Engineering Papers⌕ Search

SEARCH · Engineering Papers

Results for “Plume stability”

Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.

Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.

At least 19 records

Quantifying CO 2 Plume Stabilization at Carbon Storage Projects, North Dakota, USA

This study presents an approach for quantifying when injected carbon dioxide (CO 2 ) stabilizes pursuant to carbon capture and storage (CCS) project permitting and site closure requirements. The distribution of mobile-phase CO 2 (CO 2 plume) will evolve within the storage reservoir during and after injection through both physical and chemical trapping mechanisms. CCS policies generally agree that the CO 2 plume’s migratory behavior in post-injection should demonstrate nonendangerment to the environment but do not provide specific guidance on how to meet the definition of plume stabilization, generating some uncertainty for operators. Plume stability herein means the CO 2 plume 1) changes size minimally and predictably in the storage reservoir such that it will not cross key boundaries identified in the permit and 2) does not pose a threat to human health, underground sources of drinking water (USDWs), and the environment because of lateral migration to areas where leakage pathways may exist. Published literature on plume metrics was reviewed to determine which metric(s) may be most appropriate for determining CO 2 plume stability. A technical approach that defines plume stabilization by estimating the rate of change in the geographic footprint of the CO 2 plume with respect to time was developed and illustrated using a case study from North Dakota, USA, as a proposed solution for CCS operators to apply at the project permitting stage. Any prospective CCS operator may benefit from using the same approach to inform the selection of pore space lease and monitoring areas and develop post-injection site care plans.

03 NATURAL GAS↗

A Quantitative Approach for Demonstrating Plume Stabilization Under CCS Policy Frameworks

Conference presentation at Carbon Capture, Utilization, and Storage (CCUS) Conference 2024, Houston, Texas, March 11–13, 2024. The study highlighted the operator’s responsibilities for demonstrating plume stabilization in partial fulfillment of postinjection monitoring and site closure requirements. The metric dA/dt was chosen because of rules and regulations that call out the need to measure the change in area of the plume and plume extents over time. As dA/dt approached dA/dtcritical, the CO 2 plume’s growth was both minimal and predictable. Providing operators with a quantitative approach to determining plume stabilization is important for moving carbon capture and storage (CCS) projects beyond feasibility phases of development.

01 COAL, LIGNITE, AND PEAT↗

Demonstration of Plume Stability for Carbon Storage Projects

Conference paper presented at 17th International Conference on Greenhouse Gas Control Technologies (GHGT-17), Calgary, Alberta, Canada, October 20–24, 2024. A technical approach has been developed to demonstrate CO 2 plume stabilization: 1) construct a geologic model, 2) perform numerical simulations, and 3) estimate the rate of change in circumferential area of the CO 2 plume with respect to time (dA/dt). Demonstration of the technical approach for plume stabilization is presented using a North Dakota case study.

01 COAL, LIGNITE, AND PEAT↗

Performance, Stability, and Plume Characterization of the HERMeS Thruster with Boron Nitride Silica Composite Discharge Channel

NASA's Hall Effect Rocket with Magnetic Shielding (HERMeS) 12.5kW Technology Demonstration Unit-3 (TDU-3) has been the subject of extensive technology maturation in preparation for flight system development. Detailed performance, stability, and plume characterization tests of the thruster were performed at NASA GRC's Vacuum Facility 5 (VF-5). The TDU-3 thruster implements a magnetic topology that is identical to TDU-1. The TDU-3 boron nitride silica composite discharge channel material is different than the TDU-1 heritage boron nitride discharge channel material. Performance and stability characterization of the TDU-3 thruster was performed at discharge voltages between 300V and 600V and at discharge currents between 5A and 21.8A. The thruster performance and stability were assessed for varying magnetic field strength, cathode flow fractions between 5% and 9%, varying harness inductance, and for reverse magnet polarity. Performance characterization test results indicate that the TDU-3 thruster performance is in family with the TDU-1 levels. TDU-3's thrust efficiency of 65% and specific impulse of 2,800sec at 600V and 12.5kW exceed performance levels of SOA Hall thrusters. Thruster stability regimes were characterized with respect to the thruster discharge current oscillations (discharge current peak-to-peak and root mean square magnitudes), discharge current waveform power spectral density analysis, and maps of the current-voltage-magnetic field. Stability characterization test results indicate a stability profile similar to TDU-1. Finally, comparison of the TDU-1 and TDU-3 plume profiles found that there were negligible differences in the plasma plume characteristics between the TDU with heritage boron nitride versus the boron nitride silica composite discharge channel.

