Engineering Papers⌕ Search

SEARCH · Engineering Papers

Results for “Requirements Management”

Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.

Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.

At least 19 records

Generalized Information Architecture for Managing Requirements in IBM's Rational DOORS® Application

When a requirements engineering effort fails to meet expectations, often times the requirements management tool is blamed. Working with numerous project teams at Sandia National Laboratories over the last fifteen years has shown us that the tool is rarely the culprit; usually it is the lack of a viable information architecture with well-designed processes to support requirements engineering. This document illustrates design concepts with rationale, as well as a proven information architecture to structure and manage information in support of requirements engineering activities for any size or type of project. This generalized information architecture is specific to IBM's Rational DOORS (Dynamic Object Oriented Requirements System) software application, which is the requirements management tool in Sandia's CEE (Common Engineering Environment). This generalized information architecture can be used as presented or as a foundation for designing a tailored information architecture for project-specific needs. It may also be tailored for another software tool.

Aragon, Kathryn Mary↗

Safety Requirement Management System (SRMS) - Improved Documented Safety Analyses Implementation - 18476

Savannah River Remediation (SRR) developed a new software application, Safety Requirement Management System (SRMS), to improve Documented Safety Analysis (DSA) safety requirement implementation in the Savannah River Site's Liquid Waste facilities. Technical Safety Requirement (TSR) Limited Conditions of Operations (LCOs) and related surveillances were previously tracked using four different applications. Due to their differences and their age, the applications introduced a number of operational challenges and vulnerabilities, including outdated platforms, usage demands beyond original design, and different organizational work processes. SRMS was developed to resolve these issues by using a single web-based approach that provides consistency, wider accessibility, simpler maintenance, and a platform for additional functionality. Other SRS facilities are evaluating the application for its applicability as a standard practice across the site. The new SRMS application decreased the administrative overhead for application maintenance, provided the needed TSR change management functionality, and reduced error precursors with the following advantages: - Consistent process/application across all SRR facilities - More efficient way to track and communicate compliance with DSA time-related requirements (i.e., TSR LCOs and surveillances). - Web-based search capability for LCO entries/exits and a record of surveillance performances. - TSR change management and independent reviews through electronic approvals. For example, the application provides the ability to bundle and stage LCO and surveillance changes associated with a TSR revision. The approval process involves multiple roles from the facility to ensure validity. - Formal configuration management program, fully supported by software life cycle documents. SRMS was implemented at Defense Waste Processing Facility (DWPF) in June 2017, with implementation in all Liquid Waste facilities expected by the end of 2017. Next, SRR plans to expand SRMS functionality to include a linking document database (LDD) to support the DSA requirements. (authors)

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Simulation Data Management - Requirements and Design Specification

Simulation Data Management (SDM), the ability to securely organize, archive, and share analysis models and the artifacts used to create them, is a fundamental requirement for modern engineering analysis based on computational simulation. We have worked separately to provide secure, network SDM services to engineers and scientists at our respective laboratories for over a decade. We propose to leverage our experience and lessons learned to help develop and deploy a next-generation SDM service as part of a multi-laboratory team. This service will be portable across multiple sites and platforms, and will be accessible via a range of command-line tools and well-documented APIs. In this document, we’ll review our high-level and low-level requirements for such a system, review one existing system, and briefly discuss our proposed implementation.

96 KNOWLEDGE MANAGEMENT AND PRESERVATION↗

Environmental Requirements Management

CH2M HILL Plateau Remediation Company (CH2M HILL) is the U.S. Department of Energy (DOE) prime contractor responsible for the environmental cleanup of the Hanford Site Central Plateau. As part of this responsibility, the CH2M HILL is faced with the task of complying with thousands of environmental requirements which originate from over 200 federal, state, and local laws and regulations, DOE Orders, waste management and effluent discharge permits, Comprehensive Environmental Response, Compensation, and Liability Act (CERCLA) response and Resource Conservation and Recovery Act (RCRA) corrective action documents, and official regulatory agency correspondence. The challenge is to manage this vast number of requirements to ensure they are appropriately and effectively integrated into CH2M HILL operations. Ensuring compliance with a large number of environmental requirements relies on an organization’s ability to identify, evaluate, communicate, and verify those requirements. To ensure that compliance is maintained, all changes need to be tracked. The CH2M HILL identified that the existing system used to manage environmental requirements was difficult to maintain and that improvements should be made to increase functionality. CH2M HILL established an environmental requirements management procedure and tools to assure that all environmental requirements are effectively and efficiently managed. Having a complete and accurate set of environmental requirements applicable to CH2M HILL operations will promote a more efficient approach to: • Communicating requirements • Planning work • Maintaining work controls • Maintaining compliance

Cusack, Laura J.↗

Environmental requirements management: Maintaining an effective compliance program is key to a robust environmental management system - 15184

