Engineering Papers⌕ Search

SEARCH · Engineering Papers

Results for “Project Profile”

Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.

Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.

At least 19 records

Preliminary Error Characterization and Parametric Error Model for the Automatic Dependent Surveillance - Contract Extended Projected Profile Message

A critical component of Trajectory-Based Operations (TBO) is the ability for a consistent and accurate 4-dimensional trajectory (4DT) to be shared and synchronized between airborne and ground systems as well as amongst various ground automation systems. The Aeronautical Telecommunication Network—Baseline 2 (ATN-B2) standard defines the Extended Projected Profile (EPP) trajectory that can be sent via Automatic Dependent Surveillance-Contract (ADS-C) from an aircraft to ground automation. The EPP trajectory message contains a representation of the reference trajectory from an aircraft’s Flight Management System (FMS). In this work, a set of scenarios were run in a high-fidelity aircraft and FMS simulation to perform an initial characterization of EPP trajectory errors under a given set of conditions. The parameters investigated were the route length, route type, wind magnitude error, wind direction error, and with and without a required time-of-arrival (RTA) constraint. In addition, linear regression was used to identify a set of EPP error models for the cross-track, vertical, and time errors.

Guerreiro, Nelson M.↗

Understanding Extended Projected Profile (EPP) Trajectory Error Using a Medium-Fidelity Aircraft Simulation

A critical component of Trajectory-Based Operations is the ability for a consistent and accurate 4-dimensional trajectory to be shared and synchronized between airborne and ground systems as well as amongst various ground automation systems. The Aeronautical Telecommunication Network—Baseline 2 standard defines the Extended Projected Profile (EPP) trajectory that can be sent via Automatic Dependent Surveillance-Contract from an aircraft to ground automation. The EPP trajectory message contains a representation of the reference trajectory from an aircraft’s Flight Management System (FMS). In this work, a set of scenarios were run in a medium-fidelity aircraft and FMS simulation to perform an initial characterization of EPP trajectory errors under a given set of conditions. The parameters investigated were the route length, route type, wind magnitude error, wind direction error, and with and without a required time-of-arrival constraint.

Guerreiro, Nelson M.↗

Project Profile: Hydrogen Fuel Cell Mobile Lighting Tower (HFCML)

NASA is committed to finding innovative solutions that improve the operational performance of ground support equipment while providing environment and cost benefits, as well. Through the Hydrogen Fuel Cell Mobile Lighting Tower (HFCML) project, NASA gained operational exposure to a novel application of high efficiency technologies. Traditionally, outdoor lighting and auxiliary power at security gates, launch viewing sites, fallback areas, outage support, and special events is provided by diesel generators with metal halide lights. Diesel generators inherently contribute to C02, NOx, particulate emissions, and are very noisy. In 2010, engineers from NASA's Technology Evaluation for Environmental Risk Mitigation Principal Center (TEERM) introduced KSC operations to a novel technology for outdoor lighting needs. Developed by a team led by Sandia National Laboratory (SNL), the technology pairs a 5kW hydrogen fuel cell with robust high efficiency plasma lights in a towable trailer. Increased efficiency, in both the fuel cell power source and lighting load, yields longer run times between fueling operations while providing greater auxiliary power. Because of the unit's quiet operation and no exhaust fumes, it is capable of being used indoors and in emergency situations, and meets the needs of all other operational roles for metal halide/diesel generators. The only discharge is some water and warm air. Environmental benefits include elimination of diesel particulate emissions and estimated 73% greenhouse gas emissions savings when the hydrogen source is natural gas (per GREET model). As the technology matures the costs could become competitive for the fuel cell units which are approximately 5 times diesel units. Initial operational . concerns included the hydrogen storage tanks and valves, lightning safety/grounding, and required operating and refueling procedures. TEERM facilitated technical information exchange (design drawings, technical standards, and operations manuals) necessary for KSC hydrogen system experts to approve use of the HFCML unit, including initiating the environmental checklist (i.e. exterior lighting waiver due to sea turtles), and development of operations and maintenance instructions. TEERM worked with SNL to establish a bailment agreement for KSC to utilize a Beta unit as part of normal Center Operations for a period of twelve months.

