Oscillation Damping: A Comparison of Wind and Photovoltaic Power Plant Capabilities
Explore the source record for details and available documents.
SEARCH · Engineering Papers
Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.
Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.
Explore the source record for details and available documents.
A distributed photovoltaic (PV) power plant includes a plurality of distributed dc-dc converters. The dc-dc converters are configured to switch in coordination with one another such that at least one dc-dc converter transfers power to a common dc-bus based upon the total system power available from one or more corresponding strings of PV modules. Due to the coordinated switching of the dc-dc converters, each dc-dc converter transferring power to the common dc-bus continues to operate within its optimal efficiency range as well as to optimize the maximum power point tracking in order to increase the energy yield of the PV power plant.
Abstract not provided.
A system and method of using one or more DC-DC/DC-AC converters and/or alternative devices allows strings of multiple module technologies to coexist within the same PV power plant. A computing (optimization) framework estimates the percentage allocation of PV power plant capacity to selected PV module technologies. The framework and its supporting components considers irradiation, temperature, spectral profiles, cost and other practical constraints to achieve the lowest levelized cost of electricity, maximum output and minimum system cost. The system and method can function using any device enabling distributed maximum power point tracking at the module, string or combiner level.
The DC wiring system for a photovoltaic power plant presents a number of unique challenges to be overcome by the plant designers. There are a number of different configurations that the grounding of the DC wiring system can take, and the choice will affect the number and type of protective devices required to ensure safety of personnel and protection of equipment. The major grounding and fault protection considerations that must be taken into account when selecting the basic overall circuit configuration are summarized. The inherent advantages and disadvantages of each type of circuit grounding (resistance or solid) along with the personnel safety and equipment protection issues for each of these grounding methods are presented.
The paper considers the influence of the insolation level on the electric power quality indicators and efficiency of a grid-tie inverter operating as part of a grid-connected photovoltaic power plant. Over the course of a year, data were recorded for Moscow on incoming solar radiation and the grid-tie inverter input and output capacity provided by a 1 kW grid-connected photovoltaic power plant. The insolation threshold values for a Solar River 1100 TL inverter are experimentally established, corresponding to both the beginning and end of stable inverter operation, as well as the required phase angle value for the electric energy supplied to the grid.
This study presents a photovoltaic (PV) inverter architecture composed of stackable dc to three-phase ac converter blocks. Several such blocks, each containing a converter power stage and controls, are connected in series on their ac sides to obtain transformerless medium-voltage ac interfaces for PV power plants. The series-connected structure is made possible by a quadruple active bridge dc-dc converter that provides isolation between the PV input and each of the three ac-side phases within each block. Furthermore, since incoming PV power is transferred as constant balanced three-phase ac power, instantaneous inputoutput power balance bypasses the need for bulk energy storage. To streamline implementation and maximize system scalability and resilience, decentralized block-level controllers accomplish dc-link voltage regulation, maximum power point tracking, and ac-side power sharing without centralized means. The proposed architecture is validated by simulations of a PV string to mediumvoltage ac system consisting of six blocks and on a proof-of-concept hardware prototype that consists of three cascaded converter blocks.
There is a growing need to build energy infrastructure at massive scale on both Earth and in space. On Earth, increasing electricity demand from applications such as AI data centers is driving rapid expansion of power systems, while in space, long-duration missions such as lunar operations require reliable and resilient energy infrastructure that can be deployed quickly. These needs outpace the capabilities of conventional construction methods. Robotic construction offers a path to faster, lower-cost, and more consistent deployment, yet most existing approaches focus on automating individual tasks rather than end-to-end assembly. The Industrialized Construction Innovation (ICI) team at the National Laboratory of the Rockies (NLR), in collaboration with the Colorado School of Mines, has been investigating robotics and automation strategies for rapid end-to-end energy infrastructure construction. This paper presents a pilot study demonstrating level 3-4 semi-autonomous, end-to-end robotic assembly of a reduced-scale photovoltaic power plant prototype under terrestrial conditions. The approach combines hardware redesign of photovoltaic components for robotic compatibility, discrete-event and physics-based robotic simulations in synthetic environments, and sim-to-real deployment to execute end-to-end robotic assembly of[NM1.1][NM1.2] tracking components, structural members, photovoltaic modules, and embedded electrical connections. The pilot identifies key limitations like tolerance management, perception and localization, end effector capability, fastening methods, and multi-physics simulation fidelity, that must be addressed to enable end-to-end robotic assembly of full-scale energy infrastructure. The study highlights how these insights inform scaling strategies for terrestrial energy infrastructure and adaptation to unstructured and extreme environments, including off-world scenarios such as robotic assembly of vertical tall lunar towers.
