Engineering Papers⌕ Search

SEARCH · Engineering Papers

Results for “Pre-combustion CO2 capture”

Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.

Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.

At least 19 records

Novel Full-Ceramic Multi-Tubular Membrane Systems for Pre-Combustion CO2 Capture with Simultaneous H2 Production: Fabrication, Performance Testing, and 3D CFD Modeling

Inorganic membranes show promise for application in pre-combustion CO2 capture with simultaneous H2 production. State-of-the-art systems for use under high temperature and pressure conditions consist of multiple membrane tube bundles prepared in a "candle-filter" configuration, in which the membrane tubes are open at one end and sealed at the other. This configuration is used for practical reasons, specifically the need to minimize potential problems due to thermal expansion mismatch, at high temperatures, between the ceramic tube bundle and the steel housing. The primary technical problem with the candle-filter configuration for use in commercial-scale installations is the inability to purge the permeate side (typically the tube side), a feature that is crucial for high H2 recovery. In this study, we fabricated dual-end open, commercial-size ceramic multiple-tube bundles made of zeolite, palladium (Pd), and carbon molecular sieve (CMS) membranes that enable permeate-side (tube-side) purge for gas separation applications. Experimental gas separation data with these membrane bundles under harsh operating conditions (temperatures up to 350 and pressures up to 800 psig), to be presented at the meeting, manifest excellent performance. Parallel to the membrane bundle construction and testing efforts, we have also developed a detailed 3D CFD modeling package using COMSOL Multiphysics software to gain more insight into the effect on the H2 purity and recovery of the detailed geometry of the multi-tubular membrane system, including the number of tubes used, their dimensions, and placement in the bundle, as well as the number, type, and positioning of internal baffles and other flow-enhancement accessories. The CFD package is validated with experimental data from different systems (1-tube, 3-tube, and 19-tube bundles), and shows high accuracy in predicting the experimental results (<5 % error in all cases). The results of our study show that the detailed internal geometry of these multi-tubular membrane systems has a considerable impact on the performance of the system as the flow maldistribution within the shell-side can substantially decrease (>40%) the H2 recovery.

20 FOSSIL-FUELED POWER PLANTS↗

Field-Scale Testing of a High-Efficiency Membrane Reactor (MR)—Adsorptive Reactor (AR) Process for H2 Generation and Pre-Combustion CO2 Capture

The study objective was to field-validate the technical feasibility of a membrane- and adsorption-enhanced water gas shift reaction process employing a carbon molecular sieve membrane (CMSM)-based membrane reactor (MR) followed by an adsorptive reactor (AR) for pre-combustion CO2 capture. The project was carried out in two different phases. In Phase I, the field-scale experimental MR-AR system was designed and constructed, the membranes, and adsorbents were prepared, and the unit was tested with simulated syngas to validate functionality. In Phase II, the unit was installed at the test site, field-tested using real syngas, and a technoeconomic analysis (TEA) of the technology was completed. All project milestones were met. Specifically, (i) high-performance CMSMs were prepared meeting the target H2 permeance (>1 m3/(m2.hbar) and H2/CO selectivity of >80 at temperatures of up to 300 °C and pressures of up to 25 bar with a <10% performance decline over the testing period; (ii) pelletized adsorbents were prepared for use in relevant conditions (250 °C < T < 450 °C, pressures up to 25 bar) with a working capacity of >2.5 wt.% and an attrition rate of <0.2; (iii) TEA showed that the MR-AR technology met the CO2 capture goals of 95% CO2 purity at a cost of electricity (COE) 30% less than baseline approaches.

