At least 19 records

Dismantling of the Bohunice V1 Reactor Coolant System - 20011

About 2.5 kilometers from the village of Jaslovske Bohunice in the Trnava District in western Slovakia at the Bohunice V1 nuclear power plant, Westinghouse and VUJE are working on the dismantling of two VVER-440 units. The consortium was awarded this contract in October 2017 from Jadrova a vyradovacia spolocnost (JAVYS) and has begun onsite work to dismantle the reactor coolant systems of both units that operated at the plant. The Bohunice V1 plant is composed of two V-230 type VVER 440 units (440 MWe each). The first unit ceased operation on December 31, 2006, and the second on December 31, 2008, after 28 years of operation. The project strategy relies on the early release of some plant areas to allow the erection of new facilities to enable a fast and safe dismantling. These up-front activities play a crucial role within the whole project. Since schedule and ALARA are two key elements to be considered, it has been decided to separate the dry cutting activities from the ones occurring underwater. Two Wet Cutting Workshops will allow the segmentation and packaging of the high activity components. To take advantage of the large space available in the turbine building, a Dry Cutting Workshop has been built for segmenting the twelve steam generators of both units. Two more Dry Cutting Workshops (one per unit) have been installed in the reactor building for the fragmentation of the remaining large components and auxiliary systems components. This paper describes all current preparatory works as well as the on-going segmentation and packaging activities. Interesting lessons learned are also provided. (authors)

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Decommissioning of the V1 Nuclear Power Plant Jaslovske Bohunice - 20270

The paper focuses on introducing the approach and method applied for decommissioning of the V1 nuclear power plant (further the 'V1 NPP') located in Jaslovske Bohunice in the Slovak Republic, to the conference participants. The Paper outlines activities and steps necessary to comply with the requirements contained in the decision of the Slovak government from 1999 regarding the early shutdown of the V1 NPP. The company responsible for the V1 NPP decommissioning is Jadrova a vyradovacia spolocnost, a.s., (further JAVYS) with the State as a sole shareholder. On the basis of the V1 NPP Decommissioning Conceptual Plan, out of four assessed options, JAVYS selected the immediate decommissioning option (the 'IDO') for the V1 NPP. On the basis of multi-criteria analysis, the IDO specified the approach of immediate and continuous dismantling of equipment followed by demolition of buildings and preparation of the site for its further potential use. The IDO also included the summary of technical, environmental, legislative information as well as the determination of assumed costs for decommissioning of the V1 NPP. Prior to commencement of the V1 NPP decommissioning, within the process of termination of operation, activities connected with de-fuelling, monitoring, processing of historical waste and, not to forget, the process of obtaining the license for the V1 NPP decommissioning were executed. JAVYS decided to divide the decommissioning process into two stages. In 2011, JAVYS obtained a license for the first stage of the V1 NPP decommissioning. Within this stage, dismantling of inactive equipment, demolitions of inactive buildings, monitoring of systems and preparatory works for the upcoming stage of decommissioning were implemented. In 2015, in line with the license for the 2. stage of the V1 NPP decommissioning, the activities of decontamination and dismantling of contaminated and active equipment as well as demolitions of remaining buildings began. In this stage radioactive waste (RAW) produced during the decommissioning is to be processed. After decontamination, the material fulfilling the free release criteria is to be released into the environment, the site is to be cleared from the scope of the Atomic Act and released from the surveillance of the national regulators. Future application of certain methods and techniques for decontamination and dismantling in similar environments might bring an added value to the operators. Paper includes a description of best practices for Nuclear Power Plant VVER type reactors decommissioning. Schedule comparison is given to show how the critical path of certain projects is being managed. Application of the International Standard for Decommissioning Costing (ISDC) methodology provides a uniform method which enables comparison of cost estimates to other nuclear facilities under decommissioning. The cost estimate for the V1 NPP decommissioning has been continuously updated based on more advanced and detailed information on the decommissioning activities and projects. Monitoring of progress of the V1 NPP decommissioning is performed via four key-performance indicators. The Earned Value Management (EVM) methodology is used for evaluating time and cost aspect of decommissioning activities while waste conditioning index is calculated by comparing the actually produced waste to planned values of waste for a respective monitored period. Radiological safety index is assessed by comparison of the personnel records on the individual yearly doses received by each respective employee to the boundary value. (authors)

