Engineering Papers⌕ Search

SEARCH · Engineering Papers

Results for “PSH”

Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.

Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.

At least 19 records

Advanced Hydropower and PSH Capacity Expansion Modeling (Final Report on HydroWIRES D1 Improvements to Capacity Expansion Modeling)

Hydropower and pumped-storage hydropower (PSH) have played a key role in providing flexible, low-carbon electricity to the U.S. electricity system for over a century. As variable generation (VG) deployment increases the demand for flexible, dispatchable generation, it is important to use all available methods for understanding how hydropower and PSH interfaces with VG in a future low-carbon grid. Capacity expansion models (CEMs) of electricity systems are often used to study future electricity scenarios, but these tools often have difficulty representing site- and technology-details of hydropower and PSH due to limited spatial, temporal, or process resolution. This report demonstrates a set of model advancements to improve hydropower and PSH representations in CEMs and other models that consider hydropower and PSH's role in electricity systems. Model advancements include new data integration to define closed-loop PSH resource availability and cost, along with site-level parameterizations of existing PSH capacity and energy storage specifications. Shifting energy across seasons for both hydropower and PSH is explored to demonstrate the potential value of long-duration storage. New representations of hydropower upgrades offer opportunities to increase dispatchability, add pumps, or independently add capacity or energy depending on what is most valuable. New model structures and data are demonstrated individually and in combination to observe their impact on model results and provide initial insights into what is most important for analysts, electricity system planners, and hydropower decision-makers to consider when assessing future roles of hydropower. Improving flexibility of existing hydropower assets has the potential to reduce CO 2 emissions through complementing VG technologies and/or improve electricity system economics by reducing the need to deploy higher-cost systems. Large-scale energy storage is also shown to provide opportunities for balancing seasonal differences in VG, particularly solar photovoltaics (PV). Initial analysis with a new closed-loop PSH resource and cost dataset also demonstrate the potential for new PSH deployment to offer new grid flexibility opportunities. Future analysis and modeling of hydropower's role in the U.S. and other electricity systems could include methodological improvements based on those discussed here along with sensitivity analysis to better represent current and future potential hydropower and PSH flexibility. Improvements to geospatial and site-level data can further improve the understanding of how hydropower and PSH can be upgraded and operated in response to future electricity system needs. This work lays the groundwork to use advanced planning models to explore the range of roles hydropower and PSH can play in the grid of the future.

13 HYDRO ENERGY↗

Dynamic Modeling of Full Converter Adjustable-speed Pumped Storage Hydropower (FC AS-PSH)

Full converter adjustable-speed pumped storage hydropower (FC AS-PSH) technology, as one of advanced-PSH technology, is developed from wind turbine technology. By making the synchronous machine connect to the grid through a full-size converter, FC AS-PSH has a wider adjustment range of speed and a better reactive power control capability compared with a doubly-fed asynchronous generator AS-PSH technology. When it plays as an energy backup in the power system, FC AS-PSH can provide a much faster response than conventional-PSH (C-PSH) which makes this technology provide better ancillary service for a high renewable penetrated system. In this paper, the dynamic modeling of FC AS-PSH is fully studied. We develop a detailed model of this technology in the IEEE 14-bus system based on GE Positive Sequence Load Flow (PSLF) platform. Especially, the first governor model is developed based on the Engineer’s Program Control Language (EPCL) user-defined model in this platform. All operation modes are validated and studied under a system contingency. Besides, comparison cases between FC AS-PSH and C-PSH are studied to show advantages providing from FC AS-PSH when it works with renewable energy.

