Engineering Papers⌕ Search

SEARCH · Engineering Papers

Results for “Southern Company”

Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.

Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.

At least 19 records

Southern Company Services: Project 2: Tall Tower Wind Technical Potential for the Southeast (Modifications 4, 5), Project 4: Offshore Wind Potential for Southern Company Services (Modifications 7, 8)

Project 2: The National Laboratory of the Rockies (NLR) and Southern Company Services (SCS) seek to establish an agreement to assess the technical potential for wind energy in the Southeastern U.S. SCS has requested that NLR conduct a detailed assessment of system performance, available capacity, transmission distance, and levelized cost of electricity (LCOE) at turbine hub heights of 100m to 160m within the SCS service territory. NLR will also provide an assessment of utility photovoltaic (PV) technical potential within the SCS service territory. NLR has unique modeling capabilities to assist SCS with high spatial and temporal resolution assessment of wind and PV technical potential, considering geospatial constraints. Project 4: NLR and SCS seek to develop a spatially explicit techno-economic assessment for offshore wind energy in the Southeastern U.S. The analysis aims to characterize the regional sensitivities of offshore wind plant costs and performance, underwater cabling, potential siting constraints, and landfall spur transmission costs.

17 WIND ENERGY↗

Enabling Evaluation of a Southern Company Distribution Feeder on NREL ADMS Test Bed: Cooperative Research and Development (Final Report)

The objective of this project is to enable evaluation of a Southern Company distribution feeder on the Advanced Distribution Management System (ADMS) test bed. The long-term goal is to evaluate a federated distributed energy resource (DER) management solution that aggregates DERs through either direct control, transactive control or an aggregator to provide bulk services while observing distribution system voltage and power constraints. The DER aggregation needs to be coordinated with an ADMS that is responsible for reliable power delivery across the distribution systems. This project takes the first step towards enabling such evaluation by deploying an ADMS from Oracle (Southern Company's ADMS supplier) with a Southern Company feeder at NREL.

24 POWER TRANSMISSION AND DISTRIBUTION↗

Front End Engineering Design of Linde-BASF Advanced Post-Combustion CO 2 Capture Technology at a Southern Company Natural Gas-Fired Power Plant (Final Scientific/Technical Report)

This document details the execution of Cooperative Agreement DE-FE0031847, “Front End Engineering Design of Linde-BASF Advanced Post-Combustion Carbon Dioxide (CO 2 ) Capture Technology at a Southern Company Natural Gas-Fired Power Plant” during the period of 10/1/2019 to 6/30/2022. The project was funded by the U.S. Department of Energy’s Office of Fossil Energy and Carbon Management (FECM) and managed by the National Energy Technology Laboratory (NETL). Southern Company Services, Inc. (SCS) was the prime recipient and led the project team. Other members of the project team included Linde, Inc. (Linde), Linde Engineering – Dresden (LED), and BASF. The overall goal of the project was to complete a front-end engineering design (FEED) study for installing the Linde-BASF post-combustion capture (PCC) technology at an existing domestic natural gas-fired combined cycle (NGCC) power plant within Southern Company’s portfolio of assets. The CO 2 capture plant was to be of commercial scale (at least 375 MWe) and include process units for pre-conditioning of the flue gas system, the CO 2 capture plant island, storage vessels, the CO 2 compression train, and any necessary components for integration into the NGCC plant. Mississippi Power’s Plant Daniel Unit #4 was chosen as the host site for the FEED with the target of capturing 90% of CO 2 emissions from the existing combustion turbines. The information produced by the FEED was used to develop a cost estimate of +/- 15% accuracy. Capital costs, excluding financing, are estimated at approximately $\$752$ million dollars (2021). The execution of a project based on this FEED study has an estimated duration of almost five years.

03 NATURAL GAS↗

Southern company energy storage study :

This study evaluates the business case for additional bulk electric energy storage in the Southern Company service territory for the year 2020. The model was used to examine how system operations are likely to change as additional storage is added. The storage resources were allowed to provide energy time shift, regulation reserve, and spinning reserve services. Several storage facilities, including pumped hydroelectric systems, flywheels, and bulk-scale batteries, were considered. These scenarios were tested against a range of sensitivities: three different natural gas price assumptions, a 15% decrease in coal-fired generation capacity, and a high renewable penetration (10% of total generation from wind energy). Only in the elevated natural gas price sensitivities did some of the additional bulk-scale storage projects appear justifiable on the basis of projected production cost savings. Enabling existing peak shaving hydroelectric plants to provide regulation and spinning reserve, however, is likely to provide savings that justify the project cost even at anticipated natural gas price levels. Transmission and distribution applications of storage were not examined in this study. Allowing new storage facilities to serve both bulk grid and transmission/distribution-level needs may provide for increased benefit streams, and thus make a stronger business case for additional storage.

