Engineering Papers⌕ Search

SEARCH · Engineering Papers

Results for “Procurement Quality”

Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.

Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.

At least 19 records

IQPA P481-1 Quality Procurements [Slides]

The purpose of this training is to provide a comparison of concepts between what the previous policy (P840-1) stated, and what the new policy (P841-1), now stipulates. This training is intended to offer currently authorized personnel with the necessary information to transition to implementing the new processes and requirements for their positions. The included material will provide relevant descriptions of several of the key processes and tasks that personnel need to be familiar with to perform their duties.

96 KNOWLEDGE MANAGEMENT AND PRESERVATION↗

MARVEL Lessons Learned – 2026 Edition Fabrication, Fuel Procurement, Quality Assurance, and Safety Basis

The Microreactor Applications Research Validation and Evaluation (MARVEL) project is intended to be among the first U.S. advanced reactor demonstrations in four decades. By virtue of being sponsored directly by the U.S. Department of Energy (DOE), the reactor is expected to benefit the broader nuclear community by exercising design processes, safety reviews, and supply chains. This project is committed to publicly documenting key lessons learned along the way toward demonstration. Building on a 2025 report that focused on lessons learned from guard vessel fabrication and Primary Coolant Apparatus Test (PCAT) testing (Abou-Jaoude et al. 2025), this 2026 edition captures findings spanning structural fabrication, quality assurance (QA), reactivity control system (RCS) assembly, fuel fabrication and shipment, safety basis development, balance-of-plant design, and overall reactor design.

21 - SPECIFIC NUCLEAR REACTORS AND ASSOCIATED PLAN↗

Reconstitution of Sandia's Melt Laboratory: A Strategic Approach to Address Alloy Procurement and Quality Challenges - Part 1

In recent years, the procurement of essential materials such as Stainless Steels, Ni-Alloys, and Kovar has become increasingly challenging. Lead times for these materials have extended to over 24 months, placing significant stress on the reliability of attaining these alloys. This situation is exacerbated by the supplier’s minimum purchase requirement of excessively large quantities to meet unique purchase order (PO) requirements which is usually above the maximum requirements of Sandia National Laboratories (SNL). Additionally, the reluctance of foundries to engage in small lot development for SNL specific needs further complicates the procurement process. This white paper explores the reconstitution of SNL’ Melt Laboratory as a strategic solution to mitigate these challenges.

36 MATERIALS SCIENCE↗

Fabrication experience of the pre-production PIP-II SSR2 cavities at Fermilab

The Proton Improvement Plan-II (PIP-II, [1]) linac will include 35 Single Spoke Resonators type 2 (SSR2). A total of eight pre-production SSR2 jacketed cavities will be procured and five installed in the first pre-production cryomodule. The mechanical design of the jacketed cavity has been finalized and it will be presented in this paper along with fabrication and processing experience. The importance of interfaces, quality controls and procurement aspects in the design phase will be remarked as well as lessons learned during the fabrication process. Furthermore, development studies will be presented together with other design validation tests.

43 PARTICLE ACCELERATORS↗

MARVEL 90% Final Design Report

This document provides documentation of the Microreactor Applications Research Validation and Evaluation Project’s (MARVEL) 90% Final Design, as required by U.S. Department of Energy (DOE) Standard-1189, “Integration of Safety into the Design Process." Per DOE-STD-1189-2016, the 90% Final Design documentation focuses on design completion, at a level capable of supporting procurement, construction, testing, and operation. At this phase, the design organization finalizes the hazards and accident analyses, Fire Hazard Analysis (FHA), security vulnerability assessments, and other supporting analyses for design completion. The objective of this report is to provide a high-level summary of the design thus far and provide references including, but not limited to, the following design deliverables: • Complete final drawings, specifications and commercial grade dedications that may be released for bid and/or construction. • Clearly defined testing plans for the safety and functionality of all subsystems. • Quality Assurance Program for Design, Testing and Procurement. • Software Quality Assurance Plan. • Code of Record (COR), applicable design requirements including codes and standards. • Final design that meets all the requirements stipulated in the COR. • Final design review, consisting of final validation of comment resolution from previous reviews, and a review of any additional developments since the last review. • Updated Safety Design Strategy. • Hazard Analysis. • Fire Hazard Analysis. • Accident analysis. • Security vulnerability assessment. • Current and detailed cost estimate. • Current construction schedule, and • Risk & Opportunities Assessment.

