Midwestern Regional Carbon Sequestration Partnership (MRCSP) Phase III (Development Phase) (Final Report)

The Midwest Regional Carbon Sequestration Partnership (MRCSP) was founded in 2003 as part of the U.S. Department of Energy’s (DOE’s) Regional Carbon Sequestration Partnership (RCSP) Initiative. The public/private consortium, funded through the MRCSP, brings together nearly 40 industry partners in 10 contiguous states in Mid-West and North-East regions. Battelle, as the project lead, oversees research & development, operations, and coordinates activities among various partners. Since its founding, MRCSP has made significant progress towards advancing CCS and CCUS technologies for participating states in the region. Between 2008 to 2020, Phase III of the MRCSP program focused on the development of large-scale injection tests. This report is part of a series of topical reports prepared under the MRCSP Phase III. The MRCSP Final Technical Report summarizes the research conducted while monitoring large-scale injection tests at a CO 2 -EOR facility in Northern Michigan. The project successfully injected more than one million metric tons of CO 2 into depleted oil fields in the Northern Niagaran Pinnacle Reef Trend (NNPRT) for enhanced oil recovery (EOR). These commercial-scale tests provided valuable real-world knowledge that has been used to refine technologies and methods, reduce uncertainties, and demonstrate safety and effectiveness of CCUS technologies to increase public acceptance. The Final Technical Report provides an overview of Phase III efforts including advancing the understanding of the regional geology, storage capacities, deployment of many monitoring and modeling techniques and its efficacy, and technical demonstration of large-scale CO 2 injection, containment, and associated storage in the NNPRT region. Specific topical reports on the subjects covered in the Final Technical Report are also available through EDX/OSTI.

01 COAL, LIGNITE, AND PEAT↗

Southeast Regional Carbon Sequestration Partnership Phase III Overview of Accomplishments (SECARB Phase III Final Report)

The Southeast Regional Carbon Sequestration Program (SECARB) is a carbon management program established in 2003 and managed by the Southern States Energy Board (SSEB). SECARB is one of seven regional carbon sequestration partnerships formed by the Department of Energy (DOE). The seven partnerships form a national network of more than 400 organizations covering 43 states and four Canadian provinces with expertise in the areas of carbon capture, transportation, and storage. The SECARB program was funded by DOE and cost-sharing partners. The primary goal of SECARB was to identify major sources of carbon emissions, characterize the geology of a 13-state region, determine the most promising options for commercial deployment of carbon dioxide (CO 2 ) sequestration technologies in the South, and validate the technology options through carefully executed field testing through 2017. This report summarizes significant Phase III accomplishments and is organized by task as established within the SECARB Phase III Statement of Project Objectives (SOPO). This document does not provide an exhaustive overview of individual tasks. Rather, this report provides an overview of programmatic accomplishments and a timeline of events. Where applicable, hyperlinks to specific project deliverables are provided.

54 ENVIRONMENTAL SCIENCES↗

OC6 Phase III Definition Document

The objective of Phase III of the Offshore Code Comparison Collaboration, Continued, with Correlation and unCertainty (OC6) project was to evaluate the accuracy of aerodynamic load predictions by offshore wind modeling tools for a floating offshore wind turbine as it experiences large surge-translational and pitch-rotational motion, as would occur during normal operation. A variety of models were examined in the project, with the goal of performing a three-way validation between engineering-level tools, higher-fidelity tools, and measurement data from two wind tunnel experimental campaigns. This document provides the necessary information to model and simulate the system studied in the OC6 Phase III project. This information is not only useful for project participants, but also future modelers who want to replicate this work for verification and validation purposes.

