Engineering Papers⌕ Search

SEARCH · Engineering Papers

Results for “RISK ASSESSMENT”

Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.

Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.

At least 19 records

Satellite Conjunction "Probability," "Possibility," and "Plausibility": A Categorization of Competing Conjunction Assessment Risk Assessment Paradigms

A number of different conjunction assessment (CA) risk analysis methods and metrics have been proposed in the critical literature, and they vary widely in purport and form. However, they tend to be proposed individually and episodically, so that it is difficult for a CA practitioner to take stock of the possibilities, under- stand their fundamental differences, and make informed choices for their particular CA risk assessment enterprise. The present study seeks to collect the major proposals for risk assessment methods and parameters and organize them categorically, under the proposed divisions of “probability,” “plausibility,” and “possibility,” as well as formulate what appears for each to be its fundamental question and, where applicable, null hypothesis. This activity can, through a bottom-up approach, provide some of the building blocks for an overarching CA philosophy, as well as establish concepts and terminology potentially useful to the broader discussion of these topics.

Hejduk, M. D.↗

The Integrated Medical Model: A Risk Assessment and Decision Support Tool for Space Flight Medical Systems

The Integrated Medical Model (IMM) is a decision support tool that is useful to mission planners and medical system designers in assessing risks and designing medical systems for space flight missions. The IMM provides an evidence based approach for optimizing medical resources and minimizing risks within space flight operational constraints. The mathematical relationships among mission and crew profiles, medical condition incidence data, in-flight medical resources, potential crew functional impairments, and clinical end-states are established to determine probable mission outcomes. Stochastic computational methods are used to forecast probability distributions of crew health and medical resource utilization, as well as estimates of medical evacuation and loss of crew life. The IMM has been used in support of the International Space Station (ISS) medical kit redesign, the medical component of the ISS Probabilistic Risk Assessment, and the development of the Constellation Medical Conditions List. The IMM also will be used to refine medical requirements for the Constellation program. The IMM outputs for ISS and Constellation design reference missions will be presented to demonstrate the potential of the IMM in assessing risks, planning missions, and designing medical systems. The implementation of the IMM verification and validation plan will be reviewed. Additional planned capabilities of the IMM, including optimization techniques and the inclusion of a mission timeline, will be discussed. Given the space flight constraints of mass, volume, and crew medical training, the IMM is a valuable risk assessment and decision support tool for medical system design and mission planning.

Kerstman, Eric↗

Probabilistic Risk Assessment (PRA): A Practical and Cost Effective Approach

The Lunar Reconnaissance Orbiter (LRO) is the first mission of the Robotic Lunar Exploration Program (RLEP), a space exploration venture to the Moon, Mars and beyond. The LRO mission includes spacecraft developed by NASA Goddard Space Flight Center (GSFC) and seven instruments built by GSFC, Russia, and contractors across the nation. LRO is defined as a measurement mission, not a science mission. It emphasizes the overall objectives of obtaining data to facilitate returning mankind safely to the Moon in preparation for an eventual manned mission to Mars. As the first mission in response to the President's commitment of the journey of exploring the solar system and beyond: returning to the Moon in the next decade, then venturing further into the solar system, ultimately sending humans to Mars and beyond, LRO has high-visibility to the public but limited resources and a tight schedule. This paper demonstrates how NASA's Lunar Reconnaissance Orbiter Mission project office incorporated reliability analyses in assessing risks and performing design tradeoffs to ensure mission success. Risk assessment is performed using NASA Procedural Requirements (NPR) 8705.5 - Probabilistic Risk Assessment (PRA) Procedures for NASA Programs and Projects to formulate probabilistic risk assessment (PRA). As required, a limited scope PRA is being performed for the LRO project. The PRA is used to optimize the mission design within mandated budget, manpower, and schedule constraints. The technique that LRO project office uses to perform PRA relies on the application of a component failure database to quantify the potential mission success risks. To ensure mission success in an efficient manner, low cost and tight schedule, the traditional reliability analyses, such as reliability predictions, Failure Modes and Effects Analysis (FMEA), and Fault Tree Analysis (FTA), are used to perform PRA for the large system of LRO with more than 14,000 piece parts and over 120 purchased or contractor built components.