Ellison, James↗

Cybersecurity for the Operational Technology Environment (CyOTE) (Final Technical Report)

Electric grids have historically been susceptible to both physical attacks and environmental hazards but the implementation of smart grids, remote management, and self-healing networks, has now made the grid vulnerable to cyber attacks. To address risks introduced by routable connectivity, utilities must establish dynamic solutions to identify, protect, detect, respond to, and recover from cyber security threats and vulnerabilities. In response to the evolving threat landscape U.S. Department of Energy-Office of Cybersecurity, Energy Security, and Emergency Response (DOE CESER) initiated the Cybersecurity for the OT Environment (CyOTE) pilot program, a U.S. Department of Energy (DOE) effort designed to leverage U.S. intelligence capabilities to prevent, detect, or mitigate a cyber attack on utility operational technology (OT) networks. As part of the CyOTE pilot, The Southern Company (Southern Company or Southern) researched, evaluated and deployed emerging Commercial off the Shelf (COTS) technologies and cyber security monitoring architectures to provide previously unrealized network visibility and situational awareness through deep packet inspection and data analytics. This Final Scientific/Technical Report documents the objectives, methodology, lessons learned, and results of Southern Company’s participation in the CyOTE pilot from December 2018 to September 2023.

24 POWER TRANSMISSION AND DISTRIBUTION↗

Natural Gas Community of the Future (Final Report)

Nicor Gas, a subsidiary of Southern Company Gas and its parent company Southern Company, is developing the concept of the Carbon-neutral, Affordable, Resilient, and Equitable Community ("CARE Community") to address the challenges of accessibility and affordability of grid-interactive efficient buildings in historically disadvantaged communities. The CARE Community is a new construction net-zero energy and carbon neutral residential neighborhood consisting of 50 homes with electricity and natural gas services in South Suburban Chicago, built as low-income affordable housing. The National Renewable Energy Laboratory (NREL) is assisting Southern Company to explore how energy efficiency, renewable technologies, and the reliability and resilience of natural gas can be combined and optimized in an islandable energy system as part of a broader effort to understand the role natural gas plays in future communities integrated with renewable energy and improved energy efficiency. The CARE Community will demonstrate how energy efficiency, distributed energy resources (DERs), and advanced controls can be combined with existing natural gas infrastructure to serve historically disadvantaged communities in a cold climate with low energy cost for affordable housing programs and enhanced resilience to withstand extreme weather. Homes will be a part of an islandable energy system, integrating multiple DER technologies such as solar panels, natural gas fuel cells, reciprocating natural gas engines, and battery storage. The CARE Community will provide a replicable template that affordable housing developers and energy companies can adopt throughout the United States. In this report, we present the design and modeling of the community and potential approaches for integrating DERs. We analyze and discuss annual simulations under normal operating conditions and week-long simulations under electric power grid outage conditions.

03 NATURAL GAS↗

Nuclear Direct Air Capture with Carbon Storage (NuDACCS) (Final Technical Report)

This final report, which is for DOE Award Number DE-FE0032160 (Direct Air Capture Combined with dedicated Long-Term Carbon Storage, Coupled to Existing Low-Carbon Energy), covers the Nuclear Direct Air Capture with Carbon Storage (NuDACCS) project period of performance from 03/31/2022 to 12/27/2024. Battelle Memorial Institute (Battelle) partnered with Aircapture LLC (Aircapture), Southern Company (Southern), Carbonvert, the University of Alabama, and Sargent & Lundy (S&L) to develop a front end engineering design (FEED) study for a direct air capture (DAC) system co-located with Southern Company's Joseph M. Farley Nuclear Plant (Plant Farley) in Columbia, Alabama. The DAC system was designed to capture at least 5,000 net tonnes of carbon dioxide (CO2) per year from ambient air in a form suitable for long duration carbon storage (e.g., geologic storage). To complement and support the FEED study, additional analyses were completed, including a Technology Maturation Plan (TMP); Workforce Readiness Plan; Project Cost Estimate; Business Case Analysis (BCA); Life Cycle Analysis (LCA); Environmental Health and Safety (EH&S) Assessment; and Environmental Justice (EJ) Analysis and Economic Revitalization and Job Creation Outcomes Analysis.