17 WIND ENERGY↗

NORTH DAKOTA CARBONSAFE PHASE III: SITE CHARACTERIZATION AND PERMITTING OF GEOLOGIC STORAGE OF CARBON DIOXIDE

The Energy & Environmental Research Center (EERC), in partnership with Minnkota Power Cooperative Inc. (Minnkota), SLB, and Computer Modelling Group Ltd. (CMG), supported wide-scale deployment of carbon capture and storage (CCS) as part of the U.S. Department of Energy (DOE) National Energy Technology Laboratory Carbon Storage Assurance Facility Enterprise (CarbonSAFE) Initiative Phase III. This phase included the acquisition, analysis, and development of information to fully characterize two storage complexes to demonstrate viable storage resources for commercial volumes of CO2 (defined by DOE as a minimum of 50 million tonnes [MMt] of CO2 within a 30-year period) (National Energy Technology Laboratory, 2024). Phase III also involved the preparation, submission, and approval of North Dakota underground injection control (UIC) Class VI storage facility permits (SFPs)—required precursors to applications for Class VI injection well permits. The presumed viability of commercial-scale CCS, situated adjacent to Minnkota’s Milton R. Young Station (MRYS), is validated by Minnkota’s continued pursuit of Project Tundra—an initiative to build the world’s largest lignite-based CCS project in central North Dakota (www.projecttundrand.com). Project Tundra comprises two scopes of work, Tundra Capture (installation of postcombustion CO2 capture at MRYS) and Tundra SGS (secure geologic storage). The efforts of North Dakota CarbonSAFE Phase III, Site Characterization and Permitting, supported Tundra SGS. Extensive site-specific characterization activities included a successful multimeasurement geophysical approach and drilling a stratigraphic test well (J-ROC 1, subsequently renamed Liberty-1) adjacent to MRYS. Core collection and analyses, downhole testing and fluid sampling, and geophysical logging were performed on J-ROC 1 and on a nearby stratigraphic test well (known as J-LOC 1), which was drilled, cored, and tested under a complementary project funded by the North Dakota Lignite Research Program. The injection tests performed on J-LOC 1 positively impacted the CarbonSAFE project, resulting in fewer proposed injection wells and significant construction, operations, and monitoring cost savings. The characterization data collected and analyses performed were integrated into geologic models, and successive numerical simulations were run to determine CO2 plume extent and subsurface pressure buildup associated with the planned CO2 injection rate of nearly 4 MMt per year. The latter doubles the CarbonSAFE Initiative goal with an estimated 100 MMt of CO2 stored in 20 years. Application of the U.S. Environmental Protection Agency’s (EPA’s) method for estimating the Class VI Rule area of review (AOR) to the overpressurized Broom Creek Formation inspired an alternative method of calculation, called risk-based AOR delineation. This peer-reviewed method was applied for the first time during the storage facility-permitting process. The two SFP applications submitted in 2021 successfully resulted in North Dakota Industrial Commission (NDIC) orders in 2022 authorizing the creation of the storage facility areas and amalgamation of pore space as well as establishing financial responsibility requirements. After approval of the SFPs, Minnkota filed in 2022 applications for permits to reenter the J-ROC 1 well and to drill two new wells—all with the intended purpose to become Class VI injection wells. To establish eligibility under the Internal Revenue Code for Section 45Q tax incentives, a monitoring, reporting, and verification (MRV) plan was prepared and submitted by Minnkota to EPA in 2022, resulting in the first such plan approved in North Dakota. Also in 2022, under the National Environmental Policy Act (NEPA), Minnkota prepared and submitted an environmental information volume (EIV) describing the proposed CCS project and associated potential environmental impacts. Based on the EIV, DOE determined that the proposed construction project required an environmental assessment, and Minnkota submitted the first draft in 2023 and a revised draft in 2024. Both submissions were followed by a public comment period. Subsequently, DOE issued a finding of no significant impact (FONSI) on September 13, 2024. A successful outreach program, strongly based in the production, presentation, and dissemination of informational material, fostered an environment to aid stakeholders in making informed decisions regarding the planned project. Opportunities for public input were provided at various steps along the way, including at county planning and zoning meetings, before and during the SFP administrative hearing, and during environmental assessment public comment periods. In addition, land/pore space owners and mineral owners had various points of contact, including granting access rights, securing pore space leasing, and mineral owner notifications. Based upon the successful storage facility permitting issued by NDIC, approval of the MRV plan by EPA, and receipt of a FONSI under the NEPA, Minnkota is continuing its pursuit of Project Tundra. In December 2023, the Office of Clean Energy Demonstrations under its Carbon Capture Demonstrations Projects Program announced funding for the capture system (Office of Clean Energy Demonstrations, 2023) and a proposal for CarbonSAFE Phase IV: Construction funding was submitted in March 2024 for the storage project. A go/no-go decision to proceed with construction and operations in the Broom Creek Formation is anticipated in 2024. References National Energy Technology Laboratory, CarbonSafe Initiative, https://netl.doe.gov/carbon-management/carbon-storage/carbonsafe (accessed August 2024). Office of Clean Energy Demonstrations, 2023, OCED selects three projects in CA, ND, and TX to reduce harmful carbon pollution, create new economic opportunities, and advance carbon reducing technologies, December, www.energy.gov/oced/articles/oced-selects-three-projects-ca-nd-and-tx-reduce-harmful-carbon-pollution-create-new (accessed August 2024).

