Engineering Papers⌕ Search

SEARCH · Engineering Papers

Results for “SB10”

Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.

Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.

At least 19 records

SB10 Frit Recommendation, and Evaluations of the Glass Variability Study and Cs-137 Concentrations in Strip Effluent Based on May 2021 Projections

The Defense Waste Processing Facility (DWPF) is currently preparing to initiate processing of Sludge Batch 10 (SB10), which is comprised of material from Tanks 11H, 13H, 15H, and 26F, Alternate Feed Stock-2 (AFS-2) and Sodium Reactor Experiment (SRE) material from H-Canyon. In support of SB10 qualification, frit development using 2020 Tank 40 blend projections and experimental work for the glass variability study were previously conducted. Frit 473 and Frit 209 were identified as candidate frits and both were included in the development of the variability study test matrix; however, a final frit recommendation was postponed until more information could be determined about the composition of SB10 after washing. In May 2021, Savannah River Remediation (SRR) reprojected SB10 based on the analytical results from the Tank 51 qualification sample that was washed in the Savannah River National Laboratory (SRNL) Shielded Cells Facility.

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Sludge Batch 10 (SB10) Acceptance Evaluation: Radionuclide Concentrations in Tank 51 Washed Qualification Sample

Savannah River National Laboratory (SRNL) has been tasked with the radionuclide characterization of the washed Sludge Batch 10 (SB10) qualification sample. The washed SB10 qualification sample is based on SRR Engineering guidance and the sample slurry is expected to be similar in composition to Tank 51 slurry after final preparations for transfer to Tank 40. Forty-four radionuclides along with total alpha and beta activity have been reported herein. These radionuclide measurements are required for the Defense Waste Processing Facility (DWPF) Radiological Evaluation Program, DWPF Technical Safety Requirements (TSR)/Waste Acceptance Criteria (WAC) Evaluation, and the DWPF Solid Waste Characterization Program.

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Measurement Acceptance Region (MAR) Assessment Results Based On Sludge Batch 10 Projections from December 2021, February 2022 and August 2022

The Defense Waste Processing Facility (DWPF) is currently preparing to initiate processing of Sludge Batch 10 (SB10), which is comprised of material from Tanks 11H, 13H, 15H, and 26F, Alternate Feed Stock-2 and Sodium Reactor Experiment material from H-Canyon. Frit 473 (8B 2 O 3 -8Li 2 O-5Na 2 O-79SiO 2 , in weight percent) was recommended for sludge-only (SO) and coupled processing with the Salt Waste Processing Facility (SWPF) based on previous assessments of SB10 projections with the DWPF Product Composition Control System (PCCS) glass property models and their associated Measurement Acceptance Region (MAR) constraints. Due to the lower processing rate of Sludge Batch 9 (SB9), the heel in Tank 40 is anticipated to be greater than 40 inches at the projected start of SB10 processing to meet the upcoming Accelerated Basin Deinventory addition dates in Tank 51 for Sludge Batch 11. In December 2021 and February 2022, Savannah River Remediation System Planning provided updated SB10 Tank 40 blend projections based on heels of 74 inches, 84 inches, 94 inches and 103.4 inches. Savannah River Mission Completion (SRMC) subsequently pursued Wash Cycle Y to further reduce the total sulfur in the sludge batch and increase processing flexibility at DWPF. In August 2022, SRMC System Planning provided an updated SB10 Tank 40 blend projection with a 76 inch-heel representing Decant Y2 and 60 kilogallons of bearing water inleakage that is anticipated during the Tank 51 to Tank 40 transfer. The objectives of this task were to: • Determine the impact on the operating windows for SO and coupled processing • Determine whether any composition gaps exist between the already completed SB10 variability study and the reprojected SB10 glass composition region • Compare the SB10 reprojected glass composition region to the DWPF PCCS model development and validation ranges to ensure that compositional gaps do not exist between the data sets. This report documents the results of these evaluations. Calculation-based frit assessments were performed using the DWPF PCCS glass property models and their associated MAR constraints. Evaluated parameters for coupled processing included the following transfer volumes per Sludge Receipt and Adjustment Tank batch: 5700 gallons of Tank 40 sludge, 2400-4500 gallons of the SWPF monosodium titanate (MST) and sludge solids stream, and 15,000 gallons of strip effluent. Based on these MAR assessment results, Frit 473 remains viable for SB10 processing. A target waste loading (WL) of 36% is possible for SO operation and single strike (0.4 g/L MST) coupled processing up to 600 mg/L of SB9 insoluble sludge solids at a nominal transfer volume of ~2800 gallons. Increasing the single strike transfer volume to 4500 gallons may reduce the maximum WL below 40%. Operating windows are 12 percentage points for SO processing and 14-16 percentage points for coupled processing. Frit 625 allows for a target WL of 36% and is acceptable for use during the SB9 to SB10 transition to deplete remaining inventory as needed. Operating windows are 8 percentage points for SO processing and 12-14 percentage points for coupled processing. Predictive PCCS evaluations performed at DWPF will provide insight into batch-specific acceptability at desired WLs for compositions having expected oxide ratios during processing versus the extreme vertices (corner points) evaluated in this study. The reprojected SB10 glass composition region generally overlaps the previously evaluated SB10 variability study composition region. Thus, the minor composition shift of these updated SB10 projections indicates that no additional glasses are necessary to demonstrate acceptability relative to the chemical durability of the Environmental Assessment benchmark glass and predictability using the current PCCS models for durability. Based on a comparison of the PCCS model development and validation data to the reprojected SB10 glass composition region, the viscosity and liquidus temperature models will reliably predict SB10 compositions. No additional glasses are necessary to demonstrate predictability of these models.

