Engineering Papers⌕ Search

SEARCH · Engineering Papers

Results for “Stack testing”

Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.

Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.

At least 19 records

Performance and Microstructure of a Novel Cr-Getter Material with LSCF-based Cells in a Generic Stack Test Fixture

In addition to developing passive means for Cr mitigation via coatings, Pacific Northwest National Laboratory has teamed up with the University of Connecticut to adopt an active approach by employing a novel Cr-getter material in the system. In this work, validation of the novel Cr-getter was conducted using cells in a generic stack test condition with humidified air and coated metallic interconnect. Two Cr-getter locations were investigated: one upstream and one “on cell.” Pre-oxidized AISI 441 metal stripes were used as Cr source. Three single cell tests were conducted at 800oC in constant current mode for 1000h with periodic stops for measurement of impedance and IV: a baseline cell, a cell with Cr source and getter, and a cell with Cr source but no getter. Results showed that the cell with Cr-getter degraded much slower (11.5% kh-1) than the baseline (15.3% kh-1) and the cell without the getter (56% kh-1).

Chou, Yeong-Shyung↗

Solid oxide electrolysis cell and stack testing best practices

Solid oxide electrolyzer (SOE) technology is an emerging method for hydrogen production, noted for its superior electrical efficiency. Despite the significant progress made in recent years, the broad development of SOE technology is often constrained by the necessary and extensive "skill of the craft" required to successfully test simple single cell test articles. This may be linked to the dearth of practical and pragmatic guidance within the literature for safe, reliable, and performant test equipment and test procedures. Researchers at the Idaho National Laboratory (INL) have been actively testing SOEs ranging from button cells to stacks up to 500 kW, in collaboration with industry and other national laboratories. Based on operational experience, INL has developed system design procedures that ensure safe and reliable operation of SOE systems with the level of support required for each test. This paper presents key aspects of SOE stack and system testing, including safe design procedures, balance of plant components design, and specific implementations at INL. Practical design details of reactants, heat, and power management are presented along with lessons learned from the SOE test facility operations at INL.

08 HYDROGEN↗

Stack Test Summary for TA-59-0001

The Radioactive Air Emissions Management (RAEM) team performed stack flow characterization tests at Technical Area (TA) 59 Building 0001 Exhaust Stack (ES) 8. These tests were completed in accordance with Title 40 of the Code of Federal Regulations (CFR), Part 61, Subpart H and the American National Standards Institute (ANSI) N13.1-1999 required by the Clean Air Act. Subpart H of the regulation is the National Emission Standards for Hazardous Air Pollutants (NESHAP) for radionuclides, which compliance with is maintained by the REAM team.

54 ENVIRONMENTAL SCIENCES↗

Summary of Stack Tests at TA-16-Bldg 205: Horizontal Duct on WETF Roof

In late 2023 and early 2024, testing was done at the Weapons Engineering Tritium Facility (WETF) rooftop exhaust duct to verify that the stack sample location was in compliance with the ANSI standard for stack sampling, ANSI N13.1-1999. This ANSI standard is called out by the Clean Air Act rules for airborne radionuclide emissions from DOE facilities, 40 CFR 61 Subpart H. This sample location is designated 16020504, indicating Technical Area 16, Building 0205. The rooftop duct formerly discharged to Exhaust Stack 04, but in 2007 it was re-routed to exhaust out Building 0450, Exhaust Stack 05. For continuity, we have kept the 16020504 designation to represent this duct sample location.

54 ENVIRONMENTAL SCIENCES↗

Novel Approach to Strengthening Ceramic Cathode Contact and Validation in a Generic Stack Test Fixture

The ceramic contact material at the cathode side has been identified as the weakest mechanical link in solid oxide fuel cells, due to poor sintering at low stack fabrication temperatures. In this work, a novel approach of mechanical interlocking with an engineered surface was proposed to strengthen LSM-type contacts. The engineered cathode surface was made by depositing large LSM20 granules onto a wet cathode print, followed by sintering. Granules of three sizes were tested (mesh #35, #60, and #100). Small coupons of anode-supported YSZ electrolyte with LSM cathode were joined at 850 and 950oC for 2h with LSM contact using either the engineered surface or plain surfaces. The results of contact strength measurements showed about 14 times increase with engineered surface compared to plain surfaces. Validation with a 2”x2” LSM-based cell in a generic stack fixture showed good thermal cycle stability with minimal change in ohmic impedance over ten cycles.

