Packaging Plan for Mark-18A Plutonium Oxide

Mark-18A (Mk-18A) targets were irradiated at the Savannah River Site and have been in wet storage at the site since the 1970s. The Mk-18A Target Material Recovery Program has been established to recover the 244 Pu and heavy curium (≥50% 246 Cm and 248 Cm) in the targets at the Savannah River National Laboratory (SRNL) and ship the materials to Oak Ridge National Laboratory’s (ORNL’s) Radiochemical Engineering Development Center for programmatic use. Two products will be recovered from the Mk- 18A targets for shipment from SRNL to ORNL: a plutonium oxide stream and an oxide material that will contain the americium, curium, and lanthanides. This document presents the plan for packaging of the plutonium oxide material for shipment and storage at ORNL.

98 NUCLEAR DISARMAMENT, SAFEGUARDS, AND PHYSICAL P↗

NEAMS Software Licensing, Release, and Distribution: Implications for FY2013 Work Package Planning

The vision of the NEAMS program is to bring truly predictive modeling and simulation (M&S) capabilities to the nuclear engineering community in order to enable a new approach to the analysis of nuclear systems. NEAMS anticipates issuing in FY 2018 a full release of its computational 'Fermi Toolkit' aimed at advanced reactor and fuel cycles. The NEAMS toolkit involves extensive software development activities, some of which have already been underway for several years, however, the Advanced Modeling and Simulation Office (AMSO), which sponsors the NEAMS program, has not yet issued any official guidance regarding software licensing, release, and distribution policies. This motivated an FY12 task in the Capability Transfer work package to develop and recommend an appropriate set of policies. The current preliminary report is intended to provide awareness of issues with implications for work package planning for FY13. We anticipate a small amount of effort associated with putting into place formal licenses and contributor agreements for NEAMS software which doesn't already have them. We do not anticipate any additional effort or costs associated with software release procedures or schedules beyond those dictated by the quality expectations for the software. The largest potential costs we anticipate would be associated with the setup and maintenance of shared code repositories for development and early access to NEAMS software products. We also anticipate an opportunity, with modest associated costs, to work with the Radiation Safety Information Computational Center (RSICC) to clarify export control assessment policies for software under development.

21 SPECIFIC NUCLEAR REACTORS AND ASSOCIATED PLANTS↗

RH-72B Packaging Plan Slides for University of Washington [Slides]

This report describes the Shipping Package RH-72B, specially in terms of why this container should be used, its features, how it will be utilized for the shipment of radiation and radioactive material from the University of Washington, and the placement of the 72B for loading.

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Generative large language models for predictive maintenance planning

Maintenance planning and the generation of necessary components for tasks can prove time-consuming and complex. Automating the creation of recurring or similar tasks by leveraging previous planning packages and data, while uncovering insights to automate planning package generation, presents an opportunity to conserve valuable time and resources. This work aims to harness the textual and probabilistic capabilities of large language models (LLMs) to automate the generation of planning packages. Utilizing diverse data sources ranging from raw data to handwritten text, both singular and collaborative LLMs are trained and tested. Results demonstrate their capability to generate essential planning package components, effectively replicating the statistical patterns in the data. This demonstrates the use of these tools inside a digital asset for automated planning. This work outlines a methodology for constructing datasets, a training suite, and evaluation methods for LLM-based textual and conversational planning tools utilized in an asset digital twin. Results indicate that the fine-tuned models generate estimated planning information within the statistical ranges observed in real maintenance data. The models achieve high accuracy (>90%) in document question-answering and instruction generation tasks. Furthermore, the conversational retrieval-augmented generation (RAG) assistant system achieves 100% document retrieval accuracy, while conversational information capture exceeds 98% across the majority of work-package assistant modules.

