Engineering Papers⌕ Search

SEARCH · Engineering Papers

Results for “Risk Informed Decision Making”

Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.

Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.

At least 19 records

Evaluating Supply Prioritization Strategies for Risk-Informed Decision Making in an Arbitrary Gas Network

Supply disruptions and infrastructure failures in natural gas networks present critical challenges to energy reliability and risk-informed planning. This study evaluates two supply prioritization strategies, Maximum Delivery Prioritization (MDP) and Demand-Based Prioritization (DBP), within an arbitrary natural gas network under conditions of supply shortage. Model performance under both strategies is assessed in response to node and edge failure using demand satisfaction metrics, system-wide and localized dependency scores, and geographic information system (GIS)-based spatial analysis. Results show that DBP better preserves supply for high-demand nodes, while MDP offers broader coverage. The underlying network topology plays a critical role in shaping prioritization outcomes. Integrated GIS visualization enhances the interpretability of vulnerability assessments, revealing structurally critical components and localized vulnerabilities. The proposed framework supports scalable, data-driven decision-making for infrastructure planners and engineers, enabling improved disruption recovery and efficiency in constrained natural gas networks. These insights contribute to the development of more robust energy systems capable of withstanding stress and disruptions.

Peterson, Steven [ORNL] (ORCID:0000000287672998)↗

The Technical Resilience Navigator: Risk-Informed Decision Making to Support Resilience Planning

The Technical Resilience Navigator (TRN) helps organizations manage the risk to critical functions at a site from disruptions in energy and water services. Developed in partnership by the Pacific Northwest National Laboratory and the National Renewable Energy Laboratory, under direction and funding from the Department of Energy’s Federal Energy Management Program, the TRN helps organizations enhance their resilience to a variety of disruptive events, both natural and human-caused, that could interrupt normal operations for an unknown period of time. This report provides an overview of the TRN’s risk-informed approach to resilience planning and formally describes how it uses a streamlined risk model to identify effective strategies for improving resilience.

99 GENERAL AND MISCELLANEOUS↗

The Screening Tool for Industrial Resilience: Risk-Informed Decision Making to Support Resilience Planning

The Screening Tool for Industrial Resilience (STIR) helps small and medium-sized manufacturing plants manage risk to their production. Developed by the Pacific Northwest National Laboratory under direction and funding from the Department of Energy’s Office of Manufacturing and Energy Supply Chains, the STIR helps manufacturers enhance their resilience to a variety of disruptive events, both natural and human-caused, that could interrupt normal operations. This report provides an overview of the STIR’s risk-informed, high-level approach to resilience planning, which identifies potential solutions that could enhance site resilience based on calculated major risk drivers.

97 MATHEMATICS AND COMPUTING↗

Panel Session 132: Risk-Informed Approach for Decision Making in WM, D and D and SNF Management: Reasonable Assurance for Safety

Mr. Larry Camper organized a panel of experts to discuss approaches to better make risk-informed decisions in waste management, decommissioning, and the management of Spent Nuclear Fuel (SNF). The audience heard the perspectives from four panelists that addressed issues ranging from the technical basis used to make risk-informed decisions to for developing cleanup criteria and promulgating regulations and safety standards both domestically and abroad. A summary of each of the presentations given by the panelists is provided herein. This WMS BOD featured panel focused on the Risk-Informed Approach for Decision Making in WM, D and D and SNF Management and the Reasonable Assurance for Safety. The panelists addressed and discussed with the audience different approaches used for decision-making, summarizing ongoing probabilistic vs. deterministic approaches, including IAEA graded approach, and discussed policies/approaches to achieve reasonable assurance for safety rather than using absolute assurance. Panelists with presentations: Risk-Informed Decision Making - More than a Motto? (Paul Black); NRC Staff Perspective on Risk-Informed Approach and Reasonable Safety Assurance in D and D and LLW (Rateb (Boby) Abu Eid); Risk-Informed Decision-Making and Illustrative National Academies Studies (Charles Ferguson); IAEA's Revised Safety Guidance on Remediation (Michelle Roberts); NDA Radioactive Waste Strategy - A Risk Informed Approach (James McKinney)

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Supporting Risk-informed Decision-making During Reactor Accidents

