Introduction to Flight Test Engineering [Introduction Aux Techniques Des Essais En Vol]

Flight test is at the core of what organizations must do in order to validate the operation and systems on an aircraft. While the AGARDograph series 300 and 160 series deal with aspects of this testing, this volume pulls it all together as an introduction to the process required to do effective flight test engineering. This volume was originally published in 1995. Its utility has been proven in that many flight test organizations and universities have requested copies for their engineers and students. It was felt that re-issuing it in a new format designed for electronic publication would be valuable to the community. This second printing changes none of the text, but rather reformats it. All the original references to AGARD (instead of RTO) are left in place so that none of the flavor of the original publication is lost. This is the Introductory Volume to the Flight Test Techniques Series. It is a general introduction to the various activities and aspects of Flight Test Engineering that must be considered when planning, conducting, and reporting a flight test program. Its main intent is to provide a broad overview to the novice engineer or to other people who have a need to interface with specialists within the flight test community. The first two Sections provide some insight into the question of why flight test and give a short history of flight test engineering. Sections 3 through 10 deal with the preparation for flight testing. They provide guidance on the preliminary factors that must be considered; the composition of the test team; the logistic support requirements; the instrumentation and data processing requirements; the flight test plan; the associated preliminary ground tests; and last, but by no means least, discuss safety aspects. Sections 11 through 27 describe the various types of flight tests that are usually conducted during the development and certification of a new or modified aircraft type. Each Section offers a brief introduction to the topic under consideration, and the nature and the objectives of the tests to be conducted. It lists the test instrumentation (and, where appropriate, other test equipment and facilities) required, describes the test maneuvers to be executed, and indicates the way in which the test data is selected, analyzed, and presented. The various activities that should take place between test flights are presented next. Items that are covered are: who to debrief; what type of reports to send where: types of data analysis required for next flight; review of test data to make a comparison to predicted data and some courses of action if there is not good agreement; and comments on selecting the next test flight. The activities that must take place upon completion of the test program are presented. The types of reports and briefings that should take place and a discussion of some of the uses of the flight test data are covered. A brief forecast is presented of where present trends may be leading.

Test facilities

The Habitable Worlds Observatory Technology Development Plan

The Habitable Worlds Observatory (HWO) is NASA’s next large space telescope, selected by the 2020 Decadal Survey in Astronomy and Astrophysics to search for and characterize habitable exoplanets while enabling a broad range of transformative astrophysics. In August 2024, the HWO Technology Maturation Project Office (TMPO) was formed to begin exploring the HWO science, technology, and mission architectures toward a Mission Concept Review (MCR) at the end of the decade. A primary deliverable of this effort is this technology development plan that identifies critical technologies that enable the mission, defines a process for assessing the readiness of those technologies, and outlines a strategy for developing those technologies to a Technology Readiness Level (TRL) of 5 before the MCR. This document covers technologies organized along three “tracks”: Coronagraph System technologies, Ultra-stable Telescope System technologies, and High-sensitivity Ultraviolet and Visible Instrumentation technologies. Additional emerging and enhancing technologies are also discussed.

technology development

Advanced Composite Structures and Materials Technologies for Launch Vehicles

The NASA's Advanced Composites Technologies (ACT) Project has the potential to develop composite materials and structures technologies for the largest composite aerospace structures ever made. The objective the ACT Project of is to develop mid-technology readiness level (TRL) composite materials and structures technologies to TRL 6 for specific heavy lift Ares V launch vehicle and Altair lunar lander applications. To accomplish this objective, the ACT Project has four major technical elements: materials and manufacturing; structural concepts development and assessment of lightweight components; testing and evaluation; and highly loaded composite struts. The Project uses capabilities from across NASA to form multi-disciplinary, cross-center teams to meet the milestones of these technical elements. This presentation will describe the activities and plans for the ACT Project. Studies from the first execution year of the project will be summarized including results from materials selection and structural concept evaluation studies. Plans for continuing activities include studies for nondestructive evaluation/structural health monitoring, damage tolerance, joints, and material and structural testing, and these studies will be described. A major emphasis this fiscal year is the start of work for a manufacturing demonstration barrel. This structure will be composed of six, 5-m-diameter, 3-m-long curved panels that when assembled, result in a 10-m-diameter barrel. Activities related to the development of this structure will also be described.