CH2M HILL Plateau Remediation Company (CH2M HILL) is the U.S. Department of Energy (DOE) prime contractor responsible for the environmental cleanup of the Hanford Site Central Plateau. As part of this responsibility, the CH2M HILL is faced with the task of complying with thousands of environmental requirements which originate from over 200 federal, state, and local laws and regulations, DOE Orders, waste management and effluent discharge permits, Comprehensive Environmental Response, Compensation, and Liability Act (CERCLA) response and Resource Conservation and Recovery Act (RCRA) corrective action documents, and official regulatory agency correspondence. The challenge is to manage this vast number of requirements to ensure they are appropriately and effectively integrated into CH2M HILL operations. Ensuring compliance with a large number of environmental requirements relies on an organisation's ability to identify, evaluate, communicate, and verify those requirements. To ensure that compliance is maintained, all changes need to be tracked. The CH2M HILL identified that the existing system used to manage environmental requirements was difficult to maintain and that improvements should be made to increase functionality. CH2M HILL established an environmental requirements management procedure and tools to assure that all environmental requirements are effectively and efficiently managed. Having a complete and accurate set of environmental requirements applicable to CH2M HILL operations will promote a more efficient approach to: - Communicating requirements- Planning work - Maintaining work controls - Maintaining compliance. (authors)

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

TA-55 FOD Waste Management Requirements

Virtually all activities conducted in the TA-55 FOD (Facility Operations Division) (TA-55, TA-50,RLWTF[Radioactive Liquid Waste Treatment Facility], RLUOB[Radiological Laboratory/Utilities/Office Building], TWF, TA-63 [Transuranic Waste Facility], RANT, TA-54 West [Radioassay Nondestructive Testing Facility], WCRRF [Waste Characterization, Reduction, and Repackaging Facility]and CMR[Chemistry and Metallurgy Research])facilities generate waste. Generation and management of waste arecomplex activitiessubject toFederal and State regulations as well as DOE(Department of Energy)and Laboratory requirements. Improper management of waste can result in civiland/or criminal penalties as well as potential significant impacts to operations.

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Requirements Management Database

This application is a simplified and customized version of the RBA and CTS databases to capture federal, site, and facility requirements, link to actions that must be performed to maintain compliance with their contractual and other requirements.

Nelson, Jerel↗

Tritium Management Requirements and Approaches for UNF Reprocessing

Four radionuclides have been identified as being sufficiently volatile in reprocessing of nuclear fuel that their release to the environment needs to be controlled to meet U.S. regulatory requirements. These radionuclides are {sup 3}H, {sup 14}C, {sup 85}Kr, and {sup 129}I. While iodine has been the focus of a number of studies due to the high decontamination factor (DF) requirements on multiple escape pathways, it is clear from prior studies that the control of tritium will also be a significant issue for future reprocessing plants, especially if processing relatively short-cooled fuels (<10 yr post-reactor discharge). Tritium contained in a used nuclear fuel (UNF) matrix will be released into the liquid and off-gas streams during fuel reprocessing. The amounts released into the process streams are a function of the type and burnup of the fuel processed and the chemical processes employed within the reprocessing plant. Previous studies have examined the tritium capture requirements for the reprocessing facility assuming that all of the tritium contained in the fuel matrix is volatilized in the head-end operations; i.e., tritium pretreatment is employed and tritium is completely released from the cladding. This scenario tends to limit the release pathway to the headend off-gas stream. Previous studies by Jubin and Spencer examined the accumulation and distribution of tritium in an aqueous-based reprocessing plant.

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

A platform for effective requirements management and collaboration in nuclear compliance and licensing

Buoyed by its promise as a cost effective and low-carbon-footprint source of electricity, the nuclear industry is in the midst of a world-wide renaissance. However, significant challenges, including responding to increased safety and regulatory mandates, making a smooth transition to next-generation reactor technology, and dealing with the adoption of digital instrumentation and control (I and C) systems that rely heavily on software must be effectively addressed to ensure the momentum continues. New technology solutions, such as those developed by IBM's Rational business unit, coupled with well codified processes, policies and best practices leveraged across the nuclear ecosystem's participants have been shown to aid in overcoming these obstacles. This paper will highlight some of the compliance and collaboration challenges facing the extended nuclear ecosystem, describe a potential solution that can aid in addressing the challenges, and present several examples of where the solution has been implemented in the nuclear space. (authors)

22 GENERAL STUDIES OF NUCLEAR REACTORS↗

Training and Required Reading Management Tool

This tool manages training and required reading for groups, facilities, etc – abilities beyond the site training systems. TRRMTool imports training data from controlled site data sources/systems and provides greater management and reporting. Clients have been able to greatly reduce the time and effort required to manage training, have greater accuracy, foster individual accountability, and be proactive in verifying training of support personnel, to maintain compliance.