21 SPECIFIC NUCLEAR REACTORS AND ASSOCIATED PLANTS↗

Field Testing of a Wet FGD Additive for Enhanced Mercury Control

This document is the final report for DOE-NETL Cooperative Agreement DE-FC26-04NT42309, 'Field Testing of a Wet FGD Additive'. The objective of the project has been to demonstrate the use of two flue gas desulfurization (FGD) additives, Evonik Degussa Corporation's TMT-15 and Nalco Company's Nalco 8034, to prevent the re-emission of elemental mercury (Hg{sup 0}) in flue gas exiting wet FGD systems on coal-fired boilers. Furthermore, the project was intended to demonstrate whether such additives can be used to precipitate most of the mercury (Hg) removed in the wet FGD system as a fine salt that can be separated from the FGD liquor and bulk solid byproducts for separate disposal. The project involved pilot- and full-scale tests of the additives in wet FGD absorbers. The tests were intended to determine required additive dosages to prevent Hg{sup 0} re-emissions and to separate mercury from the normal FGD byproducts for three coal types: Texas lignite/Powder River Basin (PRB) coal blend, high-sulfur Eastern bituminous coal, and low-sulfur Eastern bituminous coal. The project team consists of URS Group, Inc., EPRI, Luminant Power (was TXU Generation Company LP), Southern Company, IPL (an AES company), Evonik Degussa Corporation and the Nalco Company. Luminant Power provided the Texas lignite/PRB co-fired test site for pilot FGD tests and project cost sharing. Southern Company provided the low-sulfur Eastern bituminous coal host site for wet scrubbing tests, the pilot- and full-scale jet bubbling reactor (JBR) FGD systems tested, and project cost sharing. IPL provided the high-sulfur Eastern bituminous coal full-scale FGD test site and cost sharing. Evonik Degussa Corporation provided the TMT-15 additive, and the Nalco Company provided the Nalco 8034 additive. Both companies also supplied technical support to the test program as in-kind cost sharing. The project was conducted in six tasks. Of the six tasks, Task 1 involved project planning and Task 6 involved management and reporting. The other four tasks involved field testing on FGD systems, either at pilot or full scale. These four tasks included: Task 2 - Pilot Additive Testing in Texas Lignite Flue Gas; Task 3 - Full-scale FGD Additive Testing in High-sulfur Eastern Bituminous Flue Gas; Task 4 - Pilot Wet Scrubber Additive Tests at Plant Yates; and Task 5 - Full-scale Additive Tests at Plant Yates. The pilot-scale tests were completed in 2005 and the full-scale test using high-sulfur coal was completed in 2006; only the TMT-15 additive was tested in these efforts. The Task 5 full-scale additive tests conducted at Southern Company's Plant Yates Unit 1 were completed in 2007, and both the TMT-15 and Nalco 8034 additives were tested.

01 COAL, LIGNITE, AND PEAT↗

Field Testing of a Wet FGD Additive for Enhanced Mercury Control - Task 5 Full-Scale Test Results

This Topical Report summarizes progress on Cooperative Agreement DE-FC26-04NT42309, 'Field Testing of a Wet FGD Additive'. The objective of the project is to demonstrate the use of two flue gas desulfurization (FGD) additives, Evonik Degussa Corporation's TMT-15 and Nalco Company's Nalco 8034, to prevent the re-emission of elemental mercury (Hg{sup 0}) in flue gas exiting wet FGD systems on coal-fired boilers. Furthermore, the project intends to demonstrate whether the additive can be used to precipitate most of the mercury (Hg) removed in the wet FGD system as a fine salt that can be separated from the FGD liquor and bulk solid byproducts for separate disposal. The project is conducting pilot- and full-scale tests of the additives in wet FGD absorbers. The tests are intended to determine required additive dosages to prevent Hg{sup 0} re-emissions and to separate mercury from the normal FGD byproducts for three coal types: Texas lignite/Powder River Basin (PRB) coal blend, high-sulfur Eastern bituminous coal, and low-sulfur Eastern bituminous coal. The project team consists of URS Group, Inc., EPRI, Luminant Power (was TXU Generation Company LP), Southern Company, IPL (an AES company), Evonik Degussa Corporation and the Nalco Company. Luminant Power has provided the Texas lignite/PRB co-fired test site for pilot FGD tests and cost sharing. Southern Company has provided the low-sulfur Eastern bituminous coal host site for wet scrubbing tests, as well as the pilot- and full-scale jet bubbling reactor (JBR) FGD systems tested. IPL provided the high-sulfur Eastern bituminous coal full-scale FGD test site and cost sharing. Evonik Degussa Corporation is providing the TMT-15 additive, and the Nalco Company is providing the Nalco 8034 additive. Both companies are also supplying technical support to the test program as in-kind cost sharing. The project is being conducted in six tasks. Of the six project tasks, Task 1 involves project planning and Task 6 involves management and reporting. The other four tasks involve field testing on FGD systems, either at pilot or full scale. The four tasks include: Task 2 - Pilot Additive Testing in Texas Lignite Flue Gas; Task 3 - Full-scale FGD Additive Testing in High-sulfur Eastern Bituminous Flue Gas; Task 4 - Pilot Wet Scrubber Additive Tests at Plant Yates; and Task 5 - Full-scale Additive Tests at Plant Yates. The pilot-scale tests and the full-scale test using high-sulfur coal were completed in 2005 and 2006 and have been previously reported. This topical report presents the results from the Task 5 full-scale additive tests, conducted at Southern Company's Plant Yates Unit 1. Both additives were tested there.