50 EE - Wind and Water Power Program - Water (EE-4↗

Pumped Storage Hydropower (PSH) FAST Commissioning Prize Technical Analysis

The US energy landscape has undergone major changes over the past 10 years and will continue to see significant changes in future decades as the power grid increases its reliance on variable renewable energy resources. Because of the inherent variability of these resources, renewable energy growth may require additional energy storage capacity to provide flexible load-following capabilities and other grid services that can quickly adjust to changes in energy demand and generation. Pumped storage hydropower (PSH)—one such energy storage technology—uses pumps to convey water from a lower reservoir to an upper reservoir for energy storage and releases water back to the lower reservoir via a powerhouse for hydropower generation. PSH facility pump and generation cycling often follows economic and energy demand conditions. Across the United States, 43 PSH facilities are in operation and 55 projects are in various permitting or licensing stages. Altogether, the 43 operational projects provide the wide majority (95%) of utility-scale electricity storage in the United States. These facilities also provide significant power and nonpower grid benefits, including large-scale electrical system reserve capacity, grid reliability support, and electricity supply-demand balancing through quick-response capabilities and operational flexibility. PSH systems can accomplish these at a scale (e.g., size) and cost that makes these systems highly attractive from a technical standpoint. Although these research concepts are still in their infancy, they demonstrate promising potential as future PSH energy storage technologies. Although PSH has many advantages, development in the United States has effectively stalled since the 1990s, partially because of the magnitude of project costs and financing interest during development and construction, the length of time from project investment until project revenue begins, permitting challenges, construction risks, competition from other storage technologies (e.g., batteries, hydrogen storage), and electricity market evolution and uncertainty. In short, the time, cost, and risk associated with modern PSH development have resulted in limited growth in the United States recently, despite the growing energy storage demand stemming from increased wind and solar power deployment. Technology innovation is needed to help reduce PSH commissioning time, cost, and risk, particularly during the post-licensing phase of project development. To address challenges facing the PSH industry and to improve PSH commissioning timelines, the US Department of Energy (DOE) Water Power Technologies Office (WPTO) initiated the PSH Furthering Advancements to Shorten Time to (FAST) Commissioning Prize project.

13 HYDRO ENERGY↗

Closed-Loop Pumped Storage Hydropower Resource Assessment for the United States. Final Report on HydroWIRES Project D1: Improving Hydropower and PSH Representations in Capacity Expansion Models

Pumped storage hydropower represents the bulk of the United States' current energy storage capacity: 23 gigawatts (GW) of the 24-GW national total (Denholm et al. 2021). This capacity was largely built between 1960 and 1990. PSH is a mature and proven method of energy storage with competitive round-trip efficiency and long life spans. These qualities make PSH a very attractive potential solution to energy storage needs, particularly for longer-duration storage (8 hours or more); such storage will be crucial to bridge gaps in electricity production as variable wind and solar production continue to comprise an ever-larger portion of the United States' energy portfolio (Cole et al. 2021; Frazier et al. 2021). However, it is unclear how much potential the United States has for the development of new PSH. No new large PSH has been constructed in the United States since the 1990s, and attempts to quantify technical potential capacity from PSH project applications to the Federal Energy Regulatory Commission (FERC) suffer from inconsistent site and cost evaluation methodologies and likely are not representative of all PSH opportunities. This study seeks to better under understand the technical potential for PSH development in the United States by developing a national-scale resource assessment for closed-loop PSH. Individual sites are not modeled in sufficient detail for project-level development, but they do provide valuable insights into potential resource areas across the United States, including the ability to provide estimates for a range of long-term development scenarios.

13 HYDRO ENERGY↗

Representing the Future Role of Hydropower and Pumped Storage Hydropower (PSH) in Electricity Planning Tools

Existing tools for long-term electric sector planning struggle to represent hydropower's nuanced site-specific technical and operating characteristics, which depend on technical specifications as well as water management practices and regulations. As a result, long-term planning models and tools insufficiently characterize hydropower value and incentives, and they cannot fully represent the role hydropower can play in a future electricity system that could include a high penetration of variable wind and solar generation, battery storage, and other low-carbon technologies. This presentation demonstrates the culmination of a multi-year effort to enhance hydropower representations in electricity planning models at the National Renewable Energy Laboratory (NREL), as part of the U.S. Department of Energy (USDOE) HydroWIRES Initiative. New modeling techniques are demonstrated using the NREL Regional Energy Deployment System (ReEDS), an open-access electric sector capacity expansion model used extensively in a wide range of technology deployment and integration analysis, including the 2016 USDOE Hydropower Vision. ReEDS uses a least-cost optimization approach to understand investment and operation of electricity generation, storage, and transmission technologies under future scenarios of electricity technology innovation, demand, policy, and other sectoral drivers. ReEDS was modified to better represent value and opportunities for both pumped storage hydropower (PSH) and hydropower systems without pumping. We incorporated a new national closed-loop PSH resource and cost assessment to explore new PSH deployment opportunities and added plant-level data to better represent the existing PSH fleet. New upgrade pathways enable opportunities for enhanced hydropower flexibility by adding pumps, upgrading dispatchability, increasing capacity, or increasing energy availability. The model was also modified to better represent the value of long-duration energy storage beyond diurnal time scales, allowing both hydropower and PSH to better balance energy supply and demand variations in high-renewable systems. These new features are demonstrated under reference and high-renewable futures and a range of sensitivity scenarios to understand which hydropower and PSH deployment and upgrade opportunities are the most attractive. These scenarios indicate potential for new closed-loop PSH deployment and for hydropower flexibility improvements to have important impacts on long-term electricity system emissions and economic outcomes. Increasing flexibility of the existing hydropower fleet can reduce the need to invest in new flexible grid technologies and help achieve decarbonization goals. Systems with sufficient energy storage could also be valuable for balancing seasonal differences in renewable energy availability, particularly from solar energy. The methods developed for ReEDS and subsequent scenario results reveal important considerations for future hydropower and grid system planning, and all data and code is freely available in a public code repository for use throughout the hydropower industry.