Mark J Shuart

The Habitable Worlds Observatory Technology Development Plan

The Habitable Worlds Observatory (HWO) is NASA’s next large space telescope, selected by the 2020 Decadal Survey in Astronomy and Astrophysics to search for and characterize habitable exoplanets while enabling a broad range of transformative astrophysics. In August 2024, the HWO Technology Maturation Project Office (TMPO) was formed to begin exploring the HWO science, technology, and mission architectures toward a Mission Concept Review (MCR) at the end of the decade. A primary deliverable of this effort is a technology development plan that identifies critical technologies that enable the mission, defines a process for assessing the readiness of those technologies, and outlines a strategy for developing those technologies to a Technology Readiness Level (TRL) of 5 before the MCR. In this paper we summarize the HWO technology development plan which comprises three “tracks”: Coronagraph System technologies, Ultra-stable Telescope System technologies, and High-sensitivity Ultraviolet and Visible Instrumentation technologies. Each track has completed an initial assessment of technology gaps, prioritized the gaps for investment, and laid out development roadmaps to mature candidate technologies to close those gaps.

Matthew R Bolcar

Risk Reduction Project in Pad Abort-1 Launch Vehicle Loads & Dynamics

The Pad Abort (PA-1) system includes the Launch Abort System (LAS) and the Command Module (CM). The PA-1 abort flight test will launch from the White Sands Missile Range. Prior to the ignition, the vehicle will be resting, without restraints, on a short support structure. The Launch Abort Motor will ignite and burn for less than 5 seconds before a 20 second coast. Then the LAS will separate from the CM and the CM will descend via parachute to a soil landing. The static firing of the Abort Motor (ST-1) for PA-1 Launch Vehicle resulted in unexpected higher levels that superseded the environment predictions and all the design and test loads of all subassemblies and components. A rapid project was put in place to develop the flight environments, loads and associated uncertainties for the Verification Load Cycle (VLC) of PA-1. An acoustic test and shaker test of the CM were planned and executed in support of the developments of damping and transfer functions. Instead of using the traditional structure-borne envelops, the actual ST-1 pressures and forces were used to develop the internal accelerations. The PA-1 motor was cooled to 60 Deg F using thermal conditioning to reduce the thrust profile. The plumes of the abort motor were studied to determine if the airborne environments would be reduced. The combination of all items, noted above, allowed a reduction in loads for VLC.

Sasan C Armand

Surveyor Project Final Report: Part 1 - Project Description and Performance, Volume 1

The Surveyor Project planned and conducted seven unmanned lunar missions for which spacecraft were launched between May 1966 and January 1968. Each of the spacecraft was successfully launched with the then newly developed Atlas/Centaur vehicle which utilized for the first time a high-specific-impulse, liquid hydrogen/liquid oxygen fueled stage. Five of the spacecraft successfully soft-landed and returned a great quantity of engineering and scientific data on extensive postlanding operations, accomplishing all mission and project objectives. Four of the spacecraft soft-landed at selected mare sites to provide data which were required to support the Apollo Program. The final spacecraft was then successfully used for scientific investigation of a contrasting site in the rugged lunar highlands. Surveyor was a fully attitude-stabilized spacecraft designed to receive and execute a wide variety of earth commands, as well as to perform certain automatic functions including the critical terminal-descent and soft-landing sequences. Significant new and advanced subsystems that were developed and/or used in combination to enable Surveyor to execute the complex terminal phase of flight were: (1) a solid-propellant main retro motor, (2) throttlable liquid-propellant vernier engines (also used for midcourse velocity correction), (3) highly sensitive velocity- and altitude-sensing radars, and (4) an automatic closed-loop guidance and control system. The first Surveyor spacecraft carried a survey television camera which, together with other engineering instrumentation, obtained in-flight and postlanding data. The complement of instruments carried on later missions included various combinations of the following additional devices: (1) a soil mechanics/surface sampler instrument for picking, digging, and handling lunar surface material; (2) an alpha scattering instrument for performing a chemical analysis of the lunar surface material; and (3) magnets attached to the spacecraft for determining magnetic properties of the soil.

