Engineering Papers⌕ Search

SEARCH · Engineering Papers

Results for “Process integration”

Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.

Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.

At least 19 records

Space Medicine in the Human System Integration Process

This slide presentation reviews the importance of integration of space medicine in the human system of lunar exploration. There is a review of historical precedence in reference to lunar surface operations. The integration process is reviewed in a chart which shows the steps from research to requirements development, requirements integration, design, verification, operations and using the lessons learned, giving more information and items for research. These steps are reviewed in view of specific space medical issues. Some of the testing of the operations are undertaken in an environment that is an analog to the exploration environment. Some of these analog environments are reviewed, and there is some discussion of the benefits of use of an analog environment in testing the processes that are derived.

Scheuring, Richard A.↗

The LEAN Payload Integration Process

It is recognized that payload development and integration with the International Space Station (ISS) can be complex. This streamlined integration approach is a first step toward simplifying payload integration; making it easier to fly payloads on ISS, thereby increasing feasibility and interest for more research and commercial organizations to sponsor ISS payloads and take advantage of the ISS as a National Laboratory asset. The streamlined integration approach was addressed from the perspective of highly likely initial payload types to evolve from the National Lab Pathfinder program. Payloads to be accommodated by the Expedite the Processing of Experiments for Space Station (EXPRESS) Racks and Microgravity Sciences Glovebox (MSG) pressurized facilities have been addressed. It is hoped that the streamlined principles applied to these types of payloads will be analyzed and implemented in the future for other host facilities as well as unpressurized payloads to be accommodated by the EXPRESS Logistics Carrier (ELC). Further, a payload does not have to be classified as a National Lab payload in order to be processed according to the lean payload integration process; any payload that meets certain criteria can follow the lean payload integration process.

Jordan, Lee P.↗

Integration Process for Payloads in the Fluids and Combustion Facility

The Fluids and Combustion Facility (FCF) is an ISS research facility located in the United States Laboratory (US Lab), Destiny. The FCF is a multi-discipline facility that performs microgravity research primarily in fluids physics science and combustion science. This facility remains on-orbit and provides accommodations to multi-user and Principal investigator (PI) unique hardware. The FCF is designed to accommodate 15 PI's per year. In order to allow for this number of payloads per year, the FCF has developed an end-to-end analytical and physical integration process. The process includes provision of integration tools, products and interface management throughout the life of the payload. The payload is provided with a single point of contact from the facility and works with that interface from PI selection through post flight processing. The process utilizes electronic tools for creation of interface documents/agreements, storage of payload data and rollup for facility submittals to ISS. Additionally, the process provides integration to and testing with flight-like simulators prior to payload delivery to KSC. These simulators allow the payload to test in the flight configuration and perform final facility interface and science verifications. The process also provides for support to the payload from the FCF through the Payload Safety Review Panel (PSRP). Finally, the process includes support in the development of operational products and the operation of the payload on-orbit.

Free, James M.↗

Systems Integration Processes for NASA's Crew Launch Vehicle

NASA's Exploration Initiative will require development of many new elements to constitute a robust system of systems. New launch vehicles are needed to place cargo and crew in stable low earth orbit. This paper examines the systems integration processes NASA is utilizing to ensure integration and control of propulsion and non-propulsion elements within NASA's Crew Launch Vehicle (CLV). The objective of the CLV is to provide the transportation capabilities to meet the Constellation Program requirements for delivering a Crew Exploration Vehicle (CEV) or other payload to Low Earth Orbit (LEO) in support of the lunar and Mars missions. The CLV must successfully provide the capability within cost and schedule with an acceptable risk approach. This paper will describe in detail the systems engineering management processes that will be applied to assure CLV Project success through complete and efficient technical integration. Discussion of specific processes for requirements development and verification, integrated design and analysis, integrated simulation and testing and the integration of reliability, maintainability and supportability (RMS) into the design will also be included. The CLV Project is broken logically into elements by the major hardware groupings, and associated management, system engineering, and integration functions. The processes to be described herein are designed to integrate within these CLV elements and among the other Constellation projects. Launch vehicle stack integration (CLV to CEV, and Ground and Flight Operations integration) throughout the life cycle, including integrated vehicle performance through orbital insertion, recovery of the first stage, and reentry of the upper stage will also be discussed. The processes for decomposing requirements to the Elements and ensuring that requirements have been correctly validated, decomposed, allocated, and that the verification requirements are properly defined to ensure that the system design meets requirements will be discussed.