21 SPECIFIC NUCLEAR REACTORS AND ASSOCIATED PLANTS↗

Surveillance LANL-ASMT-2026-0059 Procurement – NNSS Supplier Review

The Institutional Quality and Performance Assurance Division's Quality Support Services Group conducted a surveillance of IQPA-IQ Supplier Evaluation group's required assessments of suppliers providing items and services relevant to the Nevada National Security Site. Based upon records examined, the surveillance team has determined that all supplier evaluation/oversight requirements are being met, and no Findings or Opportunities for Improvement are noted.

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

A robust synthetic data generation framework for machine learning in high-resolution transmission electron microscopy (HRTEM)

Machine learning techniques are attractive options for developing highly-accurate analysis tools for nanomaterials characterization, including high-resolution transmission electron microscopy (HRTEM). However, successfully implementing such machine learning tools can be difficult due to the challenges in procuring sufficiently large, high-quality training datasets from experiments. In this work, we introduce Construction Zone, a Python package for rapid generation of complex nanoscale atomic structures which enables fast, systematic sampling of realistic nanomaterial structures and can be used as a random structure generator for large, diverse synthetic datasets. Using Construction Zone, we develop an end-to-end machine learning workflow for training neural network models to analyze experimental atomic resolution HRTEM images on the task of nanoparticle image segmentation purely with simulated databases. Further, we study the data curation process to understand how various aspects of the curated simulated data—including simulation fidelity, the distribution of atomic structures, and the distribution of imaging conditions—affect model performance across three benchmark experimental HRTEM image datasets. Using our workflow, we are able to achieve state-of-the-art segmentation performance on these experimental benchmarks and, further, we discuss robust strategies for consistently achieving high performance with machine learning in experimental settings using purely synthetic data. Construction Zone and its documentation are available at https://github.com/lerandc/construction_zone.

36 MATERIALS SCIENCE↗

Sample Preparation Laboratory (SPL) Best Practices: CGD as the Primary Acceptance Method

The traditional paradigm applied to the construction of nuclear safety related systems, structures, and components (SSCs), like SPL, involves an owner/licensee hiring an EPC firm with an NQA 1 program to manage the engineering, procurement, and construction of the desired SSC. This traditional approach would have posed significant barriers to the successful completion of the SPL. As a smaller capital project, in the $\$$100–$\$$200 million range, there was concern that employing one of the larger EPC companies would escalate costs and extend the projected schedule beyond what would be feasible for the Department of Energy (DOE). The traditional acceptance method employed for nuclear facilities with credited safety functions requires the use of an EPC firm applying American Society of Mechanical Engineers (ASME) NQA 1 nuclear quality assurance (NQA) to accept safety SSCs. In lieu of this approach, INL elected to apply its own NQA 1 program to hire an EPC firm operating a commercial quality program. This method used commercial grade dedication (CGD) as outlined in NQA 1 which had not been applied at this scale. Use of the commercial supply chain was identified as a key factor to the successful completion of SPL. Favorable conditions enabling the use of CGD included: • INL serving as both the designer and the design authority • Design created by an NQA 1 qualified source • A mature CGD program • Availability of a CGD subject matter expert (SME) • A strong construction management program. This white paper elaborates on the methodology employed in the construction of the SPL, the successes achieved, and best practices implemented.

42 - ENGINEERING↗

PTSFA QA Review of Container Procurements: Information Use Procedure

The purpose of this Packaging and Transportation Safety Functional Area (PTSFA) procedure is to describe the process in which the PTSFA Quality Assurance Engineer (QAE) or designee reviews and approves the documentation associated with the procurements of containers to be used for onsite transfer or off-site transportation of hazardous materials and waste.

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Operational and Mission Highlights A Monthly Summary of Top Achievements: September 2022

Associate Laboratory Director for Plutonium Infrastructure Mark Anthony and a procurement team visited three glovebox fabricators the week of Aug. 23, 2022, to discuss equipment procurement options and assess the vendors’ production capability, factory conditions, and safety records. The team determined that all three fabricators can produce complex gloveboxes and meet Nuclear Quality Assurance-1 standards.

