Landing dynamics studies of the Surveyor spacecraft.
Surveyor spacecraft landing dynamics, using mathematical model to predict touchdown conditions for spacecraft pretouchdown motion and orientation
SEARCH · Engineering Papers
Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.
Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.
Surveyor spacecraft landing dynamics, using mathematical model to predict touchdown conditions for spacecraft pretouchdown motion and orientation
Surveyor spacecraft thermal control system design evolution and performance, discussing lunar landings and environmental factors in design requirements
Data processing systems, thermal subsystems, design, and mission performance summary for Surveyor 1 spacecraft
Performance analysis of electric power, data link, signal processing, and flight control systems of Surveyor 1 spacecraft
Performance analysis of propulsion system, retrorocket, altitude radar, radar altimeter, and television system of Surveyor 1 spacecraft
Flight performance characteristics of Surveyor 2 spacecraft and its subsystems
Real time and postflight data used for reporting flight performance characteristics of Surveyor 3 spacecraft and its subsystems, including TV equipment and soil mechanics/surface sampler
Flight performance of Surveyor 4 spacecraft and subsystems analyses data
Flight performance analysis of Surveyor 5 spacecraft, including TV equipment and alpha scattering device data
Surveyor 6 spacecraft flight performance characteristics, including data on television equipment, alpha scattering experiment, and powered flight translation
Performance analyses of Surveyor 7 lunar probe including launch, orbit, descent, photography, alpha scattering measurements, and soil sampling
Surveyor I spacecraft exploration results of lunar surface
Surveyor spacecraft star sensor calibration and spaceborne performance
Surveyor telecommunications system from standpoint of actual subsystem implementation and performance, detailing reliability, flexibility, redundancy and data transmission modes
Surveyor spacecraft star sensor calibration and spaceborne performance
Surveyor spacecraft A-21A design and performance
Launch dynamic environment of Surveyor spacecraft