Lee, Lydia L.↗

Computational Tools and Workflows for Quantitative Risk Assessment and Decision Support for Geologic Carbon Storage Sites: Progress and Insights from the U.S. DOE’s National Risk Assessment Partnership

The 2005 Intergovernmental Panel on Climate Change (IPCC) Special Report on CCS raised the profile of CO2 capture and storage (CCS) as an important technology for reducing greenhouse gas (GHG) emissions. CCS is now recognized as a key component of most climate change mitigation scenarios. Since publication of that report the international research, development, and deployment (RD&D) community has advanced key technical aspects, clarified regulatory requirements, explored value chain and infrastructure solutions, and developed incentive paradigms to enable and promote large-scale deployment of CCS. These efforts have included research to better characterize geologic storage resources, to improve injection performance and storage efficiency, to assess and manage subsurface environmental risks, and to advance monitoring technologies to assure system conformance. These efforts have helped to build confidence in the viability of geologic carbon storage (GCS), but stakeholder concerns about long-term risks and liability associated with GCS remain a hurdle to broad acceptance and large-scale deployment of CCS. Since 2010, the U.S. DOE’s National Risk Assessment Partnership (NRAP) – a research collaboration between five contributing national laboratories – has worked to establish and demonstrate methods and tools to quantify and manage the subsurface environmental risks associated with GCS, amidst uncertainty. This work supports the Office of Fossil Energy and Carbon Management Carbon Transport and Storage Program’s goal of advancing safe and secure commercial-scale GCS deployment. To address the technical challenge of simulating the physical response of the GCS site to large-scale CO2 injection, NRAP has adopted an approach that relies on coupling computationally efficient reduced-order and/or data-driven proxy models of important system components (i.e., storage reservoir, sealing caprock, leakage pathways, intermediate formations, overlying groundwater aquifers, and the atmosphere) in integrated assessment framework. That integrated model of the physical system is complemented with fit-for purpose functionality to support site characterization and risk-related decisions. The recently released NRAP Phase II toolset includes the Open-Source Integrated Assessment Model (NRAP-Open-IAM) for evaluation of trends in leakage risk and potential impact, tools to support monitoring design optimization (Designs for Risk Evaluation and Management – DREAM v3.0 and Passive Seismic Monitoring Tool - PSMT), and tools for state of stress evaluation (State-of-Stress Analysis Tool - SOSAT) and forecasting induced seismicity risk. The NRAP team has also released a pair of reports describing conceptual workflows to incorporate physics-based, quantitative risk assessment into many of the design, planning, operation, and closure decisions for GCS projects. An online catalogue highlights published studies where these tools and methods are demonstrated. In this presentation, the utility of these products to assess risks and address key stakeholder questions will be highlighted through examples, and related insights about the safety and security of geologic carbon storage in qualified storage sites will be discussed. The prospect of rapid, large-scale deployment of GCS technology to aggressively reduce anthropogenic CO2 emissions requires careful consideration of interference between multiple commercial-scale storage projects within a basin. Going forward, NRAP is expanding and adapting site-scale risk quantification tools and methods to enable assessment of risks and inform management decisions for basin-scale deployment. Increasingly, this work will leverage next-generation approaches for surrogate modelling, fast prediction, and advanced visualization enabled by machine learning and artificial intelligence to promote virtual learning, scenario evaluation, and augment risk-based decision making.

quantitative risk assessment, geologic carbon stor↗

Operating Experience Data Analysis for Digital Instrumentation and Control System Reliability and Risk Assessment in Nuclear Power Plants

The implementation of advanced digital instrumentation and control (DI&C) systems in U.S. nuclear power plants (NPPs) can bring significant advancements in reliability, monitoring, and control capabilities. However, these systems also introduce new challenges, particularly in assessing risks such as common-cause failures (CCFs) and establishing robust reliability estimates for DI&C components. Addressing these challenges is critical for ensuring the safe and efficient operation of NPPs. Recently, Idaho National Laboratory was tasked by the U.S. Nuclear Regulatory Commission (NRC) to conduct a DI&C reliability study using operating experience data from the nuclear industry. The two operating experience data sources for the study are the Institute of Nuclear Power Operations’ Industry Reporting and Information System (IRIS) and the NRC’s Licensee Event Report database which is hosted at Idaho National Laboratory at https://lersearch.inl.gov/LERSearchCriteria.aspx. This report provides a comprehensive examination of DI&C systems, including their architecture, operational advantages, and associated challenges. It reviews existing industry DI&C studies and failure mode taxonomies, along with reliability data from various industries. Through a detailed analysis of these databases, the study provides insights into DI&C system performance. Considerations should be given to incorporate DI&C failure data into the NRC's Integrated Data Collection and Coding System and updating the Reliability and Availability Data System to support ongoing DI&C reliability studies. Recommendations are also provided for modeling DI&C reliability and CCF in probabilistic risk assessment, thereby supporting risk-informed decision-making and enhancing the reliability and safety of NPPs.