21 SPECIFIC NUCLEAR REACTORS AND ASSOCIATED PLANTS↗

High Yield Xray Imager Final Design Review

The High Yield Xray Imager (HYXI) is a new NIF target diagnostic system currently under development. The goal of HYXI is to provide high-fidelity, high temporal resolution x-ray imaging capability on high yield NIF implosions at 10MJ and above. The HYXI instrument design concept is based on the combination of two technologies that have been successfully utilized at the NIF on previous instruments, electron pulse-dilation and hybrid-CMOS sensor imaging. The combination of these two techniques will give HYXI sufficient data quality to ascertain differences in hot spot formation dynamics between high and low yield implosions. This information will highlight the critical hot spot conditions needed for ignition and burn. The HYXI design leverages the successful operation of the PDIXI x-ray imager at the NIF on multi MJ yield shots. A new radiation tolerant CMOS imaging array (HYPERION) is being developed to eliminate the significant background noise which limits the data quality of PDIXI. We successfully placed the contract with Advanced hCMOS Systems (AHS) to develop the HYPERION sensor, which fulfils our criteria to place long lead time item procurements by end of FY24. The HYXI Final Design Review was completed at the end of Q4 FY24 (Sep 24 th and Sep 30 th ). The HYXI project is a multi-year effort with a phased approach to be bring up system functionality over time in parallel with the development and fabrication effort of the HYPERION CMOS imaging array. In Phase 1, time-integrated x-ray images on NIF DT experiments will be collected starting in Q3 FY25. In Phase 2 of the project, time-resolved imaging with HYXI utilizing a spare microchannel plate detector back-end will begin in Q3 FY26. Phase 3 concludes the project with the installation of the HYPERION sensor array and the final performance qualification of the HYXI instrument which is scheduled for Q3 FY27 as discussed in the PDR and MRT report on this project in FY23.

42 ENGINEERING↗

PIP-II SRF Couplers Fabrication Status and Addressing Ceramic Yield Challenges

The PIP-II project requires reliable SRF couplers to deliver high RF power to the cavities. This talk presents the current status of coupler fabrication, including progress on procurement, assembly, and testing. In particular, it focuses on the challenges encountered with ceramic window production, where limited yield has become a concern. Observed issues and inspection results will be discussed, together with the actions taken to improve quality and consistency. The path forward, including ongoing work with vendors and process adjustments, will also be outlined.

Aiazzi, Tommaso [Fermilab] (ORCID:0009000297503407↗

Materials for Advanced Ultra-Supercritical (A-USC) Steam Turbines --- A-USC Component Demonstration

The U.S. Advanced Ultra-Supercritical (A-USC) Consortium was formed in 2001 as a government/industry program, sponsored by the U.S. Department of Energy (DOE) and the Ohio Coal Development Office (OCDO) and cost shared by industrial and not-for-profit partners. The purpose of the consortium was to advance the state of the art for power generation by evaluating and developing materials that allow the use of advanced steam cycles in coal-based power plants. These advanced cycles, with steam temperatures up to 1400°F (760°C), can increase the efficiency of coal-fired boilers from an average of 35% (current U.S. fleet) to more than 45% higher heating value (HHV) (>49% lower heating value [LHV]). The increase in a plant’s efficiency is limited unless new materials able to withstand these higher operating temperatures and pressures are identified and approved for use. The A-USC Consortium identified these needed materials during earlier phases of the program. It developed the welding and joining techniques along with manufacturing processes for casting and wrought products made from these new high-nickel alloys. It subjected these materials to extensive laboratory and steam loop testing. It then obtained ASME code approval for their use in U.S. boiler systems. The program’s successes leave this last remaining activity (ComTest Phase 2) that the U.S. utility industry has recommended to be accomplished prior to commercialization. The focus of the activity is the evaluation and demonstration of commercial readiness for “full scale” components to be made from these nickel-based alloy materials and provided by a U.S. domestic supply chain that is new to working with these alloys. According to studies completed by the Electric Power Research Institute (EPRI), the cost of an A-USC plant is approximately 20% higher than a non-A-USC plant because of its use of nickel-based alloys needed for the high temperature operating conditions. However, CO 2 reductions of approximately 30% from the current fleet average provide a strong incentive for its consideration. The actual costs and perceived value for CO 2 abatement will determine whether new or retrofitted plants are undertaken, although decisions to build A-USC plants in India would indicate its economic feasibility while also being part of a global carbon emissions strategy. The work by the A-USC Consortium, prior to the start of the ComTest project, has included lab scale and pilot scale materials testing, both in air and oxy-combustion. This testing has included air-cooled and steam-cooled “loops” that were installed into existing operating utility boilers to gain exposure of these materials to realistic conditions of high temperature and corrosion caused by the constituents in the coal ash. The A-USC Consortium also gained ASME Code approval of the Inconel 740 material, has cast and extruded the largest high nickel precipitation hardened alloys, and developed unique welding techniques to avoid problems identified by the competing European program. However, as valuable as these material test loops and accomplishments have been for obtaining information, their scale is below that required to minimize the risk associated for a U.S. utility to build a multibillion-dollar A-USC power plant. To reduce the final identified risk barrier to full-scale commercialization of these advanced materials and systems, the A-USC Consortium (guided by a utility industry advisory committee) has identified the key areas of the technology they desire to see as being capable of full-scale manufacturing and/or fabrication from an identified, capable U.S. domestic supplier base. A significant amount of work was accomplished during Phase 1 to identity the components, as well as the component size, that would be manufactured from advanced alloys such as Inconel 740H or Haynes 282 alloys. Pathways to supply these components for ComTest have been identified, as well as any further development that would be required. The Phase 2 effort used Phase 1 findings for designing these key full-scale components for A-USC boilers and turbines to include large castings; extrusions, forgings, fabrication of water walls and steam loops with headers from advanced materials, raw material (such as pipe extrusion billets) are at the commercial readiness level to permit advancement to a demonstration project. The Phase 2 work scope was addressed by a diverse team, including government, industry, and not-for-profit partners. The work scope under Phase 2 addressed fabrication of components identified as being outside of the proven capabilities of the existing supply chain, including the following: Steam turbine rotor forging and Haynes 282 nozzle carrier casting Superheater and reheater header and tube assemblies Large-diameter pipe extrusions and forgings Test valve articles to support ASME Code approval. In addition, key fabrication steps were completed, including boiler weld overlays and simulated field repairs. Throughout, extensive inspection and quality assurance testing of the components were performed. The team worked to advance ASME Code approval for key components and processes. Although much of the focus of ComTest Phase 2 was the high-temperature nickel-based alloy materials, a broader range of materials were incorporated, which would be representative of the materials used in full-scale A-USC power plant applications and have cross-cutting applicability on other high-temperature power generation options, such as advanced nuclear, supercritical CO 2 cycles, and central solar receivers. This report that has been submitted is organized in the following manner: Section 1 contains an Executive Summary. Section 2 discusses the ComTest project background and organization. Section 3 discusses project management and reporting. Section 4 discusses the procurement of nickel-based alloy and other A-USC materials and components. Section 5 discusses the fabrication of procurement of nickel-based alloy and other A-USC materials and components. Section 6 discusses the fabrication of cast nickel-based A-USC steam turbine components. Section 7 discusses the fabrication of forged nickel-based A-USC steam turbine piping and steam pipe components. Section 8 discusses the qualification of pressure relieve valves (PRVs) for A-USC power plants. Section 9 discusses proposed plans for future evaluation of A-USC components. Section 10 contains the summary and conclusion.