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Evaluation of a Sulfate Solubility Limit Greater Than 0.65 Weight Percent in Sludge Batch 10 Glasses

Previous laboratory-scale crucible testing with batch chemicals confirmed that the sulfate (SO 4 2- ) limit for Sludge Batch 10 (SB10) was 0.65 weight percent (wt.%) in glass. This limit signifies that 0.65 wt.% SO 4 2- can be retained in the glass without the formation of a sulfate phase. The Defense Waste Processing Facility imposes this constraint in the Material Tracking Program. Based on preliminary calculations to support the Material Tracking Program, it was anticipated that transfer volumes of the monosodium titanate/sludge solids (MST/SS) stream from the Salt Waste Processing Facility (SWPF) may need to be reduced to maintain projected sulfate concentrations below 0.65 wt.% in glass. Savannah River Mission Completion requested that the Savannah River National Laboratory perform additional sulfate testing to determine whether a sulfate solubility limit greater than 0.65 wt.% is feasible for SB10, which could allow for higher transfer volumes of the MST/SS stream. This report documents the results of the testing at higher sulfate concentrations for the glass composition region defined by the most recent SB10 projection (November 2022) and Frits 473 and 625. Frit 473 was recommended for SB10 and Frit 625 was used during SB9 processing and the SB9 to SB10 transition. A total of twenty-one glass compositions were developed based on the expected compositional variables, which include sludge-only (SO) and coupled processing with the SWPF, waste loading (WL), and frit composition. The target sulfate concentrations were varied from 0.65-0.85 wt.% at 32 and 40% WL. Each glass was prepared from reagent grade chemicals and melted at 1150 °C. Visual observations were used to confirm the presence of a sulfate salt phase on the cooled glass surfaces. Representative samples of each glass were submitted for chemical composition analysis by inductively coupled plasma-optical emission spectroscopy and Cs analysis by inductively coupled plasma-mass spectrometry. Overall the majority of mean measured values are consistent with the target values for each major oxide of interest with less than 5% error. The percent errors for the measured SO 4 2- concentrations are generally less than 10%, which is comparable with previous sulfate solubility study measurements and acceptable. Only the SO glasses based on Frit 625 formed a sulfate phase at a 0.80 wt.% SO 4 2- target concentration at both 32 and 40% WL. The remainder of the glasses did not form a sulfate layer. Due to the formation of the sulfate phase, the limit is conservatively set at 0.70 wt.% based on the measured sulfate concentrations of 0.71 wt.% and 0.75 wt.% for these two glasses. None of the SO or coupled operation glasses based on Frit 473 formed a sulfate salt phase, which supports a sulfate limit of 0.80 wt.%. The following SO 4 2- concentration limits are recommended during SO and coupled SB10 processing: (1) 0.70 wt.% during processing with Frit 625, and (2) 0.80 wt.% during processing with Frit 473.