42 ENGINEERING↗

Effect of Power Plant Capacity on the CAPEX, OPEX, and LCOC of the CO2 Capture Process in Pre-Combustion Applications - Abstract

Aspen Plus v8.8 was used to simulate the pre-combustion CO2 capture process from a typical fuel gas stream at different power plant capacities ranging from 54.3 to 543 MW. Polyethylene glycol polydimethyl siloxane (PEGPDMS-1) was used as a physical solvent to capture CO2 in a countercurrent packed-bed absorber containing a structured packing (Mellapak 250Y). The process pressure was 51.4 bar and the solvent temperature was varied from 10 to 40 <sup>o</sup>C. The internal diameter of the absorber ranged from 1.9 to 7 m and the packing height from 13.9 to 45.5 m. The physico-chemical properties were obtained and modeled using the Perturbed Chain-Statistical Associating Fluid Theory (PC-SAFT) Equation-of-State (EOS).<p> Four process constraints were imposed in Aspen Plus: (1) no flooding in the absorber, (2) the absorber height to diameter ratio (H/D) is greater than or equal 6, (3) at least 90 mol% of the CO2 capture from the fuel gas stream, and (4) the CO2 stream destined to sequestration sites should contain less than 600 ppm water concentration and less than or equal 0.5 mol% of fuel gases (H2, CO, CH4). The plant lifetime was assumed to be 30 years with an annual discount rate of 10% and an annual maintenance cost of 4% of the total capital expenses.</p><p> Seven power plants with different capacities were used and for each plant, the corresponding CO2 capture process was simulated. The absorber flooding was checked using the generalized pressure drop correlation (GPDC) by Leva [1] and the capital expenditure (CAPEX), operating expenditure (OPEX), and levelized costs per ton of CO2 captured (LCOC) were calculated [2-5]. Normalized by the largest power plant capacity (543 MW) used in the simulation, the results indicated that the capital and operating expenditures increased, however, the LCOC decreased with increasing plant capacity. This behavior was due to the increased annual tonnage of the CO2 captured with plant capacity as shown in Figure 1. The calculated CAPEX, OPEX, LCOC and the tonnage of CO2 captured for the 543 MW power plant were about 52 MM$, 22 MM$/year, 7.46 $/ton and 4 MM ton/year.</p>

Ashkanani, Husain↗

Di-substituted siloxane solvents for gas capture

The present disclosure provides a method for the separation of a gas constituent from a gaseous mixture. The disclosure also provides polyethylene glycol disubstituted siloxane based solvents for use in the method. These solvents are of use for pre-combustion CO2 capture and are capable of replacing glycol-based solvents while offering operation at a higher temperature region. These solvents are also of use for generation of hydrogen from reformed natural gas or syngas, adjusting CO/H2 ratio for Coal & Biomass to Liquids, removal of CO2 from syngas for coal & biomass to NH3/Fertilizer, natural gas sweetening, and upgrading of landfill and biogas.

01 COAL, LIGNITE, AND PEAT↗

Gasification of Coal and Biomass: The Route to Net-Negative-Carbon Power and Hydrogen

