Feasibility study of rotating boiler for high- performance Rankine cycle power generation systems.
Rotating boiler for high performance Rankine cycle power generator using water as test fluid, obtaining heat-transfer coefficients
SEARCH · Engineering Papers
Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.
Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.
Rotating boiler for high performance Rankine cycle power generator using water as test fluid, obtaining heat-transfer coefficients
Feasibility of rotating boiler for high performance Rankine cycle power generator
Brayton cycle power generation using SNAP 8 nuclear reactor as energy source
A Brayton cycle was analyzed and optimized over the power range 60 - 140 kWe, for application to electric propulsion systems. A gas-cooled reactor heat source with exit temperature 1150 K was assumed. Power generation system specific masses (alpha) from 36 kg/kWe at 60 kWe to 22 kg/kWe at 140 kWe were obtained. These masses do not include the thrust production system, which is predicted to add 6 to 8 kg/kWe. Cycle efficiencies varied from 32% at 60 kWe to 36% at 140 kWe. Cycle minimum temperature, cycle pressure ratio, and heat exchanger design parameters were varied for the optimization. Optimization parameters and methods are described.
Balance of plant of a High-Temperature gas-cooled Reactor – Pebble bed Module (HTR-PM) is modeled using RELAP-7. The model includes the primary helium loop where the heat produced by the core is transferred to a helical-coil steam generator and the secondary loop where super-heated steam is fed to a turbine to extract power. The steam is then condensed to subcooled water and pumped back into the steam generator. Results demonstrate that RELAP-7 has the capability to model different regimes encountered in two-phase flow with wall boiling, superheated steam, subcooled liquid and condensation. RELAP-7 also has the capability of modeling different fluids with their own specific models in a very flexible way, without any code change. This also demonstrates the capability of modeling the transfer of fission power into electrical power.
Closed cycle magnetohydrodynamic power generators with two channels
During phase-I, the project team led by Echogen Power Systems (EPS) had two primary objectives based on investigating the application of gas turbines with supercritical carbon dioxide (sCO 2 ) power cycles. The first objective was to improve the overall efficiency and performance of a hybrid gas turbine/sCO 2 power system through a joint optimization of the two subsystems (gas turbine and sCO 2 power cycle) using non-linear optimization techniques that simultaneously evaluate thermal performance of the combined cycle. The hybrid power system included several points of interaction, including (but not limited to) gas turbine exhaust, fuel heating, inlet chilling and turbine cooling. The second objective was to establish a baseline transient response model of the hybrid power system and a notional microgrid and begin steps to integrate the control systems of the three major elements (gas turbine, sCO 2 cycle and grid controller). The project team established a baseline performance for a combined cycle power plant using a production gas turbine and scaled sCO 2 power cycle only utilizing exhaust heat recovery. Echogen’s non-linear techno-economic optimization code was extended by adding gas turbine component models derived from a in-house developed gas turbine design code. With the two cycles coupled by the gas turbine exhaust, design parameters of both cycles were allowed to vary simultaneously to determine performance opportunity versus isolated designs. Returning to the baseline gas turbine/sCO 2 power cycle transient models: Echogen had in-house developed sCO 2 cycle transient model in GT-Suite system simulation software, and had partnered with Siemens Finspång for gas turbine transient model, and Siemens PTI group to provide micro-grid load profile as well as hybrid power cycle generated load (power and frequency) analysis. The transient model for the SGT-750 Siemens gas turbine was a “black-box” functional mock-up interface (FMI) model developed by Siemens Industrial Turbomachinery in Finspång, Sweden. The SGT-750 is a twin-shaft gas turbine that produces 40 MW electricity with an efficiency of about 40% at ISO conditions. At 100% gas turbine throttle (load), the SGT-750 has average exhaust conditions of 114.6 kg/s and 469.8°C. The transient model for sCO 2 power cycle was developed by Echogen in GT-SUITE 1D system simulation software platform. The basic CO 2 flow circuit has single-shaft turbomachinery with net 11.5 MW electrical power output at design conditions. The power turbine has a double-ended shaft with one end connected to synchronous generator through a fixed-ratio gearbox. The other end of power turbine is connected to the compressor through a continuously variable transmission. The major components of the sCO 2 power cycle modeled include air cooled condenser/cooler, CO 2 compressor, recuperator, two waste heat exchanger coils, power turbine, continuous variable transmission, gearbox and generator. Integration of SGT-750 transient model and sCO 2 power cycle transient model was done in Matlab Simulink. In the integrated model, the gas turbine and sCO 2 power cycle interacted at two points, first one being the gas turbine exhaust gas flow rate and temperature, which were inputs to sCO 2 power cycle model. The second point was the distribution of micro-grid load demand signal between the SGT-750 generator and sCO 2 cycle generator. For a given combined-cycle load demand, the gas turbine load demand was equal to the total demand minus the sCO 2 cycle power generated. In the present study the integrated model was simulated for two cases of grid load demand: (i) for a step change, both positive-step and negative-step, in grid load demand (ii) for a micro-grid load demand curve provided by Siemens PTI group. Finally, the time series plots representing load demand versus integrated system response were presented including the sCO 2 power cycle control system performance plots. The actual generated power and frequency of both the generators, gas turbine and sCO 2 power cycle, was supplied to Siemens PTI group for dynamic grid assessment, results of which are provided in appendices.
