An AI-driven framework for evaluating local and state authorities’ permitting processes

The demand for new energy infrastructure is increasing across the United States, but heterogenous permitting processes and embedded requirements across different local jurisdictions can cause project delays, increase “soft costs,” and hinder developer expansion. This study analyzes the variability in local permitting requirements across the U.S. and develops a quantitative approach to describe their clarity and effectiveness in enabling infrastructure project development. By using an Energy Language Model (ELM), a large language model (LLM) for energy technologies, we systematically gathered permitting information from nearly 300 state-, county-, and city-level documents, creating a structured dataset of requirements and procedures on an unprecedented scale and speed. Our analysis revealed that local (city and county) permitting requirement documents are underrepresented compared to state-level guidance documents, which can impede timely and cost-effective installation of new electric infrastructure. Our validation process showed that the final database has an accuracy of approximately 95%. We, further, created a new quantitative method to score permitting requirements for clarity and efficiency, with electric vehicle supply equipment as an initial use case. The average local permitting document scored a 1.8 out of 5, which we interpret as meaning that half of the requirements developers face when installing electric infrastructure are ambiguous, increasing both cost and time. We also created a “Generalized Permit Process”, highlighting common procedural steps and identifying specific opportunities for municipalities to improve their documentation. This research establishes a systematic and scalable framework for evaluating the complexities of local infrastructure permitting processes by combining LLM-powered data collection and quantitative scoring. The framework enables policymakers and developers to identify and mitigate procedural bottlenecks, with the expectation that these improvements can accelerate application review and approval, reduce project costs, and expedite connection to utility distribution grids. As a foundational approach for streamlining local project development processes, this study’s methods are intended to be extended to a wide range of energy applications.

29 ENERGY PLANNING, POLICY, AND ECONOMY↗

SolarAPP+ ® (Solar Automated Permit Processing Plus) [SWR-19-51]

SolarAPP+ ®: Safe and affordable home solar through permitting automation. NREL has launched a collaborative effort with key code officials, authorities having jurisdiction (AHJs), and the solar industry to develop an instant online solar permitting platform for code compliant residential systems. SolarAPP (Solar Automated Permit Processing) will: -Provide a flexible, web-based PV-permitting tool for residential systems at no-cost to AHJs. -Enable standardization of instant permitting processes. -Evaluate applications for safety and code compliance. -Offer opportunities to incorporate energy storage and expand to other market segments.

Cook, Jeffrey↗

Solar Automated Permit Processing Software for Distributed PV (Cooperative Research and Development Final Report, CRADA Number CRD-19-00825)

NREL and its project partners built and commercialized the novel Solar Automated Permitting Processing Plus (SolarAPP+) software platform that delivers instant residential rooftop solar permits. The tool provides installers with a standard portal for entering permit information for residential solar systems across all Authorities Having Jurisdiction (AHJs) using SolarAPP+, thereby providing a streamlined plan review form, transparency into permitting timelines, and required specifications. The project has proven to reduce permitting timelines from as many as 20 business days to zero, delivering solar projects faster in the four participating AHJs using the platform. Streamlining permitting timelines, all else equal, results in consumers installing their systems and reducing their electricity bills faster. The continued expansion of SolarAPP+ features and adoption nationwide will expand the benefits of the SolarAPP+ beyond the current user base.

14 SOLAR ENERGY↗

Complementing the CCS Class VI Well Permit Process with DOE-NETL's SMART Initiative Tools and Workflows

This is a presentation on model explorer developed under SMART initiative Task 2. Our team will present the current progress of the model explorer in using machine learning models to accelerate CCS project at GWPC meeting. Model explorer bring new capabilities, (fast, Realtime, and accurate) that can help CCS stakeholders including regulatory agencies, public and site operators make faster decisions and process information and data.

