Engineering Papers⌕ Search

SEARCH · Engineering Papers

Results for “Requirements engineering”

Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.

Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.

At least 19 records

Cyber-Informed Engineering Requirements Framework Use Cases

The requirement analysis use case effort leverages the Cyber-Informed Engineering (CIE) requirements framework to examine two real-world scenarios: Battery Energy Storage System (BESS) installation at the Flatirons Campus, NLR; SCADA improvement program. This work evaluates the existing requirements for each use case, applies the CIE requirements framework, and assesses the benefits and enhancements gained compared to the current requirements. The results will advance CIE from concept to practical application by identifying key opportunities for integrating CIE principles into established engineering workflows during the requirements phase.

97 MATHEMATICS AND COMPUTING↗

Direct Laser Impulse (DLI) System Alignment: Requirements Engineering Project

The National Ignition Facility (NIF) is the world’s largest and most energetic laser, and it is comprised of 192 laser beams that must align onto one target for the purpose of learning about Internal Confinement Fusion (ICF) and High Energy Density (HED) physics. A new NIF capability under development is the Direct Laser Impulse (DLI). The DLI capability will provide a test environment where high pulsed laser energy is delivered to a three-dimensional target. Achieving this delivery to target relies on a precision alignment and positioning of the two redirected NIF beams, as shown in Figure 1. When aligned, the two combined beams—with a frequency converted from infrared (IR) to green laser light, at a fluence (energy per unit area) of roughly 20 joules per square centimeter—will be capable of delivering up to 30 kilojoules of direct, unfocused energy to a one cubic foot target. The 40-cm x 40-cm aligned impulse area at the DLI target interaction plane (TIP) is achieved by using a beam path comprised of pickoff and transport mirrors, frequency conversion crystals, optics serving as environmental barriers, and debris shields. A separate aligned diagnostic beam path is also required for impulse to TIP characterization. Final in-situ alignment is required for the two populated diverted NIF beam paths onto the DLI target as well as the diagnostic optical beam path. Existing NIF alignment subsystems do not offer references that meet DLI’s unique demand. The new DLI Red Box, which has been designed to allow for alignment, has been shown to require deviation from the intended configuration and operational use case to obtain adequate functionality. A systems engineering evaluation has identified a solution that meets the stakeholder requirements while optimizing key performance parameters. The solution, referred to in this document as the Red Box “+” Rotated, was determined to be an improved version of the current DLI Red Box. This system offers improved system repeatability and alignment stability while maintaining similar interfaces and decreasing the demand for engineer/operator interaction.

70 PLASMA PHYSICS AND FUSION TECHNOLOGY↗

Conceptual design of HTS magnets for fusion nuclear science facility

Second-generation high temperature superconductors (HTS) are available for producing >20 T at the magnet bore compared to 13–16 T for lower temperature superconducting (LTS) toroidal field magnets proposed in recent fusion energy systems studies (FESS) of Fusion Nuclear Science Facility (FNSF). HTS may enable higher fusion power density and smaller device size. High current density cables of multi-layered REBCO tapes have achieved >10 kA at 4–20 K operation in short sample tests for fusion. High current density cables are required for engineering design of FNSF to allow space for interior plasma components. High current density HTS magnets are particularly attractive in reducing the size of a fusion device, beneficial for compact tokamaks, due to their space constraints. Successful HTS magnet development may enable the design of smaller and cheaper fusion pilot plants with a mission of demonstrating net electricity. It may also offer significant cost and performance advantages in non-fusion applicants such as nuclear magnetic resonance (NMR) and magnetic resonance imaging (MRI). Furthermore, we developed HTS magnet design concepts for a compact FNSF radial build in order to define the coil size, winding pack mechanical loading and engineering requirements. Partnering with vendors in the US, PPPL is also testing high current cable prototypes aiming at enabling low cost cable technology toward 100 A/mm 2 engineering current density over the winding pack desired in high field model coil development for compact fusion pilot plants.

