Engineering Papers⌕ Search

SEARCH · Engineering Papers

Results for “Peaker”

Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.

Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.

At least 19 records

Economic Case for Replacing High-Emitting Peaker Plants with Fuel Cells for Automotive Applications

The identification of clean and cost-effective solutions to replace high-emitting peaker plants and support a just transition is a challenge faced by utilities across the US today. However, falling costs of hydrogen production as well as the widespread availability of fuel cells for automotive applications have made them an attractive option for a zero-emission peak power supply. This study evaluates the techno-economics, operation, and environmental justice impacts of siting a peaker plant based on fuel cells for automotive applications through the lens of the existing Intermountain Power Plant, in order to supply peak power to the Los Angeles basin. Compared to the fossil fuel-fired peakers in operation today, the fuel cell peaker would be lower-cost up to a 17% capacity factor with Inflation Reduction Act incentives while also reducing air pollution in environmental justice communities. With corresponding transmission upgrades, the Intermountain site could host up to a 5 GW fuel cell peaker in the future.

37 INORGANIC, ORGANIC, PHYSICAL, AND ANALYTICAL CH↗

Analysis of Energy Justice and Equity Impacts from Replacing Peaker Plants with Energy Storage

Transitions to low-carbon energy systems are essential to mitigating and adapting to climate change. Energy storage systems are a key component in achieving a viable decarbonized electric grid. However, decarbonization alone does not guarantee a fairer, more inclusive, or socially just energy system. Energy equity and justice should be integrated in energy system transitions to ensure benefits and burdens are shared equitably. In this paper, we discuss the relationship between energy storage and social equity by assessing the use of energy storage to replace natural gas-fired (NG) peaker plants. Peaker plants are disproportionately located near disadvantaged communities and tend to be older and high emitters of health-affecting fine particulate matter and other pollutants. This paper investigates the equity implications of NG peaker plant replacements with battery energy storage in the context of Washington State’s peaker plants to highlight the human-centered values of retiring the plants. The study performed production cost simulations using the latest Western Electric Coordinating Council Anchor Dataset 2030 case and found that total generation cost, locational marginal price, and total annual emissions were reduced with the replacements. These reductions will have equity benefits on local communities including access to clean air, enhanced health outcomes, and energy burden reductions.

Tarekegne, Bethel W.↗

NG-CT Peaker Upgrades with Bottoming Cycle: Preliminary Analysis

The National Energy Technology Laboratory (NETL) has conducted a preliminary analysis exploring a significant opportunity to increase the nation's power grid capacity and reliability. The study focuses on retrofitting under-utilized natural gas combustion turbines (NG-CTs), often called "peaker" plants, with a bottoming cycle to capture waste heat and generate additional electricity. This analysis shows that upgrading these existing assets could add approximately 26,250 MW of new power capacity across the United States. A detailed study of the PJM Interconnection, the nation's largest grid operator, confirmed the benefits of these upgrades. Key findings for the PJM region include: - A median increase in the plants' capacity factor by 17 percentage points. - A projected 36.2% median reduction in the levelized cost of electricity (LCOE) for the upgraded plants, with nearly 88% of them expected to break even. - An average reduction in the regional wholesale price of electricity by approximately 3.0% in the year 2030. - A significant boost to grid reliability, with a 46% reduction in projected Loss of Load Hours (LOLH). These findings suggest that retrofitting peaker plants is a promising and economically viable strategy to enhance grid performance, reduce electricity costs, and meet future demand without the challenges associated with building entirely new facilities.

bottoming cycle↗

Leveraging automotive fuel cells can supply zero-emission peak power in the near-term

An increasingly decarbonized yet resilient power grid requires the corresponding build-out of dispatchable zero-emission resources to supply peak power. However, there is a recognized dearth of solutions which can serve multi-day peak demand events both cost-effectively and with near-term deployability. Here, we find that pairing low-cost automotive fuel cells with hydrogen storage in salt caverns can serve as a peaker plant at less than 500 US$/kW at present, a fraction of the cost of conventional fossil fuel-fired peakers. We demonstrate the peaker’s value for long duration storage by comparing it with pumped hydro and assessing its profitability within Texas’ energy-only market region. Although deployment of these peakers is constrained by the presence of salt caverns, we show that a number of sites in the United States and Europe are endowed with suitable salt formations, while utilizing hydrogen storage in pressurized containers could form a location-agnostic peak power solution.