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

DWPF COAL-CARBON WASTE ACCEPTANCE CRITERIA LIMIT EVALUATION BASED ON EXPERIMENTAL WORK (TANK 48 IMPACT STUDY)

This report summarizes the results of both experimental and modeling studies performed using Sludge Batch 10 (SB10) simulants and FBSR product from Tank 48 simulant testing in order to develop higher levels of coal-carbon that can be managed by DWPF. Once the Fluidized Bed Steam Reforming (FBSR) process starts up for treatment of Tank 48 legacy waste, the FBSR product stream will contribute higher levels of coal-carbon in the sludge batch for processing at DWPF. Coal-carbon is added into the FBSR process as a reductant and some of it will be present in the FBSR product as unreacted coal. The FBSR product will be slurried in water, transferred to Tank Farm and will be combined with sludge and washed to produce the sludge batch that DWPF will process. The FBSR product is high in both water soluble sodium carbonate and unreacted coal-carbon. Most of the sodium carbonate is removed during washing but all of the coal-carbon will remain and become part of the DWPF sludge batch. A paper study was performed earlier to assess the impact of FBSR coal-carbon on the DWPF Chemical Processing Cell (CPC) operation and melter off-gas flammability by combining it with SB10-SB13. The results of the paper study are documented in Ref. 7 and the key findings included that SB10 would be the most difficult batch to process with the FBSR coal present and up to 5,000 mg/kg of coal-carbon could be fed to the melter without exceeding the off-gas flammability safety basis limits. In the present study, a bench-scale demonstration of the DWPF CPC processing was performed using SB10 simulants spiked with varying amounts of coal, and the resulting seven CPC products were fed to the DWPF melter cold cap and off-gas dynamics models to determine the maximum coal that can be processed through the melter without exceeding the off-gas flammability safety basis limits. Based on the results of these experimental and modeling studies, the presence of coal-carbon in the sludge feed to DWPF is found to have both positive (+) and negative (-) impact as summarized below: (-) Coal-carbon is a melter reductant. If excess coal-carbon is present, the resulting melter feed may be too reducing, potentially shortening the melter life. During this study, the Reduction/Oxidation Potential (REDOX) of the melter could be controlled by varying the ratio of nitric and formic acid. (-) The addition of coal-carbon increases the amount of nitric acid added and decreases the amount of formic acid added to control melter REDOX. This means that the CPC with the FBSR product is much more oxidizing than current CPC processing. In this study, adequate formic acid was present in all experiments to reduce mercury and manganese, two of the main goals of CPC processing. (-) Coal-carbon will be oxidized to carbon dioxide or carbon monoxide in the melter. The addition of coal-carbon to the FBSR product will lead to approximately 55% higher offgas production from formate, nitrate and carbon due to the decomposition of the carbon at the maximum levels in this testing. Higher offgas production could lead to higher cold cap coverage or melter foaming which could decrease melt rate. No testing was performed to evaluate the impact of the higher melter offgas flow. (+) The hydrogen production is greatly reduced in testing with coal as less formic acid is added in CPC processing. In the high acid run without coal, the peak hydrogen generation was 15 times higher than in the high acid run with added coal-carbon. (+) Coal-carbon is a less problematic reducing agent than formic acid, since the content of both carbon and hydrogen are important in evaluating the flammability of the melter offgas. Processing with coal-carbon decreases the amount of formic acid added in the CPC, leading to a lower flammability risk in processing with coal-carbon compared to the current DWPF flowsheet. (+) The seven SB10 formulations which were tested during the bench-scale CPC demonstration were all determined to be within the off-gas flammability safety basis limits during the 9X/5X off-gas surge for normal bubbled melter operation. The concentration of coal-carbon in these baseline melter feeds varied widely from 0 to 17,863 ppm, depending on the acid addition strategy used and the extent to which the required reductant (formic acid) was replaced with coal-carbon. All baseline feeds were redox-adjusted and three of them contained TOC higher than the current theoretical TSR limit of 18,900 ppm. (-) Additional coal-carbon was then added to each baseline feed until the calculated off-gas flammability equaled the safety basis limit of 60% of the LFL at the peak of off-gas surge ('max-coal'). In doing so, however, no counterbalancing nitrate was added, thus simulating the scenario where slugs of coal enter the melter as a result of uneven distribution of coal in the slurry.