97 MATHEMATICS AND COMPUTING↗

Development and use of the computer software package for planning the 12 GHz broadcasting-satellite service at RARC '83

The 1983 Regional Administrative Radio Conference (RARC '83) had mainly the objective to draw up a plan of detailed frequency assignments and orbital positions for the 12 GHz broadcasting-satellite service (BSS) in ITU Region 2 (the Western Hemisphere) and associated feeder links (earth-to-space) in the 17 GHz band. It was found that for RARC '83 new planning methods and procedures would be needed. The new requirements made it necessary to develop a new generation of planning software. Attention is given to the development of the computer programs to be used at the conference, the package of computer programs, and the use of the computer programs.

Bowen, R. R.↗

Prairie Island Nuclear Station Spent Filter Processing for Direct Disposal - 12333

This paper will discuss WMG's filter processing experience within the commercial nuclear power industry, specifically recent experience processing high activity spent filters generated by Xcel Energy's Prairie Island Nuclear Station (Prairie Island), located in Welch, MN. WMG processed for disposal eighty-four 55-gallon drums filled with varying types of high activity spent filters. The scope of work involved characterization, packaging plan development, transport to the WMG's Off-Site Processing location, shredding the filter contents of each drum, cement solidifying the shredded filter material, and finally shipping the solidified container of shredded filter material to Clive, Utah where the container was presented to EnergySolutions Disposal site for disposal in their Containerised Waste Facility. This sequence of events presented in this paper took place a total of nine (9) times over a period of four weeks. All 1294 filters were successfully solidified into nine (9) -WMG 142 steel liners, and each was successfully disposed of as Class A Waste at EnergySolutions Disposal Site in Clive, Utah. Prairie Island's waste material was unique in that all its filters were packaged in 55-gallon drums; and since the station packaged its filters in drums it was much easier to develop packaging plans for such a large volume of legacy filters. For this author, having over 20-years of waste management experiences, storing and shipping waste material in 55-gallon drums is not immediately thought of as a highly efficient method of managing its waste material. However, Prairie Island's use of 55-gallon drums to store and package its filters provided a significant advantage. Drums could be mixed and matched to provide the most efficient processing method while still meeting the Waste Class A limits required for disposal. (author)

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

SATCOP mission planning software package

As the CDSLR Network grows into the 1990's, it is undergoing many changes in both its capabilities and requirements. On the one hand, great progress has been made in terms of increasing the SLR systems' performance. Upgrades to the onsite computer and improved laser ranging hardware have greatly increased the number of satellite passes which can be acquired during an operating shift by reducing the amount of time needed for operations other than actual ranging. On the other hand, more requirements have been placed on the systems. Many more satellites have become available, with more scheduled for launch, thus, increasing the likelihood of simultaneous satellite visibility. In addition, the possible scenarios required for ranging these many satellites are changing frequently, with conflicting priorities and needs. It became apparent that some tools needed to be developed to assist the planners in determining Network ranging priorities. Such tools have been developed at Bendix under the direction of NASA's Dynamics of the Solid Earth Project (DOSE) for both long range planning and routine operations to maximize the amount of data collected. This paper reviews some of these tools and describe their uses.

Bucey, Steve↗

Importance of Upfront Preparatory Works for Vessel Internals Segmentation Projects - 16096

For more than thirty years, Westinghouse has been involved in reactor internals segmentation activities in the U.S. and Europe. Westinghouse completed in 2015 the segmentation of the reactor vessel and reactor vessel internals at the Jose Cabrera nuclear power plant in Spain and a similar project is on-going at Chooz A in France. Four more major reactor internals segmentation projects have been recently awarded in Sweden (Barsebaeck 1-2) and in Germany. (Philippsburg 1 and Neckarwestheim 1). For all reactor dismantling projects, it is essential that all activities are thoroughly planned and discussed upfront together with the customer. Detailed planning is crucial for achieving a successful project. One key activity in the preparation phase is the 'Segmentation and Packaging Plan' that documents the sequential steps required to segment, separate, and package each individual component, based on an activation analysis and component characterization study. Detailed procedures and specialized rigging equipment have to be developed to provide safeguards for preventing certain identified risks. The preparatory work can include some plant civil structure modifications for making the segmentation work easier and safer. Some original plant equipment is sometimes not suitable enough and need to be replaced. Before going to the site, testing and qualification are performed on full scale mock-ups in a specially designed pool for segmentation purposes. The mockup testing is an important step in order to verify the function of the equipment and minimize risk on site. This paper is describing the typical activities needed for preparing the reactor internals segmentation activities using under water mechanical cutting techniques. It will provide experiences and lessons learned that Westinghouse has collected from its recent projects and that will be applied for the new awarded projects. (authors)