Uncertainty in severe accident evolution and outcome is driven by event bifurcations that represent distinctive challenges to defensive layers and tend to promote the emergence of discrete classes of core damage and accident risk. This discrete set of "attractor" states arise from the complex networks of competing physical phenomena and conditional event cascades occurring as the overall system degrades – a process that yields increasing degrees of freedom and accident progression pathways. Characterization of these event spaces has proven elusive to more traditional data interrogation methods, but proves tractable by application of more advanced data collection and machine learning approaches. Through application of these approaches we demonstrate a conceptual framework that enables real-time/robust, risk-informed decision-making support to improve accident mitigation and encourage “graceful exits” during low probability, extreme events limiting accident consequences. In this analysis, we simulated over 8,000 short-term station blackout (STSBO) accidents with the state-of-the-art integral severe accident code, MELCOR, and demonstrate the potential for ML approaches to predict simulation outcomes. We chose to pair ML tools with interpretable and mechanistic event trees for the considered STSBO accident space to predict the likelihood of future event paths along the tree. In addition to the current state of the system, we use information from recent trajectories of temperature, pressure, and other physical features, combining both the current state and past trajectories to forecast future event paths. Finally, we simulate the random injection of variable amounts of water to quantify the efficacy of available actions at reducing risks along the many branches in the event tree. We identify scenarios and windows of opportunity to mitigate risk as well as scenarios in which such actions are unlikely to alter the accident end-state.

22 GENERAL STUDIES OF NUCLEAR REACTORS↗

Development and Demonstration of a Risk Assessment Approach for Approval of a Transportation Package of a Transportable Nuclear Power Plant for Domestic Highway Shipment

The U.S. Department of Defense (DoD) Strategic Capabilities Office (SCO) has tasked PNNL to address the regulatory challenges associated with confirming the safe transport of Transportable Nuclear Power Plants (TNPPs) containing irradiated nuclear fuel. A previous report—Proposed Risk-Informed Regulatory Framework for Approval of Microreactor Transportation Packages (PNNL-31867)—determined that the expected radioactive inventory in the irradiated fuel of a TNPP would likely require shipment in an NRC-approved Type B package (or spent nuclear fuel cask) but that a TNPP “package” is unlikely to meet the entire suite of NRC requirements set forth in Part 71 of Title 10 of the Code of Federal Regulations (CFR) for a Type B package. It was therefore concluded that shipment of this initial TNPP transportation package, as well as possibly others, under existing regulations would likely require NRC approval using the 10 CFR 71.12 (“Specific exemptions”) process that relies on risk-informed decision making supported by quantitative risk assessment (i.e., Probabilistic Risk Assessment).

11 NUCLEAR FUEL CYCLE AND FUEL MATERIALS↗

First-of-a-Kind Risk-Informed Digital Twin for Operational Decision Making

A digital twin (DT) is a digital model or a collection of models of a physical entity. DTs in the nuclear arena can be used from plant design through decommissioning. Decisions are typically a priori or made offline. Risk-informed decision making is identifying what can go wrong, its frequency, and the consequences of its failure. Ideally risk-informed decision making reflects the current state of the plant and provides a decision in real time. Traditionally, probabilistic risk assessments (PRAs) evaluate the failures of safety systems, the risk of core damage, and the offsite dose as the consequence. However, this DT evaluates the decisions on the control side rather than the protection side. It uses the same risk methods to probabilistically inform the decision-making process but in a different way. Rather than evaluating the risk of core damage, this DT evaluates the likelihood of avoiding a trip set point while maintaining plant safety. Performance-based assessments are identified via its probabilistic evaluation of operational alternatives based on system status. Because the purpose of the control system is to maintain system variables within prescribed operating ranges, upsets or challenges that can exceed a trip set point resulting in a plant transient and a challenge to plant mitigating systems based on actual plant conditions, are evaluated to safely maintain the plant within the operating ranges. The probabilistic portion of the model is autonomously and automatically adjusted, and the metric of interest (i.e. likelihood of avoiding a trip set point) is recalculated. The digital representation of the physical system (i.e. the DT) performs a deterministic performance–based assessment of the probabilistically identified alternatives identified to validate the probabilistic assessment. A decision-making algorithm selects the appropriate option based on the probabilistic and deterministic assessments and transmits a control signal to a component(s) to initiate a corrective action or informs an operator of its decision.

digital twin↗

Developing a Process for Collaboration-Based Siting of a Federal Consolidated Interim Storage Facility in the United States: Learning from Communities Living with Legacy Waste