One promising process that is a candidate for meeting the goals of the US Department of Energy’s 21st Century Power Plant initiative is to gasify a mixture of coal and biomass to yield a syngas, which can have CO2 removed and then be used to produce hydrogen as well as an off-gas that can be used to flexibly produce power. This concept would overall be carbon net-negative and readily meet the 21st Century Power Plant initiative targets of smaller scale MW generation, high ramp rates and turndown, feedstock flexibility, and high efficiency—at a reasonable cost. Moreover, adding the large-scale production of “ultra-green” hydrogen yields a system tailored for the coming hydrogen economy, providing long-term energy storage and an attractive co-product for sale. The objective of the work being led by the Electric Power Research Institute, Inc. (EPRI), with support by Bechtel Corporation (Bechtel), Gas Technology Institute (GTI), Hamilton Mauer International, Inc. (HMI), Nebraska Public Power District (NPPD), NexantECA, Inc. (Nexant), and Wärtsilä, is to perform a front-end design and engineering (FEED) study on an oxygen-blown gasification system coupled with water-gas shift, pre-combustion CO2 capture, and pressure-swing adsorption working off a coal/biomass mix to yield high-purity hydrogen and a fuel off-gas that can generate power. Several designs are being considered that will be capable of producing 50 MW net from a flexible generator, over 8500 kg/hr of hydrogen, and net-negative CO2 emissions, at an efficiency of 50% net HHV. The plant would be hosted at an NPPD site, where opportunities for enhanced oil recovery and sequestration have been investigated and the need for low-carbon power and hydrogen is imminent. The principal biomass to be used is corn stover—prevalent in Nebraska where the plant will be located—mixed with Powder River Basin (PRB) coal, necessitating a gasifier that can use this feedstock and be flexible to allow other types. Waste plastics will also be reviewed for use. Two oxygen-blown gasifiers have been identified as candidates that have done testing with biomass including corn stover: the GTI gasifier—a high-pressure, fluidized-bed type—and HMI’s, a lower pressure moving-bed type. Both have relative advantages that are being investigated in the Phase I design study, with a resultant down select of one system for which the FEED will be performed in Phase II. The technical tasks for the proposed project are: • Design Development: Completion of design activities necessary to provide inputs for the FEED study. Multiple design cases will be assessed with the selection of the optimal one for the FEED. • Investment Case Preparation: Development of the draft investment case for the proposed process with business cases performed for the proposed host site and two other locations. • Host Site Selection: Evaluation of the two potential host sites within NPPD’s portfolio to select the preferred candidate based on technical, economic, and environmental considerations. • Environmental Information Volume (EIV) Development: Completion of the EIV for the host site. • FEED Study: Completion of a FEED study based on the design selected in Phase I. A Greenhouse Gas Life Cycle Analysis will also be performed for the process. • Update Investment Case: Finalization of the investment case based on findings from the FEED. The advantages of the proposed project are significant. Having an engaged U.S. power utility willing to provide a host site that will produce energy from coal plus a deep and experienced team is critical; the process meets all the goals of DOE’s 21st Century Power Plant initiative at an estimated total plant cost of ~$880M and a production cost of hydrogen of ~$2/kg-H2 while producing net-negative carbon power. If developed, this process has real commercial potential in the United States—supported by EPRI’s initial review of the considerable interest from selected U.S. utilities—and elsewhere around the globe. The process has fewer environmental hurdles compared to other concepts, lowering regulatory and protest risks—providing a pathway to preserving the viability of a critical indigenous energy source by transforming its use to match a changing world. This presentation will outline the motivation for the effort, summarize project plans, work completed to date, results of the Design Development task, and detailed work scope for the remainder of the project.

01 COAL, LIGNITE, AND PEAT↗

Gasification of Coal and Biomass: The Route to Net-Negative-Carbon Power and Hydrogen