25 ENERGY STORAGE↗

Dispatchable Solar Power Plant Project

As penetration of intermittent renewable power increases, grid operators must manage greater variability in the supply and demand on the grid. One result is that utilities are planning to build many new natural gas peaking power plants that provide added flexibility needed for grid management. This report discusses the development of a dispatchable solar power (DSP) plant that can be used in place of natural gas peakers. Specifically, a new molten-salt tower (MST) plant has been developed that is designed to allow much more flexible operation than typically considered in concentrating solar power plants. As a result, this plant can provide most of the capacity and ancillary benefits of a conventional natural gas peaker plant but without the carbon emissions. The DSP system presented was designed to meet the specific needs of the Arizona Public Service (APS) utility 2017 peaking capacity request for proposals (RFP). The goal of the effort was to design a MST peaker plant that had the operational capabilities required to meet the peaking requirements of the utility and be cost competitive with the natural gas alternative. The effort also addresses many perceived barriers facing the commercial deployment of MST technology in the US today. These include MST project development issues such as permitting, avian impacts, visual impacts of tower CSP projects, project schedule, and water consumption. The DSP plant design is based on considerable analyses using sophisticated solar system design tools and in-depth preliminary engineering design. The resulting DSP plant design uses a 250 MW steam power cycle, with solar field designed to fit on a square mile plot of land that has a design point thermal rating of 400 MWt. The DSP plant has an annual capacity factor of about 16% tailored to deliver greater than 90% capacity during the critical Arizona summer afternoon peak. The table below compares the All-In energy cost and capacity payment of conventional combustion turbines to DSP plants. These results estimate that the cost of the DSP plant is about 10% higher than a similarly-sized and operated frame combustion turbine and slightly cheaper than an aero derivative combustion turbine when APS reference fuel and emissions costs are included. The DSP plant cost is based on a single, first-of-a-kind plant, and it is likely that subsequent plants would be less expensive.

14 SOLAR ENERGY↗

The past, present, and future of peaking thermal power plants in the United States

Today's power systems rely on "peaker plants" to reliably serve load during peak demand periods. In this study we consider the present competitiveness of different peaking options, how much and what kinds of plants have provided U.S. peaking capacity, and potential future peaking fleet compositions. We explore how capital intensity impacts the breakeven capacity factor between two potential resources: combustion turbines (CTs) and combined cycle plants (CCs). CTs outcompete CCs below 12%-17% annual capacity factor at today's prices, but can shift with changes to fuel or start costs. Historically, gas CTs and petroleum steam plants most closely fit the role of peakers. Peaking capacity could grow from approximately 280 GW today to 460-770 GW in 2050 composed of a wider range of resources. We conclude by discussing implications of this shift, with a focus on the potential planning considerations for shifting to a greater utilization of CCs for peaking needs.

24 POWER TRANSMISSION AND DISTRIBUTION↗

Integration of Pumped Heat Energy Storage with Fossil-Fired Power Plant (Final Report)

The project team of Southwest Research Institute ® (SwRI ® ), Malta Inc. (Malta), and Luminant Generation Company LLC (Luminant) completed a feasibility study for the integration of a 100-MW, 10-hour (1000-MWh) Malta Pumped Heat Energy Storage (MPHES) system with multiple full-sized fossil-fired electricity generation units (EGU) in Luminant portfolio. MPHES is a long-duration, molten-salt-energy storage technology that uses turbomachinery and heat exchangers to transfer energy to a thermal storage media when charging, and removes the heat in a similar fashion when discharging. With high round trip efficiency (60-65%) and long lifespan (30+ years), MPHES provides economic benefits to the fossil-asset owners that can be scaled to integrate with assets across their portfolio. This technology uses hardware components, workforce personnel, and skillsets similar to those used by fossil EGUs, allowing for synergy when co-locating the two technologies. Luminant has approximately 39,000 megawatts of generation across 12 states, operating in six of the seven competitive markets in the U.S. and powered by a diverse portfolio of natural gas, nuclear, coal, and solar facilities. The DeCordova plant in Granbury, Texas, a simple cycle natural gas peaker power plant, was used as the fossil-fired asset in this project. The local market in Granbury, Texas has many influences, including several nearby power plants, a Luminant-owned nuclear plant (Comanche Peak), and substantial wind energy, which causes both negative pricing at night and high market volatility. Reducing false starts of the DeCordova plant and better responding to market volatility would be an economic advantage. Luminant is currently integrating battery storage plant on site to begin addressing these challenges. Integrating long-duration storage, like MPHES, would expand this capability beyond one hour of storage and have the potential to greatly reduce the total number of gas turbine starts. The MPHES charging requirement could help offset the overnight operating costs of Comanche Peak, which cannot load follow, and the nearby Luminant-owned Wise County combined cycle plant that cycles too often. Following the assessment of Luminant’s ERCOT-based portfolio for integration compatibility with Malta’s PHES system and the project tasks of conceptual study, technoeconomic analysis, technology gap assessment, and commercialization plan, the project team effort has resulted in several key outcomes: (1) Identification of market trends in a high-wind penetration market outside a major metropolitan area; (2) Creation of a dispatching model for the MPHES system and the pairing of Li-ion battery with a gas turbine in a real time market; (3) Revenue and cost estimations for operating MPHES alongside a gas peaker plant with real dispatching considerations and comparison with variations in the Malta implementation, including doubling the storage capacity and using two discharge drivetrains; (4) Potential carbon emission reductions possible by replacing gas turbine operation with Malta PHES operation; and (5) Summary of literature-based future market predictions for Texas.