Hosseini, Seyyed↗

SolarAPP+ Performance Review (2022 Data)

The Solar Automated Permit Processing Plus (SolarAPP+) platform is an online portal to facilitate and expedite rooftop solar photovoltaic (PV) permitting processes. SolarAPP+ allows PV contractors to upload system specifications, have those specifications automatically reviewed for code compliance, and receive instant approval for code-compliant systems. SolarAPP+ also provides inspection checklists to verify installation practices and adherence to approved designs. SolarAPP+ is available to authorities having jurisdiction (AHJs) at no cost. This report is part of an ongoing series of reviews of SolarAPP+ performance. Consistent with previous performance reviews, we summarize SolarAPP+ adoption trends to date and compare various metrics for PV systems permitted through SolarAPP+ versus systems permitted through conventional AHJ permitting processes. As of the end of 2022, the National Renewable Energy Laboratory (NREL) had contacted over 1,500 AHJs with significant solar permitting volume regarding SolarAPP+. Of those, 607 AHJs had at least expressed interest in the platform. 16 AHJs had begun piloting the platform and 15 of these had publicly launched the platform by the end of 2022. In 2022, 206 installers submitted 11,092 permits through the SolarAPP+ platform, including 708 permits for solar+storage systems. SolarAPP+ permits accounted for around 37% of all permits issued in participating AHJs. We compare permitting timelines through SolarAPP+ to traditional AHJ permitting processes to assess the platform's performance. Consistent with previous SolarAPP+ performance reviews, we find that permitting timelines are significantly shorter for SolarAPP+ projects. Based on median timelines, a typical SolarAPP+ project is permitted and inspected 8 business days sooner than traditional projects. We estimate that automatic SolarAPP+ permitting saved between 3,500 and 13,900 hours of AHJ staff time in 2022. Finally, we find evidence that SolarAPP+ may improve inspection outcomes, with SolarAPP+ projects failing inspections about 28% less frequently than traditional projects.

14 SOLAR ENERGY↗

SolarAPP+ Performance Review (2023 Data)

The Solar Automated Permit Processing Plus (SolarAPP+) platform is an online portal to facilitate and expedite rooftop solar photovoltaic (PV) and battery storage permitting processes. SolarAPP+ allows PV contractors to upload system specifications, have that information automatically reviewed for code compliance, and receive instant approval for code-compliant systems, reducing authority having jurisdiction (AHJ) staff time needed for review. SolarAPP+ also provides inspection checklists to verify installation practices and adherence to approved designs. SolarAPP+ is available to AHJs at no cost. This report is part of an ongoing series of reviews of SolarAPP+ performance. Consistent with previous performance reviews, we summarize SolarAPP+ adoption trends to date and compare various metrics for PV systems permitted through SolarAPP+ versus systems permitted through traditional AHJ permitting processes. As of the end of 2023, the National Renewable Energy Laboratory (NREL) had contacted over 1,700 AHJs with significant solar permitting volume regarding SolarAPP+. Of those, 793 AHJs had expressed interest in the platform as of the end of 2023. 161 AHJs had begun piloting the platform and 97 of these had publicly launched the platform by the end of 2023. In 2023, 668 installers submitted 18,906 permits through the SolarAPP+ platform, including 4,834 permits submitted as part of a solar plus storage program. SolarAPP+ permits accounted for around 43% of all permits issued in participating AHJs. We compare permitting timelines through SolarAPP+ to traditional AHJ permitting processes to assess the platform's performance. Consistent with previous SolarAPP+ performance reviews, we find that permitting timelines are significantly shorter for SolarAPP+ projects. Based on median timelines, a typical SolarAPP+ project is permitted and inspected 14.5 business days sooner than traditional projects. We estimate that automatic SolarAPP+ permitting saved around 7,200 hours of AHJ staff time in 2023. Finally, we estimate that SolarAPP+ eliminated over 150,000 business days in permitting-related delays in 2023.

14 SOLAR ENERGY↗

SolarAPP+ Performance Review (2024 Data)