Reuter, James L.↗

Systems Integration Processes for NASA Ares I Crew Launch Vehicle

NASA's Exploration Initiative will require development of many new elements to constitute a robust system of systems. New launch vehicles are needed to place cargo and crew in stable Low Earth Orbit (LEO). This paper examines the systems integration processes NASA is utilizing to ensure integration and control of propulsion and nonpropulsion elements within NASA's Crew Launch Vehicle (CLV), now known as the Ares I. The objective of the Ares I is to provide the transportation capabilities to meet the Constellation Program requirements for delivering a Crew Exploration Vehicle (CEV) or other payload to LEO in support of the lunar and Mars missions. The Ares I must successfully provide this capability within cost and schedule, and with an acceptable risk approach. This paper will describe the systems engineering management processes that will be applied to assure Ares I Project success through complete and efficient technical integration. Discussion of technical review and management processes for requirements development and verification, integrated design and analysis, integrated simulation and testing, and the integration of reliability, maintainability and supportability (RMS) into the design will also be included. The Ares I Project is logically divided into elements by the major hardware groupings, and associated management, system engineering, and integration functions. The processes to be described herein are designed to integrate within these Ares I elements and among the other Constellation projects. Also discussed is launch vehicle stack integration (Ares I to CEV, and Ground and Flight Operations integration) throughout the life cycle, including integrated vehicle performance through orbital insertion, recovery of the first stage, and reentry of the upper stage. The processes for decomposing requirements to the elements and ensuring that requirements have been correctly validated, decomposed, and allocated, and that the verification requirements are properly defined to ensure that the system design meets requirements, will be discussed.

Taylor, James L.↗

Reinventing the International Space Station Payload Integration Processes and Capabilities

The fundamental ISS payload integration philosophy, processes and capabilities were established in the context of how NASA science programs were conducted and executed in the early 1990 s. Today, with the designation of the United States (US) portion of ISS as a National Lab, the ISS payload customer base is growing to include other government agencies, private and commercial research. The fields of research are becoming more diverse expanding from the NASA centric physical, materials and human research sciences to test beds for exploration and technology demonstration, biology and biotechnology, and as an Earth and Space science platform. This new customer base has a broader more diverse set of expectations and requirements for payload design, verification, integration, test, training, and operations. One size fits all processes are not responsive to this broader customer base. To maintain an organization s effectiveness it must listen to its customers, understand their needs, learn from its mistakes, and foster an environment of continual process improvement. The ISS Payloads office is evolving to meet these new customer expectations.

Jones, Rod↗

The use of artificial intelligence techniques to improve the multiple payload integration process

A maximum return of science and products with a minimum expenditure of time and resources is a major goal of mission payload integration. A critical component then, in successful mission payload integration is the acquisition and analysis of experiment requirements from the principal investigator and payload element developer teams. One effort to use artificial intelligence techniques to improve the acquisition and analysis of experiment requirements within the payload integration process is described.

Cutts, Dannie E.↗

Launch Vehicle/Carrier Interaction, Improving the Analytical Integration Process

A goal of the aerospace industry is to reduce the cost of space transportation by a significant within the next decade. The present cost of launching a space transportation system which includes propulsion system, vehicle, carrier, and payload integrated together to form a system, encompasses much more than the design of the propulsion system and vehicle. The total cost includes the recurring cost of the process of integrating carriers, and payloads into the vehicle for each flight. The recurring cost of the integration of carrier/payloads systems is driven by the interaction of the vehicle. If the interaction can be well characterized and made to be very predictable for a range of payloads, or if it can be minimized then the cost of integrating a payload can be reduced significantly from today's levels. The Space Shuttle is very interactive with the payload. The interaction has been well characterized through finite element modeling and is reasonably predictable for a specific payload. Experience has shown, however, that the interaction is very manifest dependent, and small changes in one portion of a payload complement can change the interaction significantly in another portion. That is the affects of one on the other are such that if one or the other is changed slightly the environment at the interfaces can change significantly. To date the Shuttle has made in excess of one hundred flights. For each of these flights several iterations of dynamic analyses have been required in the development of each vehicle/carrier/payload system. The iterative analyses are needed because of the sensitivity of the interaction of the launch vehicle to the attached carrier/payload. The Multi Purpose Logistics Module (MPLM) is a carrier designed for flight in the Space Shuttle carrying a wide variation of cargo, supplies, and experiments to and from Space Station. Its integration process provides a unique area for improvement in the template in use today for transporting items to space. Discussion of the present MPLM integration analysis requirements and possible areas for improvement of the process are provided in the subject paper. Special emphasis is placed on reduction of requirements based on similarity of items being transported, and the use of carrier hardware for protection of the Shuttle Orbiter.

Shariett, Charles A.↗

Integrated Process For Insertion And Beatup Of Fill Yarns

Integrated apparatus and process devised for insertion and beatup of fill yarns during weaving of fabrics containing bias-oriented yarns. New technology supplants old shuttle method and modern water-jet method of insertion and conventional reed method of beatup. Intended for use in angle-ply or bias-direction weaving process.