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Chooz A, First Pressurized Water Reactor to be Dismantled in France - 13445

Nine commercial nuclear power plants have been permanently shut down in France to date, of which the Chooz A plant underwent an extensive decommissioning and dismantling program. Chooz Nuclear Power Station is located in the municipality of Chooz, Ardennes region, in the northeast part of France. Chooz B1 and B2 are 1,500 megawatt electric (MWe) pressurized water reactors (PWRs) currently in operation. Chooz A, a 305 MWe PWR implanted in two caves within a hill, began operations in 1967 and closed in 1991, and will now become the first PWR in France to be fully dismantled. EDF CIDEN (Engineering Center for Dismantling and Environment) has awarded Westinghouse a contract for the dismantling of its Chooz A reactor vessel (RV). The project began in January 2010. Westinghouse is leading the project in a consortium with Nuvia France. The project scope includes overall project management, conditioning of the reactor vessel (RV) head, RV and RV internals segmentation, reactor nozzle cutting for lifting the RV out of the pit and seal it afterwards, dismantling of the RV thermal insulation, ALARA (As Low As Reasonably Achievable) forecast to ensure acceptable doses for the personnel, complementary vacuum cleaner to catch the chips during the segmentation work, needs and facilities, waste characterization and packaging, civil work modifications, licensing documentation. The RV and RV internals will be segmented based on the mechanical cutting technology that Westinghouse applied successfully for more than 13 years. The segmentation activities cover the cutting and packaging plan, tooling design and qualification, personnel training and site implementation. Since Chooz A is located inside two caves, the project will involve waste transportation from the reactor cave through long galleries to the waste buffer area. The project will end after the entire dismantling work is completed, and the waste storage is outside the caves and ready to be shipped either to the ANDRA (French National Radioactive Waste Management Agency) waste disposal facilities - (for low-level waste [LLW] and very low-level waste [VLLW], which are considered short lived) - or to the EDF Interim Storage Facility planned to be built on another site - (for low- and intermediate-level waste [LILW], which is considered long lived). The project has started with a detailed conceptual study that determines the step-by-step approach for dismantling the reactor and eventually supplying the packed containers ready for final disposal. All technical reports must be verified and approved by EDF and the French Nuclear Safety Authority before receiving the authorization to start the site work. The detailed conceptual study has been completed to date and equipment design and manufacturing is ongoing. This paper will present the conceptual design of the reactor internals segmentation and packaging process that will be implemented at Chooz A, including the planning, methodology, equipment, waste management, and packaging strategy. (authors)

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

DROP TESTS RESULTS OF REVISED CLOSURE BOLT CONFIGURATION OF THE STANDARD WASTE BOX, STANDARD LARGE BOX 2, AND TEN DRUM OVERPACK PACKAGINGS

The Transuranic (TRU) Disposition Project at Savannah River Site will require numerous transfers of radioactive materials within the site boundaries for sorting and repackaging. The three DOT Type A shipping packagings planned for this work have numerous bolts for securing the lids to the body of the packagings. In an effort to reduce operator time to open and close the packages during onsite transfers, thus reducing personnel exposure and costs, an evaluation was performed to analyze the effects of reducing the number of bolts required to secure the lid to the packaging body. The evaluation showed the reduction to one-third of the original number of bolts had no effect on the packagings capability to sustain vibratory loads, shipping loads, internal pressure loads, and the loads resulting from a 4-ft drop. However, the loads caused by the 4-ft drop are difficult to estimate and the study recommended each of the packages be dropped to show the actual effects on the package closure. Even with reduced bolting, the packagings were still required to meet the 49 CFR 178.350 performance criteria for Type A packaging. This paper discusses the effects and results of the drop testing of the three packagings.