capacity expansion↗

Pumped-Storage Hydropower using Abandoned Underground Mines (PSH-AUM) as an Innovative Energy Storage Technology for Fossil-Integrated Systems

Pumped-storage hydropower (PSH) provides around 95% of all utility-scale energy storage in the U.S. and globally. Additional deployment of PSH is hampered by excessively long permitting and commissioning requirements and is constrained to locations for which natural topography provides suitable elevation relief between the upper and lower reservoirs (the ΔH challenge). The purpose of this research was to evaluate Pumped-Storage Hydropower using Abandoned Underground Mines (PSH-AUM) as a means to solve the ΔH challenge and initiate the commercialization pathway for a promising new energy storage technology. Four primary tasks were conducted: Screening and ranking of candidate sites for project development; multiphase reservoir modeling to evaluate mine performance; techno-economic analysis and preliminary designs for PSH-AUM systems integrated with fossil-fuel power units; and stakeholder engagement to identify pathways to commercialization of this new technology. Key results were achieved in each of the four primary tasks. Candidate site screening determined that nearly 10,000 underground mines were spatially locatable, of which more than 100 sites appear suitable for integration with existing fossil power plants that are expected to remain in longer-term operation. Mine reservoir models were developed using PNNL’s STOMP simulator and parameterized using candidate site data to evaluate interactions with the surrounding groundwater system and confirm the potential for some mines to accommodate inflows and outflows on the order of 100 m3/s over 8-hour durations (1.6 GWh system) without excessive aqueous pressures. Techno-economic analysis resulted in a project cost optimization scheme to identify key sensitivities and the development of preliminary designs that can minimize overall costs of deployment. Finally, stakeholder engagement with industry, state government, and local economic development leaders confirmed the viability of PSH-AUM as a promising new technology. Our Phase I project results suggest that PSH-AUM technology has a domestic market potential on the order of $100+ Billion with ample space for technology development to commercialization within the next decade.

13 HYDRO ENERGY↗

PSH Assessment and Site Identification [Slides]

NLR's Pumped Storage Hydropower (PSH) geospatial and cost model algorithms are applied to the Chemehuevi Reservation to assess the potential for PSH within the reservation. The algorithm identifies both "open-loop" PSH opportunities formed by constructing a new reservoir within the reservation paired with bordering Lake Havasu and "closed-loop" systems formed by two new reservoirs within the reservation. Options range from 28 to 538 MW of electrical generation power at maximum generation and 10 hours of storage. CAPEX is estimates as 4422 2022 $\$$/kW of generating power, which is meaningfully higher than the lowest cost systems identified in NLR's national scale assessments. Further economic analysis is needed to fully evaluate whether this would be an attractive option to meet the Chemehuevi Reservation's goals.

25 ENERGY STORAGE↗

AmeriFlux FLUXNET-1F US-PSH USSL San Joaquin Valley Pistachio High

This is the AmeriFlux Management Project (AMP) created FLUXNET-1F version of the carbon flux data for the site US-PSH USSL San Joaquin Valley Pistachio High. This is the FLUXNET version of the carbon flux data for the site US-PSH USSL San Joaquin Valley Pistachio High produced by applying the standard ONEFlux (1F) software. Site Description - High soil salinity pistachio orchard in San Joaquin Valley.