22 GENERAL STUDIES OF NUCLEAR REACTORS↗

Computational Analyses in Support of Sub-scale Diffuser Testing for the A-3 Facility: Unsteady Analyses and Risk Assessment - Part 2

Simulation technology can play an important role in rocket engine test facility design and development by assessing risks, providing analysis of dynamic pressure and thermal loads, identifying failure modes and predicting anomalous behavior of critical systems. This is especially true for facilities such as the proposed A-3 facility at NASA SSC because of a challenging operating envelope linked to variable throttle conditions at relatively low chamber pressures. Design Support of the feasibility of operating conditions and procedures is critical in such cases due to the possibility of startup/shutdown transients, moving shock structures, unsteady shock-boundary layer interactions and engine and diffuser unstart modes that can result in catastrophic failure. Analyses of such systems is difficult due to resolution requirements needed to accurately capture moving shock structures, shock-boundary layer interactions, two-phase flow regimes and engine unstart modes. In a companion paper, we will demonstrate with the use of CFD, steady analyses advanced capability to evaluate supersonic diffuser and steam ejector performance in the sub-scale A-3 facility. In this paper we will address transient issues with the operation of the facility especially at startup and shutdown, and assess risks related to afterburning due to the interaction of a fuel rich plume with oxygen that is a by-product of the steam ejectors. The primary areas that will be addressed in this paper are: (1) analyses of unstart modes due to flow transients especially during startup/ignition, (2) engine safety during the shutdown process (3) interaction of steam ejectors with the primary plume i.e. flow transients as well as probability of afterburning. In this abstract we discuss unsteady analyses of the engine shutdown process. However, the final paper will include analyses of a staged startup, drawdown of the engine test cell pressure, and risk assessment of potential afterburning in the facility. Unsteady simulations have been carried out to study the engine shutdown process in the facility and understand the physics behind the interactions between the steam ejectors, the test cell and the supersonic diffuser. As a first approximation, to understand the dominant unsteady mechanisms in the engine test cell and the supersonic diffuser, the turning duct in the facility was removed. As the engine loses power a rarefaction wave travels downstream that disrupts the shock cell structure in the supersonic diffuser. Flow from the test cell is seen to expand into the supersonic diffuser section and re-pressurizes the area around the nozzle along with a upstream traveling compression wave that emanates from near the first stage ejectors. Flow from the first stage ejector expands to the center of the duct and a new shock train is formed between the first and second stage ejectors. Both stage ejectors keep the facility pressurized and prevent any large amplitude pressure fluctuations from affecting the engine nozzle. The resultant pressure loads the nozzle experiences in the shutdown process are small.

Ahuja, Vineet↗

Risk Assessment Overview

Risk assessment is used in many industries to identify and manage risks. Initially developed for use on aeronautical and nuclear systems, risk assessment has been applied to transportation, chemical, computer, financial, and security systems among others. It is used to gain an understanding of the weaknesses or vulnerabilities in a system so modification can be made to increase operability, efficiency, and safety and to reduce failure and down-time. Risk assessment results are primary inputs to risk-informed decision making; where risk information including uncertainty is used along with other pertinent information to assist management in the decision-making process. Therefore, to be useful, a risk assessment must be directed at specific objectives. As the world embraces the globalization of trade and manufacturing, understanding the associated risk become important to decision making. Applying risk assessment techniques to a global system of development, manufacturing, and transportation can provide insight into how the system can fail, the likelihood of system failure and the consequences of system failure. The risk assessment can identify those elements that contribute most to risk and identify measures to prevent and mitigate failures, disruptions, and damaging outcomes. In addition, risk associated with public and environment impact can be identified. The risk insights gained can be applied to making decisions concerning suitable development and manufacturing locations, supply chains, and transportation strategies. While risk assessment has been mostly applied to mechanical and electrical systems, the concepts and techniques can be applied across other systems and activities. This paper provides a basic overview of the development of a risk assessment.