This paper applies a robust technique for determining the available power from a curtailed utility-scale photovoltaic (PV) power plant. The proposed technique does not require deploying any additional equipment or sensors and is based only on the addition of new control logic to the existing power plant controller. Also, the proposed method is universally applicable to PV plants with any type of smart inverters and PV modules. Accurate determination of available power is important for using curtailed PV generation as a resource for various types of active power controls, such as spinning reserves and primary and secondary frequency control. For PV plants to be able to maintain the desired regulation range, the plant controller must be able to estimate the available aggregate peak power that all the plant's inverters can produce at any point in time and ensure that the control error stays within the tolerance band at all times. In this paper, we explore a highly accurate control method that uses dedicated inverters within the plant as reference units and evaluates the available aggregate peak power for the whole plant under different cloud variability conditions.
The California Independent System Operator (CAISO), First Solar, and the National Renewable Energy Laboratory (NREL) conducted a demonstration project on a large utility-scale photovoltaic (PV) power plant in California to test its ability to provide essential ancillary services to the electric grid. With increasing shares of solar- and wind-generated energy on the electric grid, traditional generation resources equipped with automatic governor control (AGC) and automatic voltage regulation controls -- specifically, fossil thermal -- are being displaced. The deployment of utility-scale, grid-friendly PV power plants that incorporate advanced capabilities to support grid stability and reliability is essential for the large-scale integration of PV generation into the electric power grid, among other technical requirements. A typical PV power plant consists of multiple power electronic inverters and can contribute to grid stability and reliability through sophisticated 'grid-friendly' controls. In this way, PV power plants can be used to mitigate the impact of variability on the grid, a role typically reserved for conventional generators. In August 2016, testing was completed on First Solar's 300-MW PV power plant, and a large amount of test data was produced and analyzed that demonstrates the ability of PV power plants to use grid-friendly controls to provide essential reliability services. These data showed how the development of advanced power controls can enable PV to become a provider of a wide range of grid services, including spinning reserves, load following, voltage support, ramping, frequency response, variability smoothing, and frequency regulation to power quality. Specifically, the tests conducted included various forms of active power control such as AGC and frequency regulation; droop response; and reactive power, voltage, and power factor controls. This project demonstrated that advanced power electronics and solar generation can be controlled to contribute to system-wide reliability. It was shown that the First Solar plant can provide essential reliability services related to different forms of active and reactive power controls, including plant participation in AGC, primary frequency control, ramp rate control, and voltage regulation. For AGC participation in particular, by comparing the PV plant testing results to the typical performance of individual conventional technologies, we showed that regulation accuracy by the PV plant is 24-30 points better than fast gas turbine technologies. The plant's ability to provide volt-ampere reactive control during periods of extremely low power generation was demonstrated as well. The project team developed a pioneering demonstration concept and test plan to show how various types of active and reactive power controls can leverage PV generation's value from being a simple variable energy resource to a resource that provides a wide range of ancillary services. With this project's approach to a holistic demonstration on an actual, large, utility-scale, operational PV power plant and dissemination of the obtained results, the team sought to close some gaps in perspectives that exist among various stakeholders in California and nationwide by providing real test data.
Oscillations with very low frequency at 0.1 Hz, have been observed in voltage and var in practical solar photovoltaic (PV) systems when power exporting ramps up to a certain level. Here, this letter provides an explanation on the formation of 0.1-Hz oscillations and identifies three critical factors that lead to the oscillations: communication delay between the plant-level control and the inverter-level control, high volt/var sensitivity at a high power exporting level, and the volt-var feedback system consisting of the plant control, inverter control and the grid impact. Furthermore, a critical feature of the 0.1-Hz oscillation is also explained: why oscillations appear only in voltage and var, but not in real power.
