Engineering Papers⌕ Search

SEARCH · Engineering Papers

Results for “RELIABILITY CHALLENGES”

Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.

Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.

At least 19 records

Urban Air Mobility Electric Motor Winding Insulation Reliability: Challenges in the Design and Qualification of High Reliability Electric Motors and NASA’s Research Plan

This work was motivated by the needs of the emerging Urban Air Mobility (UAM) concept. Guided by analyses of concept vehicles, electric motor winding insulation reliability was identified as a subsystem limiting the vehicle reliability. This paper covers NASA’s understanding of the current state-of-the-art for electric motor winding insulation reliability, life modeling and qualification testing in the context of UAM. The needed improvements to the accepted practice for qualification of high reliability UAM motors are highlighted. NASA’s Revolutionary Vertical Lift Technologies Project strives to develop new testing methods to support the rating and qualification of UAM motor winding insulation. We describe assumptions used to frame a research approach, and we outline a NASA RVLT research plan for motor winding insulation.

Thomas Tallerico↗

TPSAS-NF1676L-18870-DND

The reliability challenges for space missions are unique, mainly because of the space environment, the one-of-a-kind space systems, and the high level of reliability requirements. The tutorial is to go through the uniqueness of the space reliability challenges, space technologies, fundamental approaches and processes to ensure mission assurance, and some comparison to commercial industry. The tutorial is focused on design and reliability challenges from electronics perspective.

Yuan Chen↗

Technical Challenges in Reliable Microelectronics Packaging of Microelectromechanical Systems (MEMS) for Space Applications

MEMS have shown a significant promise in the last decade for a variety of applications such as air-bag, pressure sensors, accelerometer, microgyro, chemical sensors, artificial nose, etc. Standard semiconductor microelectronics packaging needs the integrated circuits (IC) to be protected from the harsh environment, and provide electrical communication with the other parts of the circuit, facilitate thermal dissipation efficiently, and impart mechanical strength to the silicon die. Microelectronics packaging involves wafer dicing, bonding, lead attachment, encapsulation to protect from the environment, electrical integrity, and package leak tests to assure the reliable IC packaging technology. Active elements or microstructures in MEMS devices often interfaces with the hostile environment where packaging leak tests and testing of such devices using chemical and mechanical parameters will be very difficult and expensive. Packaging of MEMS is significantly complex as they serve to protect from the environment and microstructures interact with the same environment to measure or affect the desired physical or chemical parameters. The most of the silicon circuitry is sensitive to temperature, moisture, magnetic field, light, and electromagnetic interference. The package must then protect the on-board silicon circuitry while simultaneously exposing the microsensor to the effect it measures to assure the packaging technology of MEMS. MEMS technology has a major application in developing a microspacecraft for space systems provided reliability of MEMS packaging technology is sufficiently addressed. This MEMS technology would eventually miniaturize many of the components of the spacecraft to reach the NASA's goal by building faster, cheaper, better, smaller spacecraft to explore the space more effectively. This paper discusses the latest developments in the MEMS technology and challenging technical issues in the packaging of hermetically sealed and non-hermetically sealed MEMS sensor devices for microspacecraft applications.

Ramesham, Rajeshuni↗

Problem Complexity and LLM: H-M Team Reliability in Challenging Environments

In traditional human-machine operations, the functional decomposition of actions and responsibilities among various agents is assigned a priori. For instance, in current air traffic operations, although assisted by software, human pilots have the ultimate control of aircraft. Multiagent human-machine and machine-machine systems will face problems of varying and potentially unpredicted complexity in future challenging scenarios of planetary, en route, and orbital activities. Hence, it is important to enable dynamic transfer of decision-making to appropriate team members, human or machine, depending on which agent is best equipped to solve that specific problem on a time budget. In this paper, we consider aspects of problem-solving and its modeling that affect the outcomes of decision-making as a function of solution quality and the likelihood of solving the problem on a required time budget. We focus on Large Language Models (LLM) as potential machine teammates and conclude that practical, predictive modeling of their performance, at the current stage of their development, is infeasible. Simple examples help us illustrate that current LLM will require fundamental advancements to provide reliable support in team decision-making, especially in safety-critical and time-critical domains. The study is not meant to diminish the value of the remarkable capabilities of LLM, but rather to gain a better understanding of the technology’s appropriate use and the needed additions.