The MHD channel in the NASA Lewis Research Center was redesigned and used in closed cycle power generation experiments with a helium-cesium working fluid. The cross sectional dimensions of the channel were reduced to 5 by 16.5 cm to allow operation over a variety of conditions. Experiments have been run at temperatures of 1900-2100 K and Mach numbers from 0.3 to 0.55 in argon and 0.2 in helium. Improvements in Hall voltage isolation and seed vaporization techniques have resulted in significant improvements in performance. Typical values obtained with helium are Faraday open circuit voltage 141 V (92% of uBh) at a magnetic field strength of 1.7 T, power outputs of 2.2 kw for tests with 28 electrodes and 2.1 kw for tests with 17 electrodes. Power densities of 0.6 MW/cu m and Hall fields of about 1100 V/m were obtained in the tests with 17 electrodes, representing a factor of 18 improvement over previously reported results. The V-I curves and current distribution data indicate that while near ideal equilibrium performance is obtained under some conditions, no nonequilibrium power has been generated to date.
Cold argon and air performance of 6.02 inch radial inflow turbine designed for 10 kilowatt shaft output Brayton cycle space power generation system
Discussion of the performance improvements achieved through some modifications made in the closed cycle MHD facility. These modifications include a redesign of the MHD duct interior, addition of mixing bars, increased electrical isolation, and experimentation with various cesium seed vaporization and injection techniques. Uniform Faraday and Hall voltage profiles were obtained, and the Faraday open circuit voltage varied from 90 to 100% of the ideal uBh.
A MHD channel, which was previously operated for over 500 hours of thermal operation, ten thermal cycles, and 200 cesium injection tests, was removed from the facility and redesigned. The cross sectional dimensions of the channel were reduced to 5 by 16.5 cm to allow operation over a variety of conditions. The redesigned channel has been operated for well over 300 hours, 10 thermal cycles, and 150 cesium injection tests with no problems. Experiments have been run at temperatures of 1900-2100 K and Mach numbers from 0.3 to 0.55 in argon and 0.2 in helium. The best results to date have been obtained in the helium tests. Power outputs of 2.2 kw for tests with 28 electrodes and 2.1 kw for tests with 17 electrodes were realized. Power densities of 0.6 MW/cu m and Hall fields of about 1,100 V/m were obtained in the tests with 17 electrodes.
The study focuses on achieving energy self-sufficiency in Wastewater Treatment Plants by proposing a comprehensive model for integrating, sizing, and optimizing an Organic Rankine Cycle system. The Organic Rankine Cycle system is designed to utilize waste heat from the gensets at As Samra Wastewater Treatment Plant in Jordan, where it will contribute to the overall electrical energy supply of the plant. Real data from As Samra Wastewater Treatment Plant is used to model and calculate the available waste heat using TRNSYS® software. The Organic Rankine Cycle model is then developed using ASPEN PLUS® software to explore the impact of operational parameters and determine their optimal values for maximizing the plant's energy profile. An economic analysis is conducted to assess the feasibility of the proposed model, considering system components, installation, operation, and maintenance costs. To optimize the Organic Rankine Cycle system, the study employs the Multi-Output Support Vector Regression technique to capture nonlinear relationships between independent variables (fluid type, turbine inlet pressure, turbine inlet temperature, turbine outlet pressure, and mass flow rate) and dependent variables (pump power input, waste heat input, and turbine specific work). The Osprey optimization algorithm is used to address the multi-objective optimization problem, with the proposed Pareto-based Osprey Optimization Algorithm and the Multi-Objective Particle Swarm Optimization technique being employed to evaluate critical performance and economic parameters such as system thermal efficiency, net power output, and the levelized cost of electricity. The results of the optimization strategies indicate that the M-SVR model's prediction accuracy is significantly improved after parameter optimization, with the model returning high R 2 and low Mean Square Error values of 0.991 and 0.00216, respectively. The Pareto-Based Osprey Optimization Algorithm optimizer identifies the best working fluid as Isobutane/Isopentane in a ratio of 66:34, with optimal turbine inlet pressure and temperature of 15 bars and 218 °C, respectively. In conclusion, the Organic Rankine Cycle model at these optimal conditions achieves a cycle efficiency of 19.93% and an Levelized Cost of Electricity value of 0.0353 USD/kWh.