The Solar Automated Permit Processing Plus (SolarAPP+) platform is an online portal to facilitate and expedite rooftop solar photovoltaic (PV) and battery storage permitting processes. SolarAPP+ allows PV contractors to upload system specifications, have that information automatically reviewed for code compliance, and receive instant approval for code-compliant systems, reducing authority having jurisdiction (AHJ) staff time needed for review. SolarAPP+ also provides inspection checklists to verify installation practices and adherence to approved designs. This report is part of an ongoing series of reviews of SolarAPP+ performance. Consistent with previous performance reviews, we summarize SolarAPP+ adoption trends to date and compare various metrics for PV systems permitted through SolarAPP+ versus systems permitted through traditional AHJ permitting processes. As of the end of 2024, 799 AHJs had expressed interest in the platform, with 264 fully adopting (215) or piloting (49) the platform. In 2024, 861 installers submitted 37,393 permits through the SolarAPP+ platform, including 27,375 permits for PV+storage systems. SolarAPP+ permits accounted for around 43% of all permits issued in all participating AHJs, and more than 60% of all permits in several participating AHJs. We compare permitting timelines through SolarAPP+ to traditional AHJ permitting processes to assess the platform's performance. Consistent with previous SolarAPP+ performance reviews, we find that permitting timelines are significantly shorter for SolarAPP+ projects. Based on median timelines, a typical SolarAPP+ project is permitted and inspected 12 business days sooner than traditional projects. We estimate that automatic SolarAPP+ permitting saved around 18,400 hours of AHJ staff time in 2024. Finally, we estimate that SolarAPP+ eliminated over 100,000 business days in permitting-related delays in 2024.

14 SOLAR ENERGY↗

Laws in Order: An Inventory of State Renewable Energy Siting Policies

This report identifies which government entity or entities in each state or territory have the jurisdictional authority to make siting and permitting decisions about large scale wind and solar projects. The report also covers established timelines for siting and permitting processes, requirements for public involvement in those processes, and the availability of permitting guides and model ordinances designed to assist local jurisdictions. It details state renewable energy siting policies and permitting authorities across the United States, profiling all 50 states plus Puerto Rico. The report release also includes an interactive map that allows users to easily explore each state’s authorities and policy features. The map, hosted by DOE, includes high-level information on each state’s siting and permitting processes and link directly to the profiles in the report.

14 SOLAR ENERGY↗

Supercritical Carbon Dioxide Primary Power Large-Scale Pilot Plant

The United States electrical power generation fleet encompasses a wide range of technologies, ranging from traditional combustion-based power generation, to nuclear power, to renewable energy. While the distribution of these assets continues to shift due to economic and regulatory influences, coal combustion continues to be a key part of the US energy portfolio. Despite the relative maturity of coal combustion technology, improvements in overall fuel-to-power efficiency and generation flexibility are still possible and will improve both the economic and environmental factors of coal combustion. Echogen Power Systems proposes to lead a world-class team including the University of Missouri, Electric Power Research Institute and Louis Perry Associates in the design, construction and operation of a 10MWe coal-fired supercritical carbon dioxide (sCO 2 ) large-scale pilot. This transformational technology uses sCO 2 as a working fluid instead of water to achieve high thermodynamic efficiencies that can significantly exceed advanced steam-Rankine cycles. Further, the compact nature of sCO 2 turbomachinery offers capital cost and footprint advantages, and the low maintenance of a water-free power cycle can significantly reduce operation and maintenance (O&M) costs over conventional steam-Rankine systems. Recent integration studies of sCO 2 with coal combustion power plants highlight the significant improvements in plant efficiency that sCO 2 can offer relative to even advanced steam Rankine cycles. At commercial scales, coal-sCO 2 plant net efficiency is predicted to be 39-44.0% (HHV), or 10-20% higher output than conventional steam-Rankine systems, which will significantly improve the competitiveness of coal-fired generation. This proposal builds upon projects previously funded by the Department of Energy, including DE-FE0025959 (High-Efficiency Thermal Integration of Closed Supercritical CO 2 Brayton Power Cycles with Oxy-Fired Heaters) and DE-NE0008470 (Conceptual Design for sCO 2 Power Cycle Test Facility). An appropriately-scaled and properly designed and operated pilot project is essential to overcome the natural risk-aversion of the power generation industry and project financing community. The 10 MWe coal-fired sCO 2 pilot power plant proposed herein will reduce the technical and economic risk of this transformational technology, enabling commercial deployment at the conclusion of the project. For the second phase of this project, Echogen lead a team that completed and refined the pilot system conceptual system and key component designs resulting in the completion of a front-end-engineering-design (FEED) study, completed the NEPA review process, completed the permitting process for construction and operation, refined the techno-economic analysis of the proposed system at commercial scale and received commitments for Phase III cost share. The end result of the program will be to demonstrate the technical and economic superiority of the sCO 2 power cycle for coal-fired operation. Major risk elements will have been retired with sufficient operation at high power to enable the power generation industry to move forward with the first commercial deployment of this transformational system.

