Engineering PapersSearch

SEARCH · Engineering Papers

Results for “Qualification”

Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.

Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.

At least 19 records

Computational Materials for Qualification and Certification (CM4QC) Strategy Document: Maturation of Computational Materials Methods for Aviation-Focused Qualification and Certification of Metal Additive Manufacturing (as an Example of Process-Intensive Materials)

Although considerable scientific and technological advances have been made in recent years in additive manufacturing (AM) processes, these advances have not translated into significant market penetration of AM parts within the aviation industry. It is broadly acknowledged that using traditional qualification and certification (Q&C) approaches for AM components is one of the most significant barriers to broader adoption of AM, resulting in high costs, long product development and certification timelines, and complex design iterations during the product development cycle. A new approach is urgently needed. This document lays out a vision for a new Q&C paradigm with increased use of computational materials (CM) methods aimed at decreasing the time and cost of Q&C of process-intensive material (PIM) approaches in the aviation industry, with AM as the immediate use case. This vision was developed with substantial input from industry, regulatory agencies, government research organizations, and academia.

Edward H Glaessgen

Qualification of the T2 wind tunnel in cryogenic operation. B: Flow fluctuations, particle detection and qualification

This report presents part of the tests for verification of the T2 transonic induction wind tunnel in cryogenic operation. The first part of the results presented concerns fluctuations in pressure and temperature at ambient temperature and in cryogenic regulation. The second part presents the condensation phenomena which could be observed in the cryogenic flow by means of an optical particle detection system in the test section.

Dor, J. B.

Role of Accelerated Burnup Irradiation Testing in Support of Accelerated Fuel Qualification

Accelerated fuel qualification has gained attention as a means to reduce the time needed to realize new nuclear fuel concepts and expand the operating windows of existing fuel forms. A key component of this approach is accelerated burnup irradiation testing. Although the concept of accelerated burnup has been familiar to the community for many decades, the specifics about how the increasing fission rate may be used as a qualification tool have not yet been elucidated. The present work provides a vision of how accelerated fission rate testing can enable accelerated fuel qualification. Technology readiness levels (TRLs) are reintroduced to demarcate the stages of traditional fuel qualification, and accelerated fuel qualification is presented in this context. The critical steps needed to achieve each TRL are reframed within the context of modern nuclear materials research and development, as revolutionary fuel concepts are more common than previous eras. The practical impacts of accelerated fuel qualification approaches as applied to contemporary fuel qualification efforts are illustrated. Examples are given to illustrate how accelerated burnup irradiations are being used currently and could be applied in the future to support qualification and licensure. Finally, outstanding challenges in the application of accelerated burnup methods to nuclear fuel qualification are summarized, with priority placed on understanding how fission rate impacts diffusion, microstructure evolution, and other critical mechanisms that dictate fuel performance.

Accelerated fuel qualification

NASA Progress on the Development and Qualification of a 12-kW Hall-Effect, Solar Electric Propulsion Thruster

I. Motivation and Background Beginning in 2014, the National Aeronautics and Space Administration (NASA) Space Technology Mission Directorate (STMD) began a project to increase the state of the art for the Hall-Effect Solar Electric Propulsion (SEP) technology. The resulting Advanced Electric Propulsion System (AEPS) project has developed a 12 kW Hall Current Thruster in support of the NASA mission to establish a permanent human presence in lunar orbit and to land the next American astronauts on the South Pole of the Moon. The project is led by the NASA Glenn Research Center, supported by the Jet Propulsion Laboratory and development, qualification & flight hardware all provided by L3 Harris Aerojet Rocketdyne (AR).The AEPS project has completed the development testing of a high power, solar electric propulsion Hall Current thruster that will be used on the NASA Power & Propulsion Element (PPE) of the Gateway space station. NASA initially built three Technology Development Units to understand key characteristics of the hall-effect rocket with magnetic shielding. The design led to development testing on two Engineering Test Unit Thrusters and multiple critical components. The project has begun production of the three flight thrusters and entered qualification testing at the component and thruster levels. II. Approach NASA and AR teams completed all development phases of the project, including full development and integration testing of the Engineering Model hardware, Critical Design Review, and ground test equipment validation, as well as fabrication and acceptance testing of the initial qualification thruster. Qualification and verification of the environmental and life requirements of the AEPS design was initiated in the Fall of 2023 and will be accomplished on two thruster units and using a series of component-level tests during 2024 and 2025. Environmental testing will incorporate functional reference firings, shock, vibration, and Thermal Vacuum (TVAC) testing. Life verification will assess the thruster wear and performance over the lifetime of the Gateway spacecraft. Critical component qualification tests include cathode heater, magnet coils, magnet heaters, temperature sensors, and a cathode assembly that will undergo life cycle testing on multiple units. Flight thrusters will complete assembly and acceptance testing and be delivered to the PPE program in early 2025. III. Preliminary and Anticipated Results The program has completed the acceptance testing, including dynamic testing and hot fire characterization, of the first qualification thruster. In the Fall of 2023, the program entered the environmental qualification phase for thruster testing. This paper will present an overview of the AEPS thruster project, thruster capabilities and flight design, preliminary results from the thruster acceptance and qualification testing, component life cycle testing and flight hardware status.