Chou, Yeong-Shyung↗

High Thermal Conductivity Resin Systems for High Energy Physics Magnets

In Nb3Sn superconducting magnets, the cable and insulation system dominate the behavior of a completed magnet, with contributions to the mechanical behavior from the stiff, brittle components of the superconductor, the soft annealed copper stabilizer, and the properties of the composite insulation system. As these components are closely integrated on a small scale, it is of value to explore the properties of the entire system at a larger scale, to enable practical magnet design. Subscale composite testing (Stack Testing) has been used extensively to study the bulk material properties of the magnet composite structure. Small samples that mimic the fabrication process of magnets are fabricated and tested to qualify and characterize magnet insulation systems for use in future magnet projects as well as to better inform magnet designers about means for assembly and general handling processes. Subscale composite samples will be fabricated and characterized using various novel resins to work to improve magnet performance. New resin systems will be screened to allow for down selection to one or more highly promising resin systems. The work performed under this agreement at Fermilab will feed via CTD into the fabrication of subscale magnets at Lawrence Berkeley National Laboratory (LBNL) for verification of magnet performance.

43 PARTICLE ACCELERATORS↗

Hanford Waste Treatment Plant LAB Facility Stack Effluent Monitoring: Sampling Probe Location Qualification Evaluation

The Waste Treatment Plant laboratory (LAB) facility stack monitor locations were qualified using scale model stacks to mitigate the risk of identifying that sampling locations do not meet the qualification criteria on the full-scale stack. As required by the American National Standards Institute/Health Physics Society (ANSI/HPS) N13.1-1999 standard, the scale model and its sampling location were geometrically similar to the actual stack and the Reynolds numbers for both the actual and model stacks were >10,000. An additional criterion is that the product of the hydraulic diameter and mean velocity (DV) of the full-scale stack must be between 1/6 DV and 6 DV of the scale model stack tests. Verification tests of the LAB stacks were performed at normal operating conditions. The minimum 1/6 DV value, along with the maximum 6 DV value from the scale model testing determines the range of conditions for which the full-scale stack may be operated and remain in compliance with the stack verification criterion. Based on these DV values, the corresponding stack flow rates for each of the LAB stacks are 625 to 47,237 scfm for LB-C2, 1,704 to 103,131 scfm for LB-S1, and 467 to 18,088 scfm for LB-S2. The remaining criteria for the stack verification to be considered valid involve the flow angle and velocity uniformity results. First, the flow angle at the full-scale stack must be =20°. Second, the velocity uniformity at the full-scale stack must be =20% coefficient of variance (COV). Finally, the velocity uniformity results for the actual and scale model stack tests must agree within 5% COV. These criteria were met through the full-scale stack tests at the LAB facility. Flow angle results were primarily less than 10 degrees, except for the LB-C2 Fan A results, which were an average of 17.6 degrees; all flow angle results were within the =20° criterion. The velocity uniformity results for each test condition averaged between 1.5 and 3.5% COV, which were all within the range of the target %COV values from the scale model tests. Based on these stack verification test results, the three LAB filtered exhaust stack sampling locations meet the qualification criteria provided in the ANSI/HPS N13.1-1999 standard for all fan operating configurations. This includes single-fan as well as dual-fan operations for LB-C2, each of the dual-fan operating conditions for LB-S1, and each single-fan operating condition for LB-S2. Further changes to the system configuration or operating conditions that are outside the bounds described in this report may require additional tests or analyses to determine compliance with the standard.

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Hanford Waste Treatment Plant Low Activity Waste Facility Stack Effluent Monitoring - Sampling Probe Location Qualification Evaluation