01 COAL, LIGNITE, AND PEAT↗

Measurement Acceptance Region (MAR) Assessment Results Based on Confirmation Sample Sludge Batch 10 Projections

The Defense Waste Processing Facility (DWPF) is currently preparing to initiate processing of Sludge Batch 10 (SB10), which is comprised of material from Tanks 11H, 13H, 15H, 26F, 40H (heel only), and Alternate Feed Stock-2 and Sodium Reactor Experiment material from H-Canyon. Frit 473 was recommended for sludge-only (SO) and coupled processing with the Salt Waste Processing Facility (SWPF) based on previous assessments of SB10 projections with the DWPF Product Composition Control System (PCCS) glass property models and their associated Measurement Acceptance Region (MAR) constraints. Savannah River Mission Completion (SRMC) subsequently pursued Wash Cycle Y to further reduce the total sulfur in the sludge batch and increase processing flexibility at DWPF. In October 2022, SRMC System Planning provided an updated SB10 Tank 40H blend baseline projection based on the Tank 51 confirmation sample results. Due to the reduced Na concentration relative to previous SB10 projections, two additional projections based on the addition of 7,000 gallons of caustic were provided in November 2022.

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Evaluation of the 0.65 Weight Percent Sulfate Solubility Limit for Sludge Batch 10 Based on November 2022 Projections

The Defense Waste Processing Facility (DWPF) is currently preparing to initiate processing of Sludge Batch 10 (SB10), which is comprised of material from Tanks 11H, 13H, 15H, 26F, 40H (heel only), and Alternate Feed Stock-2 and Sodium Reactor Experiment material from H-Canyon. Frit 473 was recommended for sludge-only (SO) and coupled processing with the Salt Waste Processing Facility (SWPF) based on previous assessments of SB10 projections with the DWPF Product Composition Control System glass property models and their associated Measurement Acceptance Region constraints. Savannah River Mission Completion (SRMC) subsequently pursued Wash Cycle Y to further reduce the total sulfur in the sludge batch and increase processing flexibility at DWPF. In October 2022, SRMC System Planning provided an updated SB10 Tank 40H blend baseline projection based on the Tank 51 confirmation sample results. Due to the reduced Na concentration relative to previous SB10 projections, two additional projections based on the addition of 7,000 gallons of caustic were provided in November 2022.

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Sludge Batch 10 Frit Development and Variability Study Matrix Design

The Defense Waste Processing Facility (DWPF) is currently preparing to initiate processing of Sludge Batch 10 (SB10), which is comprised of material from Tanks 11H, 13H, 15H, and 26H, and Alternate Feed Stock-2 (AFS-2). H-Canyon also had a need to discard Sodium Reactor Experiment (SRE) material that was stored in Tanks 16.3 and 16.4. Savannah River Remediation (SRR) added a portion of the SRE material to Sludge Batch 9 (SB9) in Tank 40 and the remainder was added to SB10 that is currently being prepared in Tank 51. In support of sludge batch preparation and qualification efforts, SRR requested that the Savannah River National Laboratory (SRNL) complete the following tasks based on the SB10 projections provided by the SRR System Planning group.

11 NUCLEAR FUEL CYCLE AND FUEL MATERIALS↗

Selection of Glasses to Confirm the 0.65 Weight Percent Sulfate Solubility Limit for Sludge Batch 10

In preparation for Sludge Batch 10 (SB10) processing, projections of sulfate (SO 4 2- ) in glass at 36% waste loading (WL) were calculated in May 2020 for Tank 40 blend projections representing 0.7M and 0.85M Na wash endpoints. The projected SO 4 2- ) concentrations for either sludge-only (SO) or coupled processing with the Salt Waste Processing Facility (SWPF) were either near or exceeded the current Sludge Batch 9 (SB9) limit of 0.65 weight percent (wt.%). Four nominal glass compositions were selected based on SO and coupled processing for the 0.85M Na wash endpoint Tank 40 blend projection to conduct an initial evaluation of the SB10 sulfate solubility behavior. A sulfate salt phase was absent from each of the prepared glasses, which provided preliminary results that supported the 0.65 wt.% SO 4 2- ) limit for SB10.