70 PLASMA PHYSICS AND FUSION TECHNOLOGY↗

Generalized Information Architecture for Managing Requirements in IBM's Rational DOORS® Application

When a requirements engineering effort fails to meet expectations, often times the requirements management tool is blamed. Working with numerous project teams at Sandia National Laboratories over the last fifteen years has shown us that the tool is rarely the culprit; usually it is the lack of a viable information architecture with well-designed processes to support requirements engineering. This document illustrates design concepts with rationale, as well as a proven information architecture to structure and manage information in support of requirements engineering activities for any size or type of project. This generalized information architecture is specific to IBM's Rational DOORS (Dynamic Object Oriented Requirements System) software application, which is the requirements management tool in Sandia's CEE (Common Engineering Environment). This generalized information architecture can be used as presented or as a foundation for designing a tailored information architecture for project-specific needs. It may also be tailored for another software tool.

Aragon, Kathryn Mary↗

Hydropower Geotechnical Foundations: Current Practice and Innovation Opportunities for Low-Head Applications

Hydropower is a renewable energy resource that produces electricity from flowing water under pressure. Engineered hydropower structures, such as dams, are used to create a hydraulic head, enabling a turbinegenerator unit to convert pressurized flow into electricity. While hydropower has been a source of renewable energy since antiquity, new development in the United States has slowed in recent decades. Based on recent resource assessments, the largest opportunity to expand hydropower in the United States is from new stream-reach development (i.e., new hydropower development along stream-reaches that do not currently have hydroelectric facilities or other forms of infrastructure, such as dams). Roughly 75% of identified new stream-reach development potential is from low-head sites (less than 30 ft of head), which typically suffer from smaller power densities and higher normalized costs, given economies of scale. Hydropower developers and other stakeholders are thus interested in strategies to reduce initial capital costs while practicing sustainable development to maximize environmental compatibility with minimal disruption to natural aquatic life, sediment, and water flows. Historically, civil works have represented a significant cost driver for new hydropower development, with the foundation system representing a major cost component and source of uncertainty. The foundation system is the collection of engineered structural features (e.g. cutoff trenches, walls, grouting, anchors) constructed at or below the preconstruction ground surface that interfaces between the overlying structures (superstructures) and the bed material below (subsurface). Development of a hydropower foundation system must consider the various characteristics of the surrounding stream environment and subsurface while adhering to the engineering requirements of the superstructure that it supports. The care of water, excavation, and other construction activities are important features of foundation design and construction. The design and construction cost of the foundation system is largely dependent on the site geology and riverbed composition and is influenced by the level of geotechnical assessment required and conducted. Thus, a hydropower facility’s geotechnical foundation is often highly site-specific, with proper site selection and assessment being important to project success. The foundation system is designed to provide structural stability (of the foundation and dam), limit seepage, ensure public safety, and maintain functionality for the project life, during both construction and facility operations. Inadequate foundation or dam design can result in dam failure and the uncontrolled release of significant volumes of water, which could cause a high number of casualties and extensive property damage downstream of the failure. According to the Association of State Dam Safety Officials, approximately 30% of all historical dam failures in the United States are attributed to foundation or abutment defects, and another 20% are attributed to piping or seepage through the embankment, foundation, or abutment. To ameliorate these safety considerations, foundations often require massive amounts of construction material (e.g., grout, concrete, engineered dam fill) and long construction times. Foundation design also requires significant analysis prior to construction because the initial in-stream and abutment subsurface conditions are site-specific, and sufficient data for them often are lacking. Current practice requires on-site assessment, using expensive drilling and invasive and non-invasive investigation methods, to determine the expected cost of foundation material and treatment. Additionally, foundation construction often requires site dewatering (and other care of water activities), which involves constructing temporary diversion structures upstream and often downstream, called cofferdams, and water diversion systems that route water around the construction site. Cofferdams and water diversion systems can drastically increase construction costs and contribute to environmental disruption, including modification of flow patterns and benthic habitats. Given the technical, economic, and environmental challenges associated with hydropower foundations, opportunities exist to improve the current state of practice and to develop new and innovative solutions to Hydropower is a renewable energy resource that produces electricity from flowing water under pressure. Engineered hydropower structures, such as dams, are used to create a hydraulic head, enabling a turbinegenerator unit to convert pressurized flow into electricity. While hydropower has been a source of renewable energy since antiquity, new development in the United States has slowed in recent decades. Based on recent resource assessments, the largest opportunity to expand hydropower in the United States is from new stream-reach development (i.e., new hydropower development along stream-reaches that do not currently have hydroelectric facilities or other forms of infrastructure, such as dams). Roughly 75% of identified new