The Hanford Tank Waste Treatment and Immobilization Plant low activity waste (LAW) facility stack monitor locations were qualified using scale model stacks to mitigate the risk of identifying that sampling locations do not meet the qualification criteria on the full-scale stack. As required by the American National Standards Institute/Health Physics Society (ANSI/HPS) N13.1-1999 standard, the scale model and its sampling location were geometrically similar to the actual stack and the Reynolds numbers for both the actual and model stacks were >10,000. An additional criterion is that the product of the hydraulic diameter and mean velocity (DV) of the full-scale stack must be between 1/6 DV and 6 DV of the scale model stack tests. Verification tests of the LAW stacks were performed at normal operating conditions. The minimum 1/6 DV value, along with the maximum 6 DV value from the scale model testing determines the range of conditions for which the full-scale stack may be operated and remain in compliance with the stack verification criterion. Based on these DV values, the corresponding stack flow rates for each of the LAW stacks are 815–55,758 scfm for LV-S1, 980–112,078 scfm for LV-S2, 264–22,901 scfm for LV-S3, and 981–79,832 scfm for LV-C2. The remaining criteria for the stack verification to be considered valid involve the flow angle and velocity uniformity results. First, the flow angle at the full-scale stack must be =20°. Second, the velocity uniformity at the full-scale stack must be =20% coefficient of variance (COV). Finally, the velocity uniformity results for the actual and scale model stack tests must agree within 5% COV. These criteria were met through the full-scale stack tests at the LAW facility. Flow angle results were primarily less than 10°, except for one LV-S2 Fan A result, which was 13.2°; all flow angle results were within the =20° criterion. The velocity uniformity results for each test condition ranged between 1.5 COV and 9.2% COV, which were all within the range of the target % COV values from the scale model tests. Based on these stack verification test results, the four LAW filtered exhaust stack sampling locations meet the qualification criteria provided in the ANSI/HPS N13.1-1999 standard for all fan operating configurations. This includes single-fan operating conditions for LV-S1 and LV-S2, dual-fan operations for LV-S3 at both the continuous air monitor and record sampler locations, and both the single-fan as well as the dual-fan operations for LV-C2. Further changes to the system configuration or operating conditions that are outside the bounds described in this report may require additional tests or analyses to determine compliance with the standard.

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Hanford Waste Treatment Plant LAB Facility Stack Effluent Monitoring: Sampling Probe Location Qualification Evaluation

The WTP LAB stack monitor locations were qualified using scale model stacks to mitigate the risk of identifying that sampling locations do not meet the qualification criteria on the full-scale stack. As required by the ANSI/HPS N13.1-1999 standard, the scale model and its sampling location were geometrically similar to the actual stack and the Reynolds numbers for both the actual and model stacks were >10,000. An additional criterion is that the DV of the full-scale stack must be between 1/6 DV and 6 DV of the scale model stack tests. Verification tests of the LAB stacks were performed at normal operating conditions. The maximum 6 DV value from the scale model testing determines the maximum conditions for which the full-scale stack may be operated and remain in compliance with the stack verification criterion. The remaining criteria for the stack verification to be considered valid involve the flow angle and velocity uniformity results. First, the flow angle at the full-scale stack must be = 20°. Second, the velocity uniformity at the full-scale stack must be = 20% COV. Finally, the velocity uniformity results for the actual and scale model stacks must agree within 5% COV. In general, these criteria were met through the full-scale stack tests at the LAB facility. Some specific items for each scale model and full-scale stack comparison should be noted in assessing the validity of the verification tests. The LB-C2 scale model stacks were performed with single fan operations at then-minimum flow conditions. These conditions resulted in DV values that were too low to meet the DV range criterion, and therefore are unable to be used in qualifying single fan operations on the full-scale stack. However, the single fan operations demonstrated COV values for velocity uniformity as well as flow angles that were comparable to the dual-fan operations at high flows. Overall, the test conditions and test results were within the range of acceptable values based on current design flow rates. Single fan operations are expected to only occur infrequently for maintenance needs and is therefore not a planned operating condition at this time. The LB-S1 scale model stacks were performed at three fan combinations, and in each combination, at least one test was performed at the then-minimum flow conditions as well as at then-maximum flow conditions. While the then-minimum flow conditions result in a DV range that is lower than the verification test DV value, and therefore does not meet the criterion, these tests are un-necessary for the verification test acceptance. The normal and maximum flow conditions from the scale model stack tests meet the DV range criterion, and the velocity uniformity test results compare favorably with the full-scale stack results. The LB-S2 scale model stacks were performed at nominally the same maximum flow condition; however, the 6 DV value for Fan A operation was slightly lower than the full-scale stack test DV. The COV values from the scale model stacks were comparable between the Fan A and Fan B results, and the overall test conditions are within the range of acceptable values. The stack verification is therefore considered acceptable for both Fan A and Fan B operations. The verification tests were performed at flows that were appreciably higher than the design conditions, and further elevated flow rates would be beyond the range of acceptable DV. Based on these stack verification test results, the three LAB filtered exhaust stacks meet the qualification criteria provided in the ANSI/HPS N13.1-1999 standard. Further changes to the system configuration or operating conditions that are outside the bounds described in this and the scale model test reports (Glissmeyer, Flaherty, and Piepel (2001), Glissmeyer and Geeting (2013)) may require additional tests and additional analyses to determine compliance with the standard.