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Artificial Intelligence a D and D Enabler - 20552

The paper addresses the development of a specific search engine dedicated to Decommissioning and Dismantling (D and D) projects. The solution combines advanced model based system engineering methodologies and a data centric approach. It is based on an appropriate use of the last Natural Language processing techniques, the most innovative artificial intelligence algorithms and open source framework to handle large volume and diversity of data met in the case of a nuclear infrastructure we have to dismantle. (authors)

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Certifying the Performance of Fixative Technologies under Open Air Demolition Activities for D and D - 20096

Department of Energy (DOE) facilities undergoing deactivation and decommissioning (D and D) activities struggle with safety concerns of residual radioactive contamination leftover after gross decontamination efforts have concluded. The positive effects of implementing fixative technologies for decommissioning and maintenance is known across the DOE complex. However, there is no standardized metric in place that quantifies the performance of these technologies such as incombustible fixative platforms that immobilize the contamination in a solid polymer material under normal operating conditions or when exposed to stressors. The primary focus of this research is to provide the empirical data necessary to properly characterize the effects of implementing fixative technologies on mitigating the release of contamination. In addition, this effort has been used to identify and establish uniform testing protocols to quantify operational parameters of fixating platforms and properly credit such systems under a variety of operational conditions and stressors that can arise during open air demolition efforts (e.g. impact, water, thermal, etc.). The established protocols will be provided to the ASTM International E10.03 Subcommittee on Radiological Protection for Decontamination and Decommissioning of Nuclear Facilities and Components for the potential of formal standardization. Attributes to be addressed during testing are material compromise from impact stress, thermal stress for incombustible fixative materials, and immobilization factors (how well an immobilizing platform is capable of retaining fixated material during thermal and impact stressors). In developing these test methods, a greater understanding of the material's behavior under anticipated and unanticipated events, such as decommissioning activities and contingency events as outlined in the Basis of Interim Operations (BIO), can be successfully characterized. There are several key components of the experimental methodology that is essential in empirically certifying fixative technologies. A surrogate contaminant with a unique signature has been utilized with the implementation of a uniform contamination process of test coupons that is quantifiable and replicable for direct fixative comparisons. A modular test chamber has also been used to apply the various stressors of interest. Collection of released contamination that includes airborne and resettled contaminant particles and analyzed using mass spectrometry. This research directly supports DOE complex-wide concerns in terms of final disposition of nuclear facilities and the considerations made during their time between ceasing facility operation and final disposition. The results of this effort aims to provide a standardized road map and logical decision flow to better facilitate fixative technologies into D and D activities required to achieve the desired facility end state. (authors)

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

D and D Research on KM-IT Platform - 20494

The Knowledge Management Information Tool (KM-IT) is a web-based system developed to maintain and preserve the Department of Energy's (DoE's) knowledge base. The system was developed by Florida International University's Applied Research Center (FIU-ARC) with the support of the D and D community including the DOE Office of Environmental Management, and with the collaboration and support of the DoE's Energy Facility Contractors Group (EFCOG) and the former ALARA Centers at Hanford and Savannah. The KM-IT system is a community driven system tailored to serve the technical issues faced by the workforce across the DOE Complex. This KM-IT web-based interactive system is operational and available for use at www.dndkm.org and is currently comprised of the following modules: Web Crawler, Hotline, Technology, Hanford's ALARA Center Reports, Specialist Directory, Lessons Learned, Best Practices, Video/Picture Library, Vendors and Industry News. The Web Crawler dynamically searches through the KM-IT repository as well as the web and displays search results based on the search criteria. The Hotline allows registered users to post questions/problems related to D and D and to receive solutions from a subject-matter specialist. The Technology module serves as repository of D and D technologies and contains technology/ demonstration fact sheets and vendor information. D and D community members can add Lessons Learned, Best Practices, and Pictures/Videos to the D and D repository, after a formal approval process. The Vendor module provides a directory of commercial vendors who provide D and D related technologies, supplies, and services. KM-IT makes an excellent use of the knowledge that exists within the D and D community by allowing D and D project managers around the DOE complex to collaborate by sharing innovative ideas, past experiences, and practices and by maintaining a directory of subject matter specialists. FIU has developed the dedicated module on KM-IT platform to publish D and D research being performed at FIU. This module highlights current EM research efforts and activities in support of D and D being performed at FIU/SRNL associated with fixatives and intumescent products. FIU will expand this module to include the recent and current D and D research being performed across multiple DOE EM sites, national labs and universities. FIU will collaborate with SRNL, INL, ANL and other universities to explore and publish D and D research activities on KM-IT. As a result, the user community will have a centralized location to review new D and D related research across the DOE EM complex. (authors)

