Engineering PapersSearch

SEARCH · Engineering Papers

Results for “SIM-Lite”

Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.

Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.

SIM-Lite Update

Discussion focus on: SIM-Lite Instrument Update - 6m baseline, 50cm, approximately 900M cost; Technology Update - Systematic errors and floor; SIM-Lite terrestrial planet discovery capability; Double blind multiple planet study summary; and the changing landscape of exoplanet science and the role of SIM-Lite. Slides include technology to flight component engineering; instrumental systematic errors; ultra deep search for Earth clones; double blind test, astrometric detection of Earths in multiplanet systems; the current era of exoplanet science and where SIM-Lite fits in; the next frontier and where SIM-Lite fits in, why SIM is unique in discovering Earths; imaging planet status is uncertain without masses and ages; SIM role in establishing how planetary systems form and evolve; and SIM probes of broad planet mass range around young stars.

exoplanets

Recent Results of the Guide-2 Telescope Testbed for the SIM-Lite Mission

The Space Interferometry Mission Planet QuestLite (SIM-Lite) is a new mission concept to perform microarcsecond narrow-angle astrometry to search approximately 50 nearby stars for Earth-like planets, and also to perform a global astrometry. The SIM-Lite consists of two Michelson interferometers and one telescope. The main six-meter baseline science interferometer observes a target star and a set of reference stars. The four-meter baseline interferometer (Guide-1) monitors the attitude of the instrument in the direction of a target star. A new Guide-2telescope (G2T) tracks a bright star to monitor the attitude of the instrument in the other two orthogonal directions. In the current mission concept, the G2T consists of a 30 cm siderostat and a 30 cm confocal telescope, similar to other four telescopes used in the science and Guide-1interferometers. A testbed has been built to demonstrate the G2T feasibility for SIM-Lite mission. Recent results show that field-independent, star-tracking capability of the system is less than 30 (mu)as after the SIM narrow angle analysis.

Guide-2 Telescope

Mitigation of Angle Tracking Errors Due to Color Dependent Centroid Shifts in SIM-Lite

The SIM-Lite astrometric interferometer will search for Earth-size planets in the habitable zones of nearby stars. In this search the interferometer will monitor the astrometric position of candidate stars relative to nearby reference stars over the course of a 5 year mission. The elemental measurement is the angle between a target star and a reference star. This is a two-step process, in which the interferometer will each time need to use its controllable optics to align the starlight in the two arms with each other and with the metrology beams. The sensor for this alignment is an angle tracking CCD camera. Various constraints in the design of the camera subject it to systematic alignment errors when observing a star of one spectrum compared with a start of a different spectrum. This effect is called a Color Dependent Centroid Shift (CDCS) and has been studied extensively with SIM-Lite's SCDU testbed. Here we describe results from the simulation and testing of this error in the SCDU testbed, as well as effective ways that it can be reduced to acceptable levels.

Spectral

SIM-Lite Mission Spectral Calibration Sensitivities and Refinements

SIM-Lite missions will perform astrometry at microarcsecond accuracy using star light interferometry. For typical baselines that are shorter than 10 meters, this requires to measure optical path difference (OPD) accurate to tens of picometers calling for highly accurate calibration. A major challenge is to calibrate the star spectral dependency in fringe measurements -- the spectral calibration. Previously, we have developed a spectral calibration and estimation scheme achieving picometer level accuracy. In this paper, we present the improvements regarding the application of this scheme from sensitivity studies. Data from the SIM Spectral Calibration Development Unit (SCDU) test facility shows that the fringe OPD is very sensitive to pointings of both beams from the two arms of the interferometer. This sensitivity coupled with a systematic pointing error provides a mechanism to explain the bias changes in 2007. Improving system alignment can effectively reduce this sensitivity and thus errors due to pointing errors. Modeling this sensitivity can lead to further improvement in data processing. We then investigate the sensitivity to a model parameter, the bandwidth used in the fringe model, which presents an interesting trade between systematic and random errors. Finally we show the mitigation of calibration errors due to system drifts by interpolating instrument calibrations. These improvements enable us to use SCDU data to demonstrate that SIM-Lite missions can meet the 1pm noise floor requirement for detecting earth-like exoplanets.

wave front aberration

SIM-Lite Instrument Description, Operation and Performance

SIM Lite Astrometric Observatory, a space borne mission to be located in a solar Earth-trailing orbit, will conduct high precision differential astrometry. During the 5-year mission, SIM Lite will search about 60 nearby Sun-like stars for exoplanets of mass down to one Earth mass, in the Habitable Zone of those stars. In addition, SIM Lite will survey the architecture of planetary systems of about 1000 stars of all ages and types. SIM Lite will also build a 4 micro-arc-second astrometric grid and perform global astrometry on a variety of astrophysics objects. The instrument consists of two Michelson stellar interferometers and a precision telescope. The Science interferometer is composed of two 50 cm collectors separated by a 6 meter baseline. The technology development was completed in 2005. The mission is now ready for full flight implementation.

exoplanet

SIM PlanetQuest: Progress Report

SIM PlanetQuest, a micro-arcsecond astrometry space mission, has been impacted by significant changes in NASA priorities over the last two years, resulting in the mission being indefinitely delayed. The SIM team has responded by investigating alternative mission concepts based upon completed SIM technology. Several alternative mission concepts have been identified, ranging from a planets-only concept, to versions of SIM, called SIM-Lite, that still address the full breadth of SIM science envisioned by two previous National Academy Astrophysics Decadal Surveys but with lower precision and reduced throughput. These mission concepts, Planet Hunter and SIM-Lite, are significantly more affordable and may fit into a nearer-term future scenario than the full SIM PlanetQuest would. This paper describes the current state of the SIM project, including its design and technology, and the alternative mission concepts for the use of these designs and technology.

SIM-Lite

SCDU Testbed Automated In-Situ Alignment, Data Acquisition and Analysis

In the course of fulfilling its mandate, the Spectral Calibration Development Unit (SCDU) testbed for SIM-Lite produces copious amounts of raw data. To effectively spend time attempting to understand the science driving the data, the team devised computerized automations to limit the time spent bringing the testbed to a healthy state and commanding it, and instead focus on analyzing the processed results. We developed a multi-layered scripting language that emphasized the scientific experiments we conducted, which drastically shortened our experiment scripts, improved their readability, and all-but-eliminated testbed operator errors. In addition to scientific experiment functions, we also developed a set of automated alignments that bring the testbed up to a well-aligned state with little more than the push of a button. These scripts were written in the scripting language, and in Matlab via an interface library, allowing all members of the team to augment the existing scripting language with complex analysis scripts. To keep track of these results, we created an easily-parseable state log in which we logged both the state of the testbed and relevant metadata. Finally, we designed a distributed processing system that allowed us to farm lengthy analyses to a collection of client computers which reported their results in a central log. Since these logs were parseable, we wrote query scripts that gave us an effortless way to compare results collected under different conditions. This paper serves as a case-study, detailing the motivating requirements for the decisions we made and explaining the implementation process.

Automation