Peck, Wesley↗

OC6 Phase III: Validation of Wind Turbine Aerodynamic Loading During Surge/Pitch Motion

The objective of Phase III of the Offshore Code Comparison Collaboration, Continued, with Correlation and unCertainty (OC6) project was to validate the accuracy of aerodynamic load predictions by offshore wind modeling tools for a floating offshore wind turbine as it experiences large surge-translational and pitch-rotational motion, as would occur during normal operation. The test data considered were generated at Politecnico di Milano – a wind tunnel with a robotic excitation system to emulate wave loading on the wind turbine. Testing was performed using a scaled version of the DTU 10-MW reference model, and motion was prescribed as harmonic oscillations in the surge and pitch directions, independently. A variety of models were examined in the project, performing a three-way validation between engineering-level tools, higher-fidelity tools, and measurement data from two wind tunnel experimental campaigns. The Load Cases (LC) considered in this testing are as follows: LC 1.X - Steady Wind LC 2.X - Unsteady Wind - Surge Motion LC 3.X - Unsteady Wind - Pitch Motion Details on the results of the OC6 Phase III campaign can be found in the following reference: Bergua R., et al. OC6 project Phase III: validation of the aerodynamic loading on a wind turbine rotor undergoing large motion caused by a floating support structure, Wind Energ. Sci., 8, 465–485, https://doi.org/10.5194/wes-8-465-2023, 2023.

17 WIND ENERGY↗

Subgroup analysis of efficacy and safety of orantinib in combination with TACE in Japanese HCC patients in a randomized phase III trial (ORIENTAL)

A randomized, phase III trial of orantinib in combination with transcatheter arterial chemoembolization (TACE) did not prolong overall survival (OS) over placebo (ORIENTAL study). A subgroup analysis was conducted to evaluate the efficacy and safety of orantinib in Japanese patients enrolled in the ORIENTAL study. The data of Japanese patients from this study were analyzed. The overall survival (OS), time to progression (TTP), and time to TACE failure (TTTF) were compared between orantinib and placebo arms using stratified log-rank test. Since TTTF in patients with Barcelona Clinic Liver Cancer stage B (BCLC-B) showed favor outcome in this study, the OS and TTTF according to BCLC staging system were also analyzed. The subgroup analysis consisted of 219 and 213 patients in the orantinib and placebo arms. Median OS was 32.5 vs 33.0 months (p = 0.906), median TTP was 4.7 vs 3.1 months (p = 0.011), and median TTTF was 25.3 vs 18.2 months (p = 0.160) in the orantinib and placebo groups, respectively. Patients with BCLC-B in the orantinib and placebo groups showed a median OS of 33.7 and 30.1 months, respectively (p = 0.260), while the corresponding median TTTF were 25.3 and 14.0 months (p = 0.125). The Japanese population safety profile was similar to all over population in the ORIENTAL study. No significant differences were observed in the OS and TTTF though the TTP was significantly improved in the orantinib arm. The OS and TTTF showed a tendency to be prolonged following orantinib treatment of Japanese HCC patients with BCLC-B in the ORIENTAL study.

62 RADIOLOGY AND NUCLEAR MEDICINE↗

Optimizing Alabama’s CO 2 Storage in Shelby County (Project OASIS): Task 6.0 Deliverable – CarbonSAFE Phase III Readiness