20 FOSSIL-FUELED POWER PLANTS↗

The peculiar radio source M17 JVLA 35

M17 JVLA 35 is a radio source detected in projection against the M17 H II region. In recent observations, its spectrum between 4.96 and 8.46 GHz was found to be positive and very steep, with α ≥ 2.9 ± 0.6 (S {sub ν}∝ν{sup α}). Here we present Very Large Array observations made in the 18.5 to 36.5 GHz region that indicate a spectral turnover at ∼13 GHz and a negative spectral index (α ≅ –2.0) at higher frequencies. The spectrum is consistent with that of an extragalactic high frequency peaker (HFP). However, M17 JVLA 35 has an angular size of ∼0.''5 at 8.46 GHz, while HFPs have extremely compact, milliarcsecond dimensions. We discuss other possible models for the spectrum of the source and do not find them feasible. Finally, we propose that M17 JVLA 35 is indeed an HFP but that its angular size becomes broadened by plasma scattering as its radiation travels across M17. If our interpretation is correct, accurate measurements of the angular size of M17 JVLA 35 across the centimeter range should reveal the expected ν{sup –2} dependence.

79 ASTRONOMY AND ASTROPHYSICS↗

Improved Decarbonization Planning through Climate Resiliency Modeling

California has set ambitious decarbonization goals concerning both emissions and the portion of energy generated by renewable resources. However, climate change poses considerable uncertainties. Variation in load is driven both by the level of electrification as well as the impact of climate change on weather. Further, climate change stands to make weather more variable, impacting not just load but generation from renewable resources. In this paper, we approach the issue of the impacts of climate change on decarbonization planning from two perspectives. First, we look at the range of decarbonization pathways through 8 pathways that account for differences in socioeconomic development, global emissions, and warming. Second, we develop a more robust way of ensuring the reliability of energy resources planning than the commonly used planning reserve margin. We show that the proposed method can save between 6 and 14 billion dollars in investment and maintenance costs and outline critical policy implications concerning the reliance of power plants for satisfying planning reliability requirements, including the potential retirement of dozens of peaker power plants.

Anderson, Osten P.↗

Identifying Challenging Operating Hours for Solar Intergration in the NV Energy System

Abstract-- In this paper, the ability of the Nevada (NV) Energy generation fleet to meet its system balancing requirements under different solar energy penetration scenarios is studied. System balancing requirements include capacity, ramp rate, and ramp duration requirements for load following and regulation. If, during some operating hours, system capability is insufficient to meet these requirements, there is certain probability that the balancing authority’s control and reliability performance can be compromised. These operating hours are considered as “challenging” hours. Five different solar energy integration scenarios have been studied. Simulations have shown that the NV Energy system will be potentially able to accommodate up to 942 MW of solar photovoltaic (PV) generation. However, the existing generation scheduling procedure should be adjusted to make it happen. Fast-responsive peaker units need to be used more frequently to meet the increasing ramping requirements. Thus, the NV Energy system operational cost can increase. Index Terms—Solar Generation, Renewables Integration, Balancing Process, Load Following, Regulation.

capacity↗

Design of a Compact Dry Cooler With an Aluminum Heat Exchanger Core for a Supercritical CO2 Power Cycle Is Evaluated for a Concentrating Solar Power Application