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Is there a Perfect D and D Plan - 20100

Problems with many Deactivation and Demolition (D and D) projects arise not necessarily from the technical difficulty of the actions required in a given facility, but rather from lack of integration of the stove piped planning efforts; engineering, operations, environmental, radiological, human resources, etc. This paper will cover Polestar Technical Service, Inc. (Polestar) systems engineering approach to D and D planning based on the company's experience over the past 27 years. This systematic, four-pronged approach to planning is applicable to any D and D project and addresses several diverse topics in a cohesive and integrated manner. The four areas to be discussed are project scope, requirements, facility end state, work force and base operations. This approach progresses a facility through the typical DOE life-cycle from operations, through deactivation, into surveillance and maintenance (S and M) and to eventual demolition and site remediation. To achieve a final end state the approach brings together the efforts associated with identifying and managing the right set of requirements, detailing the scope of work, establishing the baseline, redefining the work processes, aligning the workforce resources with the work processes, and maintaining the base operations activities as the project progresses through the various life-cycle stages. Getting these building blocks right provides a solid framework for executing any D and D project. (authors)

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Development of the Underwater Disc Saw Used to Segment the Internals of Taiwan Research Reactor - 20038

Taiwan Research Reactor will be dismantled in the period of 2022 to 2027 according to the approved dismantling plan. Based on the sampling and analyzing results, some internals of Taiwan Research Reactor must be segmented under the water because of their higher radiation, and the calandria is one of them. To dismantle this calandria, Institute of Nuclear Energy Research develops an underwater disc saw that is driven by a hydraulic pump and will be used to segment the shell of the calandria. In this article, Taiwan Research Reactor and the structure of the calandria are briefly depicted, and the segmentation processes of this calandria and the design of this disc saw are also included. Besides, the trial of cutting the shell of the simplified full size calandria mockup is briefly demonstrated in this article. Further tests will be performed in the near future to figure out which parts or functions of this disc saw need to be modified to get better cutting performance. (authors)

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

New Designed Containers for Activated ILW from NPP Decommissioning - 20208

The paper focuses on packaging of dismantled and fragmented reactor components into containers and their transport to their storage and/or disposal facility within the immediate dismantling strategy applied on decommissioning of nuclear power plant (NPP) finally shutdown after standard operation. The main purpose of the paper is to present the process of design, manufacture, testing and use of new transport and storage containers for activated intermediate level waste (ILW) from V1 NPP decommissioning at Jaslovske Bohunice site. Legislation conditions, container selection process, requirements on their design and manufacture, scope of associated licensing documentation and technical procedures applied up to their use on site are described in detail. (authors)

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

The Study of TRR Radial Thermal Shielding Dismantling Process - 20063

The decommissioning of nuclear facilities has become an important worldwide topic because many nuclear power facilities will permanently cease operation in the foreseeable future. Taiwan Research Reactor (TRR) has stepped into the decommissioning phase in 2004, and the dismantling processes will start in 2022. TRR is a heavy water reactor designed by Canatom Company with output thermal power 40 MW. On January 3, 1973, it reaches criticality. TRR had been operated for 15 years and was permanently shut down in early 1988. The decommissioning plan of TRR was approved in 2004. According to the Nuclear Reactor Facilities Regulation Act in Taiwan, a nuclear facility must be dismantled in 25 years after stepping into the decommissioning phase. Therefore, TRR decommissioning must be completed before 2029. One of the most important tasks of TRR decommissioning is to dismantle reactor body. In the task of TRR decommissioning, mechanical cutting with remote handling is used to dismantle radial thermal shielding, which are the internal components of the TRR. This study outlines the internal components of the TRR and explains the difficulties encountered during the dismantling processes. Considering the structure and radiation dose rate of TRR and its internal components, the dismantling method and packaging method are properly arranged to complete the TRR dismantling task. This study describes the process of dismantling the radial thermal shielding during the dismantling processes and considers the impact of the radiation dose on the staff during the operation. The calculation of the radiation dose rate for the personnel during the segmentation process is based on the evaluation result by using VRdose. If the calculation of personnel working dose rate is too high, we will increase the shielding or use remote handling to reduce the operator's exposure dose in the dismantling processes to comply with the As Low As Reasonably Achievable (ALARA) principle. In this study, the latest developments in the TRR decommissioning program are described. It also provides usable experience and information regarding the future decommissioning of other nuclear facilities or nuclear power plants in Taiwan. (authors)