The OASIS CarbonSAFE Phase II Project OASIS (Optimizing Alabama’s CO 2 Storage in Shelby County) is a geologic and reservoir characterization study designed to evaluate deep saline formations for potential long-term carbon dioxide (CO 2 ) storage in central Alabama near the National Carbon Capture Center (NCCC) and Alabama Power’s Plant Gaston. The project centers on understanding the potential of the Cambro-Ordovician Knox Group and underlying strata such as the Conasauga and Rome Formations for geologic storage of CO 2 . These formations were investigated as part of SECARB-USA (DE-FE0031830) and Project OASIS through the drilling of two stratigraphic test wells to obtain electronic well logs, core, and sidewall core plugs. These data provide direct measurements of porosity, permeability, and lithologic variability critical for reservoir characterization. Complementing the well program, a limited 2D seismic survey was conducted to help select the site for Westover #2 as part of SECARB-USA (DE-FE0031830), and a more regional Seismic Exchange (SEI) seismic survey was licensed and interpreted to define structural and stratigraphic frameworks in a new Static Earth Model (SEM), map reservoir continuity, and to identify potential sealing intervals. Integrated with geologic and reservoir modeling, these datasets form the basis for evaluating storage capacity, injectivity, and containment. While this document endeavors to provide readers with a high-level overview of Project OASIS activities and its suitability for subsequent CarbonSAFE Phases, such as a Phase III effort. Other project deliverables and milestones will provide more details on individual subjects.

20 FOSSIL-FUELED POWER PLANTS↗

Plains CO 2 Reduction (PCOR) Partnership Phase III (Annual Assessment Report)

This report presents an update of Phase III PCOR Partnership activities from October 1, 2013, through September 30, 2014 (PY7) and planned activities for the following year. The Plains CO 2 Reduction (PCOR) Partnership is one of seven Regional Carbon Sequestration Partnerships (RCSPs) competitively awarded by the U.S. Department of Energy (DOE) National Energy Technology Laboratory (NETL) in 2003 as part of a national plan to mitigate greenhouse gas emissions. The PCOR Partnership is led by the Energy & Environmental Research Center (EERC) at the University of North Dakota in Grand Forks, North Dakota, and includes over 90 stakeholders from the public and private sector in Phase III. The PCOR Partnership region includes all or part of nine U.S. states and four Canadian provinces.

02 PETROLEUM↗

Plains CO 2 Reduction (PCOR) Partnership Phase III (Annual Assessment Report)

This report presents an update of Phase III PCOR Partnership activities from October 1, 2014, through September 30, 2015 (PY8) and planned activities for the following year. The Plains CO 2 Reduction (PCOR) Partnership is one of seven Regional Carbon Sequestration Partnerships (RCSPs) competitively awarded by the U.S. Department of Energy (DOE) National Energy Technology Laboratory (NETL) in 2003 as part of a national plan to mitigate greenhouse gas emissions. The PCOR Partnership is led and managed by the Energy & Environmental Research Center (EERC) at the University of North Dakota in Grand Forks, North Dakota, and includes almost 100 stakeholders from the public and private sector in Phase III. The PCOR Partnership region includes all or part of nine U.S. states and four Canadian provinces.

02 PETROLEUM↗

Plains CO 2 Reduction (PCOR) Partnership Phase III (Annual Assessment Report)

This report presents an update of Phase III PCOR Partnership activities from October 1, 2015, through September 30, 2016 (PY9) and planned activities for the following year. The Plains CO 2 Reduction (PCOR) Partnership is one of seven Regional Carbon Sequestration Partnerships (RCSPs) competitively awarded by the U.S. Department of Energy (DOE) National Energy Technology Laboratory (NETL) in 2003 as part of a national plan to mitigate greenhouse gas emissions. The PCOR Partnership is led and managed by the Energy & Environmental Research Center (EERC) at the University of North Dakota in Grand Forks, North Dakota, and includes over 100 stakeholders from the public and private sector in Phase III. The PCOR Partnership region includes all or part of nine U.S. states and four Canadian provinces.

02 PETROLEUM↗

SPSP Phase III Recruiting, Selecting, and Developing Secure Power Systems Professionals. Job Profiles

The Secure Power Systems Professional Phase III final report was released last year which an appendix of Job Profiles. This new report is that appendix broken out as a standalone document to assist utilities in recruiting and developing Secure Power Systems Professionals at their site. A major accomplishment during Phase III of the project was the development of psychometrically validated job profiles for four identified SPSP job roles: the secure power systems engineer, incident responder, intrusion analyst, and security operator. The job profiles were produced by integrating the results of Phases I and II to capture the relevant job requirements that would be necessary to accurately predict job performance. They can be immediately applied by human resources professionals, recruiters, and hiring managers to assist in the recruitment, selection, and training of SPSPs, as well as to identify needed skills to qualify and equip existing employees to work as SPSPs.

