants of our statistical detection method can be used and are further analyzed using composite detection metrics.

IEC 61850 electrical substations↗

SDN-Based Smart Cyber Switching (SCS) for Cyber Restoration of a Digital Substation

In recent years, critical infrastructure and power grids have increasingly been targets of cyber-attacks, causing widespread and extended blackouts. Digital substations are particularly vulnerable to such cyber incursions, jeopardizing grid stability. This paper addresses these risks by proposing a cybersecurity framework that leverages software-defined networking (SDN) to bolster the resilience of substations based on the IEC- 61850 standard. The research introduces a strategy involving smart cyber switching (SCS) for mitigation and concurrent intelligent electronic device (CIED) for restoration, ensuring ongoing operational integrity and cybersecurity within a substation. The SCS framework improves the physical network’s behavior (i.e., leveraging commercial SDN capabilities) by incorporating an adaptive port controller (APC) module for dynamic port management and an intrusion detection system (IDS) to detect and counteract malicious IEC-61850-based sampled value (SV) and generic object-oriented system event (GOOSE) messages within the substation’s communication network. The framework’s effectiveness is validated through comprehensive simulations and a hardware-in-the-loop (HIL) testbed, demonstrating its ability to sustain substation operations during cyber-attacks and significantly improve the overall resilience of the power grid.

Liu, Chen-Ching (ORCID:0000000289417958)↗

CPS Testbed Architectures for WAMPAC using Industrial Substation and Control Center Platforms and Attack-Defense Evaluation

Advanced persistent threats and cyberattacks can impact wide-area monitoring, protection, and control (WAMPAC) system operation. Many cyber-physical system (CPS) testbeds have been developed for attack-defense experimentation and attack-resiliency tools evaluation for WAMPAC, but they are limited to a simulation-and-emulation based environment. This paper presents a quasi-realistic CPS attack-defense testbed-based framework for WAMPAC applications using the industrial substation and control center platforms such as eTerra integrated with the hardware-in-the-loop CPS smart grid testbed available at Iowa State University. The proposed framework includes various combinations of industry-grade substation and control center platforms, communication topologies, real-time digital simulators, and a novel cyber-physical distributed intrusion-and-anomaly detection system (D-IADS) for WAMPAC applications. The D-IADS includes a master at the control center and geographically distributed sensor devices at each substation. Each D-IADS sensor deployed at a substation or control center network monitors ingress and egress traffic, detect intrusions, and dispatch alerts to the D-IADS master. The D-IADS master centrally monitors and analyze the alerts and controls D-IADS sensors. We considered an EMP60 synthetic CPS grid as a case study to demonstrate the framework and proposed D-IADS for WAMPAC applications against cyberattack vectors such as Man-in-the-Middle DNP3 attack, denial-of-service, and data-integrity attacks.

24 POWER TRANSMISSION AND DISTRIBUTION↗

Distribution Substation Planning Toolkit (dsp-toolkit) v1.0

The Distribution Substation Planning Toolkit (DSP Toolkit) is a software suite designed to streamline the planning and optimization of distribution substations. This toolkit offers a comprehensive set of tools and APIs for data curation, short-term electric load forecasting, and weather-sensitive load adjustment, making it an essential resource for utility companies, engineers, and researchers. Features • Data Preprocessing and Curation: Efficiently manage and preprocess large datasets to ensure high-quality input for analysis. • Short-Term Load Forecasting: Utilize data-driven models to predict short-term electric loads accurately. • Weather-Sensitive Modeling: Automatically adjust load forecasts based on weather data to predict future peak demands more precisely. Uses The DSP Toolkit is ideal for planning and optimizing distribution substations, providing a user-friendly interface and comprehensive documentation. It is suitable for both novice and experienced users, facilitating efficient and accurate planning processes. Advantages • Efficiency: Automates complex planning tasks, reducing manual effort and minimizing errors. • Scalability: Handles large datasets and complex models, making it suitable for large-scale projects. • Community and Support: Open-source with active community contributions, ensuring continuous improvement and support. • Extensibility: Easily extendable with custom modules and plugins, allowing users to tailor the toolkit to their specific needs. The DSP Toolkit stands out by offering a robust, flexible, and user-friendly solution for distribution substation planning. Public Abstract

Li, Han [Lawrence Berkeley National Laboratory (LB↗

Substation-Level Grid Topology Optimization Using Bus Splitting

Operations of substation circuit breakers are important for maintenance needs and topology reconfiguration in power systems. Bus splitting is one type of topology change where the two bus bars at a substation can become electrically disconnected under certain actions of circuit breakers. Because these events involve detailed substation modeling, they are typically not considered in routine power system operation and control. In this paper, an improved substation-level topology optimization framework is developed by expanding traditional line switching decisions by breaker-level bus splitting, which can further reduce grid congestion and generation costs. A tight McCormick relaxation is proposed to reformulate the bilinear terms in the resultant optimization problem to linear inequality constraints. Thus, a tractable mixed-integer linear program reformulation is attained that allows for efficient solutions in real-time operations. Numerical studies on the IEEE 14-bus and 118-bus systems demonstrate the computational performance and economic benefits of the proposed topology optimization approach.

bus split↗

Substation-Level Grid Topology Optimization Using Bus Splitting: Preprint

Operations of substation circuit breakers are of high significance for performing system maintenance and topology optimization. Bus splitting is one type of topology changes where the two bus-bars at a substation become electrically disconnected after certain actions of circuit breakers. As these events involve detailed substation modeling, they are not typically considered in power system routine operation and control. In this paper, an improved substation-level topology optimization is developed by expanding traditional line switching with breaker-level bus splitting, which can further reduce grid congestion and generation costs. A tight McCormick relaxation is proposed to reformulate the bi-linear terms in the resultant topology optimization model. Thus, a tractable mixed-integer linear program formulation is presented which can be efficiently solved for real-time control. Numerical studies on the IEEE 14-bus and 118-bus systems demonstrate the performance and economic benefits of the proposed topology optimization approach.

bus split↗

Zero-day Attack Detection in Digital Substations Using In-Context Learning

In this paper, we address the critical challenge of detecting zero-day attacks in digital substations that employ the IEC-61850 communication protocol to ensure the security and reliability of modern power systems. While many heuristic and machine learning (ML)-based methods have been proposed for attack detection in IEC-61850 digital substations, generalization to unknown or zero-day attacks remains a challenge. We propose an approach that leverages the in-context learning ability of transformer architecture, which enables the model to learn from a few examples of a new task without explicit retraining. Our experiments on the IEC-61850 dataset demonstrate that the proposed method achieves more than 87% detection accuracy on zero-day attacks while the existing baselines fail. We believe this work has the potential to enhance the security of digital substations by enabling the effective detection of zero-day attacks.

LIu, Chen-Ching [Virginia Tech] (ORCID:00000002894↗

Substation Cable Layouts for EMP Coupling Analysis

Direct coupling of early-time high-altitude electromagnetic pulse (HEMP) to substation control cables is simulated for cable layouts based on surveys of seven electrical substations in the United States. An analytic transmission line modeling code is used to estimate worst-case coupled current at the terminations of cable segments in or near the control shack. Where applicable, an induced voltage due to cable shield grounding is also estimated. Various configurations are simulated, including cables with different elevations, lengths, radii, and terminations. Plots of the coupled HEMP effects are given, and general relationships between these effects and the substations geometric and material parameters are highlighted and discussed.

24 POWER TRANSMISSION AND DISTRIBUTION↗