Prassinos, Peter G.↗

Use of System Safety Risk Assessments for the Space Shuttle Reusable Solid Rocket Motor (RSRM)

This paper discusses the System Safety approach used to assess risk for the Space Shuttle Reusable Solid Rocket Motor (RSRM). Previous to the first RSRM flight in the fall of 1988, all systems were analyzed extensively to assure that hazards were identified, assessed and that the baseline risk was understood and appropriately communicated. Since the original RSRM baseline was established, Thiokol and NASA have implemented a number of initiatives that have further improved the RSRM. The robust design, completion of rigorous testing and flight success of the RSRM has resulted in a wise reluctance to make changes. One of the primary assessments required to accompany the documentation of each proposed change and aid in the decision making process is a risk assessment. Documentation supporting proposed changes, including the risk assessments from System Safety, are reviewed and assessed by Thiokol and NASA technical management. After thorough consideration, approved changes are implemented adding improvements to and reducing risk of the Space Shuttle RSRM.

Greenhalgh, Phillip O.↗

Schedule Risk Assessment

Schedule risk assessments determine the likelihood of finishing on time. Each task in a schedule has a varying degree of probability of being finished on time. A schedule risk assessment quantifies these probabilities by assigning values to each task. This viewgraph presentation contains a flow chart for conducting a schedule risk assessment, and profiles applicable several methods of data analysis.

Smith, Greg↗

Assessing the Relative Risk of Aerocapture Using Probabalistic Risk Assessment

A recent study performed for the Aerocapture Technology Area in the In-Space Propulsion Technology Projects Office at the Marshall Space Flight Center investigated the relative risk of various capture techniques for Mars missions. Aerocapture has been proposed as a possible capture technique for future Mars missions but has been perceived by many in the community as a higher risk option as compared to aerobraking and propulsive capture. By performing a probabilistic risk assessment on aerocapture, aerobraking and propulsive capture, a comparison was made to uncover the projected relative risks of these three maneuvers. For mission planners, this knowledge will allow them to decide if the mass savings provided by aerocapture warrant any incremental risk exposure. The study focuses on a Mars Sample Return mission currently under investigation at the Jet Propulsion Laboratory (JPL). In each case (propulsive, aerobraking and aerocapture), the Earth return vehicle is inserted into Martian orbit by one of the three techniques being investigated. A baseline spacecraft was established through initial sizing exercises performed by JPL's Team X. While Team X design results provided the baseline and common thread between the spacecraft, in each case the Team X results were supplemented by historical data as needed. Propulsion, thermal protection, guidance, navigation and control, software, solar arrays, navigation and targeting and atmospheric prediction were investigated. A qualitative assessment of human reliability was also included. Results show that different risk drivers contribute significantly to each capture technique. For aerocapture, the significant drivers include propulsion system failures and atmospheric prediction errors. Software and guidance hardware contribute the most to aerobraking risk. Propulsive capture risk is mainly driven by anomalous solar array degradation and propulsion system failures. While each subsystem contributes differently to the risk of each technique, results show that there exists little relative difference in the reliability of these capture techniques although uncertainty for the aerocapture estimates remains high given the lack of in-space demonstration.

Percy, Thomas K.↗

Updated Filter Leak Frequencies for Use in Risk Assessments

Quantitative risk assessment (QRA) is highly dependent on data, leading to more robust models as new and updated data is acquired. The Hydrogen Plus Other Alternative Fuels Risk Assessment (HyRAM+) QRA capabilities include calculations of individual risk from leaks in a gaseous hydrogen facility due to the potential effects of jet fires and explosions. Leak frequencies are acquired through statistical analysis of published data from a variety of sources and industries. The filter leak frequencies in previous versions of the HyRAM+ software are substantially greater than the leak frequencies of other components, leading to QRA results for gaseous hydrogen in which filters consistently dominate the overall risk. Data that were previously used to derive the filter leak frequencies were reevaluated for applicability and additional data points were added to update the filter leak frequencies. The new frequencies are more comparable to leak frequencies for other components.