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Hanford Waste Treatment Plant Effluent Management Facility Stack Effluent Monitoring: Sampling Probe Location Qualification Evaluation

The Hanford Tank Waste Treatment and Immobilization Plant Effluent Management facility (EMF) stack monitor location was qualified using the LV-S1 scale model stack as a baseline, augmented by the LB-S1 and LV-S2 scale model stacks to address the Direct Feed Low Activity Waste Effluent Management Facility Vessel Vent Process (DVP) injection into the main Active Confinement Ventilation (ACV) system duct. As required by the American National Standards Institute/Health Physics Society (ANSI/HPS) N13.1-1999 standard, the scale models and its sampling locations were geometrically similar to the actual stack and the Reynolds numbers for both the actual and model stacks were >10,000. An additional criterion is that the product of the hydraulic diameter and mean velocity (DV) of the full-scale stack must be between 1/6 DV and 6 DV of the scale model stack tests. Verification tests of the EMF stack was performed at normal operating conditions. The minimum 1/6 DV value, along with the maximum 6 DV value from the scale model testing determines the range of stack flow rates for which the full-scale stack may be operated and remain in compliance with the stack verification criterion. Based on the LV-S1 scale model test DV values, the corresponding stack flow rates for the EMF stack are as listed in Table S1. Table S1. Effluent Management Facility Stack Qualified Flow Range. Stack Parameter EM-1 Minimum Qualified Stack Flow (scfm) 781 Maximum Qualified Stack Flow (scfm) 53,432 The remaining criteria for the stack verification to be considered valid involve the flow angle and velocity uniformity results. First, the flow angle at the full-scale stack must be =20°. Second, the velocity uniformity at the full-scale stack must be =20% coefficient of variance (COV). Finally, the velocity uniformity results for the actual and scale model stack tests must agree within 5% COV. These criteria were met through the full-scale stack test at the EMF. Flow angle results were less than 5°; all flow angle results were within the =20° criterion. The velocity uniformity results for each test condition ranged between 2.2% COV and 4.3% COV, which were all within the range of the target % COV values from the scale model tests on the LV-S1, LB-S1, and LV S2 scale models. Based on these stack verification test results, the EMF filtered exhaust stack sampling location meets the qualification criteria provided in the ANSI/HPS N13.1-1999 standard for all fan operating configurations. This includes each combination of ACV fan with the DVP exhausters. Further changes to the system configuration or operating conditions that are outside the qualified flow rates described in this report may require additional tests or analyses to determine compliance with the standard.

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Hanford Waste Treatment Plant Effluent Management Facility Stack Effluent Monitoring: Sampling Probe Location Qualification Evaluation