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

MH-1A Sturgis Decommissioning and Dismantlement - 20281

The U.S. Army Corps of Engineers (USACE) with its prime contractor, Aptim Federal Services, LLC (APTIM), recycled 5,260 metric tons (11.6 million pounds) of material from Sturgis Barge (Sturgis) during the Decommissioning and Dismantlement of the MH-1A nuclear power reactor. The overall objective of the project was to reduce residual radioactivity associated with MH-1A to levels that permitted release of Sturgis for dismantlement and termination of the Army Reactor Office permit. By effectively applying waste hierarchy's three Rs - reduce, reuse and recycle - the Sturgis project not only minimized the amount of waste that required disposal at landfills, but also reduced the potential for long-term environmental liability emanating from these landfills. The project team completed the physical decommissioning efforts in June 2018 in Galveston, TX. In September 2018, radiological surveys were completed to demonstrate the vessel could be released for shipbreaking. Sturgis was towed from Galveston, TX to Brownsville, TX in late September 2018. Shipbreaking, dismantlement and recycling efforts began in early October 2018 and were completed on 15 March 2019. As part of the decommissioning effort in Galveston, the team shipped 69 shipments (860 metric tons) of low-level radioactive waste and radioactive components to the Waste Control Specialist (WCS) facility in Andrews TX for disposal. Certain radioactive components had to be transferred to the Department of Energy prior to placing the materials into the Federal Waste Facility located within WCS. However, most of the radioactive waste was characterized, profiled, approved and managed under the WCS permitted radioactive waste exemption process authorized and implemented by the Texas Commission on Environmental Quality (TCEQ) and the Radioactive Materials Division. This allows LLRW and LLMW to be shipped as regulated waste and then upon receipt at WCS through satisfying the relevant waste acceptance criteria the waste is exempted and placed into the WCS RCRA permitted cell. An additional 35 shipments (544 metric ton) of contaminated hazardous waste water were transported to U.S. Ecology in Robstown, TX for treatment/disposal. An additional 36 shipments (500 metric tons) of non-hazardous wastewater was sent to Republic Waste Services' facility in Fresno, TX. The disposal of these materials required close coordination with State of Texas regulators. During decommissioning, the project team recycled approximately 270 metric tons (600,000 pounds) of lead and steel. As part of the dismantlement in Brownsville, TX the team recycled approximately 5,000 metric tons (11 million pounds) of ferrous and non-ferrous material, limiting our disposal requirements to about 180 metric tons (400,000 pounds) of material (<4% from entire shipbreaking activity). Although the primary hazard being mitigated by this project was radiological, recycling was always a priority for the project. The team strived to achieve sustainability goals as we implemented this one of a kind project. Scrap metal recycling has a large positive impact on the environment and can also favorably impact project disposal costs. Steel is among the most recycled material in the world. Nearly 40% of the world's steel production is made from scrap. Recycling steel also requires 75% less energy than producing it from raw materials. By using recycled steel rather than virgin materials, 2.33 kg of carbon emissions are eliminated per kg of steel [1]. The project recycled more than 4,500 metric tons (10 million pounds) of steel, which eliminated about 10,400 metric tons (23 million pounds) of CO{sub 2}. By implementing a recycling initiative for the Sturgis project, the team was able to realize cost avoidance for disposal of scrap, cost savings from the metals recycled, plus the project provided benefits to the environment through our recycling efforts. Once the dismantlement was complete, the team prepared a detailed decommissioning closure report, which allowed for the termination of the Army Reactor Decommissioning Permit. While it not only reduced any potential long-term environmental liability, this project to decommission and dismantle a floating nuclear power plant is truly unprecedented - it is a prime example of the USACE mission which is: 'Engineering solutions for the Nation's toughest challenges'. This unique, one of a kind, historical power plant was never designed to be taken apart, and the available information about its construction was lacking in many details. The hazards that required mitigation dictated a painstaking and deliberate process in order to avoid any release to the environment and the community, and to protect the health and safety of the workers involved while keeping the waste hierarchy's three R's - reduce, reuse and recycle at the forefront. (authors)

