Engineering PapersSearch

SEARCH · Engineering Papers

Results for “Prefabrication”

Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.

Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.

At least 19 records

Force-triggered, Bio-based, Sealants for Prefabricated Building Components: Towards Improved Efficiency, Performance and Sustainability

The prefabricated building construction industry has made extensive progress in expediting the manufacture of prefabricated components at offsite plants. However, this progress has not translated to the assembly of the prefabricated components at the construction site. Case in point, sealing the joints between components to prevent air leaks requires the manual application of tape, caulk, or spray foam at the jobsite, and performance is highly dependent on the skills of the installer. To reduce assembly time and improve the airtightness and waterproofness of prefabricated components, we developed a sealant that can be installed at the plant and have its curing reaction triggered at the jobsite. Additionally, we used this opportunity to explore the use of bio-based feedstocks that are abundant and not used for food. We evaluated a series of force-triggered, bio-based, high strength, and fast curing sealants, consisting of a one-part heterogeneous system. These sealants are derived from formulations with ≥80% of bio-based components, consisting of a cardanol derived diepoxy that is microencapsulated in a polymer shell and embedded in a cardanol derived amine curing agent. The microcapsule shell allows separation of the reactive species in the one-part sealant allowing a fast-curing system to remain unreacted until the right trigger is applied. When the microcapsules are activated and broken by force, the highly reactive species mix and cure, exhibiting peel strengths up to 143 ppi. The open-air shelf stability of the sealant complexes was demonstrated by peel strength values of ~16 ppi when triggering the curing reaction even after being exposed for 8 months to open air and humidity. The successful on-demand triggering of curing reactions and the shelf stability provide efficacy of these force-triggered sealants for installation on prefabricated components, storage for months prior to delivery, and assembly at the jobsite. These force-triggered bio-based sealants for prefabricated buildings could result in lower installation time and cost as well as better performance than tapes and caulks at the jobsite.

Cortes Guzman, Karen [ORNL] (ORCID:000000028793468

A review of prefabricated overclad panels for building energy retrofits

Over 50% of existing buildings in the US were constructed before 1980 and lack modern, energy-efficient technologies. Despite the large number of old buildings, less than 2% of buildings are retrofitted each year with many of those retrofits consisting of small incremental improvements that often ignore the building envelope. The opaque building envelope affects 25% of building energy use equating to 10% of total US primary energy use. To meet decarbonization goals by 2035, the US must increase the rate of retrofit of existing building envelopes. The process of prefabrication is one potential opportunity to increase the rate of envelope retrofits and reduce costs. Prefabrication is the process of manufacturing construction components in a controlled environment before shipping them on-site to perform assembly of the construction. The process of prefabrication has been demonstrated to increase production efficiency, quality control, and rate of production. Prefabricated overclad panels, consisting of a cladding material and insulation designed to be installed over the existing envelope, have been successfully used to retrofit existing buildings in countries other than the US; however, the technology still has some barriers to major market adoption within the US. This paper will present a review of current implementations and demonstrations of prefabricated overclad panels. The review will include identification of panel types, materials, and applications and aims to identify barriers to retrofit market entry and widespread adoption.

Hayes, Nolan [ORNL] (ORCID:0000000332245718)

Force-triggered, Bio-based, Sealants for Prefabricated Building Components: Towards Improved Efficiency, Performance and Sustainability

The prefabricated building construction industry has made extensive progress in expediting the manufacture of prefabricated components at offsite plants. However, this progress has not translated to the assembly of the prefabricated components at the construction site. Case in point, sealing the joints between components to prevent air leaks requires the manual application of tape, caulk, or spray foam at the jobsite, and performance is highly dependent on the skills of the installer. To reduce assembly time and improve assembly quality of prefabricated components, we developed a sealant that can be installed at the plant and triggered at the jobsite. Additionally, we used this opportunity to lower the use of fossil fuel derived feedstocks and introduced bio-based alternatives to decrease the embodied carbon of the new sealant. We evaluated a series of force-triggered, bio-based, high strength, and fast curing sealants, consisting of a one-part heterogeneous system. These sealants are derived from formulations with ≥80% of biogenic carbon, consisting of a cardanol derived diepoxy that is microencapsulated in a polymer shell and embedded in a cardanol derived amine curing agent. The microcapsule shell allows separation of the reactive species in the one part sealant allowing shelf stability to an otherwise fast curing system. When the microcapsules are broken and activated by force, the highly reactive species mix and cure, exhibiting peel strengths up to 143 ppi. The shelf stability of these sealants and the on-demand triggering of the curing reactions enable installation on prefabricated components and storage prior to delivery and assembly at a jobsite, which could result in consistent sealant application with lower installation time than tapes and caulks at the construction site.