Clayton Kachele

A method of hardware qualification for flight by analyses, similarity and integrated testing

The results are described of a study on four pieces of flight hardware from the Saturn 1U and S-4B stages to determine whether the objectives of the formal qualification tests on that hardware could have been obtained within that program by methods other than performing the qualification tests. These methods include qualification by analyses, similarity and integrated testing, i.e., distribution of the objectives among the other tests in the program. It was found that it is feasible to delete the requirements for formal qualification testing provided that it is accomplished early in the program to allow adequate planning for accomplishing the qualification objectives by other means. Additionally, a scorekeeping system was defined that is simple, straightforward, easy to implement. This scorekeeping system provides complete visibility of equivalent qualification status at any point during the program. A set of groundrules for implementing this study was established as a result of findings on the specific items of hardware studied.

Andriulli, J. B.

BSM Delta Qualification 2, volume 3, book 2

This report, presented in three volumes, provides the results of a two-motor Delta Qualification 2 program conducted in 1993 to certify the following enhancements for incorporation into booster separation motor (BSM0 flight hardware: vulcanized-in-place nozzle aft closure insulation; new iso-static ATJ bulk graphite throat insert material, adhesive EA9394 for bonding the nozzle throat, igniter grain rod/centering insert/igniter case; deletion of the igniter adapter insulator ring; deletion of the igniter adapter/igniter case interface RTV; and deletion of loctite from igniter retainer plate threads. The enhancements above directly resulted from (1) the BSM total quality management (TQM) team initiatives to enhance the BSM producibility, and (2) the necessity to qualify new throat insert and adhesive systems to replace existing materials that will not be available. Testing was completed at both the component and motor levels. Component testing was accomplished to screen candidate materials (e.g., throat materials, adhesive systems) and to optimize processes (e.g., aft closure insulator vulcanization approach) prior to their incorporation into the test motors. Motor testing--consisting of two motors, randomly selected by USBI's on-site quality personnel from production lot AAY, which were modified to accept the enhancements -- was completed to provide the final qualification of the enhancements for incorporation into flight hardware. Volume 3, Book 2 provides various supporting documentation to the previous volumes with regards to the testing of the two Delta qualification units: data acceptance records, thermal conditioning analysis, igniter adapter thermal flake analysis, laboratory adhesive (EA-9394) qualification report, throat insert thermal/structural analysis, Delta Qualification Nonconformance Reports (NCR's), O-ring seating tests, and interim test report for vulcanization process qualification.

Source record

Research Needs for Developing Qualification Standards for Flight Simulation Training Devices with Head Mounted Displays