In June of 2023, the U.S. Department of Energy (DOE), Office of Nuclear Energy (NE) announced the selection of its Collaboration-Based Siting (CBS) Consortia, a group of 12 awardees, including the Consortium for Risk Evaluation with Stakeholder Participation (CRESP) (led by Vanderbilt University) to assist DOE-NE with the development of its process for siting a federal consolidated interim storage facility (FCISF) for spent nuclear fuel (SNF) storage. At this time, DOE NE is not soliciting interested host communities, rather the CBS Consortia are tasked with in-depth engagement, mutual learning, and capacity building to provide DOE NE with feedback on the CBS process. CRESP’s objective is to engage communities in two regions (the Pacific Northwest and the Southeast) with sites currently storing defense- and research-related SNF to foster learning concerning the best and worst practices in community participation in risk-informed decision making. This includes learning from existing structures for public input in radioactive waste management decision making [e.g. citizen advisory boards (CABs)] and other local parties about how to build and sustain trust among the parties. CRESP has been working to engage stakeholders and Tribes surrounding two DOE sites historically differing in receptiveness to engaging with DOE and trusting in DOE to accomplish its missions. CRESP’s approach to date has consisted of (1) engaging voluntarily members and former members of the DOE Office of Environmental Management’s CABs to develop a mutual understanding of their perspectives, values, and experiences related to risk and participatory decision making; (2) engaging members of those communities that would likely be part of any radioactive waste management discussions and who may provide valuable feedback for the development of the CBS process; and in the longer term, (3) engaging communities to foster knowledge sharing on understanding and definitions of risk and how risk is factored into community decision making. Our emphasis is to identify opportunities for improving risk communication frameworks, strategies, and decision making. The selection of a future FCISF site is likely to result in the creation of a structure similar to a CAB composed of members of the local community. We anticipate that these insights can help DOE NE learn from existing participatory risk communication structures in place at sites storing defenseor research-related SNF to understand best practices for fostering enduring and participatory relationships with future CABs. Within this paper, we (1) describe CRESP’s overall approach to assisting DOE NE with maturing the CBS process; (2) present a summary of preliminary phase 1 project results, including the development of a body of knowledge (describing available resources to support community engagement, risk communica tion, and participatory decision making) and community ecosystem information (leveraging demographic, social, economic, and environmental attribute mapping and advanced sentiment analysis of social media data); and (3) based on these results, provide observations for future research opportunities to support the development of CBS processes for radioactive waste management facilities, generally.

collaboration-based siting↗

Choosing the Best Modeling Platform for Radiological Risk Assessment Models - 20468

Radiological risk assessments, in the form of performance or safety assessments, are often required under regulations or guidance for remediation of contaminated land, decommissioning of contaminated buildings or structures, and radioactive waste disposal. These risk assessments are usually supported by fate and transport models that address decay and ingrowth of radionuclides, as well as their movement through engineered systems and the natural environment. These models are often projected thousands, or more, years into the future, largely because the radioactive species change through decay and ingrowth, and hence the magnitude of the radioactive effect changes with time. There are many computer codes that are available to address this type of modeling. They range from addressing specific pathways or processes such as infiltration of water, groundwater, surface water, air, biota, diffusion and advection of water and gases, to those that try to couple all processes together to evaluate the impact of fate and transport through the entire system to places in space and time to which access is assumed. These different types of codes are sometimes separated with the monikers process-level and systems-level codes, although it is often not clear that this separation does justice to the capabilities of the many codes that are available to evaluate fate and transport of radionuclides. The focus of this paper is the latter group of modeling codes. Several systems level modeling codes exist and are used. There are differences between these codes in terms of utility, flexibility, complexity and cost. The purpose of this paper is to compare a few of these codes in the context of work currently being performed by the International Atomic Energy Agency (IAEA) Modeling and Data for Radiological Impact Assessments (MODARIA) II Working Group 1 (WG1). The MODARIA II WG1's main focus is how stakeholder engaged decision analysis can, or should, be applied to radiological contamination problems so that better, longstanding, sustainable, solutions are reached. However, the WG1 also recognizes the potential impact of the modeling tools that are chosen to address radiological risk, which is often a primary objective of decision making for radiological problems. Other objectives might also be important, such as constraining costs, obtaining financing, minimizing impact on ecosystems, saving cultural resources, saving jobs, farmland, environmental justice, etc., in a full decision analysis for a given radiological contamination problem, but none of these other objectives have the same types of complex modeling needs as minimize radiological dose. Consequently, a further focus of WG1 is to evaluate the potential impacts on decision making of the choice of fate and transport, and risk assessment, modeling codes that are used to support decision making. The WG1 will produce a report at the end of 2020 that will focus on an approach to effective decision making and stakeholder engagement. The report will also consider the role that performance assessment modeling should play in the decision-making process, including the impact of the choice of modeling tools or computer codes on risk-informed decision making. Several sites around the World have been made available by Member States for these model comparisons, and several modeling tools have been considered. However, the focus of this paper is on two of the sites, one in Belgium and one in Ukraine, and on three of the tools: NORMALYSA (NORM And Legacy Site Assessment); GoldSim{sup C}, and AMBER{sup C}. The final report from this working group will also cover other modeling tools, including RESRAD, and PC-Cream{sup R}. (authors)