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Solubility Testing to Support the Addition of Sodium Reactor Experiment Material to Sludge Batch 10

The Savannah River Site H-Canyon Facility is planning to discard dissolved Sodium Reactor Experiment (SRE) material into Tank 51 prior to Sludge Batch 10 (SB10). SB10 with the SRE material will be processed in the Defense Waste Processing Facility (DWPF) using the Nitric-Glycolic Acid (NGA) flowsheet. The DWPF Nuclear Criticality Safety Evaluation (NCSE) protects a 14:1 mass ratio of manganese to equivalent uranium-235 in both the solid and liquid phases during processing by requiring a 70:1 mass ratio in the feed. A concern was raised that freshly precipitated manganese in the SRE material will behave differently from the manganese in sludge during DWPF processing and potentially invalidate the criticality control. To mitigate risks to the DWPF criticality controls, the Savannah River National Laboratory (SRNL) performed a metals solubility test applicable to recently precipitated manganese and uranium, as would be expected with SRE transfers to SB10. The objective of this analysis is the tracking of partitioning of the primary fissile component (uranium-235) with the credited poison (manganese) between the aqueous and insoluble phases.

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Characterization of the SRNL-Washed Tank 51 Sludge Batch 10 Qualification Sample

Savannah River National Laboratory (SRNL) personnel have been requested to qualify the next sludge batch (Sludge Batch 10 – SB10) for processing at the Defense Waste Processing Facility (DWPF). To accomplish this task, Savannah River Remediation (SRR) sent SRNL two 3-L samples of Tank 51H slurry to be characterized, washed, and then used in a lab-scale demonstration of the DWPF flowsheet. Sample HTF-51-19-114 was received on January 28, 2020, and HTF-51-20-15 was received on February 4, 2020. SRNL washed the Tank 51H sample per the Tank Farm washing strategy. During washing, material from H Canyon Tanks 16.3 and 16.4 was also added to the Tank 51 samples to simulate canyon discharges subsequent to sampling. A part of the qualification process is extensive radionuclide and chemical characterization of the SRNL-washed Tank 51H slurry. This report documents the chemical characterization of the washed slurry; radiological characterization will be documented in a separate report. The major supernatant components, elements on a weight percent calcined basis, and the weight percent solids of the SRNL-washed sample were comparable to the Tank Farm projections, with the exception of free hydroxide and carbonate. Therefore, this SRNL-washed sample is suitable for further SB10 qualification activities and SRR planning for SB10.

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Radioactive Waste Sludge Washing and Demonstration of the Nitric-Glycolic Acid Flowsheet for Sludge Batch 10 Qualification

For each sludge batch that is processed in the Defense Waste Processing Facility (DWPF), the Savannah River National Laboratory (SRNL) performs qualification testing to demonstrate that the sludge batch (SB) is processible. During processing of SB9, DWPF will be transitioning from the Nitric-Formic Acid (NFA) flowsheet to the Nitric-Glycolic Acid (NGA) flowsheet. Thus, the qualification of SB10 was requested to only be performed using the NGA flowsheet. In order to qualify the batch for the NGA flowsheet, Sludge Receipt and Adjustment Tank (SRAT) and Slurry Mix Evaporator (SME) cycles, designated SC-19, were performed using SB10 Tank 51 sample material. SRNL received Tank 51 material in the midst of Tank Farm washing. SRNL continued the washing in the SRNL Shielded Cells. The SRNL process included the addition of Sodium Reactor Experiment (SRE) material from H Canyon, simulating the transfer of SRE from H Canyon to Tank 51 during Tank Farm washing. The washed SB10 Tank 51 material, with SRE, was characterized prior to flowsheet qualification testing.