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Annual Transuranic Waste Inventory Report – 2015 (Data Cutoff Date 12/31/2014)

The purpose of this Annual Transuranic Waste Inventory Report – 2015 (ATWIR-2015) is to document the updated inventory estimate of transuranic (TRU) waste reported by the TRU waste generator sites as of December 31, 2014. This updated inventory information is provided to the U.S. Department of Energy (DOE) Carlsbad Field Office (CBFO) and is available to the DOE TRU waste complex, Waste Isolation Pilot Plant (WIPP) stakeholders, and regulators. The TRU waste inventory information is used for strategic planning, supports DOE/CBFO’s input into documents (e.g., WIPP Documented Safety Analysis and National Environmental Policy Act analyses), the development of new containers or shipping packages, planned change requests, and other design changes that may take place in the repository. Furthermore, if requested by DOE/CBFO, this report will provide the basis for the Performance Assessment Inventory Report for performance assessment modeling. This report focuses on the TRU waste stored or projected to be generated (up through calendar year [CY] 2033) at the TRU waste generator sites.

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Region Three Aerial Measurement System Flight Planning Tool - 12006

The Region 3 Aerial Measurement System Flight Planning Tool is used by the National Nuclear Security Agency (NNSA), United States Department of Energy, Radiological Assistance Program, Region 3, to respond to emergency radiological situations. The tool automates the flight planning package process while decreasing Aerial Measuring System response times and decreases the potential for human error. Deployment of the Region Three Aerial Measurement System Flight Planning Tool has resulted in an immediate improvement to the flight planning process in that time required for mission planning has been reduced from 1.5 hours to 15 minutes. Anecdotally, the RAP team reports that the rate of usable data acquired during surveys has improved from 40-60 percent to over 90 percent since they began using the tool. Though the primary product of the flight planning tool is a pdf format document for use by the aircraft flight crew, the RAP team has begun carrying their laptop computer on the aircraft during missions. By connecting a Global Positioning System (GPS) device to the laptop and using ESRI ArcMap's GPS tool bar to overlay the aircraft position directly on the flight plan in real time, the RAP team can evaluate and correct the aircraft position as the mission is executed. (authors)

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Annual Transuranic Waste Inventory Report – 2016 (Data Cutoff Date 12/31/2015)

The purpose of this Annual Transuranic Waste Inventory Report – 2016 (ATWIR-2016), using a cutoff date of December 31, 2015, is to document the updated inventory estimate of transuranic (TRU) waste reported by the TRU waste generator sites in the Annual Transuranic Waste Inventory Report – 2015 (ATWIR-2015) (DOE 2015a) that had a cutoff date of December 31, 2014. This updated inventory information is provided to the U.S. Department of Energy (DOE) Carlsbad Field Office (CBFO) and is available to the DOE TRU waste complex, Waste Isolation Pilot Plant (WIPP) stakeholders, and regulators. The TRU waste inventory information is used for strategic planning, and supports DOE/CBFO’s input into documents (e.g., WIPP Documented Safety Analysis and National Environmental Policy Act analyses), the development of new containers or shipping packages, planned change requests, and other design changes that may take place in the repository. Furthermore, if requested by DOE/CBFO, this report will provide the basis for the Performance Assessment Inventory Report for performance assessment (PA) modeling. This report focuses on the TRU waste stored or projected to be generated (up through calendar year [CY] 2050) at the TRU waste generator sites.