ion engines↗

Launch Complex 34, SWMU CCO542022 DNAPL Source Zone Operations, Maintenance, and Monitoring, Site-Wide Long-Term Monitoring, and Hot Spot 6 Air Sparge System Annual Performance Monitoring Report Cape Canaveral Space Force Station, Florida

This Annual Performance Monitoring Report (PMR) for the Dense Non-Aqueous Phase Liquid (DNAPL) Source Zone (DSZ), Site-Wide Long-Term Monitoring (LTM), and Hot Spot (HS) 6 Air Sparge (AS) System presents the results of Year 13 operation of the hydraulic containment (HC) Interim Measure (IM), the results of performance monitoring direct-push technology (DPT) sampling and monitoring well sampling conducted in the DSZ, results of the biennial site-wide LTM event, and the results of operations and performance sampling of the HS 6 AS IM at Launch Complex 34 (LC34), located at Cape Canaveral Space Force Station (CCSFS), Florida. This site has been designated Solid Waste Management Unit (SWMU) CC054 under the Kennedy Space Center (KSC) Resource Conservation and Recovery Act (RCRA) Corrective Action Program. For the site-wide biennial LTM event, a total of 55 monitoring wells were sampled for volatile organic compounds (VOCs) in February 2023 and one well was sampled for polychlorinated biphenyls (PCBs) in December 2022. One well planned for VOC sampling was found to be destroyed and could not be sampled (CW0002). The LTM wells are screened in two lithologic zones: Layer 1 (0 to 25 feet below land surface [bls]) and Layer 2 (25 to 30 ft bls), and are located in the outlying areas of LC34 to monitor groundwater conditions within the Low-Concentration Plume (LCP), defined as concentrations exceeding Groundwater Cleanup Target Levels (GCTLs), and the High-Concentration Plume (HCP), defined as concentrations exceeding Natural Attenuation Default Concentrations (NADCs). Results from the biennial sampling event indicated overall plume stability and delineation for the plume, which extends over 300 acres. The operational period for Year 13 of the HCS was from April 1, 2022 to March 31, 2023. Operational runtime for the system was 90 percent during Year 13, with downtime events attributed to planned maintenance, system repairs, and power outages. As of March 31, 2023, a total of 313,673,241 cumulative gallons of groundwater containing 88,337 pounds of VOCs have been removed by the HCS. Influent concentrations of trichloroethene (TCE) have decreased since startup from approximately 280,000 μg/L (January 2010) to 12,000 μg/L (March 2023). During the reporting period, all effluent concentrations from the HCS (aqueous and vapor) were below regulatory reporting limits, indicating the system continues to operate as intended. Performance monitoring was conducted in December 2022 within the DSZ to evaluate TCE contamination. Groundwater samples were collected via DPT at nine locations, consistent with previous events between 2017 and 2021. Full vertical profile sampling was completed at each DPT from 8 to 98 feet bls, at 5-foot intervals. The DPT performance monitoring results are summarized in this PMR. The results revealed TCE remains at concentrations greater than 11,000 μg/L in the DSZ (1-percent solubility, indicative of DNAPL) at eight of the nine DPT locations and at depths ranging from 8 to 98 feet bls. In addition to DPT sampling, groundwater samples were collected from deep monitoring wells in the DSZ area (Layers 7 and 8) in December 2022 to verify vertical delineation. Layer 7/8 monitoring well results were non-detect in December 2022, with exception of three wells (IW0162, IW043D2, and IW044D2), where TCE, cis-1,2-dichloroethene (cDCE), and/or vinyl chloride (VC) were detected above GCTLs. These wells are screened 105 to 115 feet bls, which is below the existing recovery well capture zone. TCE was first detected in IW0162 in December 2021 and has since been sampled at least monthly to monitor TCE concentrations. The maximum TCE concentration during this operational period was 15,000 μg/L at IW0162 in March 2023. Because of the increased TCE concentrations in this well, a new recovery well (RW21D), screened 86 to 106 feet bls, was installed in January 2023 and incorporated into existing HCS operations. The HS 6 AS IM was initiated in 2018 with 160 AS wells, and expanded in 2019 with an additional 140 AS wells. Quarterly performance monitoring was reduced to semi-annual in 2020. The HS 6 AS system remained operational during the reporting period covered under this report. The results of the HS 6 system operation and semi-annual performance monitoring are summarized in this report. Semi-annual monitoring results collected in April and October 2022 show concentrations of contaminants of concern (cDCE, trans-1,2-dichloroethene, and vinyl chloride) are generally decreasing and not impacting the surface water drainage canal, indicating the HS 6 IM is meeting objectives. A Phase Two Expansion of the HS 6 AS IM was recently completed. As of the date of this report, the expansion became operational in August 2023 and the first quarter of monitoring was conducted in November 2023. Details of the construction, start-up, and performance monitoring will be included in a future Annual PMR. Overall, the tasks associated with Year 13 operation of the HC IM, operation of the HS 6 AS IM, and biennial site-wide sampling were performed in accordance with recommendations included in the previous 2021 LC34 (Year 12) annual report. Evaluation of results from the HC IM and HS 6 IM show that these systems are operating as designed and meeting performance objectives. Results from the site-wide biennial LTM program also show that the overall network of monitoring wells is adequate to continue monitoring plume-wide conditions.