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Development of the 3 m{sup 3} Low Level Radioactive Waste Container in Taiwan - 20037

Chinshan Nuclear Power Plant stopped its business operation in July, 2019, and Kuosheng Nuclear Power Plant will also be permanently shut down in 2023. Nuclear Reactor Facilities Regulation Act requires a nuclear facility must be dismantled in 25 years after being permanently ceased operation. According to the approved decommissioning plan of Chinshan Nuclear Power Plant and the proposed one of Kuosheng Nuclear Power Plant, the 3 m{sup 3} low level radioactive waste container is planned to store the low level radioactive wastes with higher radiation produced during the decommissioning. However, 3 m{sup 3} low level radioactive waste containers are not used or developed in Taiwan before. To meet such need, Institute of Nuclear Energy Research develops a new type of 3 m{sup 3} low level radioactive waste container and performs the corresponding analyses and tests based on Guidelines of Applying the Usage License of Low Level Radioactive Waste Containers and Regulations for the Safe Transport of Radioactive Material. In this article, it provides the information of the low level radioactive waste containers that have been approved or is under reviewing in Taiwan, and so do the design specifications of the developed 3 m{sup 3} waste container. Besides, the numerical evaluation and test results of the developed 3 m{sup 3} waste container are also included in this article. Based on the evaluation and test results, the developed 3 m{sup 3} waste container satisfies the requirements of the storage container and industrial package type 2. Institute of Nuclear Energy Research will submit the usage license applications to the authority this year, and the usage licenses would be granted in 2021, expectedly. (authors)

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

The HRA/Solarium Project: Feedback Based on 20 Years of Experience in Treatment of Medium Level Waste - 20185

Since the 1980's the management of the historical site of Mol has been transferred to the National Agency for Radioactive Waste and Enriched Fissile Materials (ONDRAF/NIRAS). Belgoprocess is entrusted by ONDRAF/NIRAS with the operational waste management and site remediation. One of the major challenges has been the characterization, treatment and conditioning of approximately 200 m{sup 3} of medium level waste. These waste packages were stored in poor conditions in storage vaults ('HRA') or concrete containers ('Solarium'). They have been produced in various research programs and reactor operations at the Belgian nuclear energy research centre SCK.CEN, isotope production, decontamination and dismantling operations from the 1960's up to the 1980's. Despite the limited volume, this historical waste consists of a great variation of waste characteristics and waste configurations. To tackle these liabilities, a new processing facility was built in the 1990's to allow safe transfers, handling, characterization and treatment of these packages. Also some auxiliary facilities have been built to deal with the by-products, like emptied concrete containers. The engineering of the installation, safety procedures and (characterization) methodology that has been developed generically have been proved to be successful. Nevertheless, the specific nature of some items made it necessary to organize a step-by-step treatment in distinct campaigns in which some relevant extra (safety) measures had to be taken into account. This dynamic approach made it possible to process a great variety of waste types in order to to ensure that this legacy is no longer left for subsequent generations. After about 20 years of operations, there has been a great build-up of experience and feed-back concerning the waste management of these specific waste streams. Some cases will be highlighted to specify the approach followed for treatment of e.g.: - Na/NaK containing equipment; - spent radioactive sources; - fuel element residues; - medium level waste originating from activation experiments; - radium bearing medium level waste originating from Ac-227 production research. (authors)