The Hanford Tank Waste Treatment and Immobilization Plant Effluent Management Facility (EMF) stack monitor location was qualified using a combination of scale model stacks to mitigate the risk of identifying that the sampling location does not meet the qualification criteria on the full-scale stack. The LV-S1 scale model stack was used as a baseline, augmented by the LB-S1 and LV-S2 scale model stacks to address the Direct Feed Low Activity Waste Effluent Management Facility Vessel Vent Process (DVP) injection into the main Active Confinement Ventilation (ACV) system duct. As required by the American National Standards Institute/Health Physics Society (ANSI/HPS) N13.1-1999 standard, the scale model and its sampling locations were geometrically similar to the actual stack, and the Reynolds numbers for both the actual and model stacks were >10,000. An additional criterion is that the product of the hydraulic diameter and mean velocity (DV) of the full-scale stack must be between 1/6 DV and 6 DV of the scale model stack tests. The LV-S1, LB-S1, and LV-S2 scale model stack tests have met the criteria of the ANSI/HPS N13.1-1999 standard to demonstrate the stack sampling locations are well mixed. Verification tests of the EMF stack were performed at normal operating conditions. The minimum 1/6 DV value and the maximum 6 DV value from the scale model testing determine the range of stack flow rates for which the full-scale stack may be operated while remaining in compliance with the stack verification criterion. A practical range for the full-scale stack qualification uses the average DV through 6 DV from the scale model tests to compute the corresponding flow rates. Table S1 lists the operating flow rate along with the average and maximum qualified stack flow rate based on the LV-S1 scale model DV values. The operating flow is below the maximum qualified stack flow, which means that the scale model test results are acceptable for stack qualification. The remaining criteria for the stack verification to be considered valid involve the flow angle and velocity uniformity results. First, the flow angle at the full-scale stack must be ≤20°. Second, the velocity uniformity at the full-scale stack must be ≤20% coefficient of variance (COV). Finally, the velocity uniformity results for the actual and scale model stack tests must agree within 5% COV. These criteria were met through the full-scale stack test at the EMF. Flow angle results were <5°; all flow angle results were within the ≤20° criterion. The velocity uniformity results for each test condition ranged between 2.2% COV and 4.3% COV, all of which were within the range of the target % COV values from the scale model tests on the LV-S1, LB-S1, and LV S2 scale models. Based on these stack verification test results, the EMF filtered exhaust stack sampling location meets the qualification criteria provided in the ANSI/HPS N13.1-1999 standard for all planned fan operating configurations. This includes each combination of ACV fans with DVP exhausters. Further changes to the system configuration or operating conditions that are outside the qualified flow rates described in this report may require additional tests or analyses to determine compliance with the standard.

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Hanford Waste Treatment Plant LAB Facility Stack Effluent Monitoring: Sampling Probe Location Qualification Evaluation

The Waste Treatment Plant laboratory (LAB) facility stack monitor locations were qualified using scale model stacks to mitigate the risk of identifying that sampling locations do not meet the qualification criteria on the full-scale stack. As required by the American National Standards Institute/Health Physics Society (ANSI/HPS) N13.1-1999 standard, the scale model and its sampling location were geometrically similar to the actual stack, and the Reynolds numbers for both the actual and model stacks were >10,000. An additional criterion is that the product of the hydraulic diameter and mean velocity (DV) of the full-scale stack must be between 1/6 DV and 6 DV of the scale model stack tests. Verification tests of the LAB stacks were performed at normal operating conditions. The minimum 1/6 DV value, along with the maximum 6 DV value from the scale model testing, determines the range of conditions for which the full-scale stack may be operated and remain in compliance with the stack verification criterion. A practical range for the full-scale stack qualification uses the average DV through 6 DV from the scale model tests to compute the corresponding flow rates. Table S1 lists the operating flow rates along with the average and maximum qualified stack flow rates for each of the LAB facility stacks. For each stack, the operating flow is below the maximum qualified stack flow, which means that the scale model test results are acceptable for stack qualification. The remaining criteria for the stack verification to be considered valid involve the flow angle and velocity uniformity results. First, the flow angle at the full-scale stack must be ≤20°. Second, the velocity uniformity at the full-scale stack must be ≤20% coefficient of variance (COV). Finally, the velocity uniformity results for the actual and scale model stack tests must agree within 5% COV. These criteria were met through the full-scale stack tests at the LAB facility. Flow angle results were primarily less than 10°, except for the LB-C2 Fan A results, which were an average of 13.7°; all flow angle results were within the ≤20° criterion. The velocity uniformity results for each test condition averaged between 1.5 and 4.1% COV, which were all within the range of the target percent coefficient of variation values from the scale model tests. Based on these stack verification test results, the three LAB filtered exhaust stack sampling locations meet the qualification criteria provided in the ANSI/HPS N13.1-1999 standard for all fan operating configurations. This includes single-fan as well as dual-fan operations for LB-C2, each of the dual-fan operating conditions for LB-S1, and each single-fan operating condition for LB-S2. Further changes to the system configuration or operating conditions that are outside the bounds described in this report may require additional tests or analyses to determine compliance with the standard.