NASA radial flow turbine research related to Brayton cycle power generator, investigating size, Reynolds number and speed effects on efficiency and flow
Many modifications were made in the MHD facility. These include a redesign of the MHD duct interior, addition of mixing bars, increased electrical isolation of all the high temperature components from each other and from ground, and experimentation with various cesium seed vaporization and injection techniques. With the exception of the cesium system which needs further improvement the above modifications were quite successful and resulted in improvements in generator performance. The facility was run for a total of 400 hours in the past year, with 70 hours of this operation at temperatures of 2000 K or more with hot generator walls. With the exception of replacing one cracked brick in the MHD channel no repairs were required in the high temperature loop components for the duration of these tests. Uniform Faraday and Hall voltage profiles were obtained and the Faraday open circuit voltage varied from 90 to 100 percent of the ideal uBh. The magnitudes of the measured parameters are: Faraday open circuit voltage approximately 70 V, total Faraday current approximately 20 A, Hall voltage approximately 250 V, power output approximately 300 W, and power density .036 W/cu cm.
Explore the source record for details and available documents.
The cross sectional dimensions of the MHD channel in the NASA Lewis closed loop facility were reduced to 3.8 x 11.4 cm. Tests were run in this channel using a helium-cesium working fluid at stagnation pressures of 160,000 n/M2, stagnation temperatures of 2000-2060 K and an entrance Mach number of 0.36. In these tests Faraday open circuit voltages of 200 V were measured which correspond to a Faraday field of 1750 V/M. Power generation tests were run for different groups of electrode configurations and channel lengths. Hall fields up to 1450 V/M were generated. Power extraction per electrode of 183 W and power densities of 1.7 MW/M3 were obtained. A total power output of 2 kW was generated for tests with 14 electrodes. The power densities obtained in this channel represent a factor of 3 improvement over those previously reported for the M = 0.2 channel.
The cross-sectional dimensions of the MHD channel in the NASA Lewis closed loop facility have been reduced to 3.8 x 11.4 cm. Tests were run in this channel using a helium-cesium working fluid at stagnation pressures of 1.6 x 10 to the 5th N/sq m, stagnation temperatures of 2000-2060 K and an entrance Mach number of 0.36. In these tests Faraday open circuit voltages of 200 V were measured which correspond to a Faraday field of 1750 V/m. Power generation tests were run for different groups of electrode configurations and channel lengths. Hall fields up to 1450 V/m were generated. Power extraction per electrode of 183 W and power densities of 1.7 MW/cu m have been obtained. A total power output of 2 kW was generated for tests with 14 electrodes. The power densities obtained in this channel represent a factor of 3 improvement over those reported for the m = 0.2 channel at the last EAM Symposium.
A 2000 MWe MHD/steam plant for central station applications has been designed and costed as part of the Energy Conversion Alternatives Study (ECAS). This plant is fueled by Illinois No. 6 coal, rejects heat through mechanical draft wet cooling towers, and includes coal processing equipment, seed reprocessing, electrical inversion of the MHD generator output and emission controls to current EPA standards. It yields an estimated overall efficiency of 0.483 (7066 Btu/kWe-hr), a capital cost of $718 per kWe (1975 dollars), and a cost of electricity at 65% capacity factor of 32 mills per kWe-hr. If the assumed life and reliability could be achieved with these performance parameters, the MHD system should prove attractive.