24 POWER TRANSMISSION AND DISTRIBUTION↗

Irradiation and PIE of alloys X-750 and XM-19 (EPRI Phase III)

The Nuclear Science User Facilities (NSUF) based at Idaho National Laboratory (INL), along with the Electric Power Research Institute (EPRI), formed an agreement to test representative alloys used as reactor structural materials as a pilot program to establish guidelines for future NSUF research programs. This report contains results from the portion of this program established as Phase III (of three phases), entailing irradiation and post-irradiation examination of select alloys typical of boiling water reactor (BWR) internal structural materials. Phases I and II are the subject of separate reports and represent baseline material test results and irradiation experiment design, respectively. The intent of this Phase III research program is to determine properties for the materials of interest after being irradiated at the Advanced Test Reactor (ATR) to three different target fast (E>1MeV) fluences: 5.0 x 10¹⁹ n/cm², 2.0 x 10²⁰ n/cm², and 1.0 x 10²¹ n/cm². These correspond to irradiation damage levels (displacements per atom [dpa]) of approximately 0.08, 0.30, and 1.4 dpa, which represent comparable levels to (a) a previous study which looked at X-750 irradiated to ~1 x 10¹⁹ n/cm², comparable to the lowest fluence; (b) approximately a medium level of fluence for BWR components; and (c) extended life (60 – 80 years) for BWR components. The materials chosen for this research are the nickel-based alloy X-750 and austenitic stainless steel XM-19. A spare core shroud upper support bracket of alloy X-750 was purchased by EPRI from Southern Co., and a section of XM-19 plate was purchased by EPRI from GE-Hitachi. These materials were sectioned at GE Global Research Center (GE-GRC), and parts were provided to INL for use in this pilot project.

22 GENERAL STUDIES OF NUCLEAR REACTORS↗

Irradiation and PIE of alloys X-750 and XM-19 (EPRI Phase III)

The Nuclear Science User Facilities (NSUF) based at Idaho National Laboratory (INL), along with the Electric Power Research Institute (EPRI), formed an agreement to test representative alloys used as reactor structural materials as a pilot program to establish guidelines for future NSUF research programs. This report contains results from the portion of this program established as Phase III (of three phases), entailing irradiation and post-irradiation examination of select alloys typical of boiling water reactor (BWR) internal structural materials. Phases I and II are the subject of separate reports and represent baseline material test results and irradiation experiment design, respectively. The intent of this Phase III research program is to determine properties for the materials of interest after being irradiated at the Advanced Test Reactor (ATR) to three different target fast (E>1MeV) fluences: 5.0 x 10¹⁹ n/cm², 2.0 x 10²⁰ n/cm², and 1.0 x 10²¹ n/cm². These correspond to irradiation damage levels (displacements per atom [dpa]) of approximately 0.08, 0.30, and 1.4 dpa, which represent comparable levels to (a) a previous study which looked at X-750 irradiated to ~1 x 10¹⁹ n/cm², comparable to the lowest fluence; (b) approximately a medium level of fluence for BWR components; and (c) extended life (60 – 80 years) for BWR components. The materials chosen for this research are the nickel-based alloy X-750 and austenitic stainless steel XM-19. A spare core shroud upper support bracket of alloy X-750 was purchased by EPRI from Southern Co., and a section of XM-19 plate was purchased by EPRI from GE-Hitachi. These materials were sectioned at GE Global Research Center (GE-GRC), and parts were provided to INL for use in this pilot project.

22 GENERAL STUDIES OF NUCLEAR REACTORS↗

Verification of a Numerical Model of the Offshore Wind Turbine From the Alpha Ventus Wind Farm Within OC5 Phase III

The main objective of the Offshore Code Comparison Collaboration Continuation, with Correlation (OC5) project, is validation of aero-hydro-servo-elastic simulation tools for offshore wind turbines (OWTs) through comparison of simulated results to the response data of physical systems. Phase III of the OC5 project analyzes the Senvion 5M wind turbine supported by the OWEC Quattropod from the alpha ventus offshore wind farm. This paper shows results of the verification of the OWT models (code-to-code comparison). A subsequent publication will focus on their validation (comparison of simulated results to measured physical system response data). Based on the available data, the participants of Phase III set up numerical models of the OWT in their simulation tools. It was necessary to verify and to tune these models. The verification and tuning were performed against an OWT model available at the University of Stuttgart - Stuttgart Wind Energy (SWE) and documentation provided by Senvion and OWEC Tower. A very good match was achieved between the results from the reference SWE model and models set up by OC5 Phase III participants.