Complex 34↗

Stationary and drone-assisted methane plume localization with dispersion spectroscopy

This work presents stationary and mobile retroreflector-based remote sensing techniques for methane leak localization and quantification using chirped laser dispersion spectroscopy equipped with a custom laser transceiver capable of continuous tracking of a flying drone and coupled with inverse atmospheric gas dispersion modeling. The techniques demonstrate the ability to localize leaks as low as 0.13 g CH 4 ·s -1 , which are up to 25 times smaller than those typically observed at natural gas facilities, as well as actively track a moving retroreflector mounted on a lightweight (~250 g) drone to enable spatial plume reconstruction. This system exhibited a 2.3 ppm-m sensitivity over pathlengths of 40–150 m. Source localization to within ±7 m is demonstrated using a modified horizontal radial plume mapping technique with a stationary retroreflector grid. Meanwhile, the mobile system utilizing a drone-mounted retroreflector is able to localize a controlled release within ±1 m of its source location and estimate leak rates using inversion techniques assuming type B Gaussian plume stability class within ±30% error with respect to the actual low flow rate releases.

47 OTHER INSTRUMENTATION↗

Transitioning CO2-EOR Field to Dedicated CO2 Storage: Risk Considerations and Quantifications

Presentation slides on “Transitioning CO2-EOR Field to Dedicated CO2 Storage: Risk Considerations and Quantifications” for the CCUS 2025 conference held in Houston, Texas March 3-5, 2025. CO2 injection wells for enhanced oil recovery (EOR) are currently regulated as Class II wells under the U.S. Environmental Protection Agency’s (EPA) Underground Injection Control (UIC) program, while dedicated geological CO2 storage (GCS) wells are considered Class VI wells. The UIC classification of wells for a transitioning CO2-EOR facility has the potential to substantially impact the feasibility of operations. This paper reports a case study of risk assessment of this transition, including areas review, plume stability and pressure transient and its impacts in dedicated CO2 storage.

carbon storage↗

Mechanism-Resolved PFM of Ferroionic and Ferroelectric Responses in Thickness-Gradient Hf 0.5 Zr 0.5 O 2 Libraries

Resolving growth mechanisms and thickness evolution of functional properties is one of the key tasks in materials discovery and optimization involving thin-film materials, traditionally requiring significant experimental budgets. Here we introduce the combination of thickness-gradient libraries and automated scanning probe microscopy as a systematic pathway to elucidate growth modes and disentangle ferroelectric and electrochemical contributions in ferroelectric thin films. As a model system, we explore the Hf 0.5 Zr 0.5 O 2 (HZO) gradient thin films grown on La x Sr 1-x MnO 3 (LSMO) bottom electrode thin films. Automated piezoresponse force microscopy, spectroscopy, and lithography reveals that irreversible topographic deformation arises from electrochemical activity at the LSMO surface, whereas reversible phase inversion in HZO reflects ferroelectric switching. Automated topography height-map scans are used to further quantify nucleation density, particle-size evolution, and roughness correlations across the thickness-gradient, demonstrating that improved plume stabilization during growth suppresses interfacial reactions and promotes dense, fine-grained HZO conducive to ferroelectric phase formation. This combined materials-engineering and automated-SPM framework establishes a platform for high-throughput, mechanism-resolved characterization of ferroionic and ferroelectric responses in complex oxide films.