01 COAL, LIGNITE, AND PEAT↗

Non-Technical Barriers to Geothermal Development in California and Nevada

Geothermal project development in the United States may be subject to numerous permits, authorizations, and other regulatory requirements at the federal, state, and local level, which are necessary to address potential environmental and resource impacts at geothermal project sites. This report presents the findings of our study, including an analysis of federal, state, and local geothermal regulatory and permitting processes, case studies analyzing site-specific attributes that may impact project development at four selected geothermal project sites, an analysis of cost and timeline implications for geothermal project development, and the results of a qualitative study focused on inter-agency coordination and collaboration efforts between federal, state, and/or local agencies for geothermal projects located in California and Nevada. Our analysis found that development timelines may be impacted by multiple federal and state environmental review processes and duplicative permitting requirements as well as coordination efforts between numerous federal, state, and local agencies involved in issuing authorizations and permits necessary for project development. In addition, projects in California and Nevada may face site-specific environmental challenges due to the presence of sensitive resources (e.g., biological species and species habitat, cultural resources) that may result in project construction delays. Our study results also indicate that protracted geothermal development timelines caused by delays in acquiring necessary permits and environmental reviews may result in loss of generated electricity revenue and additional financing costs, which may increase economic uncertainty associated with project development. Through our qualitative analysis, we found that utilization of best practices, including tiering to existing environmental review documents and developing memoranda of understanding, which clearly delineate agency roles and responsibilities may reduce overall project timelines, costs, and uncertainties associated with geothermal project development in California and Nevada.

15 GEOTHERMAL ENERGY↗

Non-Technical Barriers to Geothermal Development in California and Nevada [Slides]

This presentation presents the findings of our study, including an analysis of federal, state, and local geothermal regulatory and permitting processes, case studies analyzing site-specific attributes that may impact project development at four selected geothermal project sites, an analysis of cost and timeline implications for geothermal project development, and the results of a qualitative study focused on inter-agency coordination and collaboration efforts between federal, state, and/or local agencies for geothermal projects located in California and Nevada. Our analysis found that development timelines may be impacted by multiple federal and state environmental review processes and duplicative permitting requirements as well as coordination efforts between numerous federal, state, and local agencies involved in issuing authorizations and permits necessary for project development. In addition, projects in California and Nevada may face site-specific environmental challenges due to the presence of sensitive resources (e.g., biological species and species habitat, cultural resources) that may result in project construction delays. Our study results also indicate that protracted geothermal development timelines caused by delays in acquiring necessary permits and environmental reviews may result in loss of generated electricity revenue and additional financing costs, which may increase economic uncertainty associated with project development. Through our qualitative analysis, we found that utilization of best practices, including tiering to existing environmental review documents and developing memoranda of understanding, which clearly delineate agency roles and responsibilities may reduce overall project timelines, costs, and uncertainties associated with geothermal project development in California and Nevada.

15 GEOTHERMAL ENERGY↗

Go slow to go fast? A review of the impacts of permitting on large-scale solar project development

State and local permitting challenges could impede the ability of large-scale solar (LSS) to meet growing electricity demand in the United States. Here, we review research that explores LSS permitting and its impacts on the pace and scale of LSS project development. Research on LSS permitting is relatively scarce, such that we support our review with research in the context of wind permitting, where appropriate. Further, few studies attempt to rigorously quantify the effects of permitting on the pace and scale of LSS project development. The available evidence allows us to identify various hypotheses and identify gaps for further research. Our review suggests that differences in permitting policies, regulations, and ordinances explain relatively little variation in LSS permitting and development outcomes across jurisdictions, except where jurisdictions implement rules designed to impede LSS. The evidence suggests LSS permitting challenges largely accrue during the implementation of permitting processes. Recent research suggests that community opposition to project development is a key driver of LSS permitting challenges, given that project opponents often use permitting processes to translate opposition into legal action. We call on future researchers to more concretely describe the LSS permitting challenge and to identify the specific actors responsible for implementing solutions.