Farley, Gary L.↗

Integration Process for the Habitat Demonstration Unit

The Habitat Demonstration Unit (HDU) is an experimental exploration habitat technology and architecture test platform designed for analog demonstration activities. The HDU previously served as a test bed for testing technologies and sub-systems in a terrestrial surface environment. in 2010 in the Pressurized Excursion Module (PEM) configuration. Due to the amount of work involved to make the HDU project successful, the HDU project has required a team to integrate a variety of contributions from NASA centers and outside collaborators The size of the team and number of systems involved With the HDU makes Integration a complicated process. However, because the HDU shell manufacturing is complete, the team has a head start on FY--11 integration activities and can focus on integrating upgrades to existing systems as well as integrating new additions. To complete the development of the FY-11 HDU from conception to rollout for operations in July 2011, a cohesive integration strategy has been developed to integrate the various systems of HDU and the payloads. The highlighted HDU work for FY-11 will focus on performing upgrades to the PEM configuration, adding the X-Hab as a second level, adding a new porch providing the astronauts a larger work area outside the HDU for EVA preparations, and adding a Hygiene module. Together these upgrades result in a prototype configuration of the Deep Space Habitat (DSH), an element under evaluation by NASA's Human Exploration Framework Team (HEFT) Scheduled activates include early fit-checks and the utilization of a Habitat avionics test bed prior to installation into HDU. A coordinated effort to utilize modeling and simulation systems has aided in design and integration concept development. Modeling tools have been effective in hardware systems layout, cable routing, sub-system interface length estimation and human factors analysis. Decision processes on integration and use of all new subsystems will be defined early in the project to maximize the efficiency of both integration and field operations. In addition a series of tailored design reviews are utilized to quickly define the systems and their integration into the DSH configuration. These processes are necessary to ensure activities, such as partially reversing integration of the X-Hab second story of the HDU and deploying and stowing the new work porch for transportation to the JSC Rock Yard and to the Arizona Black Point Lava Flow Site are performed with minimal or no complications. In addition, incremental test operations leading up to an Integrated systems test allows for an orderly systems test program. For FY-11 activities, the HDU DSH will act as a laboratory utilizing a new X-Hab inflatable second floor with crew habitation features. In addition to the day to day operations involving maintenance of the HDU and exploring the surrounding terrain, testing and optimizing the use of the new X-Hab, work porch, Hygiene Module, and other sub-system enhancements will be the focus of the FY-11 test objectives. The HDU team requires a successful integration strategy using a variety of tools and approaches to prepare the DSH for these test objectives. In a challenging environment where the prototyping influences the system design, as well as Vice versa, results of the HDU DSH field tests will influence future designs of habitat systems.

Gill, Tracy↗

Optimizing Urban Air Mobility Research Through Bi-Directional Integration Processes for Effective Verification and Validation

Urban Air Mobility (UAM), a subset of Advanced Air Mobility (AAM), aims to revolutionize metropolitan transportation. This paper explores an engineering process framework within National Aeronautics and Space Administration (NASA)’s Air Mobility Pathfinders (AMP) project, which is focused on the safe scaling and seamless integration of UAM operations within the National Airspace System (NAS). Progressing through three phases — Initial, Midterm, and Mature — the Federal Aviation Administration (FAA)’s UAM Concept of Operations (ConOps) describes a proposed path for the evolution of UAM operations, presenting multifaceted challenges in technology, regulation, and stakeholder engagement. With this ConOps as a basis, the AMP project is executing research, development, test, and evaluation activities aimed at delivering validated reference architectures for the Midterm phase. This paper illuminates the pivotal role of the systems engineering process in managing these technical efforts. Robust verification and validation methods, along with systematic bi-directional integration process, enhance the ability to conduct research into the design and evolution of safe, efficient, and reliable UAM systems. In this paper a systematic framework will be presented and shown to facilitate interactions between UAM stakeholders and to effectively manage the complex architecture of UAM operations in the NAS.