Anderson, Ray G.↗

Large Scale Pumped Storage to Support Renewable Deployment; PSH Resource Assessment and Complementary Analysis for Alaska

The State of Alaska has a rather unique electric power system, as it has two larger transmission grids (Railbelt and Southeast Alaska) and over 150 islanded stand-alone power systems that are serving remote rural communities. In 2010, the Alaska legislature enacted a non-binding goal for 50% of renewable electricity generation by 2025. With the expected increase in wind and solar generation in the future, the role of energy storage becomes increasingly important. Considering the specific power system characteristics in Alaska, energy storage technologies that can supply electricity over an extended period of time, such as pumped storage hydropower (PSH), may play a key role in enabling the reliability and resiliency of both integrated and rural power systems. The overarching objective of the subject study of this presentation is to investigate the prospects and opportunities for PSH in Alaska.

Alaska↗

Furthering Advancements to Shorten the Time (FAST) to Commissioning for Pumped Storage Hydropower (PSH) Prize (Penn State-PNNL): Cooperative Research and Development Final Report, CRADA Number CRD-19-00842

The National Renewable Energy Laboratory (NREL) initiated a Prize with support from Argonne National Laboratory (ANL), Oak Ridge National Laboratory (ORNL), and Pacific Northwest National Laboratory (PNNL), and sponsored by the U.S. Department of Energy Water Power Technologies Office (DOE WPTO) to encourage ideas to reduce the time to commissioning for PSH projects. As a result, nine finalists have been chosen to develop their concepts in advance of the FAST Prize Pitch Contest to be held on October 7, 2019. The national labs will provide technical and business advisement to the noted FAST Prize finalists in preparation for this Pitch Contest.

13 HYDRO ENERGY↗

Furthering Advancements to Shorten the Time (FAST) to Commissioning for Pumped Storage Hydropower (PSH) Prize: Cooperative Research and Development, CRADA Number CRD-19-00837 (Final Report)

The National Renewable Energy Laboratory (NREL) initiated a Prize with support from Argonne National Laboratory (ANL), Oak Ridge National Laboratory (ORNL), and Pacific Northwest National Laboratory (PNNL), and sponsored by the U.S. Department of Energy Water Power Technologies Office (DOE WPTO) to encourage ideas to reduce the time to commissioning for PSH projects. As a result, nine finalists have been chosen to develop their concepts in advance of the FAST Prize Pitch Contest to be held on October 7, 2019. The national labs will provide technical and business advisement to the noted FAST Prize finalists in preparation for this Pitch Contest.

13 HYDRO ENERGY↗

Furthering Advancements to Shorten the Time (FAST) to Commissioning for Pumped Storage Hydropower (PSH) Prize (CRADA Final Report)

NREL initiated a prize with support from Argonne National Laboratory (ANL), Oak Ridge National Laboratory (ORNL), and Pacific Northwest National Laboratory (PNNL), and sponsored by the U.S. Department of Energy Water Power Technologies Office (DOE WPTO) to encourage ideas to reduce the time to commissioning for PSH projects. As a result, Southwest Research Institute (SWRI) was chosen as one of nine finalists to develop their concept in advance of the FAST Prize Pitch Contest held on October 27, 2021. The National Labs provided technical and business advisement to SWRI in preparation for this Pitch Contest.

13 HYDRO ENERGY↗

Furthering Advancements to Shorten the Time (FAST) to Commissioning for Pumped Storage Hydropower (PSH) Prize: Cooperative Research and Development (Final Report)

The National Renewable Energy Laboratory initiated a Prize with support from Argonne National Laboratory (ANL), Oak Ridge National Laboratory (ORNL), and Pacific Northwest National Laboratory (PNNL), and sponsored by the U.S. Department of Energy Water Power Technologies Office (DOE WPTO) to encourage ideas to reduce the time to commissioning for PSH projects. As a result, nine finalists have been chosen to develop their concepts in advance of the FAST Prize Pitch Contest to be held on October 7, 2019. The National Labs will provide technical and business advisement to the noted FAST Prize finalists in preparation for this Pitch Contest.