01 COAL, LIGNITE, AND PEAT↗

Materials for Advanced Ultra-Supercritical (AUSC) Steam Turbines – AUSC Component Demonstration

The work by the United States Department of Energy (U.S. DOE)/Ohio Coal Development Office (OCDO) Advanced Ultra-Supercritical (AUSC) Steam Boiler and Turbine Materials Consortia from 2001 through September 2015 was primarily focused on lab scale and pilot scale materials testing. The field testing included air-cooled probes and steam-cooled “loops” that were installed into existing utility boilers to gain exposure of these materials to realistic conditions of high temperature and corrosion due to the constituents in the coal ash. Successful research and development resulted in identification of metallic alloy materials and fabrication processes suited for power generation applications with metal temperatures up to approximately 1472°F (800°C). These materials or alloys have shown, in extensive laboratory tests and shop fabrication studies, to have excellent applicability for high-efficiency low CO2 transformational power generation technologies. However, as valuable as these material field tests have been for obtaining information, their scale is significantly below that required to minimize the risk associated with a power company building a multi-billion-dollar AUSC power plant. To decrease the identified risk barriers to full-scale implementation of these advanced materials, the U.S. DOE/OCDO AUSC Steam Boiler and Turbine Materials Consortia identified the key areas of the technology that need to be tested at a larger scale. Based upon the recommendations and outcome of a Consortia-sponsored workshop with the U.S.’s leading utilities, a Component Test (ComTest) Program for AUSC was proposed. The AUSC ComTest program would define materials performance requirements, plan for overall advanced system integration, design critical component tests, fabricate components for testing from advanced materials, and carry out the tests. A Pre-FEED evaluation of the test facility including the evaluation of three potential sites has been completed and previously reported. This report describes the Front-End Engineering Design (FEED), Detailed Engineering and the Environmental Assessment of the ComTest project. A significant amount of work was accomplished during Phase 1 to identity the components, as well as the component size, that would be manufactured from advanced alloys such as INCONEL 740H or HAYNES 282 alloys. Pathways to supply these components for ComTest have been identified as well as any further development that would be required. Every project of this nature has challenges and this project was no exception. The greatest challenge has been the project cost. Largely due to the infrastructure and balance of plant equipment upgrades required for Youngstown Thermal, the estimated project cost for the “base case” project was greater than originally budgeted. The project team spent a significant amount of time exploring opportunities for reducing the project cost. These options included: • Youngstown Thermal was exploring building a Combined Heat and Power (CHP) unit at their facility. The Youngstown Thermal staff, supported by Thermal Engineering Group, worked with the project team to determine whether it was economically desirable to supply ComTest with steam and other utilities, which would be supplied by the CHP project. • The project team also evaluated opportunities to optimize the project scope to reduce cost, such as reducing project scope by eliminating the Superheater Outlet Header test. • Southern Company had offered two sites as possible host locations for ComTest. Both sites had infrastructure in place such as steam from an existing unit, natural gas, cooling water and ample electrical power that would be required to be added at the Youngstown Thermal site. Utilizing this existing infrastructure could reduce the project cost. An additional project challenge was the departure of Babcock and Wilcox from the project in September 2016. This project setback was overcome by GE Power’s willingness to assume the design of the ComTest superheater. Since the project could not proceed without the superheater, this was a very positive project development. The merger of the GE Power and Alstom Power steam turbine divisions created synergies leading to the conclusion that instead of building a small-scale turbine, a more practical and useful endeavor would be to validate the manufacturing technology and supplier readiness for fabricating and machining full scale steam turbine components. Consequently, in March 2017, GE Power decided that a steam turbine test would not be necessary as part of the ComTest demonstration. Removing the operational testing of the steam turbine from ComTest further reduced the total project cost. Additionally, there was an opportunity to move ComTest from Youngstown Thermal to one of the Southern Company sites and operate ComTest at supercritical steam conditions and test the steam turbine main stop/control valve at a temperature and pressure that would be representative of the conditions of a high pressure steam turbine inlet valve. The