01 COAL, LIGNITE, AND PEAT↗

Hidden in Plain Sight: How Interior Furnishings Management Can Help Los Alamos National Laboratory Meet the United States Department of Energy's Sustainability Goals [Capstone Project]

In the last three years, LANL has purchased over $50 million in new interior products with a focus on sustainable building and high-quality interior furnishings, carpet, and paint. Purchasing interior products that focus on sustainable manufacturing, however, is only the beginning of properly operating and maintaining an interior space over its useable life. Sustainable commercial furniture, if well maintained and warrantied, can last well beyond the accounting depreciation of the asset, ultimately saving taxpayer dollars. Given DOE’s recently announced built environment sustainability goals, now is the time to look at interior products as an important part of the overall sustainability plan for LANL’s green building initiatives. The scope of this thesis provides an environmentally sustainable O&M process for the procurement, use, and proper decommissioning of interior products. The thesis also provides environmental and financial data to assist with LANL’s overall DOE Matrix milestones, currently due in 2030.

32 ENERGY CONSERVATION, CONSUMPTION, AND UTILIZATI↗

White Paper on Leading-Edge technology And Feasibility-directed (LEAF) Program aimed at readiness demonstration for Energy Frontier Circular Colliders (pp, μμ) by the next decade

In this White Paper for the Snowmass 2021 Process, we propose the establishment of a magnet Leading-Edge technology And Feasibility-directed Program (LEAF Program) to achieve readiness for a future collider decision on the timescale of the next decade. The LEAF Program would rely on, and be synergetic with, generic R&D efforts presently covered - in the US - by the Magnet Development Program (MDP), the Conductor Procurement and R&D (CPRD) Program and other activities in the Office of HEP supported by Early Career Awards (ECA) or Lab Directed R&D (LDRD) funds. Where possible, ties to synergetic efforts in other Offices of DOE or NSF are highlighted and suggested as wider Collaborative efforts on the National scale. International efforts are also mentioned as potential partners in the LEAF Program. We envision the LEAF Program to concentrate on demonstrating the feasibility of magnets for muon colliders as well as next generation high energy hadron colliders, pursuing, where necessary and warranted by the nature of the application, the transition from R&D models to long models/prototypes. The LEAF Program will naturally drive accelerator-quality and experiment-interface design considerations. LEAF will also concentrate, where necessary, on cost reduction and/or industrialization steps.

43 PARTICLE ACCELERATORS↗