One promising process that is a candidate for meeting the goals of the US Department of Energy’s 21st Century Power Plant initiative is to gasify a mixture of coal and biomass to yield a syngas, which can have CO2 removed and then be used to produce hydrogen as well as an off-gas that can be used to flexibly produce power. This concept would overall be carbon net-negative and readily meet the 21st Century Power Plant initiative targets of smaller scale MW generation, high ramp rates and turndown, feedstock flexibility, and high efficiency—at a reasonable cost. Moreover, adding the large-scale production of “ultra-green” hydrogen yields a system tailored for the coming hydrogen economy, providing long-term energy storage and an attractive co-product for sale. The objective of the work being led by the Electric Power Research Institute, Inc. (EPRI), with support by Bechtel Corporation (Bechtel), Gas Technology Institute (GTI), Hamilton Mauer International, Inc. (HMI), Nebraska Public Power District (NPPD), NexantECA, Inc. (Nexant), and Wärtsilä, is to perform a front-end design and engineering (FEED) study on an oxygen-blown gasification system coupled with water-gas shift, pre-combustion CO2 capture, and pressure-swing adsorption working off a coal/biomass mix to yield high-purity hydrogen and a fuel off-gas that can generate power. Several designs are being considered that will be capable of producing 50 MW net from a flexible generator, over 8500 kg/hr of hydrogen, and net-negative CO2 emissions, at an efficiency of 50% net HHV. The plant would be hosted at an NPPD site, where opportunities for enhanced oil recovery and sequestration have been investigated and the need for low-carbon power and hydrogen is imminent. The principal biomass to be used is corn stover—prevalent in Nebraska where the plant will be located—mixed with Powder River Basin (PRB) coal, necessitating a gasifier that can use this feedstock and be flexible to allow other types. Waste plastics will also be reviewed for use. Two oxygen-blown gasifiers have been identified as candidates that have done testing with biomass including corn stover: the GTI gasifier—a high-pressure, fluidized-bed type—and HMI’s, a lower pressure moving-bed type. Both have relative advantages that were investigated in the Phase I design study, with a resultant down select of one system for which the FEED will be performed in Phase II. The technical tasks for the project are: • Design Development: Completion of design activities necessary to provide inputs for the FEED study. Multiple design cases will be assessed with the selection of the optimal one for the FEED. • Investment Case Preparation: Development of the draft investment case for the proposed process with business cases performed for the proposed host site and two other locations. • Host Site Selection: Evaluation of the two potential host sites within NPPD’s portfolio to select the preferred candidate based on technical, economic, and environmental considerations. • Environmental Information Volume (EIV) Development: Completion of the EIV for the host site. • FEED Study: Completion of a FEED study based on the design selected in Phase I. A Greenhouse Gas Life Cycle Analysis will also be performed for the process. • Update Investment Case: Finalization of the investment case based on findings from the FEED. The advantages of the proposed project are significant. Having an engaged U.S. power utility willing to provide a host site that will produce energy from coal plus a deep and experienced team is critical; the process meets all the goals of DOE’s 21st Century Power Plant initiative at an estimated total plant cost of ~$880M and a production cost of hydrogen of ~$2/kg-H2 while producing net-negative carbon power. If developed, this process has real commercial potential in the United States—supported by EPRI’s initial review of the considerable interest from selected U.S. utilities—and elsewhere around the globe. The process has fewer environmental hurdles compared to other concepts, lowering regulatory and protest risks—providing a pathway to preserving the viability of a critical indigenous energy source by transforming its use to match a changing world. This presentation outlines the motivation for the effort, summarizes project plans, work completed to date, results of the Phase I effort and, and detailed work scope for the remainder of the project in the Phase II FEED effort.

01 COAL, LIGNITE, AND PEAT↗

Beta-Amino Carboxylate (BAC) non-aqueous physical solvents for enhanced CO2 separations in pre-combustion carbon capture, industrial CO 2 capture, and biogas upgrading processes

Novel beta-amino carboxylate (BAC) solvents have been synthesized and tested to efficiently capture carbon dioxide (CO 2 ) from process gas streams with CO 2 partial pressure intermediate between pre-combustion and post-combustion capture. The BAC solvents have molecular structures characterized by alkyl-substituted amides or esters containing a secondary amine functional group on the second carbon from the carbonyl carbon (referred to as the beta “β” carbon). The ester or amide functional group combined with optimal steric crowding around the amine nitrogen by proximate alkyl groups are tailored to modify the strength of CO 2 binding in the solvent. The solvents possess high CO 2 solubilities and high gas selectivity including good CO 2 /H 2 O selectivity and can be utilized for CO 2 absorption over a range of partial pressures. Due to low volatility, many of the solvents can be operated at or above ambient temperature which eliminates solvent chilling and allows regeneration using low grade waste heat. These novel solvents offer an opportunity for efficient carbon capture for a range of applications including biogas upgrading, hydrogen production, and pre-combustion carbon capture.