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Fuel Cycle Research & Development: Technical Monthly – June 2012

Topics are: (1) MPACT Campaign - (a) Management and Integration • Coordination meetings between NE and NA-22, NA-24, and NA-82 were conducted the week of June 11th. Preparations are being made for the next MPACT working group meeting, scheduled for Aug 28-30 at Idaho Falls. In addition to covering accomplishments and discussing future plans, a site tour of INL facilities (MFC, EBR, ATR, INTEC) is being organized. (2) Accounting and Control Technologies - (a) Microcalorimetry • Now operating 256-pixel array at LANL. We are in the process of tuning detector parameters to improve and optimize performance. Preliminary measurements show approximate number of live pixels is similar to that observed previously at NIST. Continuing to study contribution to systematic error from uncertainties in tabulated gamma-ray energies. (b) Electrochemical Sensor • Testing of sensors fashioned from different precursor materials continued. SEM analysis of all used sensors has been or will be performed. (c) Lead Slowing Down Spectrometer • Ongoing perturbation calculations are providing information on the fundamental systematic error limits of LSDS. In order to achieve separating the contribution of Pu and 235U to the signal, there will need to be tight controls on systematic errors. Continuing to look into a He4 detector. Research into local construction of a He4 detector continued. We have started to apply the algorithm to test the LSDS using experimental data from previous RPI measurements. PNNL also developed a plan to address the lack of statistics in the MCNP modeling of the NGSI 64 assemblies. The ISU graduate student built and tested a fission chamber to gain experience with them. (d) Fast Neutron Imaging to Quantify Nuclear Materials • The imaging detector design was modified for each pixel to have an 8 x 8 pixel array. Quotations and purchasing process for components, including the new PSD scintillator are in progress. (e) Fast Neutron Multiplicity Analysis • The team submitted two papers to the upcoming INMM meeting that are related to the fast neutron multiplicity R&D effort. Progress was made on the project's main goal of designing a concept for a prototype fast-neutron multiplicity counter. We started laying out the outline for the final report. We have been working with our ORNL collaborators to develop a new digitizer system to support our experimental campaign planned for next year. (3) MPACT Analysis Tools - (a) Multi-isotope Process Monitor • Fuel characterization framework development continued during June. A report describing the methodologies is being completed. Kenneth Dayman, from University of Texas, spent a week at PNNL wrapping up his master's research and working on a journal submission covering that work. The target journal is the IEEE transactions on Nuclear Science; submission is planned for the end of July. A proposal to instrument H-Canyon is being prepared in conjunction with SRNL and the NNSA's NGSI program. The impact of gamma-ray spectrum counting statistics on the precision of relative radioisotope component intensities as reconstructed via Principal Component Regression (PCR) continued in June with Monte Carlo simulations of a two-component (i.e., two radioisotope) system. This work generalizes earlier studies in FY12 in which Poisson counting variations of only a single spectrum component were simulated. (b) Modeling and Simulation for Analysis of Safeguards Performance (Electrochemical) • Preliminary insights into safeguards challenges and the initial design for an electrochemical plant have been written up into an INMM paper and will be presented at the INMM Summer Meeting. Work is currently adding a new visualization capability for integrating materials accountancy with physical protection. (c) Material Control including Process Monitoring (Pattern Recognition, Sensors) • Fabrication of quartz chips continued at an external foundry. Awaiting delivery of the heat exchange manifold and chip holder. (d) MPACT System Integration and Technical Support • The initial report on cost-basis metrics for nuclear material security risk and proliferation risk was completed as scheduled. (4) Safeguards and Security by Design - (a) Used fuels storage security analysis, guidance and best practices • RFP was finalized and sent out. Awaiting response from World Institute for Nuclear Security. Coordinated with Scott Demuth on joint report • LANL milestone on best practices. Attended Nuclear Energy Institute National Nuclear Security Conference. Developed plan for soliciting input on prioritized issues for used fuel storage security. Worked on setting up a meeting with the Nuclear Regulatory Commission. Worked on FY2013 work package planning.