Photovoltaic (PV) systems are essential for the transition to sustainable energy, reducing fossil fuel dependence and mitigating climate change. Although PV requires minimal land area — PV can meet the European Union's energy needs using only 0.26% of its land — space for deployment is often scarce in densely populated regions. Floating photovoltaics (FPV) offer an effective solution to land-use challenges by installing PV systems on floating structures in water bodies. FPV is a growing niche within PV with a cumulative installed capacity reaching 7.7 GW globally by 2023. Almost 90% of the installed FPV capacity is in Asia, with close to 50% of in China alone, while the Netherlands and France are the largest markets outside Asia. FPV shows strong potential to support climate targets, but still faces challenges like regulatory barriers, cost competitiveness compared to ground-based PV (GPV), and uncertainties about environmental impacts and system reliability. FPV systems are currently installed mainly on sheltered inland waters, such as quarry lakes, irrigation ponds and reservoirs. FPV technical standards are still being developed. Guidelines have been published by the World Bank, DNV, and Solar Power Europe, and emerging national standards from South Korea, China, and Singapore address design, components, and safety. The International Electrotechnical Commission (IEC) is working on formal standards for floats, mooring systems, and electrical connectors. However, the published best practices lack quantitative guidance for yield modelling and reliability, which this report aims to address. It provides data-driven insights, models, and parameters essential for accurate energy yield, reliability, and maintenance predictions over FPV systems' lifetimes.
The island of Lanai is currently one of the highest penetration PV micro grids in the world, with the 1.2 MWAC La Ola Solar Farm operating on a grid with a peak net load of 4.7 MW. This facility interconnects to one of Lanai's three 12.47 kV distribution circuits. An initial interconnection requirements study (IRS) determined that several control and performance features are necessary to ensure safe and reliable operation of the island grid. These include power curtailment, power factor control, over/under voltage and frequency ride through, and power ramp rate limiting. While deemed necessary for stable grid operation, many of these features contradict the current IEEE 1547 interconnection requirements governing distributed generators. These controls have been successfully implemented, tested, and operated since January 2009. Currently, the system is producing power in a curtailed mode according to the requirements of a power purchase agreement (PPA).
Explore the source record for details and available documents.
The rapidly increasing distributed energy resources (DERs) in power systems are now getting interconnected to set community grid structures, where power quality will be a major concern. The grid-to-grid (G2G) bidirectional power transfer among the distribution microgrid will not be considered commercially feasible unless the upstream harmonics are under the limits. The aggregation of such harmonics, measured as total harmonic distortion (THD), is feared to be beyond tolerable limits with the progression of rooftop grid-tied PV-like installations. Hence, this THD needs to be characterized with DER generation end variables. In this work, the photovoltaic (PV) DERs’ dependency on environment variables such as irradiance was profiled in the context of generating and injecting harmonics into the grid. A mathematical model of a grid-tied three-phase PV DER was developed as part of this correlation characterization, matching the fundamental unit structure of a 1.4 MW solar canopy located on the Florida International University (FIU) Miami campus. To determine the qualitative association with produced THD patterns, the model was evaluated with various irradiance settings. A real-time digital simulation (RTDS) platform was used to verify it. Following this confirmation, sets of data from power quality meters at the point of common coupling and FIU field sensors were utilized to validate further the correlation model. The results showed that the grid current’s THD exhibited a high correlation with the irradiance profile and its variation over time. The early morning and late afternoon periods of the day, associated with a low irradiance, constantly had higher harmonics generated from the PV DER. The midday THD was rather rational with partial shadings, hence a geolocation-dependent factor. These findings were verified by an RTDS and validated by real field data. In quantifying the THD injected by a single DER at a high-frequency (2–150 kHz) supraharmonics (SH) level, a 3% peak increment in magnitude was observed from the high-fixed to the low-fixed irradiance profile. The correlation characteristics depicted that the hybrid microgrid suffered from a daytime-dependent harmonic insertion from the grid-tied DER. This is a global problem unless specific measures are taken to mitigate the harmonics. The electrically notorious higher-frequency SH was found to increase proportionally. The G2G power transfer can be limited because of the higher THD in the early morning and late afternoon, which will also worsen because the numbers of grid-tied PV DERs (i.e., rooftop solar and industrial solar) are likely to increase rapidly soon. The community grid structure can thus have a controlled harmonics filtration setup purposefully designed to address the findings of this work, which also fall within the scope of our future research.
Not Available
The world's oldest, and still functional, Concentrator Photovoltaic (CPV) power plant originally rated at 350 kW, and is situated 50 km from Riyadh, Saudi Arabia. There are ongoing efforts to retrofit the modules with new secondary optics and triple-junction cell devices. The paper characterizes the initial optical train, whose design is non-conventional in its use of a two-area primary Fresnel lens. The first generation of a retrofit receiver package is described. Challenges beyond the optical design are encountered, including tracking and structural mechanics.