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Assessing the Potential for Inadvertent Human Intrusion at the Area 3 and Area 5 Radioactive Waste Management Sites on the Nevada National Security Site, Nye County, Nevada

This paper recommends an approach to inadvertent human intrusion (IHI) at the Area 3 and Area 5 Radioactive Waste Management Sites (RWMSs) on the Nevada National Security Site (NNSS). IHI analysis uses the consequences of an individual inadvertently contacting buried waste to set waste concentration limits for near-surface disposal of low-level radioactive waste (LLW). Regulatory agencies are increasingly applying risk-informed decision-making to LLW waste management (NRC 2006). Risk-informed decision-making combines scientific risk assessment with stakeholder values and perceptions to determine a level of acceptable risk. Risk considers not only the consequences of an event, but also its probability of occurring.

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Risk-Informed MultiPphysics BestEestimate Plus Uncertainties (BEPU) Application Development of RELAP5-3D Perturbation Model

The United States nuclear industry is facing a strong challenge to ensure maximum safety while enhancing economic benefit. Safety is a key parameter to all aspects related to light water reactor (LWR) nuclear power plants (NPPs), especially cost savings. Since the goal is to extend the lifetimes of these NPPs, the traditional deterministic safety concept may not guarantee a current economic asset. The Light Water Reactor Sustainability (LWRS) Program has been promoting a wide range of research and development (R&D) in this field to maximize the safety, economics, and performance of these NPPs through improved scientific understanding. One of the best practices to achieve this goal is to identify and optimize safety margins, which can lead to cost reduction. To do this, under the LWRS framework, the Risk-Informed Systems Analysis (RISA) Pathway will focus on the optimization of safety margin and minimization of uncertainties to ensure both safety and economics at the highest level. The RISA Pathway will provide enhanced capabilities for analyzing and characterizing LWR systems performance by developing and demonstrating methods, tools, and data to enable risk-informed margins management (RIMM). The goals of the RISA Pathway are twofold: (1) deploy the risk-informed tools and methods that enable better representation of safety margins and factors that contribute to cost and safety; and (2) conduct advanced risk assessment applications with industry to support margin management strategies that enable more cost-effective plant operation. The tools and methods provided by the RISA Pathway will support effective margin management for both active and passive safety systems, structures, and components (SSC) of an NPP. The tools and methods used in the RISA Pathway should have high confidence and highest technical maturity for and implementation to industry at its current setting. They should also have a capability to support risk-informed decision making for both probabilistic and deterministic elements of safety. The RISA Pathway will, therefore, perform a comprehensive assessment of verification and validation (V&V) status of RISA Toolkit to enhance credibility RISA Toolkit which be used by industry. This report summarizes RELAP5-3D development activities for best estimated and uncertainty (BEPU) capability to support ongoing RISA Pathway pilot projects for risk informed uncertainty quantification applications. Work scope includes (1) development of initial perturbation model for selected closure laws and (2) testing of suitable probability distribution functions (PDF) for the selected correlations. Developed BEPU modules are tested with selected separate effect cases and compared with conventional thermal-hydraulics model.

11 NUCLEAR FUEL CYCLE AND FUEL MATERIALS↗

Deep-learning-enhanced assessment of wellbore barrier effectiveness in geologic storage systems with intermediate aquifers

For geologic systems where carbon dioxide (CO 2 ) is injected underground, existing wells represent potential pathways for fluid migration. Here, this study introduces a novel deep learning model to quantify the likelihood and potential magnitude of fluid migration through wellbores at sites with intermediate aquifers or thief zones between the injection units and underground drinking water sources. Synthetic datasets, generated using reservoir simulations, captured a wide range of subsurface conditions, well attributes, operational parameters, and fluid migration scenarios. Among the regression models developed to predict brine and CO 2 leakage rates and CO 2 saturations along leaky wellbores, convolutional neural network (CNN) outperformed both Light Gradient Boosting Machine and deep neural network. Additionally, a CNN-based classification model was created to predict whether brine and CO 2 would leak along a wellbore, further improving performance over regression alone. The best models were integrated into the National Risk Assessment Partnership Open-source Integrated Assessment Model for rapid, stochastic assessment of storage system containment and leakage risks. A case study demonstrated the model’s ability to simulate fluid migration through existing wells with multiple intermediate aquifers. This computationally efficient wellbore model offers value in support of site performance evaluation and risk-informed decision making by stakeholders.