Jet Propulsion Laboratory

Surveyor Project Final Report: Part 1 - Project Description and Performance, Volume 2

The Surveyor Project planned and conducted seven unmanned lunar missions for which spacecraft were launched between May 1966 and January 1968. Each of the spacecraft was successfully launched with the then newly developed Atlas/Centaur vehicle which utilized for the first time a high-specific-impulse, liquid hydrogen/liquid oxygen fueled stage. Five of the spacecraft successfully soft-landed and returned a great quantity of engineering and scientific data on extensive postlanding operations, accomplishing all mission and project objectives. Four of the spacecraft soft-landed at selected mare sites to provide data which were required to support the Apollo Program. The final spacecraft was then successfully used for scientific investigation of a contrasting site in the rugged lunar highlands. Surveyor was a fully attitude-stabilized spacecraft designed to receive and execute a wide variety of earth commands, as well as to perform certain automatic functions including the critical terminal-descent and soft-landing sequences. Significant new and advanced subsystems that were developed and/or used in combination to enable Surveyor to execute the complex terminal phase of flight were: (1) a solid-propellant main retro motor, (2) throttlable liquid-propellant vernier engines (also used for midcourse velocity correction), (3) highly sensitive velocity- and altitude-sensing radars, and (4) an automatic closed-loop guidance and control system. The first Surveyor spacecraft carried a survey television camera which, together with other engineering instrumentation, obtained in-flight and postlanding data. The complement of instruments carried on later missions included various combinations of the following additional devices: (1) a soil mechanics/surface sampler instrument for picking, digging, and handling lunar surface material; (2) an alpha scattering instrument for performing a chemical analysis of the lunar surface material; and (3) magnets attached to the spacecraft for determining magnetic properties of the soil.

Jet Propulsion Laboratory

2005 NASA Seal/Secondary Air System Workshop

The 2005 NASA Seal/Secondary Air System workshop covered the following topics: (i) Overview of NASA’s new Exploration Initiative program aimed at exploring the Moon, Mars, and beyond; (ii) Overview of the NASA-sponsored Propulsion 21 Project; (iii) Overview of NASA Glenn’s seal project aimed at developing advanced seals for NASA’s turbomachinery, space, and reentry vehicle needs; (iv) Reviews of NASA prime contractor, vendor, and university advanced sealing concepts including tip clearance control, test results, experimental facilities, and numerical predictions; and (v) Reviews of material development programs relevant to advanced seals development. Turbine engine studies have shown that reducing high-pressure turbine (HPT) blade tip clearances will reduce fuel burn, lower emissions, retain exhaust gas temperature margin, and increase range. Several organizations presented development efforts aimed at developing faster clearance control systems and associated technology to meet future engine needs. The workshop also covered several programs NASA is funding to develop technologies for the Exploration Initiative and advanced reusable space vehicle technologies. NASA plans on developing an advanced docking and berthing system that would permit any vehicle to dock to any on-orbit station or vehicle. Seal technical challenges (including space environments, temperature variation, and seal-on-seal operation) as well as plans to develop the necessary “androgynous” seal technologies were reviewed. Researchers also reviewed tests completed for the shuttle main landing gear door seals.

Hypersonic

NASA Hybrid Thermally Efficient Core (HyTEC) Phase 2 Q3’GFY25 to Q2’GFY26 Unlimited Rights Annual Report for CLIN 1 and 2

The HyTEC Phase 2 Project focuses on the development and demonstration of high-power density, small engine core gas turbine engine technologies. The focus of HyTEC on these small engine core technologies will provide direct benefits to the next single-aisle class aircraft in terms of thermal efficiency, as well as integrate with other technologies, through increased hybridization, as they mature to provide substantial continuous fuel burn reductions during the aircraft lifecycle. These advances will strengthen the US position in the commercial aviation engine market and enable cost benefits in commercial aviation. In Government fiscal year 26 the HyTEC Project was closed and contract moved to the Subsonic Vehicle Technologies and Tools Project. GE Aerospace is executing two major work plans as part of the HyTEC Phase 2 contract. The first is Contract Line-Item Number (CLIN) 001 and its objective is to mature High Pressure Turbine (HPT) aerodynamics technology to TRL 5 through multiple rigs so that it may be incorporated into a complete TRL 6 evaluation and unlock learnings for the engine core demonstration as applicable. CLIN 002, the second work plan, is to design, procure and test a cost shared portion of technologies on the TRL6 Compact Core test vehicle. The compact core demonstrated through HyTEC Phase 2 along with the HPT rig TRL advancement directly matures the technologies being developed as part of the CFM RISE demonstrator program which is targeting a more than 20% fuel burn reduction at the engine level versus today’s state of the art. The RISE program’s objective is to advance both the novel Open Fan architecture, compact core technologies and advanced systems such as hybrid electric needed to achieve the desired fuel burn reduction to TRL6 ahead of a new product introduction in the single-aisle class aircraft in the 2030s timeframe.

