Engineering Papers⌕ Search

SEARCH · Engineering Papers

Results for “Storm water”

Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.

Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.

At least 19 records

Storm Water Pollution Prevention Plan Middle DP Road Recovery Effort, June 26, 2020

The United States Environmental Protection Agency (EPA) has issued a final 2017 Construction General Permit (CGP) that covers discharges of stormwater from construction sites. The 2017 National Pollutant Discharge Elimination System (NPDES) General Permit for Storm Water Discharges from Construction Activity (Appendix D) includes the following requirements:(1) conduct a critical habitat and threatened/endangered species study; (2) develop and implement a Storm Water Pollution Prevention Plan (SWPPP) in accordance with good engineering practices; (3) submit a Notice of Intent (NOI); (4) install and maintain erosion and stormwater controls; (5) perform and document storm water inspections during construction and site stabilization; (6) amend the SWPPP as necessary; and (7) submit a Notice of Termination (NOT) following project completion and final stabilization of disturbed areas. Authorization to discharge storm water is required under this Permit for both large and small construction projects disturbing more than one (1) acre or part of a larger common plan of development that collectively disturbs more than one (1) acre. All parties that meet the definition of Operator must be permitted. Each permittee is not required to develop and implement a separate SWPP Plan. It is required that there be at least one SWPP Plan for a site that incorporates the required elements for all Operators. The 2017 CGP number for New Mexico (Region 6) is NMR100000. This Plan, which has been developed for Triad National Security, LLC (Triad), describes the nature and sequencing of construction activities, potential sources of pollution, and identifies the Best Management Practices (BMPs) to minimize the potential for erosion and storm water pollution. The Plan was developed in accordance with the provisions of the Clean Water Act (33 U.S.C. § §1251 et seq., as amended by the Water Quality Act of 1987, P.L. 100-4), and the regulations established by the U.S. Environmental Protection Agency (EPA) for National Pollutant Discharge Elimination System (NPDES) General Permits for Storm Water Discharges From Construction Activities.

54 ENVIRONMENTAL SCIENCES↗

Storm Water Pollution Prevention Plan Middle DP Road Recovery Effort, June 26, 2020 (Copy for Informational Puproses Only)

The United States Environmental Protection Agency (EPA) has issued a final 2017 Construction General Permit (CGP) that covers discharges of stormwater from construction sites. The 2017 National Pollutant Discharge Elimination System (NPDES) General Permit for Storm Water Discharges from Construction Activity (Appendix D) includes the following requirements: (1) conduct a critical habitat and threatened/endangered species study; (2) develop and implement a Storm Water Pollution Prevention Plan (SWPPP) in accordance with good engineering practices; (3) submit a Notice of Intent (NOI); (4) install and maintain erosion and stormwater controls; (5) perform and document storm water inspections during construction and site stabilization; (6) amend the SWPPP as necessary; and (7) submit a Notice of Termination (NOT) following project completion and final stabilization of disturbed areas. Authorization to discharge storm water is required under this Permit for both large and small construction projects disturbing more than one (1) acre or part of a larger common plan of development that collectively disturbs more than one (1) acre. All parties that meet the definition of Operator must be permitted. Each permittee is not required to develop and implement a separate SWPP Plan. It is required that there be at least one SWPP Plan for a site that incorporates the required elements for all Operators. The 2017 CGP number for New Mexico (Region 6) is NMR100000. This Plan, which has been developed for Triad National Security, LLC (Triad), describes the nature and sequencing of construction activities, potential sources of pollution, and identifies the Best Management Practices (BMPs) to minimize the potential for erosion and storm water pollution. The Plan was developed in accordance with the provisions of the Clean Water Act (33 U.S.C. § §1251 et seq., as amended by the Water Quality Act of 1987, P.L. 100-4), and the regulations established by the U.S. Environmental Protection Agency (EPA) for National Pollutant Discharge Elimination System (NPDES) General Permits for Storm Water Discharges From Construction Activities.

54 ENVIRONMENTAL SCIENCES↗

Storm Water Samples

In the California lndustrial General Permit (IGP) 2014-0057-DWQ for storm water monitoring, effective July 1, 2015, there are 21 contaminants that have been assigned NAL (Numeric Action Level) values, both annual and instantaneous. For annual NALs, an exceedance occurs when the average of all analytical results from all samples taken at a facility during a reporting year for a given parameter exceeds an annual NAL value listed in Table 2 of the General Permit. For instantaneous maximum NALs, an exceedance occurs when two or more analytical results from samples taken for any parameter within a reporting year exceed the instantaneous maximum NAL value (for TSS and O&G), or are outside of the instantaneous maximum NAL range (for pH) listed in Table 2.

54 ENVIRONMENTAL SCIENCES↗

Planning is Key for Storm Water Regulatory Compliance [Slides]

Most construction projects at LANL are subject to a EPA regulated storm water discharge permit (NPDES Construction General Permit). Each identified non-compliance is a regulatory liability to both the subcontractor & Triad.

54 ENVIRONMENTAL SCIENCES↗

Storm Water Pollution Prevention Plan (SWPPP) for the Limited Area, Multi-Purpose (LAMP) High Bay Laboratory

Kier + Wright, as Qualified SWPPP Developer (QSD), puts forth this Storm Water Pollution Prevention Plan (SWPPP) for the Limited Area, Multi-Purpose (LAMP) High Bay Laboratory facility (Project) located at Sandia National Laboratories, 7011 East Avenue, CA. The property is owned by the U.S. Department of Energy, and managed and operated by National Technology & Engineering Solutions of Sandia, LLC. The project proposes converting an asphalt parking lot into a new high bay machine shop building and a low bay office building. Per the California State Water Resources Control Board’s (California State Water Board) Construction General Permit (CGP), a SWPPP is required when 1 acre or more of land is disturbed. The project site area of 1.6 acres exceeds the minimum acreage threshold of 1 acre and therefore requires SWPPP implementation. QSD has determined the sediment risk for this project, based on soil type at the site and starting and ending dates of construction, to be low (Section 3.4.1 and Appendix B). Receiving water for this project is the Arroyo Seco. QSD has determined the Arroyo Seco to be a high-risk receiving water because it has the three beneficial uses of “spawn”, “cold”, and “migratory” (Sections 3.3 and 3.4.2 and Appendix B). QSD has determined the overall risk level for the site to be Risk Level 2, based on a combination of low sediment risk and high receiving water risk (Appendix B). As such, QSD has delineated a variety of Best Management Practices (BMPs) to be employed during project construction to reduce or eliminate pollutants in stormwater runoff or any other discharges from the Project site. In addition to site-specific BMPs, this SWPPP report provides instruction for on site monitoring. Electronic copies of required documentation such as inspection reports, REAPs, annual report documentation, etc. shall be submitted to NTESS Sandia Delegated Representative via Newforma.

54 ENVIRONMENTAL SCIENCES↗

Storm Water Pollution Prevention Plan for the Facility LAMP Project

A site-specific Stormwater Pollution Prevention Plan (SWPPP) is needed for most construction activities/projects that disturb one (1) acre or more of land to meet the requirements of the National Pollutant Discharge Elimination System (NPDES) General Permit for Storm Water Discharges Associated With Construction and Land Disturbance Activities (General Permit) issued by the State Water Resources Control Board (State Board). This Order No. 2009-0009- DWQ was adopted by the State Board on September 2, 2009 and became effective July 1, 2010

54 ENVIRONMENTAL SCIENCES↗