Community opposition↗

Biofuel Air Emissions Analysis

U.S. has goals to produce 3 billion gallons of sustainable aviation fuel (SAF) annually by 2030, increasing to 35 billion gallons by 2050 to decarbonize the aviation sector. Meeting these production targets will require large number of biorefineries to be set up. However, ability to comply with federal air quality standards is prerequisite to being issued a construction permit. Negotiating the permitting process for a new biorefinery can be quite onerous and cost the investors significant time and money. Although there can be numerous reasons for delayed biorefinery construction, air permitting is fraught with pitfalls because the permitting process relies on precedence, which the future SAF biorefineries lack. NREL's Biofuel Air Emissions Analysis project is unique and innovative in terms of the tools, approaches, and analyses provided. NREL is the only national laboratory that is actively working at the intersection of Federal air quality regulations, emissions and air quality analysis across the supply chain, and process design. This project is focused on providing much needed data and analyses that address biorefinery air permitting. This project develops models and quantitative analyses and measures progress towards meeting air quality regulatory requirements. These models and methods are applied to analyze air permitting related to wastewater sludge to biofuel conversion pathways using hydrothermal liquefaction (HTL), impacts of HTL pathway on local and regional air quality including an assessment of health and equity impacts. In addition to filling research gaps, this project also disseminates the findings to the relevant stakeholders at BETO, other national labs, and regulatory agencies.

air quality↗

Patience is a virtue: A data-driven analysis of rooftop solar PV permitting timelines in the United States

© 2020 The Authors Local permitting can ensure the safe installation and operation of rooftop solar photovoltaic (PV) systems. At the same time, burdensome local permitting processes and local variation in requirements may pose challenges to PV deployment. In this article, we explore new data on the durations between key steps in the PV permitting process in the United States. The data suggest that a typical customer can expect to wait around 25–100 days from permit application until an installed system passes inspection. Permit durations vary significantly across jurisdictions, due in part to differences in local permitting policies. However, permit durations vary as significantly within jurisdictions as across them, in part due to significant variation across installers, suggesting that installer strategies and practices play an important role in permitting timelines. Permit durations have declined over time, reflecting progress from permit streamlining policies and jurisdiction learning-by-doing, though durations have stabilized in recent years. The data suggest that typical PV customers still face long and uncertain permitting timelines in the United States.

O'Shaughnessy, E↗

Case study on the novel permitting and authorization of PacWave South, a US grid-connected wave energy test facility: Development, challenges, and insights

Marine energy (i.e., energy from waves, tides, currents, and rivers) in the United States is a nascent industry. In particular, permitting processes—an uncertainty for industry advancement that can be costly and time consuming to navigate—have rarely been tested and used for marine energy. The novelty of the marine energy industry and utilization of open ocean permitting processes that were not originally developed for marine energy have led to extensive efforts to gain consensus amongst state and federal regulatory agencies to authorize marine energy projects. In 2021, Oregon State University successfully completed permitting of a wave energy test facility, called PacWave South, off the coast of Oregon, which is designed to advance wave energy research and development. This article documents the multi-year process that Oregon State University used to receive federal and state authorization for a pre-permitted commercial-scale grid connected facility by detailing the development of the test facility, management of uncertainty and challenges, and key decisions. The PacWave South case study provides insights for the larger marine energy community as the industry advances towards commercialization.

16 TIDAL AND WAVE POWER↗

Field Validation of MVA Technology for Offshore CCS: Novel Ultra-High-Resolution 3D Marine Seismic Technology (P-Cable) (Final Report)