stream-reach development potential is from low-head sites (less than 30 ft of head), which typically suffer from smaller power densities and higher normalized costs, given economies of scale. Hydropower developers and other stakeholders are thus interested in strategies to reduce initial capital costs while practicing sustainable development to maximize environmental compatibility with minimal disruption to natural aquatic life, sediment, and water flows. Historically, civil works have represented a significant cost driver for new hydropower development, with the foundation system representing a major cost component and source of uncertainty. The foundation system is the collection of engineered structural features (e.g. cutoff trenches, walls, grouting, anchors) constructed at or below the preconstruction ground surface that interfaces between the overlying structures (superstructures) and the bed material below (subsurface). Development of a hydropower foundation system must consider the various characteristics of the surrounding stream environment and subsurface while adhering to the engineering requirements of the superstructure that it supports. The care of water, excavation, and other construction activities are important features of foundation design and construction. The design and construction cost of the foundation system is largely dependent on the site geology and riverbed composition and is influenced by the level of geotechnical assessment required and conducted. Thus, a hydropower facility’s geotechnical foundation is often highly site-specific, with proper site selection and assessment being important to project success. The foundation system is designed to provide structural stability (of the foundation and dam), limit seepage, ensure public safety, and maintain functionality for the project life, during both construction and facility operations. Inadequate foundation or dam design can result in dam failure and the uncontrolled release of significant volumes of water, which could cause a high number of casualties and extensive property damage downstream of the failure. According to the Association of State Dam Safety Officials, approximately 30% of all historical dam failures in the United States are attributed to foundation or abutment defects, and another 20% are attributed to piping or seepage through the embankment, foundation, or abutment. To ameliorate these safety considerations, foundations often require massive amounts of construction material (e.g., grout, concrete, engineered dam fill) and long construction times. Foundation design also requires significant analysis prior to construction because the initial in-stream and abutment subsurface conditions are site-specific, and sufficient data for them often are lacking. Current practice requires on-site assessment, using expensive drilling and invasive and non-invasive investigation methods, to determine the expected cost of foundation material and treatment. Additionally, foundation construction often requires site dewatering (and other care of water activities), which involves constructing temporary diversion structures upstream and often downstream, called cofferdams, and water diversion systems that route water around the construction site. Cofferdams and water diversion systems can drastically increase construction costs and contribute to environmental disruption, including modification of flow patterns and benthic habitats. Given the technical, economic, and environmental challenges associated with hydropower foundations, opportunities exist to improve the current state of practice and to develop new and innovative solutions to challenges frequently encountered with traditional approaches. With this understanding, it is critically important to understand and document the current state of practice for hydropower geotechnical foundations, identify key challenges, and define opportunities for innovative solutions. To this end, this report documents the current state of practice across the three main phases of geotechnical foundation development: (1) geotechnical site assessment, (2) design, and (3) construction for hydropower systems. It also describes the major challenges with conventional approaches and identifies opportunities for innovation to reduce hydropower foundations costs, timelines, and risks. Key takeaways from this report include the following: Approximately 80% of available low-head sites are expected to have foundations on soil beds rather than rock beds, suggesting that rockfill and earthfill dams may be the most cost-effective conventional dam type for new projects.; Geotechnical and geologic investigation activities are time-consuming and expensive but are essential to define the parameters and criteria needed for foundation design.; Certain riverbed soil and bedrock types present significant technical challenges or require expensive foundation construction, which can prove financially prohibitive for low-head project development.; Modular hydropower design and prefabricated modular foundations represent a promising but unproven paradigm for new hydropower development. Design and construction approaches using optimized and highly repeatable, reliable components would benefit project cost, time, and risk but require additional research and development.; Temporary construction features for foundations, including cofferdams, water diversion, and water control systems, can prove costly and have inherent construction risk.; For economically viable development, hydropower geotechnical foundations should be limited to 4 to 15% of the project’s total initial capital costs. Many proposed projects have experienced cost overruns attributable to foundation difficulties or surprises during construction. These overruns may have been due to inadequate investigations, lack of adequate engineering effort to tailor the structures to site geology and topography, and/or contractual terms, among other considerations.; Challenges for hydropower foundations and opportunities for innovative technology solutions are identified in the following areas (consistent with the three main phases of foundation development): Geotechnical site assessment, Foundation design and materials, Construction methods and technology. Ultimately, this report aims to provide information about geotechnical foundations for low-head hydropower and to motivate transformative technologies to support hydropower growth.