16 TIDAL AND WAVE POWER↗

Furthering Advancements to Shorten the Time (FAST) to Commissioning for Pumped Storage Hydropower (PSH) Prize: Cooperative Research and Development (Final Report)

The National Renewable Energy Laboratory initiated a Prize with support from Argonne National Laboratory (ANL), Oak Ridge National Laboratory (ORNL), and Pacific Northwest National Laboratory (PNNL), and sponsored by the U.S. Department of Energy Water Power Technologies Office (DOE WPTO) to encourage ideas to reduce the time to commissioning for PSH projects. As a result, nine finalists have been chosen to develop their concepts in advance of the FAST Prize Pitch Contest to be held on October 7, 2019. The National Labs will provide technical and business advisement to the noted FAST Prize finalists in preparation for this Pitch Contest.

16 TIDAL AND WAVE POWER↗

A Comparison of the Environmental Effects of Open-Loop and Closed-Loop Pumped Storage Hydropower

Pumped storage hydropower (PSH) capabilities are generally characterized as either open-loop or closed-loop. The U.S. Department of Energy (DOE) defines open-loop PSH as “continuously connected to a naturally flowing water feature,” and closed-loop PSH as “not continuously connected to a naturally flowing water feature.” All the PSH projects constructed in the United States to date are open-loop, so the potential environmental effects of closed-loop systems are not as well documented as the effects of open-loop systems. To address this knowledge gap, the DOE Water Power Technologies Office, under its HydroWIRES Initiative, has prepared this report to: (1) compare the potential environmental effects of open-loop PSH projects with those of closed-loop PSH projects; (2) describe how these effects are being avoided, minimized, or mitigated at existing projects in other countries and proposed projects in the United States; and (3) discuss the relative significance of the environmental issues. The report begins with a brief introduction on the current status of PSH development in the United States. Next, the report describes the current Federal Energy Regulatory Commission (FERC) hydropower licensing process, emphasizing some recent regulatory changes that affect closed-loop PSH development. The report then provides a summary comparison of the environmental effects of constructing and operating open-loop and closed-loop PSH systems and discusses the relative significance of those issues. This comparison and discussion are based on the results of a literature review and a review of FERC licensing records. The literature review includes journal articles, technical reports, and presentations on the environmental effects of PSH systems. It includes literature from the United States as well as countries where closed-loop PSH projects have been constructed. The FERC records review examines the FERC licensing record (e.g., National Environmental Policy Act documents and license orders) to identify the environmental effects anticipated and mitigation measures proposed for six of the closed-loop PSH projects currently licensed or permitted in the United States. For comparison, the FERC records review also discusses the environmental effects and mitigation measures for four open-loop PSH projects proposed or currently operating in the United States. The comparison of effects between open-loop and closed-loop projects is relative; that is, it characterizes the impacts of each project type as generally lower or higher than another project type. The comparison reflects general trends among project types because there are sometimes exceptions to the examples cited. The comparison is based on both spatial (location) and temporal (duration) factors and reflects both the severity and likelihood of effects. The report concludes that the environmental effects of closed-loop PSH projects are generally lower (i.e., more localized and of shorter duration) than those of open-loop PSH projects because they are located “off-stream,” minimizing aquatic and terrestrial impacts, and often have greater siting flexibility than open-loop PSH projects. For certain closed-loop project designs, however, impacts to groundwater may be higher relative to open-loop projects and should be considered in any environmental review.