11 NUCLEAR FUEL CYCLE AND FUEL MATERIALS↗

Fuel Cycle Research & Development Technical Monthly – May 2012

Management and Integration LANL - Initial coordination meetings with NE and NA-20 were held the first week of May. Additional meetings, to include NA-82 and the new Proliferation and Terrorism Risk Assessment task are scheduled for June. Work package planning as part of the NTD transition is ongoing. Microcalorimetry LANL - Some parts to attempt repair of a malfunctioning water chiller that has been holding up work on the current detector array have arrived. We will attempt to begin running the compressor/cryostat next week to resume work on commissioning the detector array. We have also been working on a backup plan to temporarily move our system to a different lab space. Completed data analysis and prepared a paper summarizing Pu measurements for peer-review journal. Two members of our team presented work at the SORMA West 2012 conference. Completed data analysis and prepared a milestone report summarizing the development of Monte Carlo tools to study systematic errors. Electrochemical Sensor INL - The second sensor test was stopped short due to the work stand-down. Some activities related to this work have resumed, but not all. The sensor used during the second test was removed from the furnace and it showed cracks and later crumbled when being rinsed for sample preparation. The sensor material will be submitted to SEM analysis once work is resumed in the facilities where analysis is performed. A third sensor test has started. Tests with different arrangements will continue and will be oriented based on post-test analysis of the first three sensor tests. Materials with different annealing temperatures will also be prepared for analysis. Lead slowing down spectrometer LANL - Continued work on perturbation method for LSDS analysis. We are running simulations to delineate issues and are checking additional data libraries to see whether there are differences in simulation results. Electrochemical sensor INL - The second sensor test was stopped short due to the work stand-down. Some activities related to this work have resumed, but not all. The sensor used during the second test was removed from the furnace and it showed cracks and later crumbled when being rinsed for sample preparation. The sensor material will be submitted to SEM analysis once work is resumed in the facilities where analysis is performed. A third sensor test has started. Tests with different arrangements will continue and will be oriented based on post-test analysis of the first three sensor tests. Materials with different annealing temperatures will also be prepared for analysis. Fast Neutron Multiplicity analysis INL - The University of Michigan team continues its work on the post-experiment analysis of the validation data from JRC ISPRA, as well as scoping studies using the simulation tool MCNPX-PoliMi. At INL, our new staff member working on this project is now working to model performance capabilities for the fast-neutrons scintillator design concepts. At INL our primary analysis approach is focused on the Feynman mean-to-variance approach. At the University of Michigan, the primary analysis approach is multiplicity coincidence analysis. Fast Neutron Imaging to Quantify Nuclear Materials ORNL - Completed additional measurements of the two 'trainer' configurations as well as calibration measurements with sources on an x-y stage. The imager was shipped to Pantex for an NA-22 obligation at the end of May. Lead Slowing Down Spectrometer LANL - Continued to look into He4 detector. A Swiss company was located that makes He4 detectors and associated electronics. Had a teleconference with them to assess the possible help we can get from them. We are also looking in to constructing one locally. Ongoing perturbation calculations are providing information on the fundamental systematic error limits of LSDS. In order to achieve separating the contribution of Pu and 235U to the signal, there will need to be tight controls on systematic errors. Multi-isotope Process Monitor PNNL - Attended a training call in advanced multivariate classification and analysis methods. These methods were applied to the multivariate analysis of fuel characteristics based on simulated gamma. Work continued on a computational framework to quantify the impact of gamma-ray counting statistical precision on principal component regression (PCR) analysis of a multi-component (i.e. multi-isotope) gammaray spectrum. Tests of the simulation framework are anticipated to begin in early June. Development of a proposal to instrument H-Canyon is being prepared in conjunction with SRNL and the NNSA's NGSI program is ongoing.

11 NUCLEAR FUEL CYCLE AND FUEL MATERIALS↗