gas turbine engine

NASA Small Spacecraft and Distributed Systems: Recent and Upcoming Technology Demonstrations and Development Efforts

NASA’s Small Spacecraft & Distributed Systems (SSDS) program strengthens U.S. ability to conduct unique missions by rapidly developing and demonstrating capabilities for SmallSat exploration, science, and commercial space. In collaboration with NASA Centers, other government agencies, commercial industry, and academia, SSDS advances next generation SmallSat technologies like power, processing, propulsion, communications, autonomous navigation, architectures (swarms), and applications (AI/ML/Edge Computing)—to extend missions beyond LEO into cislunar and planetary space. Various investment mechanisms exist for SSDS to select and fund projects that will ultimately advance NASA’s Moon to Mars Architecture. Presented here are the latest achievements and findings from recently completed SSDS projects, along with updates from ongoing efforts and planned future work. Successful missions like Starling and CAPSTONE continue to demonstrate their capability after several years on-orbit. Advancements in next generation swarm configurations are being implemented by Starling for space traffic monitoring and management applications. Findings from recent SSDS flight projects are discussed: DiskSat, a unique SmallSat platform alternative to canisterized nanosatellites, launched December 2025 and is gathering data; the PTD series of missions concluded in December 2025. Current SSDS efforts are focused on addressing NASA Shortfalls relating to rendezvous and proximity operations, neuromorphic computing, and space situational awareness.

Roger Hunter

NASA Small Spacecraft and Distributed Systems Program - Recent and Upcoming Technology Demonstrations and Development Efforts

NASA’s Small Spacecraft & Distributed Systems (SSDS) program strengthens U.S. ability to conduct unique missions by rapidly developing and demonstrating capabilities for SmallSat exploration, science, and commercial space. In collaboration with NASA Centers, other government agencies, commercial industry, and academia, SSDS advances next generation SmallSat technologies like power, processing, propulsion, communications, autonomous navigation, architectures (swarms), and applications (AI/ML/Edge Computing)—to extend missions beyond LEO into cislunar and planetary space. Various investment mechanisms exist for SSDS to select and fund projects that will ultimately advance NASA’s Moon to Mars Architecture. Presented here are the latest achievements and findings from recently completed SSDS projects, along with updates from ongoing efforts and planned future work. Successful missions like Starling and CAPSTONE continue to demonstrate their capability after several years on-orbit. Advancements in next generation swarm configurations are being implemented by Starling for space traffic monitoring and management applications. Findings from recent SSDS flight projects are discussed: DiskSat, a unique SmallSat platform alternative to canisterized nanosatellites, launched December 2025 and is gathering data; the PTD series of missions concluded in December 2025. Current SSDS efforts are focused on addressing NASA Shortfalls relating to rendezvous and proximity operations, neuromorphic computing, and space situational awareness.

Roger C Hunter

MEAD In-situ Sampling and Testing at Haughton Crater

The Mars Exploration through Analog-site Drilling (MEAD) project is designed to demonstrate the feasibility and scientific value of robotic drilling missions to Mars in the search for evidence of past or extant life. MEAD conducts high-fidelity field simulations integrating drilling, autonomous operations, and in-situ life-detection and mineralogical instruments. The project tests the Signs of Life Detector (SOLID), proposed for the 2019 Discovery Mars Icebreaker mission, and ARIA (Astronaut Raman Instrument for ISRU and Astrobiology), which provides mineral identification and detects trace organics and volatiles, including indicators of organic thermal maturity. Because current and planned Mars drilling missions operate largely “blind,” MEAD also evaluates the use of drill-induced vibrations recorded by deployed geophones to enable local subsurface mapping for improved targeting of drilling and sampling. In August 2025, MEAD completed its first-year field deployment to Haughton Crater in the Canadian High Arctic, an established Mars impact-crater terrestrial analog site, bringing a Honeybee Robotics TRIDENT drill with applied automation, alongside ARIA, SOLID, and FleetSpace geophones.