13 HYDRO ENERGY↗

Environmental Impacts of Closed-Loop Pumped Storage Hydropower

The goal of this report is to help license applicants, resource agencies, and other members of the hydropower community involved in closed-loop pumped storage hydropower permitting and licensing process, focus the scope of environmental reviews, and more quickly identify impacts with project nexus and potential mitigation measures for these impacts. Pumped storage hydropower (PSH) is an energy storage technology that uses energy to pump water up from a lower reservoir to an upper reservoir where water is stored until electricity is needed and the water is released to a lower reservoir passing through turbines. Closed-loop PSH—PSH that is not continuously connected to a naturally flowing water feature—is one of the lowest greenhouse gas emitting energy storage technologies and is therefore a critical part of the transition to renewable energy (Simon et al. 2023). Proposals for closed-loop PSH facilities in the United States currently account for more than 40% of original licenses and 99% of potential generation capacity in the Federal Energy Regulatory Commission (FERC) hydropower licensing pipeline (Johnson et al. 2023). While closed-loop PSH facilities can have lower environmental impacts than open-loop PSH facilities, no closed-loop facilities have been constructed in the United States to enable direct accounting of project impacts and efficacy of mitigations. Many proposals for closed-loop PSH submitted to FERC are abandoned early in the permitting and licensing process prior to license applications and environmental assessments, so there is little documentation describing potential project impacts and proposed mitigations. The newness of closed-loop PSH proposals in the United States may mean that tribal, federal, and state agencies with authorities for cultural and natural resources protection and management involved in the FERC licensing process may not have experience with closed-loop PSH regulation. Moreover, many proposed closed-loop PSH facilities are in areas that do not have high concentrations of conventional hydropower, so these agencies may also be unfamiliar with the FERC hydropower licensing process. The goal of this report is to help license applicants, resource agencies, and other members of the hydropower community focus the scope of environmental review for the closed-loop PSH development, licensing, and federal authorization process enabling quicker identification of potential impacts, mitigations, and situations where mitigation may not be possible. We found that environmental impacts of closed-loop PSH are highly site-specific, and generalizations about the types of environmental impacts across closed-loop PSH projects are difficult to make. Environmental impacts of closed-loop PSH are like those for open-loop PSH with a few exceptions including water sourcing, which can lead to delays and contention due to potential complexities with water rights, impacts to aquatic resources, and greenhouse gas emission potential. Cultural resource impacts were commonly reported in National Environmental Policy Act (NEPA) documents reviewed and discussed in interviews, but in many cases such impacts cannot be mitigated.

13 HYDRO ENERGY↗

Developing of Quaternary Pumped Storage Hydropower for Dynamic Studies

Quaternary pumped storage hydropower (Q-PSH) technology, as one of the new advanced-PSH technology, has been developed by taking advantage of Conventional-PSH (C-PSH) and Adjustable Speed-PSH (AS-PSH). By combining adjustable-speed pump unit and conventional hydropower turbine unit in the quaternary configuration, Q-PSH has the more competitive capability of providing fast power support in the future high renewable penetrated power system. Acting as energy storage (ES), Q-PSH provides promising power supply to deal with the uncertainty and variability from renewable energy generation. This paper focuses on the dynamic modeling of Q-PSH technology employing full-converter machine and the impact of Q-PSH on the frequency response in a system. The detailed model of Q-PSH is developed and implemented in the IEEE 14-bus system based on GE Positive Sequence Load Flow (PSLF) platform, which captures the dynamic of multiple operation modes, especially hydraulic short-circuit (HSC) operation mode. Several cases are set up to reveal the advantages of Q-PSH technology when power electronic based renewable energy generation is deployed in the system. Sensitivity studies of the controller in pump governor show the impact of parameters in pump response performance. The comparison case illustrates the impact of frequency response provided by the Q-PSH in the system.

dynamic modeling↗

Pumped Storage Hydropower Valuation Guidebook: A Cost-Benefit and Decision Analysis Valuation Framework

As an energy storage technology, pumped storage hydropower (PSH) supports various aspects of power system operations. However, determining the value of PSH plants and their many services and contributions to the system has been a challenge. While there is a general understanding that PSH resources provide many services and benefits for the operation of power systems, estimating the value of these services—and especially the monetary value of some of those services—has been a challenge. The objective of this project, funded by the U.S. Department of Energy’s (DOE’s) Water Power Technologies Office (WPTO), is to advance the state of the art in assessing the value of PSH plants and their contributions to the power system. The specific goal is to develop detailed, step-by-step valuation guidance that PSH developers, plant owners or operators, and other stakeholders can use to assess the value of existing or potential new PSH plants and their services. The specific goals of this project are: (1) to develop comprehensive and transparent valuation guidance that will support consistent valuation assessments and comparisons of PSH projects or project design alternatives, (2) to test the PSH valuation guidance and its underlying methodology by applying it to two selected PSH projects, and (3) to transfer and disseminate the PSH valuation guidance to the hydropower industry, PSH developers, and other stakeholders. The authors believe that the application of a consistent, transparent, and repeatable valuation process will advance valuation assessments and allow stakeholders to compare valuation analyses performed for different PSH projects or design alternatives. It will also increase the acceptance of valuation results and enable better understanding of the true value that PSH technology brings to the grid.

13 HYDRO ENERGY↗