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Evaluation Of Glass Density to Support the Estimation of Fissile Mass Loadings in Sludge Batch 10 Glasses

Per a directive from the Department of Energy Savannah River Operations Office (DOE-SR) in 2008, the fissile mass loading concentration must remain below 897 g/m 3 in each high-level waste (HLW) glass canister produced by the Defense Waste Processing Facility (DWPF). To support Sludge Batch 5 (SB5) processing, the Savannah River National Laboratory (SRNL) developed a technical basis that facilitates the evaluation of fissile mass loading of the glass product. The calculation is based on the iron (Fe) concentration in the glass as determined by measurements from the Slurry Mix Evaporator acceptability analysis as well as the glass density. In April 2022, a subsequent DOE-SR directive increased the fissile mass loading limit to 2500 g/m 3 beginning with Sludge Batch 11. Thus, the 897 g/m 3 limit still applies to Sludge Batch 10 (SB10) processing. For SB5 through initial Sludge Batch 9 (SB9) processing prior to coupled operation with the Salt Waste Processing Facility (SWPF), SRNL provided DWPF a bounding glass density value that was based on a statistical evaluation of density measurements. To eliminate the need for experimental work, a composition-based density model for HLW glasses was developed at SRNL in 2019. The objective of this report is to present the bounding glass density determined with the composition-based density model for SB10 sludge-only (SO) and coupled processing.

11 NUCLEAR FUEL CYCLE AND FUEL MATERIALS↗

SCIX IMPACT ON DWPF CPC

A program was conducted to systematically evaluate potential impacts of the proposed Small Column Ion Exchange (SCIX) process on the Defense Waste Processing Facility (DWPF) Chemical Processing Cell (CPC). The program involved a series of interrelated tasks. Past studies of the impact of crystalline silicotitanate (CST) and monosodium titanate (MST) on DWPF were reviewed. Paper studies and material balance calculations were used to establish reasonable bounding levels of CST and MST in sludge. Following the paper studies, Sludge Batch 10 (SB10) simulant was modified to have both bounding and intermediate levels of MST and ground CST. The SCIX flow sheet includes grinding of the CST which is larger than DWPF frit when not ground. Nominal ground CST was not yet available, therefore a similar CST ground previously in Savannah River National Laboratory (SRNL) was used. It was believed that this CST was over ground and that it would bound the impact of nominal CST on sludge slurry properties. Lab-scale simulations of the DWPF CPC were conducted using SB10 simulants with no, intermediate, and bounding levels of CST and MST. Tests included both the Sludge Receipt and Adjustment Tank (SRAT) and Slurry Mix Evaporator (SME) cycles. Simulations were performed at high and low acid stoichiometry. A demonstration of the extended CPC flowsheet was made that included streams from the site interim salt processing operations. A simulation using irradiated CST and MST was also completed. An extensive set of rheological measurements was made to search for potential adverse consequences of CST and MST and slurry rheology in the CPC. The SCIX CPC impact program was conducted in parallel with a program to evaluate the impact of SCIX on the final DWPF glass waste form and on the DWPF melter throughput. The studies must be considered together when evaluating the full impact of SCIX on DWPF. Due to the fact that the alternant flowsheet for DWPF has not been selected, this study did not consider the impact of proposed future alternative DWPF CPC flowsheets. The impact of the SCIX streams on DWPF processing using the selected flowsheet need to be considered as part of the technical baseline studies for coupled processing with the selected flowsheet. In addition, the downstream impact of aluminum dissolution on waste containing CST and MST has not yet been evaluated. The current baseline would not subject CST to the aluminum dissolution process and technical concerns with performing the dissolution with CST have been expressed. Should this option become feasible, the downstream impact should be considered. The main area of concern for DWPF from aluminum dissolution is an impact on rheology. The SCIX project is planning for SRNL to complete MST, CST, and sludge rheology testing to evaluate any expected changes. The impact of ground CST transport and flush water on the DWPF CPC feed tank (and potential need for decanting) has not been defined or studied.

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Results of the Supplementary Analyses of Salt Batch 10 and 11 Samples

Supplementary analyses of material from the Interim Salt Disposition Project (ISDP) Salt Batch (SB) 10 and Salt Batch 11 (SB11) samples were analyzed beyond what is described in previous reports. These additional analyses are required to verify these materials meet Salt Waste Processing Facility (SWPF) Waste Acceptance Criteria (WAC) feed requirements. The stored SB10 and SB11 samples have been analyzed without filtering and the results found to be very similar to the previous filtered analyses performed for SB10 and SB11. The only result of significant difference is the wt% insoluble solids result for the SB11 sample. It would appear the newer method of analyzing larger volumes gives more accurate measurements for solutions with low quantities of solids.