Haughton Crater

X-Hab 2026: LiDAR-Powered Autonomous Charging Service Capability for Surface Rovers and Systems

This document details the timeline of the LiDAR-Powered Autonomous Charging Service Capability for Surface Rovers and Systems project, initiated by the Fall 2025 semester class and completed by the Spring 2026 semester class. This project focuses on developing a fully autonomous system composed of a mobile surface rover and an induction charging station with a robotic arm, both controlled by their own NVIDIA Jetson Orin Nano. Structural improvements to the rover suspension system and body eliminated excessive camber, reduced stress and strain on the plexiglass body, and improved maneuverability and durability of the rover. The charging station robotic arm was fully redesigned to increase reach while minimizing weight and increasing misalignment tolerance during docking on uneven terrain. Electrical system improvements addressed previous torque and power limitations of both the rover and charging station arm. High-torque servo motors were selected based on updated calculations which incorporated terrain slope and Factor of Safety, enabling zero-point turning for the rover and increased payload capacity of the charging station arm. Significant progress was made in autonomy and perception. The rover now employs 3D LiDAR and SLAM mapping for localization, mapping, and path planning. The Battery Monitoring System (BMS) was created to coordinate battery management between the rover and charging station. The BMS provides continuous monitoring of battery state of charge, temperature, current, and will enable the autonomous initiation, execution, and termination of the charging cycle via Bluetooth communication. Testing of the WIBOTIC induction charging system demonstrated reliable power transfer under both aligned and misaligned conditions. This project demonstrated the ability of an autonomously navigating surface rover to independently plan a path to the charging station, dock, and the charging station to autonomously deploy a robotic charging arm and initiate charging of the rover. This work details the progress made to demonstrate the feasibility of autonomous surface rover navigation and recharging systems.

Megan Steele

Artificial Intelligence for Multi-Mission Planetary Operations

A brief introduction is given to an automated system called the Spacecraft Health Automated Reasoning Prototype (SHARP). SHARP is designed to demonstrate automated health and status analysis for multi-mission spacecraft and ground data systems operations. The SHARP system combines conventional computer science methodologies with artificial intelligence techniques to produce an effective method for detecting and analyzing potential spacecraft and ground systems problems. The system performs real-time analysis of spacecraft and other related telemetry, and is also capable of examining data in historical context. Telecommunications link analysis of the Voyager II spacecraft is the initial focus for evaluation of the prototype in a real-time operations setting during the Voyager spacecraft encounter with Neptune in August, 1989. The preliminary results of the SHARP project and plans for future application of the technology are discussed.

David J Atkinson

PC4CAST: A Tool for DSN Load Forecasting and Capacity Planning

Effectively planning the use and evolution of the Deep Space Network (DSN) is a complex problem involving many parameters. The tool that models many of these complexities, yet requires simple structured inputs and provides concise easy-to-understand metrics to aid in the planning process is discussed. The tool, PC4CAST, is used for both load forecasting (predicting how well planned that DSN resources meet expected demand) and as a decision support tool in the capacity-planning process (determining the relative benefits of capacity expansion options). It is now in use in the TDA Planning Office, has been used in numerous studies, and is also being used by the JPL Multimission Operations System Office (MOSO) as an integral part of Resource Allocation Team activities. Experience using the tool has helped to identify additional requirements that will further improve the planning process, which can be met by future PC4CAST versions.

S J Loyola

Modeling Ni-Cd performance. Planned alterations to the Goddard battery model

The Goddard Space Flight Center (GSFC) currently has a preliminary computer model to simulate a Nickel Cadmium (Ni-Cd) performance. The basic methodology of the model was described in the paper entitled Fundamental Algorithms of the Goddard Battery Model. At present, the model is undergoing alterations to increase its efficiency, accuracy, and generality. A review of the present battery model is given, and the planned charges of the model are described.

Jagielski, J. M.

Planning for Execution Monitoring on A Planetary Rover

A planetary rover will be traversing largely unknown and often unknowable terrain. In addition to geometric obstacles such as cliffs, rocks, and holes, it may also have to deal with non-geometric hazards such as soft soil and surface breakthroughs which often cannot be detected until rover is in imminent danger. Therefore, the rover must monitor its progress throughout a traverse, making sure to stay on course and to detect and act on any previously unseen hazards. Its onboard planning system must decide what sensors to monitor, what landmarks to take position readings from, and what actions to take if something should go wrong. The planning systems being developed for the Pathfinder Planetary Rover to perform these execution monitoring tasks are discussed. This system includes a network of planners to perform path planning, expectation generation, path analysis, sensor and reaction selection, and resource allocation.

Erann Gat