McLaughlin, Russell↗

An Analysis of Rocket Propulsion Testing Costs

The primary mission at NASA Stennis Space Center (SSC) is rocket propulsion testing. Such testing is generally performed within two arenas: (1) Production testing for certification and acceptance, and (2) Developmental testing for prototype or experimental purposes. The customer base consists of NASA programs, DOD programs, and commercial programs. Resources in place to perform on-site testing include both civil servants and contractor personnel, hardware and software including data acquisition and control, and 6 test stands with a total of 14 test positions/cells. For several business reasons there is the need to augment understanding of the test costs for all the various types of test campaigns. Historical propulsion test data was evaluated and analyzed in many different ways with the intent to find any correlation or statistics that could help produce more reliable and accurate cost estimates and projections. The analytical efforts included timeline trends, statistical curve fitting, average cost per test, cost per test second, test cost timeline, and test cost envelopes. Further, the analytical effort includes examining the test cost from the perspective of thrust level and test article characteristics. Some of the analytical approaches did not produce evidence strong enough for further analysis. Some other analytical approaches yield promising results and are candidates for further development and focused study. Information was organized for into its elements: a Project Profile, Test Cost Timeline, and Cost Envelope. The Project Profile is a snap shot of the project life cycle on a timeline fashion, which includes various statistical analyses. The Test Cost Timeline shows the cumulative average test cost, for each project, at each month where there was test activity. The Test Cost Envelope shows a range of cost for a given number of test(s). The supporting information upon which this study was performed came from diverse sources and thus it was necessary to build several intermediate databases in order to understand, validate, and manipulate data. These intermediate databases (validated historical account of schedule, test activity, and cost) by themselves are of great value and utility. For example, for the Project Profile, we were able to merged schedule, cost, and test activity. This kind of historical account conveys important information about sequence of events, lead time, and opportunities for improvement in future propulsion test projects. The Product Requirement Document (PRD) file is a collection of data extracted from each project PRD (technical characteristics, test requirements, and projection of cost, schedule, and test activity). This information could help expedite the development of future PRD (or equivalent document) on similar projects, and could also, when compared to the actual results, help improve projections around cost and schedule. Also, this file can be sorted by the parameter of interest to perform a visual review of potential common themes or trends. The process of searching, collecting, and validating propulsion test data encountered a lot of difficulties which then led to a set of recommendations for improvement in order to facilitate future data gathering and analysis.

Ramirez-Pagan, Carmen P.↗

Mariner 9 mission profile and project history.

Mariner 9 was inserted into orbit about Mars on Nov. 14, 1971, to study that planet for a period of 90 days. Observations and measurements made by Mariner 9 continued beyond the planned 90 days, providing data to meet all science objectives. The new knowledge of Mars gained from this mission has made obsolete all previous concepts of Mars. A general background of the Mariner Mars 1971 Project and the significant events of the Mariner 9 mission are presented.

Steinbacher, R. H.↗

Software risk management through independent verification and validation

Software project managers need tools to estimate and track project goals in a continuous fashion before, during, and after development of a system. In addition, they need an ability to compare the current project status with past project profiles to validate management intuition, identify problems, and then direct appropriate resources to the sources of problems. This paper describes a measurement-based approach to calculating the risk inherent in meeting project goals that leverages past project metrics and existing estimation and tracking models. We introduce the IV&V Goal/Questions/Metrics model, explain its use in the software development life cycle, and describe our attempts to validate the model through the reverse engineering of existing projects.

Callahan, John R.↗

Measuring software technology

Results are reported from a series of investigations into the effectiveness of various methods and tools used in a software production environment. The basis for the analysis is a project data base, built through extensive data collection and process instrumentation. The project profiles become an organizational memory, serving as a reference point for an active program of measurement and experimentation on software technology.

Agresti, W. W.↗

Sequence-of-events-driven automation of the deep space network

In February 1995, sequence-of-events (SOE)-driven automation technology was demonstrated for a Voyager telemetry downlink track at DSS 13. This demonstration entailed automated generation of an operations procedure (in the form of a temporal dependency network) from project SOE information using artificial intelligence planning technology and automated execution of the temporal dependency network using the link monitor and control operator assistant system. This article describes the overall approach to SOE-driven automation that was demonstrated, identifies gaps in SOE definitions and project profiles that hamper automation, and provides detailed measurements of the knowledge engineering effort required for automation.