This presentation discusses research needs to support evidence-based qualification standards for Flight Simulation Training Devices (FSTDs) with head mounted displays (HMDs). Currently, the FAA and EASA have no qualification standards specifically for FSTDs using HMDs and extended reality (XR) visuals, and existing qualification standards may not be sufficient. Special Conditions can be prescribed for the evaluation and qualification of individual devices, but these Special Conditions need to be assessed and adjusted on a case-by-case basis resulting in an elaborate process. Furthermore, test tolerances used in Special Conditions are often based on conventional visual systems and may not be adequate. This presentation first identifies gaps in the current knowledge of using HMDs in pilot training, and, more specifically, using HMDs in the training of manual aircraft control with motion cues. Next, research is proposed to help close these gaps, inform the development of qualification criteria and tolerances, and guide efforts to update regulations. The Vertical Motion Simulator (VMS) at NASA Ames Research Center, with its large motion capability, is currently undergoing significant upgrades including a state-of-the-art out-the-window visual system. In addition, an HMD capability will be introduced to use in conjunction with the conventional visual system. With its long history of setting standards in the simulation industry, the VMS is the ultimate tool to conduct research that could help accelerate the development of standards for the use of HMDs in FSTDs. The goal of the talk is ultimately to spark a discussion about the research needs and priorities to best serve the development of new qualification standards.

XR

Qualification Testing of Engineering Camera and Platinum Resistance Thermometer (PRT) Sensors for Mars Science Laboratory (MSL) Project under Extreme Temperatures to Assess Reliability and to Enhance Mission Assurance

Package Qualification and Verification (PQV) of advanced electronic packaging and interconnect technologies and various other types of qualification hardware for the Mars Exploration Rover/Mars Science Laboratory flight projects has been performed to enhance the mission assurance. The qualification of hardware (Engineering Camera and Platinum Resistance Thermometer, PRT) under extreme cold temperatures has been performed with reference to various project requirements. The flight-like packages, sensors, and subassemblies have been selected for the study to survive three times (3x) the total number of expected temperature cycles resulting from all environmental and operational exposures occurring over the life of the flight hardware including all relevant manufacturing, ground operations and mission phases. Qualification has been performed by subjecting above flight-like qual hardware to the environmental temperature extremes and assessing any structural failures or degradation in electrical performance due to either overstress or thermal cycle fatigue. Experiments of flight like hardware qualification test results have been described in this paper.

package reliability

Open-Source RTOS Space Qualification: An RTEMS Case Study

NASA space-qualification of reusable off-the-shelf real-time operating systems (RTOSs) remains elusive due to several factors notably (1) The diverse nature of RTOSs utilized across NASA, (2) No single NASA space-qualification criteria, lack of verification and validation (V&V) analysis, or test beds, and (3) different RTOS heritages, specifically open-source RTOSs and closed vendor-provided RTOSs. As a leader in simulation test beds, the NASA IV&V Program is poised to help jump-start and lead the space-qualification effort of the open source Real-Time Executive for Multiprocessor Systems (RTEMS) RTOS. RTEMS, as a case-study, can be utilized as an example of how to qualify all RTOSs, particularly the reusable non-commercial (open-source) ones that are gaining usage and popularity across NASA. Qualification will improve the overall safety and mission assurance of RTOSs for NASA-agency wide usage. NASA's involvement in space-qualification of an open-source RTOS such as RTEMS will drive the RTOS industry toward a more qualified and mature open-source RTOS product.

Real-time operating system

Development and Qualification of the Primary Structure of the Orion European Service Module

This paper presents an overview of the development and qualification test campaign for the primary structure of the European Service Module of ORION, the NASA spacecraft which will serve the future human exploration missions to the Moon, Mars and beyond. Under an agreement between NASA and ESA, the ORION will be powered by a European Service Module (ESM), providing also water and oxygen for astronauts' life sustainability. The development and qualification of the European Service Module (ESM) is under ESA responsibility with Airbus Defense and Space as the prime contractor. Thales Alenia Space Italia is responsible for design development, manufacturing, assembly and qualification of the Structure subsystem. The European Service Module, installed onto the launch adapter, shall support the crew module with its adapter and a launch abort system. It shall sustain: - A combination of global and local launch loads during lift off and ascent phases, - On orbit loads induced by engine firing for orbital transfers and attitude control. The ESM structure is based on a core made of Composite Fiber Reinforced Polymer (CFRP) sandwich panels complemented by aluminum alloy platforms, longerons and secondary structures. A development campaign has been implemented in order to define and validate composite parts' strength allowable values for design: coupon tests at material level, test at component level up to breadboards tests performed on main structural components (composite to metallic joints, and at panels' discontinuities). An incremental approach as defined in [1] has been followed. A qualification static test campaign at primary structure assembly level has been implemented in order to validate the design against static stiffness and ultimate strength as well as to correlate the structural Finite Element Model (FEM) used for sizing and confirm the margins of safety. The tests have been performed successfully by Thales Alenia Space Italia (TAS-I) on two flight representative structural models (STA1, STA2), in Turin facilities (Italy) between August 2015 and March 2017, with engineering support of technical representatives from Airbus, ESA, NASA and LMCO. The main development and qualification test activities and associated results are presented and discussed in the paper