FOS: Physical sciences↗

Impact of Facility Pressure on the Wear of the NASA HERMeS Hall Thruster

This work presents an overview and summary of the results acquired during the final segment of the TDU-3 Long Duration Wear Test, which was completed in October 2018. The overall goal of this segment was to quantify the impact of facility pressure on the wear of the Hall Effect Rocket with Magnetic Shielding Technology Demonstration Unit Three (TDU-3) Hall thruster. This was accomplished by operating TDU-3 for approximately 270 hours at the nominal 600 V/12.5 kW operating condition while a bleed or auxiliary flow of xenon propellant was injected into the vacuum facility in order to raise the operating pressure to match that of another test facility in which previous wear segments had been performed. The performance, plume, stability, and wear results acquired at this elevated pressure (11.7 µTorr) are compared with the equivalent data previously taken at the nominal operating pressure (4.2 µTorr).

Frieman, Jason D.↗

Impact of Facility Pressure on the Wear of the NASA HERMeS Hall Thruster

This work presents an overview and summary of the results acquired during the final segment of the TDU-3 Long Duration Wear Test, which was completed in October 2018. The overall goal of this segment was to quantify the impact of facility pressure on the wear of the Hall Effect Rocket with Magnetic Shielding Technology Demonstration Unit Three (TDU-3) Hall thruster. This was accomplished by operating TDU-3 for approximately 270 hours at the nominal 600 V/12.5 kW operating condition while a bleed or auxiliary flow of xenon propellant was injected into the vacuum facility in order to raise the operating pressure to match that of another test facility in which previous wear segments had been performed. The performance, plume, stability, and wear results acquired at this elevated pressure (11.7 µTorr) are compared with equivalent data taken at the nominal operating pressure (4.2 µTorr) in the same facility as well at the elevated operating pressure in the other facility. Implications of these results for acquiring facility-independent service life estimates are discussed.

Frieman, Jason D.↗

Hydrocarbon Burn Facility SWMU 007 Interim Groundwater Monitoring Report Kennedy Space Center, Florida

This Interim Groundwater Monitoring (IGWM) Report presents the findings of IGWM activities completed in November 2021 along with an October 2021 direct push technology (DPT) investigation to confirm plume stability for the Volatile Organic Compound (VOC) Area of the Hydrocarbon Burn Facility (HBF) at Kennedy Space Center (KSC), Florida. HBF has been designated as Solid Waste Management Unit 007 under the KSC Resource Conservation and Recovery Act Corrective Action Program.

Jennifer Buel↗

Plume Mitigation for Mars Terminal Landing: Soil Stabilization Project

Kennedy Space Center (KSC) has led the efforts for lunar and Martian landing site preparation, including excavation, soil stabilization, and plume damage prediction. There has been much discussion of sintering but until our team recently demonstrated it for the lunar case there was little understanding of the serious challenges. Simplistic sintering creates a crumbly, brittle, weak surface unsuitable for a rocket exhaust plume. The goal of this project is to solve those problems and make it possible to land a human class lander on Mars, making terminal landing of humans on Mars possible for the first time.