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Low Purge and Mercury Recovery Testing with Sludge Batch 10 Tank 40 Simulant

Researchers at the Savannah River National Laboratory (SRNL) have completed testing as requested by Savannah River Mission Completion (SRMC) to perform experiments to determine the impact of using a lower or inert purge in Sludge Batch (SB) 10 processing under the Nitric-Glycolic Acid (NGA) flowsheet. A key objective of this testing was also to determine the mercury speciation and recovery during each experiment. The testing was performed as part of the SB10 Technical Task Request (TTR) and Task Technical and Quality Assurance Plan (TTQAP). Two sets of tests were performed, and a Run Plan was approved prior to each set of experiments to document the planned testing. Three initial experiments were completed to determine whether a low air purge would be beneficial to CPC processing at higher acid stoichiometry (110%) based on the Koopman minimum acid (KMA) equation (116% Hsu). One of the tests, an inert nitrogen purge experiment, was also completed to demonstrate that excluding oxygen did not introduce any new hazards. The experiments were designed to be identical except for the change in purge gas and purge flowrate from run to run. After reviewing the results from the initial three experiments, six additional tests were proposed by SRNL to support the lower purge study and to look for processing alternatives for improving mercury recovery. These additional six tests were all completed at a very low acid stoichiometry to mimic the pH experienced during processing in DWPF (~7). DWPF is processing SB10 sludge at an acid stoichiometry of 90% based on the Hsu equation. The additional SRNL experiments were performed at an acid stoichiometry of 62.5% KMA stoichiometry (66.3% Hsu) to produce a Sludge Receipt and Adjustment Tank (SRAT) product with a pH of about 7. All experiments used simulants of both SWPF streams, although no entrained solvent was added during any of the experiments

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

DWPF COAL CARBON WASTE ACCEPTANCE CRITERIA LIMIT EVALUATION

A paper study was completed to assess the impact on the Defense Waste Processing Facility (DWPF)'s Chemical Processing Cell (CPC) acid addition and melter off-gas flammability control strategy in processing Sludge Batch 10 (SB10) to SB13 with an added Fluidized Bed Steam Reformer (FBSR) stream and two Salt Waste Processing Facility (SWPF) products (Strip Effluent and Actinide Removal Stream). In all of the cases that were modeled, an acid mix using formic acid and nitric acid could be achieved that would produce a predicted Reducing/Oxidizing (REDOX) Ratio of 0.20 Fe{sup +2}/{Sigma}Fe. There was sufficient formic acid in these combinations to reduce both the manganese and mercury present. Reduction of manganese and mercury are both necessary during Sludge Receipt and Adjustment Tank (SRAT) processing, however, other reducing agents such as coal and oxalate are not effective in this reduction. The next phase in this study will be experimental testing with SB10, FBSR, and both SWPF simulants to validate the assumptions in this paper study and determine whether there are any issues in processing these streams simultaneously. The paper study also evaluated a series of abnormal processing conditions to determine whether potential abnormal conditions in FBSR, SWPF or DWPF would produce melter feed that was too oxidizing or too reducing. In most of the cases that were modeled with one parameter at its extreme, an acid mix using formic acid and nitric acid could be achieved that would produce a predicted REDOX of 0.09-0.30 (target 0.20). However, when a run was completed with both high coal and oxalate, with minimum formic acid to reduce mercury and manganese, the final REDOX was predicted to be 0.49 with sludge and FBSR product and 0.47 with sludge, FBSR product and both SWPF products which exceeds the upper REDOX limit.

01 COAL, LIGNITE, AND PEAT↗

Measurement Acceptance Region (MAR) Assessment Results Based on the October 2019 Sludge Batch 10 Projections

Recent analysis of a Tank 26 sample indicated a higher than anticipated sulfur concentration in the supernatant and a significant amount of insoluble sulfur. The final concentration in the glass product would be well above the sulfate limits of 0.6-0.65 weight percent (wt.%) determined for previous sludge batches. In preparation for Sludge Batch 10 (SB10) processing, washing of Tank 51 will be performed to reduce the sulfate concentration in the glass product to less than 0.65 wt.% at waste loadings (WLs) of interest. To evaluate the feasibility of two Tank 51 Na wash endpoints (0.8 and 1.2M), Savannah River Remediation requested that the Savannah River National Laboratory perform assessments using the Defense Waste Processing Facility Product Composition Control System (PCCS) models and their associated Measurement Acceptance Region (MAR) constraints.

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