Structural Testing

Liquid Fuel Qualification for Molten Salt Reactors: Identification of Gaps and Challenges

This report identifies and describes challenges in implementing the MSR fuel qualification process described in NUREG/CR-7299 Fuel Qualification for Molten Salt Reactors. This report provides additional information including examples and additional use case descriptions to assist applicants in understanding the content and structure of the information necessary to develop a fuel qualification report. In particular, the current report emphasizes the relationship of fuel salt qualification to the contents of the plant safety analysis report. This report is limited to the safety functions relevant to the reactor aspects of the nuclear power plant. MSRs that include significant fuel salt processing would also need to address the safety aspects of the processing facility. No significant gaps were found in NUREG/CR-7299. However, NUREG/CR-7299 focuses on generic descriptions of how the fuel salt supports achievement of plant fundamental safety functions. A fuel salt qualification report will need explicitly address the role of the fuel salt in meeting regulatory requirements for a particular plant. NUREG/CR-7299 also provides a regulatory mapping between NRC rules and the safety functions. However, by remaining at a fundamental level, NUREG/CR-7299 does not address plant specific safety analysis. Some aspects of the safety analysis may require additional emphasis for designs that incorporate particular features (such as additional confirmation of decay heat rejection performance for higher power reactors). This report provides additional structure to enable an applicant to develop their plant-specific safety analysis.

22 GENERAL STUDIES OF NUCLEAR REACTORS

Summary of Savannah River Site FY24 Salt Waste Qualification Data

Savannah River Mission Completion (SRMC), the Liquid Waste Operations subcontractor at SRS, and Savannah River National Laboratory (SRNL) analyzed samples from Savannah River Site (SRS) Waste Tanks 21H, 41H, and 42H to support qualification of Salt Waste Processing Facility (SWPF) Waste Batches 10, 11, 12, and 13 for processing (the FY24 Salt Batch Qualification samples). These Tanks (i.e. 21H, 41H and 42H) are blend tanks for feed to SWPF. This report focuses on the characterization of the Salt Batch Qualification sub-samples (i.e., any adjustments after qualification or as a part of processing are documented elsewhere). None of the samples displayed any unusual or unexpected characteristics such as large amounts of solids, floating solids, or unusual color. Characterization of these samples confirmed similar chemical composition and characteristics to previous salt waste batches. The analytical results (both rapid, typically 4 weeks, and long-term, typically 8 weeks) for Salt Batches 10, 11, 12, and 13 are now summarized and discussed in this technical report. SRMC-Analytical Laboratory (SRMC-AL), for the first time, provided all the short-term analyses data used in the qualification evaluations of SWPF Salt Batches 10, 11, 12, and 13. These SRMC short-term results are presented along with the results for the long-term analyses provided by SRNL.

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W

Acceptance and qualification test results of the 20 km electromechanical tether for TSS-1

Acceptance and qualification tests have been performed on the TSS-1 flight tether and its associated qualification tether. Acceptance testing during production included periodic measurement of conductor resistance, off-line breakstrength tests on strength member samples, continuous measurement of the insulation layer voltage withstand capability, and a continuous mechanical proof-loading procedure during the tether jacketing operation. The qualification test sequence consisted of thermal vacuum, voltage withstand and breakstrength tests on samples taken from the production runs for both the qualification and flight tethers. This paper will analyze the acceptance and qualification test data, respectively. Results indicate that the completed flight tether exceeds the design requirements for the TSS-1 mission.

Marshall, L. S.