Nelson, Jerel↗

A Framework to Assess Advanced Reactor Spent Fuel Management Facility Deployment

Advanced nuclear reactors offer various operational advantages over existing light water reactors but could produce types of spent nuclear fuel (SNF) with a wide variety of forms and characteristics depending on how many different concepts are deployed. Each advanced reactor SNF type potentially poses unique management challenges. New planning efforts will be necessary to anticipate how the management requirements of advanced reactor SNF will affect the deployment of an integrated waste management system. This paper applies a framework of high-level facility deployment milestones to a generic SNF management system, reviewing them together with the advanced reactor SNF characteristics and management requirements. This allows for the investigation of factors that influence facility and system deployment, and ultimately, the identification of challenges facing the deployment of different kinds of SNF management facilities. Here, the back end of the once-through fuel cycle is examined for four advanced reactor system technology types: sodium-cooled fast reactors, high-temperature gas-cooled reactors, liquid-fuel molten salt reactors, and lead-cooled fast reactors. It is observed that milestones earlier in the facility deployment process (e.g., siting and facility design) are more impacted by the uniqueness of advanced reactor SNF characteristics than others (e.g., construction and testing). Ultimately, none of the differences are seen as fundamentally disqualifying in a technical sense; however, they should be considered early, potentially as part of reactor design, to avoid issues in the future.

11 NUCLEAR FUEL CYCLE AND FUEL MATERIALS↗

Hydrodynamic Test Requirements Process Improvements

Hydrodynamic testing at Los Alamos National Laboratory would benefit from a process improvement for the requirements process. Cameo was used as a digital solution for requirements management to allow Lead Engineers to track requirements more effectively. This was identified as a process improvement throughout this Capstone project. This report includes a project proposal, business case, literature review, methodology, project plan, data analysis, decision-making report, financial analysis report, discussion, and conclusion. Initially, this project focused on figuring out a solution for the hydrotest requirement process improvements. The scope narrowed to focus on the use of Cameo for requirement capture and management. During this Capstone, four tests had digital models produced for requirements management in Cameo. The initial model was the baseline, with core requirements used across the tests. Commonalities in tests were used and the core requirements allowed for process efficiencies. In the data analysis, it was seen that overall, the implementation of using Cameo for requirements resulted in a decreasing trend for both schedule and normalized cost. Tests have different complexity levels which is also a factor in how long the requirements process will take. Additional data is needed to continue analyzing process improvements. Through decisionmaking and financial analysis, the recommendation was to use Cameo for requirements process improvement. Multiple experts provided feedback for requirements that were then captured within models. Numerous tangible and intangible benefits were identified with this process improvement. For return on investment, the metric of success was schedule reduction, which was overall seen. Four tests were analyzed, so future analysis will be needed. There is also not a great financial risk because the main cost would be purchasing more licenses. Individuals must generate requirements whether using this software or not. Overall, training is needed to help improve the skillsets of Lead Engineers but is already being supported on a regular frequency. A desktop guide was started associated with explaining the process, however, it is a work in progress. The team plans on adding additional information in the digital models to help status when requirements are met using verification methods and artifacts. From working on this project an improved understanding of Cameo and requirements was the result. There are future opportunities to extend the usage for requirements management and progress will continue after this project.

99 GENERAL AND MISCELLANEOUS↗

Controller Requirements for Managing Community Microgrids

Microgrid control systems are central to the functioning of a microgrid. They are responsible for managing distributed energy resources (DER) in both grid-connected and islanded modes of operation. Although microgrids are being developed and deployed by many utilities, several questions are being raised about the control system that manages them. This document provides the detailed list of requirements for a feeder-level microgrid controller to manage various islanded and grid-connected use cases. Functionally, the use cases include control scenarios that require the controller to maintain energy balance, prevent constraint violations, manage switching equipment, manage grid-forming (GFM) and grid-following (GFL) DER, manage critical/non-critical loads, and coordinate with peer systems to operate joined island areas. In addition to detailed requirements, the document includes interface and performance metrics for functional evaluation. These requirements can be applied to utility-managed microgrid controllers that exclusively manage utility-owned equipment; requirements also apply to third-party managed microgrid controllers that coordinate with the utility- and customer-owned equipment. The document can also be used by technology developers and project developers in industry to specify desired control strategies and performance characteristics for community microgrid controllers.

24 POWER TRANSMISSION AND DISTRIBUTION↗

Tethys: The Marine and Hydrokinetic Technology Environmental Impacts Knowledge Management System -- Requirements Specification -- Version 1.0

The marine and hydrokinetic (MHK) environmental impacts knowledge management system (KMS), dubbed Tethys after the mythical Greek goddess of the seas, is being developed for the U.S. Department of Energy (DOE) Office of Energy Efficiency and Renewable Energy Wind and Hydropower Technologies Program (WHTP) by Pacific Northwest National Laboratory (PNNL). This requirements specification establishes the essential capabilities required of Tethys and clarifies for WHTP and the Tethys development team the results that must be achieved by the system.

54 ENVIRONMENTAL SCIENCES↗