Engineering PapersSearch

SEARCH · Engineering Papers

Results for “Project Closeout”

Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.

Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.

At least 19 records

Multi-scale, Multi-disciplinary, and Multi-agent Explainable AI with Koopman-Undergirded Learning, Prediction, and Analysis (M3EA KULPA) (Project Closeout Report)

The goal of this project was to develop and use domain-aware machine learning formulations, based on the Koopman Operator (KO), for modelling multi-scale, multi-disciplinary (e.g., multi-physics), and/or multi-agent systems. The project developed these formulations for the following cases: • Systems with dynamics at two separate time scales, • Systems with a bi-level hierarchical control structure, • Systems with bi-level hierarchical control and dynamics at two separate time scales (the lower level controls operating at the faster time scale), and • Systems with n separate but interacting agents/disciplines (with/without control, respectively); the controls for each agent could include bi-level hierarchical control and dynamics at two separate time scales as described above. The project then defined a set of dynamical systems consisting of different nonlinear oscillators that could be used to test these different formulations and then subsequently learned the KO models for those systems. With the KO models, we were able to do the following: • Quantify system stability, including both long-term and transient behavior, • Quantify the effects of feedbacks between the different time scales and agents/disciplines in terms of those feedbacks’ effects on system stability, • Replace a standard Proportional-Integral (PI) control in the hierarchical control structure with a KO-based Linear-Quadratic Regular (LQR), a form of optimal control, • Calculate optimal supervisory control policies a) with and without time scale separated dynamics at the lower level control levels and b) with both PI and KO-based LQR lower level control policies, and • Calculate dynamic Nash equilibria for multi-agent systems where each agent makes its own control decisions.

97 MATHEMATICS AND COMPUTING

X-43A Final Flight Observations

The presentation will provide an overview of the final flight of the NASA X-43A project. The project consisted of three flights, two planned for Mach 7 and one for Mach 10. The first flight, conducted on June 2, 2001, was unsuccessful and resulted in a nine-month mishap investigation. A two-year return to flight effort ensued and concluded when the second Mach 7 flight was successfully conducted on March 27, 2004. The third and final flight, which occurred on November 16, 2004, was the first Mach 10 flight demonstration of an airframe-integrated, scramjet-powered, hypersonic vehicle. As such, the final flight presented first time technical challenges in addition to final flight project closeout concerns. The goals and objectives for the third flight as well as those for the project will be presented. The configuration of the Hyper-X stack including the X-43A, Hyper-X launch vehicle, and Hyper-X research vehicle adapter wil also be presented. Mission differences, vehicle modifications and lessons learned from the first and second flights as they applied to the third flight will also be discussed. Although X-43A flight 3 was always planned to be the final flight of the X-43A project, the X-43 program had two other vehicles and corresponding flight phases in X-43C and X-43B. Those other projects never manifested under the X-43 banner and X-43A flight 3 also became the final flight of X-43 program.

Grindle, Laurie

ALICE-USA Barrel Tracking Upgrade (Project Final Report)

The ALICE-USA Barrel Tracking Upgrade (BTU) project began in 2015 to participate in a major upgrade of the Time Projection Chamber (TPC) and the Inner Tracking System (ITS) of the ALICE Experiment at CERN in Geneva, Switzerland. This upgrade increased the maximum readout rate of the ALICE detector to accommodate the increased heavy ion interaction rates following Long Shutdown 2 of the Large Hadron Collider, and greatly improved the vertexing performance of the detector. The original scope was completed and reviewed in November 2019. The BTU project document BTU.19.v1 "ALICE Barrel Tracking Upgrade Project Closeout / Transition to Operations (2019)" from November 2019 describes the status in detail and is attached as Appendix 1 below. At that point, all delivery milestones had been met on time, all Key Performance Parameters (KPPs) of the project had been satisfied, and the project was under budget. Several subsequent No Cost Extensions (NCEs) supported integration and pre-commissioning of the BTU project deliverables at CERN, as well as study and assessment of performance with Pb-Pb collisions at 50 kHz. The BTU project was successfully completed on 30 September 2024.

46 INSTRUMENTATION RELATED TO NUCLEAR SCIENCE AND

High-Burnup Spent Fuel Data Project Sibling Pin Test Campaign Closeout Summary

The Used Fuel Disposition Campaign (UFDC) was established within the United States (U.S.) Department of Energy (DOE) Office of Nuclear Energy (NE) to conduct research and development (R&D) activities associated with storage, transportation, and disposal of used or spent nuclear fuel (UNF or SNF) and high-level radioactive waste.

11 NUCLEAR FUEL CYCLE AND FUEL MATERIALS

TC3 Overview

This presentation gives an overview of the technology, methods and processes developed during the TC3 Technical Challenge of the System-Wide Safety (SWS) project. The presentation goes over the motivation for doing this research, gives an overview of the tool, methods and process developed under this program, and describes case studies and impact in industry.

Software assurance