function allocation↗

Did Geomagnetic Activity Challenge Electric Power Reliability During Solar Cycle 23? Evidence from the PJM Regional Transmission Organization in North America

During solar cycle 22, a very intense geomagnetic storm on 13 March 1989 contributed to the collapse of the Hydro-Quebec power system in Canada. This event clearly demonstrated that geomagnetic storms have the potential to lead to blackouts. This paper addresses whether geomagnetic activity challenged power system reliability during solar cycle 23. Operations by PJM Interconnection, LLC (hereafter PJM), a regional transmission organization in North America, are examined over the period 1 April 2002 through 30 April 2004. During this time PJM coordinated the movement of wholesale electricity in all or parts of Delaware, Maryland, New Jersey, Ohio, Pennsylvania, Virginia, West Virginia, and the District of Columbia in the United States. We examine the relationship between a proxy of geomagnetically induced currents (GICs) and a metric of challenged reliability. In this study, GICs are proxied using magnetometer data from a geomagnetic observatory located just outside the PJM control area. The metric of challenged reliability is the incidence of out-of-economic-merit order dispatching due to adverse reactive power conditions. The statistical methods employed make it possible to disentangle the effects of GICs on power system operations from purely terrestrial factors. The results of the analysis indicate that geomagnetic activity can significantly increase the likelihood that the system operator will dispatch generating units based on system stability considerations rather than economic merit.

storms↗

Computer aided reliability, availability, and safety modeling for fault-tolerant computer systems with commentary on the HARP program

Many of the most challenging reliability problems of our present decade involve complex distributed systems such as interconnected telephone switching computers, air traffic control centers, aircraft and space vehicles, and local area and wide area computer networks. In addition to the challenge of complexity, modern fault-tolerant computer systems require very high levels of reliability, e.g., avionic computers with MTTF goals of one billion hours. Most analysts find that it is too difficult to model such complex systems without computer aided design programs. In response to this need, NASA has developed a suite of computer aided reliability modeling programs beginning with CARE 3 and including a group of new programs such as: HARP, HARP-PC, Reliability Analysts Workbench (Combination of model solvers SURE, STEM, PAWS, and common front-end model ASSIST), and the Fault Tree Compiler. The HARP program is studied and how well the user can model systems using this program is investigated. One of the important objectives will be to study how user friendly this program is, e.g., how easy it is to model the system, provide the input information, and interpret the results. The experiences of the author and his graduate students who used HARP in two graduate courses are described. Some brief comparisons were made with the ARIES program which the students also used. Theoretical studies of the modeling techniques used in HARP are also included. Of course no answer can be any more accurate than the fidelity of the model, thus an Appendix is included which discusses modeling accuracy. A broad viewpoint is taken and all problems which occurred in the use of HARP are discussed. Such problems include: computer system problems, installation manual problems, user manual problems, program inconsistencies, program limitations, confusing notation, long run times, accuracy problems, etc.

Shooman, Martin L.↗

Flash memory reliability NEPP 2008 task final report

This is the preliminary report which is based on the flash memory reliability studies conducted during the first year (2008) of the multi-year NEPP task. The report outlines the technology and reliability challenges for advanced flash memory technologies, summarizes the test results and analyses of reliability characterizations performed on the selected flash memory devices during 2008, and provides the preliminary thoughts on the risk mitigation approaches on using advanced flash memory technologies for space applications.

Chen, Yuan↗

Scaled CMOS Reliability and Considerations for Spacecraft Systems: Bottom-Up and Top-Down Perspective

New space missions will increasingly rely on more advanced technologies because of system requirements for higher performance, particularly in instruments and high-speed processing. Component-level reliability challenges with scaled CMOS in spacecraft systems from a bottom-up perspective have been presented. Fundamental Front-end and Back-end processing reliability issues with more aggressively scaled parts have been discussed. Effective thermal management from system-level to the componentlevel (top-down) is a key element in overall design of reliable systems. Thermal management in space systems must consider a wide range of issues, including thermal loading of many different components, and frequent temperature cycling of some systems. Both perspectives (top-down and bottom-up) play a large role in robust, reliable spacecraft system design.

Scaled CMOS↗