Cortes Guzman, Karen [ORNL] (ORCID:000000028793468

Force-Triggered, Biobased Sealants for Prefabricated Building Components: Toward Improved Efficiency and Performance

The prefabricated building construction industry has made extensive progress in expediting the manufacture of prefabricated components at off-site plants. However, the sealing of joints between these components, which is crucial to ensuring the weatherproofing of the assembly, still represents a labor-intensive, on-site effort that relies on the manual installation of tapes and caulks. Here, to reduce work at the jobsite and improve the airtightness and waterproofness of building envelopes, we developed a sealant that can be installed at the plant on prefab components and have the curing reaction triggered at the jobsite by using microencapsulation technology to separate the reactive agents. A series of force-triggered, high-strength, and fast-curing sealants derived from biobased feedstocks were developed, which consist of a biobased epoxy agent encapsulated in a polymer shell, embedded in a biobased amine curing agent. The shell of the microcapsules allows an effective separation of the reactive species in the one-part sealant, allowing shelf stability to an otherwise fast-curing system as well as improving the hydrophobicity of the whole system. When force activates and breaks the microcapsules, the highly reactive epoxy and amine mix and cure, exhibiting peel strength values of up to 143 ppi (pounds per inch). The hydrophobicity of the sealants allows them to retain up to 94% of the original peel strength after complete submersion in water for 24 h, showcasing the water resistivity of the sealant system. The open-air shelf stability of the sealant complex is demonstrated by the obtention of peel strength values of ∼16 ppi when triggering the curing reaction even after being exposed 8 months to open air and humidity. The successful on-demand triggering of curing reactions and the shelf stability provide efficacy of these force-triggered sealants for installation on prefabricated components, storage for months prior to delivery, and assembly at a jobsite. These force-triggered biobased sealants for prefabricated buildings can result in lower installation time and cost and better performance than tapes and caulks at the jobsite.

biobased

Lab-Scale Cable-Driven Parallel Robot Prototype for Automated Prefabricated Component Manipulation

This paper presents the design and evaluation of a lab-scale cable-driven parallel robot (CDPR) developed as a flexible platform for automated installation of prefabricated components onto exterior building envelopes. Traditional manual installation methods for prefabricated components, which depend on scaffolding, cranes, cherry pickers, and verbal coordination, are not only labor-intensive and error-prone but also face significant limitations in dense urban environments due to site access constraints. To address these challenges, we developed a lab-scale CDPR platform capable of autonomously transporting building envelope components from a designated pickup zone to their target installation location, minimizing the need for human intervention. This study describes the system’s mechanical design, actuation architecture, real-time feedback system, and control strategy of the CDPR, and evaluates its performance in a laboratory environment. The robot’s actuation system uses torque control for end-effector manipulation. The robot’s real-time pose feedback comes from a construction-grade total station and a wireless inertial measurement unit (IMU), which together support precise end-effector control. Experimental results demonstrate the successful integration of the hardware, sensing, state estimation, and control subsystems. Preliminary tests showed that our lab-scale prototype can position the end effector with an error of less than 3 mm, which is a level of precision not previously achieved by existing CDPRs in construction applications. The key findings are twofold: (1) torque-only control is necessary but not sufficient for minimizing final pose error, and (2) incorporating real-time pose feedback can achieve the desired placement accuracy.

Liu, Yifang [Oak Ridge National Laboratory (ORNL),

Final Technical Report (FTR) - DE-EE0009084: Prefabricated Construction: Guidance, Technical Assistance, and Virtual Inspections

This final technical report summarizes research, case studies, and resources developed from 2020–2025 on prefabricated construction and remote virtual inspections. It documents key findings on benefits, challenges, and best practices, highlights examples from multiple states, and provides guidance to support wider adoption of these innovations in the construction sector.

99 GENERAL AND MISCELLANEOUS

Dynamic analysis of fully constrained Cable-Driven Parallel Robots for automated prefabricated component installation

This paper presents a dynamic analysis and validation framework to assess a fully constrained six-anchor Cable-Driven Parallel Robot (CDPR) for automated installation of prefabricated facade components. Compared with conventional eight-anchor systems, the six-anchor configuration simplifies setup and reduces cost, but it also reduces control authority, shrinks the wrench-feasible workspace, and tightens orientation limits. Consequently, it is unclear a priori whether dynamically feasible trajectories exist to move the end effector from pickup to the facade. A constrained trajectory optimization is formulated to enforce the system dynamics, cable-tension bounds, and pose/velocity limits, and the framework is evaluated in simulation at three levels: (i) an idealized reference model, (ii) a lab-scale prototype model incorporating measured anchor misalignments and identified damping, and (iii) a full-scale three-story building model with load decomposition for structural feasibility checks. Across these scenarios, the analysis shows that optimal, constraint-satisfying trajectories exist that move the end effector from pickup to installation while maintaining a near-plumb, level orientation at the final pose. Collectively, this multi-scale dynamic analysis and validation framework supports the deployment readiness of the six-anchor CDPR and provides a prototype-based sensitivity case study of how measured anchor placement deviations affect feasibility.