Abstract As the supercritical CO2 power cycle develops and the component technologies mature, there is still a need to reduce the associated capital and operating costs to maintain a competitive levelized cost of electricity (LCOE) in order to enter the market. When considering concentrating solar power (CSP) coupled with an sCO2 power block and sensible thermal storage, the technology presents a clean source for utility-scale power generation to support baseload or peak-load electrical demand. However, the LCOE of the technology is still considered higher than the competing technologies and should be reduced to better compete in the market; 2030 targets for dispatchable solar plants are 5¢/kWh for baseload CSP and 10¢/kWh for peaker plants, as set by the United States Department of Energy. In response to this need, this study is targeting improvements in the power cycle precooler to reduce power block contribution to LCOE. This study considers a dry cooler, as CSP plants are sensitive to water consumption because many installations are slated for remote or arid locations where solar irradiance is very high, but water is scarce. Furthermore, the power block footprint for an sCO2 system is quite compact, especially as compared to a steam cycle. Therefore, there is interest in installing a more compact dry cooler that is proportional to the reduced footprint sCO2 power block, while conventional dry coolers are an order of magnitude larger. The competing goals of size, performance, and cost were considered in this study to develop a compact dry cooler that can easily be packaged with the power block, significantly reducing the installation and transport cost compared to the current state of the art, while maintaining or improving upon the heat transfer performance and impact on plant LCOE. This paper details the high-level findings of a large dry cooler sensitivity study for design point selection, design of the compact dry cooler, expected year-round performance for the dry cooler and the power cycle, and the predicted LCOE for a 30-year plant life. It was found that an aluminum heat exchanger core can be suitably designed to meet the pressure and temperature requirements for a precooler in an sCO2 recompression Brayton cycle. The dry cooler assembly was found to have improved heat transfer performance, allowing for increased cycle efficiencies and a reduced plant LCOE. When coupled with a centrifugal blower and compact transition duct, the dry cooler assembly was able to reduce the installation footprint by over 50%.

14 SOLAR ENERGY↗

Identifying and Overcoming Critical Barriers to Widespread Second Use of PEV Batteries

Both the market penetration of plug-in electric vehicles (PEVs) and deployment of grid-connected energy storage systems are presently restricted by the high cost of batteries. Battery second use (B2U) strategies--in which a single battery first serves an automotive application, then is redeployed into a secondary market--could help address both issues by reducing battery costs to the primary (automotive) and secondary (electricity grid) users. This study investigates the feasibility of and major barriers to the second use of lithium-ion PEV batteries by posing and answering the following critical B2U questions: 1. When will used automotive batteries become available, and how healthy will they be? 2. What is required to repurpose used automotive batteries, and how much will it cost? 3. How will repurposed automotive batteries be used, how long will they last, and what is their value? Advanced analysis techniques are employed that consider the electrical, thermal, and degradation response of batteries in both the primary (automotive) and secondary service periods. Second use applications are treated in detail, addressing operational requirements, economic value, and market potential. The study concludes that B2U is viable and could provide considerable societal benefits due to the large possible supply of repurposed automotive batteries and substantial remaining battery life following automotive service. However, the only identified secondary market large enough to consume the supply of these batteries (utility peaker plant replacement) is expected to be a low margin market, and thus B2U is not expected to affect the upfront cost of PEVs.

25 ENERGY STORAGE↗

ARRA Energy Storage Demonstration Projects: Lessons Learned and Recommendations

The American Recovery and Reinvestment Act (ARRA) of 2009 (Recovery Act) provided funding for 16 energy storage demonstration projects. The projects ranged in scope from feasibility studies and technology demonstrations to full-scale, operational energy storage plants. This investment had a significant positive impact on the grid-connected energy storage industry. The goal of this report is to summarize the lessons learned from the ARRA projects, and to make recommendations for future Department of Energy (DOE) investments. Information for this report primarily came from three sources: a questionnaire and interview with each project team; DOE energy storage program peer review presentations; and DOE reports required as part of the ARRA project. Some lessons learned were common to many projects. Development of standards, codes and protocols specific to energy storage systems will mitigate uncertainty over code compliance, streamline permitting, and should be a priority (especially related to safety). Removal of regulatory barriers that preclude optimal operation of an energy storage system with multiple applications would immediately enable further deployment (e.g., FERC standards preclude the marketing department from reliability activities). Maturity of the approach to monetization varies substantially between applications with frequency regulation as an ancillary service leading other applications. Finally, developers focused on ramp mitigation and time shifting envision a reference plant. This reference plant would scale up from the current demonstration systems and would lead to the deployment of 50 MW-scale peaker plants.

25 ENERGY STORAGE↗

Regulators’ Financial Toolbox: Virtual Power Plants Summary

On June 21, 2023, NARUC’s Center for Partnerships & Innovation (CPI) and the NASEO-NARUC GridInteractive Efficient Buildings (GEB) Working Group co-hosted a Regulators’ Financial Toolbox Webinar on the topic of virtual power plants (VPPs). The webinar featured opening remarks from moderator Commissioner Cecile Fraser of the Public Utilities Commission of Massachusetts and presentations from Ryan Hledik, Principal, The Brattle Group; Brenda Chew, Director of Product Management, Virtual Peaker; and Franco Albi, Director of Regional Integration, Portland General Electric.

24 POWER TRANSMISSION AND DISTRIBUTION↗