The objectives of the proposed study were to deploy and validate a specific monitoring technology, high-resolution 3D marine seismic (HR3D), appropriate for large-demonstration and commercial-scale offshore CCS sites. The project accomplished successful acquisition two HR3D seismic surveys. The first HR3D dataset was over the offshore injection site of the Tomakomai, Japan integrated pilot CCS project, which at the time of survey acquisition was actively injecting CO 2 . The first survey also represented a successful international collaboration between the DOE NETL program and Japan’s national CCS program and was the first successful acquisition and use of HR3D over an active CO 2 injection site (Meckel, Feng et al. 2019). The Tomakomai HR3D survey successfully tested a novel 4-streamer HR3D system array in which, for the first time, no cross-cable (aka “P-Cable”) was utilized and only four GeoEel streamers were used instead of the standard 12-streamer configuration. Consequently, this was not, strictly speaking, a deployment of the “P-Cable” system of (Planke and Berndt 2004) but rather a modified version, thereof, and it is the first known demonstration of the modified system configuration. One very positive outcome from the Japanese collaboration earlier in the project was the ability to learn from the Japanese how they used tail buoys with GPS to determine the position of the seismic source and receivers in time and space. Based on that experience, GCCC designed and built six GPS receivers that could be used to position the streamer receivers and the seismic source via tail buoys. A fundamental advance that was made on the original design, was the ability to directly power the tail buoy GPS units and transfer data through the streamers (i.e., vs. the batteries used at Tomakomai). The bulkiness of the GPS batteries caused drag and episodic surging of the buoys, which affected data quality by lifting up the tail end of the streamers so the receivers were not at the same depth. The units were tested onshore for accuracy and functionality, and the design was subsequently and successfully tested in marine acquisition mode during the SLP survey acquisition. The marine acquisition test and survey satisfied Subtasks 2.2.2, Novel Positioning Technology Selection and Subtask 2.2.3, Novel Positioning Technology Deployment. Results of the novel positioning technology selection (Subtask 2.2.2) were considered successful and will be incorporated in future HR3D seismic acquisition projects to reduce costs, improve deployment safety at sea, and integrate both seismic and data recording via a single data transfer through the streamers to the recording system. The project also established a permitting process through NETL NEPA compliance, which included an Environmental Assessment in a marine setting and is required for conducting these types of surveys using Federal funding. The permitting process charted a “boilerplate,” which can allow future surveys related to other funded projects to move forward more expeditiously. Future improvements that could be considered are more robust seals on the GPS module and stronger materials (especially joints) on tail buoy fabrication. These would increase fixed costs, but would be advisable and probably more economic long-term if multiple HR3D surveys are planned. Project Accomplishments include: • Pre-survey Sensitivity Study • Marine geochemistry methods and data analysis • Successful HR3D seismic dataset acquired @ Tomakomai active CO 2 injection marine site • Developed advanced seismic processing techniques • No NRMS anomalies detected in overburden; Demonstration of containment • Repeatability study • Second survey collected @ San Luis Pass, TX • 4D application using positioning techniques developed in the project for monitoring were successful

3D seismic GPS positioning↗

Thermal Assessment and In-Situ Monitoring of Insulated Gate Bipolar Transistors in Power Electronic Modules: Preprint

Insulated gate bipolar transistor (IGBT) power modules are devices commonly used for switching of high voltages and currents. Usage and environmental conditions can cause these power modules to degrade over time, and this gradual process may eventually lead to catastrophic failure of the device. This degradation process may cause some early performance symptoms related to the state of health of the power module, making it possible to detect reliability degradation of the IGBT module. Testing can be used to accelerate this process, permitting a rapid determination of whether specific declines in device reliability can be characterized. In this study, thermal cycling was conducted on multiple power modules simultaneously in order to assess the effect of thermal cycling on the degradation of the power module. In-situ monitoring of temperature was performed from inside each power module using high temperature thermocouples. Device imaging and characterization was performed along with temperature data analysis, to assess failure modes and mechanisms within the power modules. While the experiment was aimed to assess the potential damage effects of thermal cycling on die attach, results indicated that wirebond degradation was the life limiting failure mechanism.

33 ADVANCED PROPULSION SYSTEMS↗

Economic Impact of Permitting Timelines on Geothermal Power in California, Nevada, and Utah

The United States has great geothermal power potential; however, only a small fraction of this resource has been utilized for power generation. Various barriers, including technical, financial, and regulatory permit delays, are attributed to the lower penetration of geothermal energy into the national grid. Unpredictable environmental reviews and permitting timelines are some of the non-technical barriers that can cause delays in geothermal exploration and utilization plans. This document provides an assessment of the potential economic impact of permitting costs and timelines on geothermal power in California, Nevada, and Utah. Development of geothermal resources requires multi-layered regulatory permitting by local, state, and federal agencies. In this study, we collected and reviewed permit timelines and associated cost data for several existing geothermal power plants as well as for geothermal projects currently undergoing permitting processes for exploration and development activities in California, Nevada, and Utah. We interviewed several geothermal developers and staff from multiple permitting agencies to obtain insight from both sides (i.e., people applying for permits and people processing those applications for California Environmental Quality Act [CEQA] and National Environmental Policy Act [NEPA] reviews and other regulatory compliance). The intent of this project was also to identify informative pathways for the geothermal stakeholder community by which the permitting process could be streamlined.

15 GEOTHERMAL ENERGY↗