steam could also possibly be returned to the host boiler so there would be no economic penalty of using this steam for ComTest. Relocating the project could further reduce the project cost due to the infrastructure already in place, including high pressure natural gas and cooling water, and the potential for heat integration, allowing a reduction of operating costs. Due to these potential cost reductions, it was decided to move the project away from Youngstown Thermal in March 2017. As integrating ComTest at the Southern Company site was explored, an issue was raised regarding the integration of the ComTest cycle with the plant steam cycle. Steam would be supplied to ComTest at nominally ~3865 psia and 775°F. The steam would be heated with natural gas to 1400°F for the valve test and then cooled to 1000°F so that the steam would be returned to the host boiler at the same conditions as their high pressure steam turbine inlet. However, there were concerns raised that the addition of the energy (natural gas) to the steam could trigger a New Source Review on the unit. Southern Company did not want ComTest to cause this review, so condensing all of the steam exiting ComTest and returning it to the host steam cycle as condensate was explored to insure there would be no implication that ComTest was adding energy to the host plant’s steam cycle. Ultimately, Southern Company decided that they wanted to “decouple” ComTest from the operating unit, making ComTest self-supporting, similar to the Youngstown Thermal “base case.” Without the steam turbine, the project team reached a consensus that operating the ComTest Superheater and steam turbine valves at the typical pressure of a package boiler (~1000 psig) would not generate enough useful technical information to justify the cost of the test. Therefore, it was decided in the December 2017 project quarterly meeting to cancel the operational phase of ComTest. Throughout the engineering phase of ComTest, manufacturing and supply chain challenges were identified. When GE Power recommended dropping the steam turbine test from ComTest, they identified many important manufacturing issues that should be evaluated and demonstrated. Other challenges had been raised by the GE Power group designing the superheater as well as those engineering components such as pressure relief and steam turbine bypass valves. In the December 2017 meeting, the project team decided that it was more beneficial to the AUSC technology to pursue these manufacturing and supply chain issues as Phase 2 of the ComTest project. This report is organized in the following manner: • Section 2 discusses the ComTest project background and organization. • Section 3 discussed project management. • Section 4 discusses the design of the ComTest AUSC components – the Superheater, steam turbine and Superheater Outlet Header. • Section 5 discusses the implementation of ComTest at Youngstown Thermal and the Southern Company site. • Section 6 discusses the development of the AUSC Supply Chain • Section 7 discusses the recommended plan for Phase 2 of ComTest

01 COAL, LIGNITE, AND PEAT↗

Impact of Connected Communities

Buildings account for 35% of CO 2 emissions and almost 40% of the United States’ energy use. High-performance homes and neighborhoods play an important role in supporting efforts to decarbonize the US power system by 2035. Significant reductions in CO 2 emissions within the residential sector can be realized through electrification of loads paired with the flexibility created by leveraging smart Internet of Things (IoT) capabilities to shift energy use based on grid signals, thus improving generation/distribution efficiency and maximizing the use of renewable generation capacity. All of this can be achieved while allowing smart home appliances and equipment to meet homeowner needs – including reducing power bills - while optimizing operation in conjunction with the grid using novel control techniques. The Grid-Interactive Efficient Buildings Roadmap by the US Department of Energy’s (DOE’s) Building Technologies Office (BTO) notes that implementing grid-interactive efficient building (GEB) technology has the potential to reduce CO 2 emissions by 80 million tons/year—roughly equivalent to 17 million cars. To achieve this vision, the US Department of Energy’s Oak Ridge National Laboratory (ORNL)—in collaboration with Southern Company Research & Development, Alabama Power, Georgia Power, BTO and the US DOE’s Office of Electricity (OE) —is developing and demonstrating novel connected communities at two locations. Southern Company in turn engaged with industry partners, including design firms, residential developers, and residential HVAC and appliance manufacturers because their participation would be critical to the success of the initial research project, as well as the future scaling to the Southern Company service territory and beyond. Impacts of the Connected Communities projects in Alabama and Georgia are outlined including: energy, grid services and data management learnings; homeowner feedback; vendor engagement; adoption by utilities; technical, policy and business model challenges.