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Pulse: An Outlier Sensitive Downsampling Algorithm For Timeseries Data

Pulse is a downsampling algorithm for timeseries data. Frequently datasets become so large that visualization tools and web browsers cannot effectively render graphics due to memory constraints. Downsampling algorithms are commonly applied to minimize the quantity of data required to visualize important features or trends in the data, but some datasets are composed by distinct enough features and trends that most existing downsampling algorithms fail to preserve them. Pule was developed to downsample timeseries data for galvanostatic stack test data at the Idaho National Laboratory. These datasets were composed by approximately 4 million records, most of them being extremely uniform. However, during relatively brief time periods when the stack test changes state, for example when the test article is powered on, or a load is added, the data produce sparse asymptotes. No existing downsampling algorithm was capable of preserving the sparse asymptotes in electrolysis stack test data. Instead, we develop a downsampling algorithm that preserves important outliers in data, and otherwise aggressively downsamples uniform data. The algorithm has applications in other domains like seismology, in the measurement of earthquakes, or astronomy, in the measurement of quasars or transit photometry.

Woodruff, Nathan [Idaho National Laboratory (INL),↗

Evaluation of Significance Tests on Stack Sample Data

In October 2023, external assessors visiting LANL’s Rad-NESHAP team reviewed the annual source term documentation package for stack emissions. This document discusses how the team uses significance tests to determine whether or not a measurement represents an actual detection of emitted radioactive material. The significance tests used in the evaluation compare the measured sample result to the Minimum Detectable Activity (MDA) for the sample; to the uncertainty of that measurement; and to the mean blank sample for the same time period. The blank test uses the average blank plus 2-standard deviations (2σ) of the blank results as a comparison threshold for this final evaluation.

54 ENVIRONMENTAL SCIENCES↗

Hanford Waste Treatment Plant Low Activity Waste Facility Stack Effluent Monitoring: Sampling Probe Location Qualification Evaluation (Rev.1)

The Hanford Tank Waste Treatment and Immobilization Plant Low Activity Waste (LAW) facility stack monitor locations were qualified using scale model stacks to mitigate the risk of discovering that sampling locations do not meet the qualification criteria on the full-scale stacks. As required by the American National Standards Institute/Health Physics Society (ANSI/HPS) N13.1-1999 standard, the scale model and its sampling location were geometrically similar to the actual stack and the Reynolds numbers for both the actual and model stacks were >10,000. An additional criterion is that the product of the hydraulic diameter and mean velocity (DV) of the full-scale stack must be between 1/6 DV and 6 DV of the scale model stack tests. Verification tests of the LAW stacks were performed at normal operating conditions. The minimum 1/6 DV value, along with the maximum 6 DV value from the scale model testing, determines the range of stack flow rates for which the full-scale stack may be operated and remain in compliance with the stack verification criterion. For this analysis, the range of qualified flow rates listed is conservatively based on the average DV through 6 DV for LV-S1, LV-S2, and LV-C2, and 1/3 DV to 3 DV for LV-S3. Table S1 lists the operating flow rates along with the conservative lower and upper qualified stack flow rates for each of the LAW facility stacks. For each stack, the operating flow is below the upper qualified stack.

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Assessment of the 3420 Building Filtered Exhaust Stack Sampling Probe Location: Stack Verification Following Fan and Air Blender Additions

The Pacific Northwest National Laboratory (PNNL) 3420 Building, which is part of the Physical Sciences Facility (PSF), houses radiological capabilities that results in the requirement that emissions monitoring must be conducted for potential radionuclides in the exhaust air discharge of this building. The air monitoring system is required to conform to Title 40 of the Code of Federal Regulations part 61 (40 CFR 61) Subpart H, which in turns requires a sampling probe in the exhaust stream to conform to the criteria of American National Standards Institute / Health Physics Society (ANSI/HPS) N13.1-2011, Sampling and Monitoring Releases of Airborne Radioactive Substances from the Stack and Ducts of Nuclear Facilities. To support the air emissions permit for the 3420 Building on the PNNL campus, stack testing that used computational fluid dynamics (CFD) modeling as a surrogate stack and verification tests of velocity uniformity and flow angle on the retrofitted facility stack was performed. The ANSI/HPS N13.1-2011 criteria for the air monitoring probe location are that velocity uniformity, gaseous tracer uniformity, and particulate tracer uniformity must be less than or equal to 20%COV. Furthermore, no point in the sampling location may have a gaseous tracer concentration that varies from the mean concentration by more than 30%. Additionally, the flow angle at the sampling location must not be more than 20°. The CFD modeling of the stack, as reported by Recknagle et al. (2018) demonstrated that the stack meets the criteria at the probe location. The velocity uniformity and flow angle results from the 3420 stack verification tests, performed in October 2020, demonstrated that the CFD model results may be used to support the qualification of the stack sampling location. The measured velocity uniformity verification test result was 1.4%COV. This value is well within the uniformity criterion, which is that the velocity uniformity be =20%COV. Additionally, this value is well within the criterion that the actual stack measurement must be within 5% of the surrogate stack result of 2.1%COV when all four fans were operating. Additionally, the measured average flow angle at the 3420 stack monitor location was 15.5 degrees. Although this is higher than expected based on the CFD model, the result is =20 degrees, so the criterion is met. Based on these stack verification test results, the reconfigured 3420 Building filtered exhaust stack meets the qualification criteria given in the ANSI/HPS N13.1-2011 standard. Further changes to the system configuration or operating conditions that are outside the bounds described in this and the CFD report (Recknagle et al., 2018) may require additional tests and additional analysis to determine compliance with the standard.