CO2 leakage↗

Digital Tools for the Preventive Conservation of Built Heritage: The Church of Santa Ana in Seville

Historic Building Information Modelling (HBIM) plays a pivotal role in heritage conservation endeavours, offering a robust framework for digitally documenting existing structures and supporting conservation practices. However, HBIM’s efficacy hinges upon the implementation of case-specific approaches to address the requirements and resources of each individual asset and context. This paper defines a flexible and generalisable workflow that encompasses various aspects (i.e., documentation, surveying, vulnerability assessment) to support risk-informed decision making in heritage management tailored to the peculiar conservation needs of the structure. This methodology includes an initial investigation covering historical data collection, metric and condition surveys and non-destructive testing. The second stage includes Finite Element Method (FEM) modelling and structural analysis. All data generated and processed are managed in a multi-purpose HBIM model. The methodology is tested on a relevant case study, namely, the church of Santa Ana in Seville, chosen for its historical significance, intricacy and susceptibility to seismic action. The defined level of detail of the HBIM model is sufficient to inform the structural analysis, being balanced by a more accurate representation of the alterations, through linked orthophotos and a comprehensive list of alphanumerical parameters. This ensures an adequate level of information, optimising the trade-off between model complexity, investigation time requirements, computational burden and reliability in the decision-making process. Field testing and FEM analysis provide valuable insight into the main sources of vulnerability in the building, including the connection between the tower and nave and the slenderness of the columns.

Chaves, Estefanía↗

System risk quantification and decision making support using functional modeling and dynamic Bayesian network

Risk-informed decision-making requires a probabilistic assessment of the likelihood of success of control action, given the system status. This paper presents a systematic state transition modeling approach integrating dynamic probabilistic risk assessment with a decision-making process using a dynamic Bayesian network (DBN) coupled with functional modeling. A functional model designed with multilevel flow modeling (MFM) technique was used to build a system state structure inferred by energy, mass, and information flow so that one can verify the developed model with respect to system functionality. The MFM model represents the causal relationship among the nodes, which captures the structure of process parameters and control units. Each node may have multiple possible states, and the DBN structured by the MFM model represents the time-domain transitions among the defined states. Furthermore, the MFM-DBN integrated state transition modeling is a white-box approach that allows one to draw the system's risk profile by updating the system states and supports the decisions probabilistically with physical inference. An example of a simple heating system has been used to illustrate this process, including decision-making support based on quantitative risk profile. For demonstrating its applicability to a complex system operational decision making, a case study of station blackout accident scenario leading to the seal loss of coolant accident in a nuclear power plant is presented. The proposed approach effectively provided the risk profile along time for each option so that the operators can make the best decision, which minimizes the plant risk.

42 ENGINEERING↗

Risk-Informed Operations and Maintenance Decision Making Using Deep Reinforcement Learning

A challenge for operating nuclear power plants is the significant cost of operations and maintenance, at times consuming up to 66% of annual operating costs. This project aims to build a framework for a risk-informed asset-management tool that integrates inspections, repairs, spare-part inventory, supply chain, and business choices to lower overall O&M costs. Our approach uses a combination of data-driven modeling and deep reinforcement learning to create and implement optimal maintenance policies for the existing nuclear fleet, as well as new advanced reactors. The creation of an asset management tool that uses these advanced methods will give operators new capabilities to help reduce the burden of O&M spending in nuclear power plants.

22 GENERAL STUDIES OF NUCLEAR REACTORS↗

Panel Session 80: Interagency Community of Practice in Risk and Performance Assessment

This panel focused on the status of the Inter-agency Performance and Risk Assessment Community of Practice (P and RA COP). Representatives from the P and RA COP and subject matter experts discussed lessons learned and provided feedback on building the P and RA COP to support risk-informed environmental decision making. Panelists with presentations: Understanding Mechanisms to Manage Uncertainty and Risk in Waste Containment Systems (Craig Benson, University of Virginia - CRESP (USA) Scaling for Performance Assessments (Paul Black, Katie Catlett, Doug Anderson, Paul Duffy, Tom Stockton, Sam Van Sickle, John Carson); Interagency Community of Practice in Rick and Performance Assessment (Horst Monken Fernandes); Institutional Controls as a Risk Management Tool (David Esh); Superfund: Explanation of Screening and PRG's for Risk and Dose Assessment (Stuart Walker)

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