24 POWER TRANSMISSION AND DISTRIBUTION↗

Retrofittable Advanced Combined Cycle Integration for Flexible Decarbonized Generation

This is the final scientific / technical report for Front End Engineering Design (FEED) study “Retrofittable Advanced Combined Cycle Integration for Flexible Decarbonized Generation” funded by the US Department of Energy (DOE), Office of Fossil Energy and Carbon Management (FECM), Carbon Capture R&D Program under award DE-FE0032131. The prime recipient is General Electric Company working through its Gas Power division (GEGP) with subrecipients Southern Company and Linde Engineering plus subcontractor Kiewit. Southern Company’s Plant Barry, a 2x1 7F.04 CCGT, is the host site. GEGP led the overall integration of the carbon capture system (CCS) with the existing natural gas combined cycle (NGCC) facility. Linde provided the detailed process engineering and equipment costing for the carbon capture island. Kiewit focused on plant layout, constructability, and installation. With the FEED study finished, the engineering is approximately 50% complete towards the detailed design package needed to proceed to procure, install, build, commission, and operate the integrated NGCC+CCS facility. This FEED study focuses on retrofitting a 95% CO 2 capture system with attention on plant integration. The study was particularly challenging due to unique and substantial cost impacts related to global sourcing challenges associated with COVID. Additional incentives, regulatory support, and dispatch certainty are needed to move forward with implementing CCS at this or other sites in the US. This FEED study highlights the value of integrating NGCC+CCS and is a template for future CCS retrofit studies.

42 ENGINEERING↗

Information products and communication materials for NGOs

The Southeast Regional Carbon Sequestration Partnership (SECARB) Phase III Anthropogenic Test is a full integrated carbon dioxide (CO 2 ) capture, transportation, and geologic storage project located in southern Alabama. The CO 2 for the Anthropogenic Test is obtained from a demonstration-scale, post-combustion CO 2 capture facility at Southern Company's subsidiary Alabama Power's existing 2,657 Megawatt (MW) Barry Electric Generating Plant in Mobile County, Alabama. A small amount of flue gas from Plant Barry (equivalent to the amount produced when generating 25 MW of electricity) is being diverted from the plant's #5 coal burning unit and captured using a process developed by Mitsubishi Heavy Industries (MHI) to produce high purity CO 2 . The captured CO 2 is compressed at Plant Barry and transported approximately 19 kilometers (12 miles) by dedicated pipeline to the injection location at Citronelle Field. Public outreach and education associated with the Anthropogenic Test is critical to promoting public acceptance and eventual deployment of CCS technologies near large CO 2 sources in the Southeast. Southern Company, with support from the project team, has kept NGO communities informed of project status through press releases, public meetings, and presentations since site selection was announced on May 200, 2009. Maintaining good community relationships with neighbors and customers near its facilities is a priority. Goals are to educate NGO's about the demonstration, request that they inform their constituencies, and learn about their concerns related to CCS. The following report documents outreach activities by Southern Company and the project team through websites, press releases, local outreach, and presentations and outreach events.

01 COAL, LIGNITE, AND PEAT↗

Modeling and Analysis of Clean Energy and Storage Technologies (CRADA Final Report, Project 1)

The goal of this project is to provide Southern Company Services, Inc. ("Participant") with custom scripts that can be used to create an average PV energy production profile, calculate lifetime energy value, calculate capacity value, and calculate the resultant financial metrics considering those value streams. Secondly, a fuel-cell model will be added to the public version of System Advisor Model (SAM). This standalone technology will incorporate PV and battery storage, allowing the participant to model the interaction of these three technologies. By adding this capability to a public version of SAM, a broad audience will be able to consider the system performance and financial benefits of installing a fuel cell as a baseline generator with PV. Thirdly, automated dispatch algorithms will be developed and added to SAM. These algorithms will enable Southern Company to dispatch a DC-connected front-of-the-meter battery system while considering price signals and PV clipping behavior. By adding these capabilities to a public version of SAM, users will be able to consider more complex and realistic ways of dispatching a battery system.

14 SOLAR ENERGY↗