Hill, R., Jr.↗

Sequence-of-Events-Driven Automation of the Deep Space Network

In February 1995, sequence-of-events (SOE)-driven automation technology was demonstrated for a Voyager telemetry downlink track at DSS 13. This demonstration entailed automated generation of an operations procedure (in the form of a temporal dependency network) from project SOE information using artificial intelligence planning technology and automated execution of the temporal dependency network using the link monitor and control operator assistant system. This article describes the overall approach to SOE-driven automation that was demonstrated, identifies gaps in SOE definitions and project profiles that hamper automation, and provides detailed measurements of the knowledge engineering effort required for automation.

Hill, R., Jr.↗

Verification and Validation of Model-Based Autonomous Systems

This paper presents a three year project (FY99 to FY01) on the verification and validation of model based autonomous systems. The topics include: 1) Project Profile; 2) Model-Based Autonomy; 3) The Livingstone MIR; 4) MPL2SMV; 5) Livingstone to SMV Translation; 6) Symbolic Model Checking; 7) From Livingstone Models to SMV Models; 8) Application In-Situ Propellant Production; 9) Closed-Loop Verification Principle; 10) Livingstone PathFinder (LPF); 11) Publications and Presentations; and 12) Future Directions. This paper is presented in viewgraph form.

Pecheur, Charles↗

Enabling Exploration: NASA's Technology Needs

Deputy Director of Science, Carol W. Carroll has been invited by University of Oregon's Materials Science Institute to give a presentation. Carol's Speech explains NASA's Technologies that are needed where NASA was, what NASA's current capabilities are. Carol will highlight many of NASA's high profile projects and she will explain what NASA needs for its future by focusing on the next steps in space exploration. Carol's audience will be University of Oregon's future scientists and engineer's and their professor's along with various other faculty members.

Capabilities↗

An Overview of High Temperature Seal Development and Testing Capabilities at the NASA Glenn Research Center

The NASA Glenn Research Center (GRC), partnering with the University of Toledo, has a long history of developing and testing seal technologies for high-temperature applications. The GRC Seals Team has conducted research and development on high-temperature seal technologies for applications including advanced propulsion systems, thermal protection systems (airframe and control surface thermal seals), high-temperature preloading technologies, and other extreme-environment seal applications. The team has supported several high-profile projects over the past 30 years and has partnered with numerous organizations, including other government entities, academic institutions, and private organizations. Some of these projects have included the National Aerospace Space Plane (NASP), Space Shuttle Space Transport System (STS), the Multi-Purpose Crew Vehicle (MPCV), and the Dream Chaser Space Transportation System, as well as several high-speed vehicle programs for other government organizations. As part of the support for these programs, NASA GRC has developed unique seal-specific test facilities that permit evaluations and screening exercises in relevant environments. The team has also embarked on developing high-temperature preloaders to help maintain seal functionality in extreme environments. This paper highlights several propulsion-related projects that the NASA GRC Seals Team has supported over the past several years and will provide an overview of existing testing capabilities

National Aerospace Plane↗

Overview of Space Environmental Effects (SEE) Team Electrostatic Discharge (ESD) Testing

Electrostatic discharge (ESD) due to the radiation environment encountered during spaceflight missions is a serious risk that must be mitigated by careful testing and design considerations. The MSFC Space Environmental Effects (SEE) Team has world-class facilities for ESD testing along with decades of experience. The Team has recently conducted successful campaigns for several high-profile projects including Europa Clipper, Exploration Upper Stage, Lunar Gateway, Orion, Docking System, and Human Landing System. This presentation will give a brief overview of ESD causes, hazards, test methods and test deliverables.

Peter Bertone↗

Experimental radar Doppler wind profile measurements at Kennedy Space Center

A wind profile radar demonstration project was sponsored by the Space Transportation System (STS) Program Office to study the feasibility of incorporating continuous, high time resolution radar wind data into STS operations. This project required wind profile radars to be deployed in the vicinity of the Shuttle launch site into an environment quite unlike typical VHF profiler sites. Two 50 MHz radars were operated at the Kennedy Space Center in environments that were noisy in terms of RFI, large stationary ground clutter sources, non-stationary clutter sources, and heavy local aircraft traffic. Processing compensation for these operational constraints magnified design limitations of the research-level radars used in the demonstration. This report addresses the importance of system design for unique or particular applications with reference to finite radiation patterns, zero-Doppler processing, radar frequency, and beam pointing.

Jost, R. J.↗

Project objectives and mission profile

Mission planning, payloads, launch, and orbital insertion are described for Mariner mission 8 and 9. Mission sequences and planet coverage as a function of time in orbit are discussed.

Steinbacher, R. H.↗