CDPR

Cryogenic line insulation made from prefabricated polyurethane shells

Prefabricated polyurethane foam insulation is inexpensive and easily installed on cryogenic lines. Insulation sections are semicircular half shells. Pair of half shells is placed to surround cryogenic line. Cylindrically-shaped knit sock is pulled over insulation then covered with polyurethane resin to seal system.

Lerma, G.

Pivot Attachment for Prefabricated Beams

Assembly of prefabricated structural beams for roof trusses, bleachers, or other lightweight structures made easier by use of flexural pivot at one or both ends. When pivot is attached, joint is flexible, thus simplifying alinement; joint is subsequently rigidized by threaded collar that completes attachment.

Stroll, H. W. J.

Prefabricated foldable lunar base modular systems for habitats, offices, and laboratories

The first habitat and work station on the lunar surface undoubtedly has to be prefabricated, self-erecting, and self-contained. The building structure should be folded and compacted to the minimum size and made of materials of minimum weight. It must also be designed to provide maximum possible habitable and usable space on the Moon. For this purpose the concept of multistory, foldable structures was further developed. The idea is to contain foldable structural units in a cylinder or in a capsule adapted for launching. Upon landing on the lunar surface, the cylinder of the first proposal in this paper will open in two hinge-connected halves while the capsule of the second proposal will expand horizontally and vertically in all directions. In both proposals, the foldable structural units will self-erect providing a multistory building with several room enclosures. The solar radiation protection is maintained through regolith-filled pneumatic structures as in the first proposal, or two regolith-filled expandable capsule shells as in the second one, which provide the shielding while being supported by the erected internal skeletal structure.

Hijazi, Yousef

Concepts and strategies for lunar base radiation protection - Prefabricated versus in-situ materials

The most recently accepted environment data are used as inputs for the Langley nucleon and heavy-ion transport codes, BRYNTRN and HZETRN, to examine the shield effectiveness of lunar regolith in comparison with commercially-used shield materials in nuclear facilities. Several of the fabricated materials categorized as neutron absorbers exhibit favorable characteristics for space radiation protection. In particular, polyethylene with additive boron is analyzed with regard to response to the predicted lunar galactic cosmic ray and solar proton flare environment during the course of a complete solar cycle. Although this effort is not intended to be a definitive trade study for specific shielding recommendations, attention is given to several factors that warrant consideration in such trade studies. For example, the transporting of bulk shield material to the lunar site as opposed to regolith-moving and processing equipment is assessed on the basis of recent scenario studies. The transporting of shield material from Earth may also be a viable alternative to the use of regolith from standpoints of cost-effectiveness, EVA time required, and risk factor.

Simonsen, Lisa C.

Integration of a real-time orientation measurement system for a real-time evaluator (RTE) to measure the position and orientation of crane-lifted components

Prefabrication of building components holds the potential to revolutionize the construction industry. Prefabrication consists of manufacturing building components, modules, and other elements in a factory to be shipped and installed on a construction site. Prefabricated components have been produced for various applications including precast concrete panels for new construction and exterior wall retrofits. The manufacturing process has seen much innovation in recent years; however, the installation process has seen minimal advancements. A real-time evaluator (RTE) was developed to reduce the installation cost of prefabricated components by reducing installation time, decreasing rework, and improving accuracy. The RTE uses off-the-shelf hardware and novel algorithms to assist erectors with component installation by measuring the real-time positions of connections and prefabricated components, providing installation guidance through a graphical user interface, and monitoring the accumulated installation errors. An overview of the RTE and the proposed workflow is presented. Previous on-site demonstrations provided valuable feedback from users on the potential areas for improvement of the system. One common request was real-time measurement of component orientation during lifting, a process that previously required that the component remain stationary while the laser tracker cycled through target prisms. This paper will present the incorporation and testing of a real-time orientation measurement system as it was implemented into the RTE, allowing for measurement of component orientation during movement.

Selvakumar, Balaji [ORNL]