RL10A-3-3B high mixture ratio qualification program

The results of the high mixture ratio qualification testing of the RL10 engine for the Shuttle/Centaur program are presented. The objective of the engine qualification test was to demonstrate the suitability of the RL10A-3-3B engine for space vehicle flight by subjecting it to the testing specified in RL10A-3-3B Model Specification Number 2295 dated February 1986. The applicable section of the specification is presented. Due to payload volume advantages which can be achieved by increasing the operating mixture ratio of the RL10, a decision was made to qualify the engine to run at a higher mixture ratio. A program was created to qualify the RL10 engine for operation at 15,000 pounds thrust and a nominal 6.0 to 1 mixture ratio. This model of the engine was designated the RL10A-3-3B. The qualification program included three test series as follows: (1) hardware durability and limits test in which the engine completed 23 firings and 4605.7 seconds with 1588.7 seconds at less than 6.6 mixture ratio; (2) preliminary qualification test in which the engine completed 26 firings and 5750 seconds; and (3) qualification test in which the engine completed 26 hot firings and 5693.4 seconds with 905.9 seconds at 6.7 mixture ratio. Several changes in engine hardware were required for operation of the RL10A-3-3B engine in the Space Shuttle which include a duel pressure switch ignition, an oxidizer flow control, and helium plumbing changes.

Vogel, T.

Structural Qualification Testing of the WindSat Payload Using Sine Bursts Near Structural Resonance

Sine burst tests are often used for structural qualification of space flight hardware. In most instances, the driving frequency of the shaker is specified far below the structure's first resonant mode, such that the entire test article sees uniform acceleration. For large structures, this limits qualification testing to lower parts of the structure, or else it over-tests the lower structure to achieve qualification of the upper structure. The WindSat payload, a 10.5 foot tall graphite/epoxy, titanium, and aluminum radiometer, experiences accelerations at the six foot diameter reflector nearly four times that at the spacecraft interface. Due to size of the payload, the number of bonded joints, and the lightweight reflector support structure design and construction, using static pull testing to qualify all of the bonded joints in the upper structure would result in large, expensive, and extensive test fixturing. Sine burst testing near the first two structural resonant modes was performed on the WindSat payload to achieve the correct load factor distribution up the stack for structural qualification. In this presentation, how finite element method (FEM) sine burst predictions were used in conjunction with low level random and sine burst tests to achieve correct qualification test load factor distribution on the WindSat payload is discussed. Also presented is the risk mitigation approach for using the uncorrelated FEM in this procedure.

Pontius, Jim

Synergistic Development, Test, and Qualification Approaches for the Ares I and V Launch Vehicles

The U.S. National Aeronautics and Space Administration is designing and developing the Ares I and Ares V launch vehicles for access to the International Space Station (ISS) and human exploration of the Moon. The Ares I consists of a first stage reusable five-segment solid rocket booster, a upper stage using a J-2X engine derived from heritage experience (Saturn and Space Shuttle External Tank programs), and the Orion crew exploration vehicle (CEV). The Ares V is designed to minimize the development and overall life-cycle costs by leveraging off of the Ares I design. The Ares V consists of two boosters, a core stage, an earth departure stage (EDS), and a shroud. The core stage and EDS use LH2/LO2 propellants, metallic propellant tanks, and composite dry structures. The core stage has six RS-68B upgraded Delta IV engines while the EDS uses a J-2X engine for second stage ascent and trans-lunar injection (TLI) burn. System and propulsion tests and qualification approaches for Ares V elements are being considered as follow-on extensions of the Ares I development program. Following Ares I IOC, testing will be conducted to verify the J-2X engine's orbital restart and TLI burn capability. The Ares I upper stage operation will be demonstrated through integrated stage development and acceptance testing. The EDS will undergo similar development and acceptance testing with additional testing to verify aspects of cryogenic propellant management, operation of sub-systems in a space simulation environment, and orbital re-start of the main propulsion system. RS-68B certification testing will be conducted along with integrated core stage development and acceptance testing. Structural testing of the Ares V EDS and core stage propellant tanks will be conducted similar to the Ares I upper stage. The structural qualification testing may be accomplished with separate propellant tank test articles. Structural development and qualification testing of the dry structure will be pursued as part of the design and development process. Especially critical is the development test program for the composite structures. The Ares V payload shroud will undergo acoustic, vibration, structural qualification, and deployment testing in a space simulation environment. Similar to Ares I, requirements for full-scale structural dynamic testing are being studied. Both Ares I and Ares V include validation flight testing as part of the qualification programs.

Cockrell, Charles E.