07 ISOTOPE AND RADIATION SOURCES↗

Machine Vision-based Robot Manipulators for Nuclear Applications - 20370

Decommissioning and dismantling of nuclear facilities are major challenges facing the nuclear industry. Robot manipulators with capabilities of restoring nuclear structures and significantly prolonging nuclear power generation in addition to their applications in decommissioning and dismantling (D and D) would immensely ease the above-mentioned challenge. Ability to remotely sense/monitor and analyze dangerous and hazardous environments such as nuclear reactors as well as performing reparatory tasks in such environments using robot manipulators require additional information from vision sensors. Structural sample collection and inspection as well as restoration require object and position information. Computer vision is used to obtain precise 3D position information. The current work uses the Sawyer robot with the integrated Cognex camera. The research presents an approach to facilitate and improve operations in a nuclear reactor using robotic vision control. The vision control system is modeled with Augmented Image Space-based visual servoing approach. Results showing accurate robot control. Object recognition is used to recognize the image and calculate it poses. To transform coordinates of the object's pose from the camera frame to the robotic frame transformation matrices are employed. Future work will employ a 3D camera (with depth information) using Denso robot. (authors)

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Panel Session 4 and 15: Japan Fukushima Daiichi D and D Update and Technological Challenges at Japan Fukushima Daiichi D and D and Update on Nuclear Overview and Development in Japan - Nuclear Fuel Cycle

Sessions 4 and 15 represent a two-part panel series that discusses progress and challenges associated with cleanup at Fukushima. Severe limitations on availability of original panelists from Japan due to strict restrictions put in place to alleviate the spread of coronavirus necessitated changes to both panels. The result was a significantly modified panel for Session 04 (shown above) and the elimination of all panelists for Session 15. The 4 and 15 Panel Sessions provide an overview of activities related to both the progress and challenges of cleanup and decommissioning of the Fukushima Daiichi Nuclear Power Station (NPS) in Japan. Five panelists discussed perspectives of the cleanup following a Tokyo Electric Power Company (TEPCO) video showing the progress on site since the devastating Great East Earthquake and tsunami that caused the explosions at three of the six reactors on the site. Three of the five panelists discussed on-going work being performed for the effort, while the other two provided expert perspectives of on strategic efforts at the site. The panel was attended by over 80 technologists and policy makers spanning the globe and was opened by Dr. Monica Regalbuto of Idaho National Laboratory and a short video provided by TEPCO. The video described changes at the site that spanned the cleanup efforts from stabilizing water intrusion into the contaminated reactor buildings to construction of new administrative facilities. The video explained the processes underway to retrieve spent fuel rods and challenges in retrieval of the compromised fuel debris. The video highlighted working condition improvements that included establishment of rest housing and a small convenience store on the site, and the rollback of protective equipment around the site due to decreases contamination. Panelists with presentations: Revision of 'the Mid-and-Long-Term Road-map towards the Decommissioning of TEPCO's Fukushima Daiichi Nuclear Power Station' (Paul Dickman); Sharing UK experience at Fukushima Daiichi (Adrian Simper); SRNL Japan (Andrew Fellinger); ABLE's Initiative to Dismantle the Exhaust Stack (Daniel Walter); JAEA R and D in Fukushima (Tokio Fukahori); TEPCO - Overview and Update of the Fukushima Decommissioning Process (Monica Regalbuto); Toshiba's Involvement in the Decommissioning of the Fukushima Daiichi Nuclear Power Plant (Yasuhiro Yuguchi); Remote Dismantling of the Exhaust Stack At Fukushima Dai-ichi NPS (Takashi Okutsu)

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Recommended Representative Isotopic Compositions for Potential VTR Pu Supplies

This document recommends isotopic compositions to represent selected Pu supplies that might be made available for use in VTR driver fuel. These compositions are intended to be conservative representations suitable for determination of environmental impacts associated with use of the selected Pu supplies, but not upper bounds of all possible compositions. The selected Pu supplies under consideration are themselves representations of a more complicated set of possibilities, defined in a manner to allow efficient but conservative analysis of impacts. The source definitions to be considered are as follows: 1) Foreign sources of reactor-grade plutonium. This material would be provided as polished material in an oxide form and is assumed to be transported from Europe (France or England); 2) Domestic, non-weapon sources of plutonium such as unused FFTF fuel, Hanford metal (stored at SRS), and various oxides; 3) Domestic sources of weapons-grade plutonium, including metal from dismantled pits and otherwise excess to stockpile needs.