37 INORGANIC, ORGANIC, PHYSICAL, AND ANALYTICAL CH↗

BENCH-SCALE DEVELOPMENT OF A TRANSFORMATIVE MEMBRANE PROCESS FOR PRE-COMBUSTION CO 2 CAPTURE

This final technical report describes work conducted by Membrane Technology and Research, Inc. (MTR) for the Department of Energy, National Energy Technology Laboratory (DOE NETL) on development of the second generation (Gen-2) Proteus™ membrane modules and a pre-combustion membrane process for carbon dioxide (CO 2 ) capture from an Integrated Gasification Combined Cycle (IGCC) plant for power generation (award number DE-FE0031632). The work was conducted from October 1, 2018 through March 30, 2022. The overall goal of this project was to bring a Gen-2 version of the H2-selective Proteus membrane to bench-scale module (component) testing with real syngas. MTR was assisted in this project by Susteon, a technology development company with extensive experience in gasification processes, and the University of North Dakota Energy & Environmental Research Center (EERC), who provided the host site for the slipstream field testing. This report details the work conducted to optimize the Gen-2 Proteus membrane and develop modules capable of operation at 200°C; demonstrate membrane module performance processing coal-derived syngas during a field test at EERC; and optimize integration of a dual-membrane process into an IGCC with carbon capture. Work for this project included membrane optimization and scale-up, module component screening and fabrication of high-temperature lab- and bench-scale modules, design and fabrication of a bench-scale field test membrane skid, operation of the field test skid processing coal-derived syngas at EERC, and a detailed techno-economic analysis (TEA) of the MTR dual-membrane process for IGCC power plant pre-combustion CO 2 capture. This project validated recent membrane technology advancements, mitigates risk in future scale-up activities, and moved the membrane pre-combustion capture technology from TRL-4 to TRL-5. Key results for each major task are discussed in the report.

10 SYNTHETIC FUELS↗

CCUS Perspectives: Assessing Historical Contexts, Current Realities, and Future Prospects

CCUS technologies are crucial solutions for mitigating climate change by reducing CO2 emissions from industrial operations and energy sectors. This review critically examines the current state of CCUS technologies, and highlights advancements, challenges, regulatory frameworks, and future directions. It comprehensively analyzes carbon capture methods, such as pre-combustion, post-combustion, and oxy-fuel combustion capture, while comparing their efficiencies and limitations. The review also explores carbon utilization techniques, such as direct and indirect utilization, emphasizing their potential applications and technological constraints. Additionally, it assesses various carbon storage methods, focusing on geological, ocean, and mineralization storage, and discusses their capacity, feasibility, and environmental implications. The study reviews the policy and regulatory frameworks, economic viability, market trends, and environmental sustainability of CCUS. By identifying research gaps and recommending future research priorities, this review aims to guide the development of more efficient/effective, and cost-effective CCUS technology, ensuring their role in a sustaining low-carbon future. This review provides a forward-looking perspective, a critical and interdisciplinary analysis that assesses the current state of CCUS technologies, and further provides a roadmap for future development.

Energy & Fuels↗

Levelized Cost of CO 2 Captured Using Five Physical Solvents in Pre-combustion Applications

Aspen Plus v8.8 was used to perform techno-economic analysis (TEA) of a CO 2 capture process from a typical fuel gas stream in a 543-MW pre-combustion power plant using five different physical solvents (Selexol, PEGPDMS-1, NMP, [aPy][Tf 2 N] and [hmim][Tf 2 N]). The process included a countercurrent packed-bed absorber operating under high-pressure over a wide range of temperatures and three pressure-swing flash drums for solvent regeneration. Furthermore, two packings, Mellapak 250Y and IMTP50, were used and the Levelized costs of CO 2 captured (LCOC) were calculated. The simulation results indicated that using Mellapak 250Y exhibited lower LCOC values than those when using IMTP50 for the five solvents under all conditions used as it offered better mass transfer. The CO 2 capture process carried out at low temperatures showed lower LCOC values than those at higher temperatures due to the increased CO 2 solubility in the solvents at lower temperatures, requiring smaller absorber diameter and lower solvent circulation rates, which offset the cooling requirements. Comparing the lowest LCOC values for the five solvents, the hydrophobic PEGPDMS-1 solvent was the most promising one compared to the other four solvents, due to its lowest capital and operating costs and noncorrosive, which enabled using less expensive materials for the process equipment.