08 HYDROGEN↗

Macromolecular Expression and Function: A New Paradigm for NASA Risk Assessment

Predicting risks in humans of either acute effects such as bone loss or muscle wasting, or late effects such as cancer, is challenging. To an approximation, this is because uncertainties of exposure to stress factors or toxic agents and the uniformity of processing subsequent damage at the cellular level within a complex set of biological variables degrade the confidence of predicting pathologic outcome. A cellular biodosimeter that simultaneously reports 1) the type of damage due to that exposure, 2) the quantity of damage incurred by that exposure, and 3) the dataset used to assess risk of developing pathologic outcome caused by that exposure would therefore be useful for predicting ultimate risks faced by an individual, such as an astronaut. It is suggested that such a biodosimeter can be based upon analyses of gene-expression and protein expression whereby large datasets of cellular response to damage are obtained and analyzed for expression-profiles correlated with established end points and molecular markers predictive for risks being assessed. The usefulness of multiparametric cellular biodosimeters could be realized by quantitatively profiling these datasets using techniques of bioinformatics. Such an approach contributes to the foundation of molecular epidemiology as a new scientific discipline, and represents a new paradigm of risk assessment.

Richmond, Robert↗

Schedule Risk Assessment

Schedule Risk Assessment needs to determine the probability of finishing on or before a given point in time. Task in a schedule should reflect the "most likely" duration for each task. IN reality, each task is different and has a varying degree of probability of finishing within or after the duration specified. Schedule risk assessment attempt to quantify these probabilities by assigning values to each task. Bridges the gap between CPM scheduling and the project's need to know the likelihood of "when".

Smith, Greg↗

Architecture for Integrated Medical Model Dynamic Probabilistic Risk Assessment

Probabilistic Risk Assessment (PRA) is a modeling tool used to predict potential outcomes of a complex system based on a statistical understanding of many initiating events. Utilizing a Monte Carlo method, thousands of instances of the model are considered and outcomes are collected. PRA is considered static, utilizing probabilities alone to calculate outcomes. Dynamic Probabilistic Risk Assessment (dPRA) is an advanced concept where modeling predicts the outcomes of a complex system based not only on the probabilities of many initiating events, but also on a progression of dependencies brought about by progressing down a time line. Events are placed in a single time line, adding each event to a queue, as managed by a planner. Progression down the time line is guided by rules, as managed by a scheduler. The recently developed Integrated Medical Model (IMM) summarizes astronaut health as governed by the probabilities of medical events and mitigation strategies. Managing the software architecture process provides a systematic means of creating, documenting, and communicating a software design early in the development process. The software architecture process begins with establishing requirements and the design is then derived from the requirements.

Probability Theory↗

Decision Support Tool for Risk Assessment & Maneuver Planning in Collision Avoidance

As the quantity of orbital debris continues to grow, so too does the rate of conjunction messages that suggest possible collisions between high value payloads and debris. The abundance of these conjunction messages, and eventual misses, has led to a culture of ignored alerts, and an increase in satellite operation costs as a result of the frequent need to plan resources for maneuver planning and execution. The loss of “trust” in conjunction alerts is due to the poorly characterized evolution in probability of collision (Pc) as time approaches the time of closest approach (TCA) between two objects, as well as the interpretation of Pc in the context of maneuver planning. To address these problems, and in collaboration with the NASA Conjunction Assessment Risk Analysis (CARA) program, the Industrial Sciences Group has developed a novel Maneuver Decision Support System (MDSS) to assist satellite operations in conjunction assessment and Maneuver planning. It provides a meaningful and intuitive Urgency metric for actionable maneuver decisions, based on the physical dynamics of conjunctions. It is based on a forecast of the evolution of Pc over time and represents an advance over current methods that are in use for satellite conjunction monitoring and planning. The result is to give satellite operators a validated decision support systems to plan for maneuver execution or mitigation or monitoring up to 3 days before TCA.

Decision Support Tool↗

Peak Pc Prediction in Conjunction Analysis: Conjunction Assessment Risk Analysis

Satellite conjunction risk typically evaluated through the probability of collision (Pc). Considers both conjunction geometry and uncertainties in both state estimates. Conjunction events initially discovered through Joint Space Operations Center (JSpOC) screenings, usually seven days before Time of Closest Approach (TCA). However, JSpOC continues to track objects and issue conjunction updates. Changes in state estimate and reduced propagation time cause Pc to change as event develops. These changes a combination of potentially predictable development and unpredictable changes in state estimate covariance. Operationally useful datum: the peak Pc. If it can reasonably be inferred that the peak Pc value has passed, then risk assessment can be conducted against this peak value. If this value is below remediation level, then event intensity can be relaxed. Can the peak Pc location be reasonably predicted?

Operations↗