11 NUCLEAR FUEL CYCLE AND FUEL MATERIALS↗

DEM and MELT In-Can Vitrification Process for Fukushima Daiichi Water Treatment Secondary Waste - 20034

Fukushima Daiichi Nuclear Power Station was severely damaged by a tsunami induced by the earthquake on March 11, 2011. A large amount of water treatment secondary waste has been generated from the purification work of contaminated water that consists of the water flowing into the reactor building. The Mid and Long-Term Road map specifies that solid waste at Fukushima Daiichi Nuclear Power Station should be stored safely and reasonably according to its characteristics. In order to meet this goal, a versatile treatment solution is needed, and the In-Can vitrification seems to be a suitable solution. The DEM and MELT In-Can vitrification process is being developed and qualified in France to treat waste arising from decommissioning and dismantling operations. This qualification is carried out through the consortium of the DEM and MELT project coordinated by CEA which gathers Orano, ECM technologies and Andra. The DEM and MELT In-Can vitrification process is a robust, simple and versatile in situ vitrification process. It is designed for high or intermediate level waste and is compact enough to be implemented in an existing facility or close to the waste to be treated. It is developed to treat liquid and solid waste, to produce a small amount of secondary waste and to minimize investment and operating costs. The DEM and MELT In-Can vitrification process is also developed with a modular design in order to be adapted to nuclear operators needs and requirements. The In-Can melting process has already been developed and fully qualified by the CEA for Alpha liquid waste and can be rated TRL 7 for this scope. The In-Can vitrification technology is considered as a qualified solution that could be applied for the treatment of waste resulting from the D and D work in Fukushima Daiichi Nuclear Power Station. The feasibility evaluation of the DEM and MELT In-Can vitrification process for Fukushima Daiichi water treatment secondary waste is a project led by Orano, CEA and ANADEC. This R and D project is performed by the funds from the Ministry of Economy, Trade and Industry as The Subsidy Program 'Project of Decommissioning and Contaminated Water Management'. This paper presents the first results of this feasibility evaluation, from the scenarios and glass formulation definition to the industrial implementation feasibility. (authors)

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

2021 Site Environmental Report

The cover for this year’s 2021 Site Environmental Report recounts the removal of the High Flux Beam Reactor (HFBR) Stack. The Stack served as an exhaust for the Brookhaven Research Reactor (BGRR), from 1950 to 1968 and for the HFBR from 1965 to 1999. Historical operations from both facilities resulted in radiological contamination of the interior of the Stack. Under the direction of the Department of Energy (DOE), the U.S. Army Corps of Engineers oversaw the demolition and decommissioning of the HFBR Stack at BNL. Olgoonik-FPM Joint Venture was contracted to plan the work, safely dismantle the HFBR Stack, and properly dispose of all waste.

54 ENVIRONMENTAL SCIENCES↗

The Industry's Long-term, Yet Near-term, Issues: The Need for Radiation Protection Professionals - 20266

Since the discovery of X-rays and radioactivity, the civil use of nuclear technology has thrived for more than a half-century and has matured to be safer and more efficient. A balance between radiological and non-radiological knowledge and experience has been gained and retained through the years. Nevertheless, a slowly developing gap has emerged during the past few decades. National and international data show a declining trend in the existence of health physics programs and associated enrollment and training, which directly impact the pipeline of radiation professionals (i.e., educators, technicians, researchers, and regulators). This decline can be attributed to many factors including the lack of scientific inquisitiveness, declining funding, and the perception that existing protocols are sufficiently protective. Decommissioning and dismantling nuclear facilities is a complex and multi-phased process that generates large quantities of various levels of radioactive waste. With multiple facilities reaching their end of operational life, and others being shut down for economic reasons, the current pipeline for radiation protection experts cannot meet the future's need. Consequently, international organizations have proposed a variety of programs to transfer knowledge of radiation protection principles and practice. While many change-oriented efforts to counteract this trend aim to promote mobility, this is just a partial solution to the actual issue: long-term availability. This paper suggests multidisciplinary collaborations with modern technologies as a path forward to educate young professionals on the diversity of radiation-related applications to retain expert knowledge and foster innovation. (authors)

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