13 HYDRO ENERGY↗

Weapon Systems Engineering Material Database Requirements

The Weapon Systems Engineering Material Database, often called ‘Granta’ (due to the use of Granta MI software by Granta Design) but referred to in this document as ‘the database’, stores and distributes material information to W-division at Los Alamos National Laboratory (LANL). The database is constantly evolving as data is imported and methods of retrieving data are developed. Because limited resources necessitate prioritization of data to be imported and retrieval method development, a definition is needed of how the database is to be used, both currently and in the future. This document, to be used by the database developers, is intended to provide that definition in the form of requirements for the database.

36 MATERIALS SCIENCE↗

SE Requirements Development Tool User Guide

The LANL Systems Engineering Requirements Development Tool (SERDT) is a data collection tool created in InfoPath for use with the Los Alamos National Laboratory’s (LANL) SharePoint sites. Projects can fail if a clear definition of the final product requirements is not performed. For projects to be successful requirements must be defined early in the project and those requirements must be tracked during execution of the project to ensure the goals of the project are met. Therefore, the focus of this tool is requirements definition. The content of this form is based on International Council on Systems Engineering (INCOSE) and Department of Defense (DoD) process standards and allows for single or collaborative input. The “Scoping” section is where project information is entered by the project team prior to requirements development, and includes definitions and examples to assist the user in completing the forms. The data entered will be used to define the requirements and once the form is filled out, a “Requirements List” is automatically generated and a Word document is created and saved to a SharePoint document library. SharePoint also includes the ability to download the requirements data defined in the InfoPath from into an Excel spreadsheet. This User Guide will assist you in navigating through the data entry process.

96 KNOWLEDGE MANAGEMENT AND PRESERVATION↗

A Waste Heat Recovery System for Light Duty Diesel Engines

In order to achieve proposed fuel economy requirements, engines must make better use of the available fuel energy. Regardless of how efficient the engine is, there will still be a significant fraction of the fuel energy that is rejected in the exhaust and coolant streams. One viable technology for recovering this waste heat is an Organic Rankine Cycle. This cycle heats a working fluid using these heat streams and expands the fluid through a turbine to produce shaft power. The present work was the development of such a system applied to a light duty diesel engine. This lab demonstration was designed to maximize the peak brake thermal efficiency of the engine, and the combined system achieved an efficiency of 44.4%. The design of the system is discussed, as are the experimental performance results. The system potential at typical operating conditions was evaluated to determine the practicality of installing such a system in a vehicle.

33 ADVANCED PROPULSION SYSTEMS↗