National Airspace System↗

Integration Process for the Habitat Demonstration Unit

The Habitat Demonstration Unit (HDU) is an experimental exploration habitat technology and architecture test platform designed for analog demonstration activities The HDU project has required a team to integrate a variety of contributions from NASA centers and outside collaborators and poses a challenge in integrating these disparate efforts into a cohesive architecture To complete the development of the HDU from conception in June 2009 to rollout for operations in July 2010, a cohesive integration strategy has been developed to integrate the various systems of HDU and the payloads, such as the Geology Lab, that those systems will support The utilization of interface design standards and uniquely tailored reviews have allowed for an accelerated design process Scheduled activities include early fit-checks and the utilization of a Habitat avionics test bed prior to equipment installation into HDU A coordinated effort to utilize modeling and simulation systems has aided in design and integration concept development Modeling tools have been effective in hardware systems layout, cable routing and length estimation, and human factors analysis Decision processes on the shell development including the assembly sequence and the transportation have been fleshed out early on HDU to maximize the efficiency of both integration and field operations Incremental test operations leading up to an integrated systems test allows for an orderly systems test program The HDU will begin its journey as an emulation of a Pressurized Excursion Module (PEM) for 2010 field testing and then may evolve to a Pressurized Core Module (PCM) for 2011 and later field tests, depending on agency architecture decisions The HDU deployment will vary slightly from current lunar architecture plans to include developmental hardware and software items and additional systems called opportunities for technology demonstration One of the HDU challenges has been designing to be prepared for the integration of presently unanticipated systems Results of the HDU field tests will influence future designs of habitat systems.

Gill, Tracy↗

Assembly and Integration Process of the High-Density Detector Array Readout Modules for the Simons Observatory

The Simons Observatory will measure the cosmic microwave background tempera-ture and polarization using a suite of new telescopes in the Atacama Desert in Chile. The Simons Observatory will use dichroic transition edge sensor (TES) bolometer arrays spanning six frequency bands from 27 to 280 GHz. The Simons Observa-tory will pioneer the use of a densely packed multiplexing architecture based on the microwave SQUID multiplexer ( 𝜇mux), housing ∼2000 microwave resonators, each coupled to a TES. The Simons Observatory aims to multiplex each array of ∼2000 detectors with a single pair of coaxial cables and requires a multiplexing factor of ∼1000 . The Simons Observatory cryogenic readout system is called the universal microwave multiplexing module (UMM). The UMM couples to both horn and lenslet-coupled detector arrays and is integrated into the universal focal-plane module (UFM) after being independently characterized. We present processes we have developed for highly repeatable and automated integration methods of UMMs, which will be needed for the production of the 49 UFMs required for the first stage of the Simons Observatory.

CMB↗

Integral processing in beyond-Hartree-Fock calculations

The increasing rate at which improvements in processing capacity outstrip improvements in input/output performance of large computers has led to recent attempts to bypass generation of a disk-based integral file. The direct self-consistent field (SCF) method of Almlof and co-workers represents a very successful implementation of this approach. This paper is concerned with the extension of this general approach to configuration interaction (CI) and multiconfiguration-self-consistent field (MCSCF) calculations. After a discussion of the particular types of molecular orbital (MO) integrals for which -- at least for most current generation machines -- disk-based storage seems unavoidable, it is shown how all the necessary integrals can be obtained as matrix elements of Coulomb and exchange operators that can be calculated using a direct approach. Computational implementations of such a scheme are discussed.

Taylor, P. R.↗

Addressable test matrix for measuring analog transfer characteristics of test elements used for integrated process control and device evaluation

A set of addressable test structures, each of which uses addressing schemes to access individual elements of the structure in a matrix, is used to test the quality of a wafer before integrated circuits produced thereon are diced, packaged and subjected to final testing. The electrical characteristic of each element is checked and compared to the electrical characteristic of all other like elements in the matrix. The effectiveness of the addressable test matrix is in readily analyzing the electrical characteristics of the test elements and in providing diagnostic information.

Buehler, Martin G.↗

Pt/HTCC Alumina based Electronic Packaging System and Integration Processes for High Temperature Harsh Environment Applications

Electronic devices capable of operation at 500°C are required for long term Venus surface missions, as well as for in situ monitoring and control of next generation aeronautical engines. High temperature sensors and electronics can also find many applications in military, and energy and automobile industries. Various silicon carbide (SiC) sensors and electronic devices have been developed for operation at 500 °C, and a compatible packaging system is needed for long term test and deployment of these high temperature devices. High temperature co-fired ceramics (HTCC) alumina with platinum (Pt) conductor was proposed for high temperature electronic packaging. A prototype Pt/HTCC alumina packaging system including chip-level package and circuit board has been briefly reported previously for long-term electrical testing of SiC integrated circuits at 500 °C, and brief testing at much higher temperatures. HTCC alumina is an excellent dielectric material with acceptable dielectric constant and low dielectric loss over wide temperature and frequency ranges. Pt is chemically noble and can be co-fired with HTCC alumina in air ambient producing a viable electronic packaging material system for high temperature applications. This paper presents a more detailed description of this packaging system including prototype low power packages and circuit boards based on HTCC alumina and Pt metallization for 500°C and other harsh environment applications. The key technical considerations for chip-level packaging and circuit board assembly, including materials and processes for 500 °C durable wire-bonding and SiC die attach, and integration of multi-chip circuit boards, are presented. Experimental test results of this packaging approach applied to SiC integrated circuits at 500 °C and 700°C are discussed as well.

High temperature↗