3420 Building↗

Open stack thermal battery tests

We present selected results from a series of Open Stack thermal battery tests performed in FY14 and FY15 and discuss our findings. These tests were meant to provide validation data for the comprehensive thermal battery simulation tools currently under development in Sierra/Aria under known conditions compared with as-manufactured batteries. We are able to satisfy this original objective in the present study for some test conditions. Measurements from each test include: nominal stack pressure (axial stress) vs. time in the cold state and during battery ignition, battery voltage vs. time against a prescribed current draw with periodic pulses, and images transverse to the battery axis from which cell displacements are computed. Six battery configurations were evaluated: 3, 5, and 10 cell stacks sandwiched between 4 layers of the materials used for axial thermal insulation, either Fiberfrax Board or MinK. In addition to the results from 3, 5, and 10 cell stacks with either in-line Fiberfrax Board or MinK insulation, a series of cell-free “control” tests were performed that show the inherent settling and stress relaxation based on the interaction between the insulation and heat pellets alone.

25 ENERGY STORAGE↗

Transformational Solid Oxide Fuel Cell (SOFC) Technology

This project was conducted under the Co-operative Agreement No. DE-FE0027584 with the US Department Energy to developed advanced Solid Oxide Fuel Cell (SOFC) Technologies. The overall objective of this project was to advance SOFC technology at the cell and stack level to enhance cell robustness and durability, increase performance, and reduce balance-of-plant (BOP) requirements. By reducing system complexity combined with the increases in power density and efficiency, the ultimate goal of the project was to increased reliability and to reduce capital and operating costs of installed systems. The project was focused on pathways that will reduce the cost of the SOFC cell and stack, including the following areas: Robust, redox tolerant cell technology Lower cost cell manufacturing through advances in cell design, which will reduce the amount of material, energy and time used in the fabrication of SOFCs High performance, low temperature electrolyte based on improvement of established materials Innovative SOFC stack architecture which truly integrates Balance of Plant functionality into the stack level design Thermal management of the fuel cell stack for increased durability and expanded window of operation Novel stack design amenable for use in sub-MW to multi-MW-scale power plants and having low replacement cost The incorporation of balance-of-plant (BOP) equipment into the stack platform increased the economic viability of smaller scale systems. The project objectives were met by a multi-prong approach, including new cell design complemented with modifications to existing cell technology, as well as a new stack design incorporating components typically included in the BOP, such as heat exchangers, oxidizer, fuel reformers, and recycle systems. The project culminated with demonstration of a stack test validating the viability of the cell and stack improvements. A cost model was also developed to estimate costs for the advanced stack technology at high volume manufacturing levels. The net outcome of the project is SOFC cell and stack technology with costs significantly below current DOE targets without compromising and, in some cases, improving on the performance and degradation rate demonstrated with the current state-of-the-art stack design. The results of this project advanced the reliability, robustness, and endurance of low-cost SOFC technology that ultimately are ready to be deployed in coal power systems with greater than 60 percent efficiency (based on higher heating value of fuel) and the capability for ≥97% CO 2 capture at a cost-of-electricity that is approximately 40 percent below presently available Integrated Gasification Combined Cycle systems.

03 NATURAL GAS↗