Technology Portfolio System↗

Optimization of the Magnetic Field Topology in the Hall Effect Rocket with Magnetic Shielding

NASA's Hall Effect Rocket with Magnetic Shielding (HERMeS) 12.5kW Technology Demonstration Unit-1 (TDU-1) has been the subject of extensive technology maturation in preparation for flight system development. The TDU-1 thruster implements a magnetically shielded field topology and has demonstrated the elimination of the discharge channel erosion. Extensive wear testing the TDU Hall thrusters has identified the thruster front pole covers as the next life limiting component. This effort aims to explore and investigate alternate magnetic field topologies to assess whether reductions in the front pole cover erosion can be attained while still maintaining very low erosion rates on the discharge channel walls. NASA GRC and JPL have begun a magnetic field topology characterization and optimization study by designing four candidate magnetic field topologies that reduce the effectiveness of the shielding along the discharge channel walls with the intent to also reduce the erosion rates along the pole covers. Three of the four candidate magnetic field topologies have been manufactured subjected to an extensive test campaign that includes performance, plume, and stability characterization. In Phase I of the testing campaign, the thruster's oscillation magnitude and Laser Induced fluorescence (LIF) measurements of the plasma plume were performed for the three candidate topologies. In Phase I, the thruster's oscillation magnitude and LIF measurements were performed for the three candidate topologies. Phase I test results found that the B1 configuration attained lower oscillation levels than B0. Additionally, LIF measurements along the discharge chamber centerline found that upstream retraction of the thruster's peak magnetic field does result in an upstream shift of the acceleration zone but the magnitude of the shift does not correspond one-to-one to the shift in the location of the peak radial magnetic field magnitude. Phase II test segment will include performing performance, stability, plume, and erosion measurements for the various candidate magnetic field topologies.

Kamhawi, Hani↗

Optimization of the Magnetic Field Topology in the Hall Effect Rocket with Magnetic Shielding

NASA's Hall Effect Rocket with Magnetic Shielding (HERMeS) 12.5 kilowatt Technology Demonstration Unit-1 (TDU-1) has been the subject of extensive technology maturation in preparation for flight system development. The TDU-1 thruster implements a magnetically shielded field topology and has demonstrated the elimination of the discharge channel erosion. Extensive wear testing of the TDU Hall thrusters has identified the thruster front pole covers as the next life limiting component. This effort aims to explore and investigate alternate magnetic field topologies to assess whether reductions in the front pole cover erosion can be attained while still maintaining very low erosion rates on the discharge channel walls. NASA GRC (Glenn Research Center) and JPL (Jet Propulsion Laboratory) have begun a magnetic field topology characterization and optimization study by designing four candidate magnetic field topologies that reduce the effectiveness of the shielding along the discharge channel walls with the intent to also reduce the erosion rates along the pole covers. Three of the four candidate magnetic field topologies have been manufactured subjected to an extensive test campaign that includes performance, plume, and stability characterization. In the Phase I test segment, the thruster's oscillation magnitude and laser-induced fluorescence (LIF) measurements of the plasma plume were performed for the three candidate topologies. In Phase I, the thruster's oscillation magnitude and LIF measurements were performed for the three candidate topologies. Phase I test results found that the B1 configuration attained lower oscillation levels than the baseline topology (B0). Additionally, laser induced fluorescence measurements along the discharge chamber centerline found that upstream retraction of the thruster’s peak magnetic field does result in an upstream shift of the acceleration zone but the magnitude of the shift does not correspond one-to-one to the shift in the location of the peak radial magnetic field magnitude. Phase II test segment will include performing performance, stability, plume, and erosion measurements for the various candidate magnetic field topologies..

Kamhawi, Hani↗

Preliminary Analysis of the Effect of Flow Separation Due to Rocket Jet Pluming on Aircraft Dynamic Stability During Atmospheric Exit

A theoretical investigation was conducted to determine the effects of body boundary-layer separation resulting from a highly underexpanded jet on the dynamic stability of a typical rocket aircraft during an atmospheric exit trajectory. The particular flight condition studied on a digital computer for five degrees of freedom was at Mach 6.0 and 150,000 feet. In view of the unknown character of the separated flow field, two estimates of the pressures in the separated region were made to calculate the unbalanced forces and moments. These estimates, based on limited fundamental zero-angle-of-attack studies and observations, are believed to cover what may be the actual case. In addition to a fixed control case, two simulated pilot control inputs were studied: rate-limited and instantaneous responses. The resulting-motions with and without boundary-layer separation were compared for various initial conditions. The lower of the assumed misalinement forces and moments led to a situation whereby a slowly damped motion could be satisfactorily controlled with rate-limited control input. The higher assumption led to larger amplitude, divergent motions when the same control rates were used. These motions were damped only when the instantaneous control responses were assumed.

Dryer, Murray↗