17 WIND ENERGY↗

Verification of a Numerical Model of the Offshore Wind Turbine from the Alpha Ventus Wind Farm Within OC5 Phase III: Preprint

The main objective of the Offshore Code Comparison Collaboration Continuation, with Correlation (OC5) project, is validation of aero-hydro-servo-elastic simulation tools for offshore wind turbines (OWTs) through comparison of simulated results to the response data of physical systems. Phase III of the OC5 project analyzes the Senvion 5M wind turbine supported by the OWEC Quattropod from the alpha ventus offshore wind farm. This paper shows results of the verification of the OWT models (code-to-code comparison). A subsequent publication will focus on their validation (comparison of simulated results to measured physical system response data). Based on the available data, the participants of Phase III set up numerical models of the OWT in their simulation tools. It was necessary to verify and to tune these models. The verification and tuning were performed against an OWT model available at the University of Stuttgart - Stuttgart Wind Energy (SWE) and documentation provided by Senvion and OWEC Tower. A very good match was achieved between the results from the reference SWE model and models set up by OC5 Phase III participants.

17 WIND ENERGY↗

Southeast Carbon Sequestration Partnership (SECARB) Phase III Anthropogenic Test at Citronelle Field, Mobile Co., AL: Project Assessment Report

The Southeast Carbon Sequestration Partnership Phase III Anthropogenic Test at Citronelle Field is the United States’ largest CO 2 capture and transportation, injection, storage and monitoring project using CO 2 derived from a coal-fired power station. The project represents a U.S. Department of Energy research and development initiative designed to demonstrate deep underground injection and containment of 100,000 tonnes or more of anthropogenic-source CO 2 . This report provides an assessment of the CO 2 injection at the Citronelle Anthropogenic Test site for the period August 23, 2012 to August 31, 2013. The purpose of the project assessment is to re-evaluate the AoR for the injection well. The AoR is defined as the region surrounding the geological sequestration project that may be impacted by the injection activity. The AoR is further defined as the farthest reach of the tangible CO 2 plume and/or the region of ‘significant’ reservoir pressure increase. An updated geologic model of the injection zones and storage reservoir sandstones incorporates geologic data obtained from the injection well and characterization wells drilled at the Phase III Anthropogenic Test site. The numerical modeling of the injection was conducted using the updated geologic model, plus the monitoring results obtained to August 31, 2013. The simulation demonstrates effective containment of CO 2 by the reservoir architecture of the upper Paluxy Formation, consisting of multiple, stacked, highly porous and permeable sandstones, separated by low permeability flow barriers. The CO 2 containment demonstrated in this report requires an AoR with a radius of 440 ft from the injection well. This revision reduces the radius of the AoR from the preinjection determination of 1,700 ft. With the revised AoR, the only well within the AoR is the injection well itself, the D 9-7 #2. The nearest well to the injector is the D 9-8 #2. The surface location is 870 ft away from the D 9-7 #2, placing the D 9-8 #2 outside the revised AoR.

01 COAL, LIGNITE, AND PEAT↗

Establishing an Early CO 2 Storage Complex in Kemper County, Mississippi: Project ECO 2 S (Phase III) (Final Progress Report)

“Establishing an Early CO 2 Storage Complex in Kemper County, Mississippi (Project ECO 2 S)” is an early mover project within the U.S. Department of Energy (DOE) and National Energy Technology Laboratory’s Carbon Storage Assurance Facility Enterprise, or CarbonSAFE, initiative. Phase III of Project ECO2S advanced the foundational work of Phase II, which confirmed the potential for safely, permanently, and economically storing commercial volumes of carbon dioxide (CO 2 ) in the regionally significant saline reservoir system near Mississippi Power Company’s (MPC) Kemper County Energy Facility. The primary objective of Phase III was to complete detailed site characterization necessary to obtain an Underground Injection Control (UIC) Class VI Permit to Construct from the U.S. Environmental Protection Agency. This involved transitioning from regional geologic assessments to high-resolution site-specific analyses.

03 NATURAL GAS↗