42 ENGINEERING↗

High-Temperature Ceramic-Carbonate Dual-Phase Membrane Reactor for Pre-combustion Carbon Dioxide Capture (Final Scientific/Technical Report)

Arizona State University, in collaboration with University of South Carolina, worked on a project aimed at development of a new high temperature, high pressure CO 2 perm-selective membrane reactor for water-gas-shift reaction (WGS) with simulated gasifier syngas to produce a high concentration H 2 stream with CO 2 capture. The membrane reactor is made of a CO 2 semi-permeable ceramic-carbonate dual-phase (CCDP) membrane with high CO 2 perm-selectivity/permeance and thermal/mechanical stability for application in WGS reaction. The objectives of this project were to (1) synthesize the chemically/thermally stable tubular CCDP membranes with CO 2 permeance and selectivity (with respect to H 2 , CO or H 2 O) larger than 6.5×10-7 mol/m2·s·Pa and 500, respectively; (2) establish CCDP membrane reactor setup and study high pressure CO 2 permeation and WGS reaction with CO 2 capture using the setup; and (3) identify conditions for WGS in the CCDP membrane reactor that produce CO 2 and H 2 streams with purity of >99% and >90% respectively at CO conversion >95% and overall carbon capture >90%. The work in this project included both membrane development and membrane reactor process study. The membrane development efforts were focused on investigating a H 2 S resistant and highly oxygen-ionic conducting metal oxide material and membrane for CO 2 separation, fabrication of tubular samaria-doped-ceria/molten-carbonate CCDP membrane with high mechanical strength, and experimental and modeling study of high-pressure CO 2 permeation of the CCDP membranes. Mathematical models were developed to describe WGS in the CCDP membrane reactor without a catalyst or packed with a commercial high temperature WGS catalyst. Experiments on WGS in the CCDP membrane reactor with the commercial WGS catalyst, guided by the model analysis, were performed to identify optimum conditions for achieving the CO conversion, carbon capture, and the purity of the H 2 and CO 2 streams mentioned above. At 30 atm feed pressure, 750°C operation temperature, space velocity of 250 h-1, and with steam sweep, a single-stage CCDP membrane reactor with average CO 2 permeation flux of 0.5 cm3(STP)/min.cm2 can achieve CO 2 conversion of 95% and overall carbon capture of 94%, and produce CO 2 and H 2 streams with dry-based purity of >99% and 92% respectively. The project also included process design and techno-economic analysis (TEA) for a CCDP membrane reactor process for WGS reaction with CO 2 capture for a 550 MW coal-fired IGCC power plant, and its comparison with the conventional fixed-bed reactor system for WGS with follow-up CO 2 capture by an amine absorption process. The target performance for the reactor for WGS with CO 2 capture includes CO conversion >95%, hydrogen stream purity >90%, CO 2 stream purity >95%, and total carbon capture >90%. The CCDP membrane developed in this project can achieve the performance target, without subsequent CO 2 capture process at the optimum conditions identified in this project. The outcome of the process design and TEA analysis shows that the membrane reactor for WGS with in-situ CO 2 capture has an operating cost about 40% lower than that for the conventional fixed-bed reactor with a separate amine absorption process for CO 2 capture. However, the capital cost of the membrane reactor process is about twice that of the conventional process because of the higher cost of the CCDP membrane. Modeling analysis shows that a membrane reactor using a CCDP membrane with higher CO 2 permeance (about three times the current value) can deliver the targeted performance for WGS reaction with CO 2 capture at a much higher space velocity and lower membrane surface area to catalyst volume ratio, leading to a smaller catalyst amount and/or membrane area and hence significantly reduced membrane reactor capital costs.

20 FOSSIL-FUELED POWER PLANTS↗