Linking classical PRA models to a dynamic PRA

Here, this paper presents a series of methods designed to incorporate classical Probabilistic Risk Assessment (PRA) models such as Event Trees (ETs) and Fault Trees (FTs) into dynamic PRA. In contrast to classical PRA, dynamic PRA couples stochastic methods with system simulators to determine the risks associated with complex systems such as nuclear power plants. Compared with classical PRA methods, they can evaluate with higher resolution the safety impact of timing and sequencing of events on the progression of the accident. As part of a dynamic PRA analysis, it is not uncommon that parts of the system to be analyzed might not require a computationally expensive simulation model. These parts could be in fact modeled by employing classical PRA models (e.g., a FT). Here, we present a set of methods and tools that can be used to link the most common classical PRA models (ETs, FTs, reliability block diagrams and Markov models) to simulation codes such as RELAP5-3D: creating a “hybrid PRA.” In order to show the potential of such an hybrid PRA we employ this method to verify ET modeling assumptions (e.g., success criteria) using a large break loss of coolant accident initiating event as a test case. In this respect, we link a set of FTs from the original PRA to the RELAP5-3D code and perform a hybrid PRA. The FTs are employed to model the control logic of several safety systems and to propagate component failures throughout the system. Provided the generated dynamic PRA data, we show how conservative assumptions in the original PRA can be identified and how such original PRA can be modified by updating success criteria captured by the set of RELAP5-3D simulation runs.

97 - MATHEMATICS AND COMPUTING↗

Dynamic PRA Methods to Evaluate the Impact on Accident Progression of Accident Tolerant Fuels

Accident tolerant fuels (ATFs) are new nuclear fuels developed in response to the accident at the Fukushima power station in March 2011. The goal of ATFs is to withstand accident scenarios through better performance compared to currently employed fuels (e.g., small-scale hydrogen generation). This paper targets a method for evaluating and comparing ATF performance from a probabilistic risk assessment (PRA) perspective by employing a newly developed combination of event trees and dynamic PRA methods. Compared to classical PRA methods based on event trees and fault trees, dynamic PRA can evaluate with higher resolution the safety impacts of physics dynamics and the timing/sequencing of events on the accident progression without the need to introduce overly conservative modeling assumptions and success criteria. In this paper, we analyze the impact on the accident progression of three different cladding configurations for two initiating events [a large break loss-of-coolant accident (LB-LOCA) and a station blackout (SBO)] by employing dynamic PRA methods. The goal is to compare the safety performance of ATFs (FeCrAl and Cr-coated cladding) and the currently employed Zr-based clad fuel. We employ two different strategies. The first focuses on the identification of success criteria discrepancies between the accident sequences generated by the classical PRA model and the set of simulation runs generated by dynamic PRA using ATF. The second one, on the other hand, directly uses dynamic PRA to evaluate the impact of timing of events (e.g., recovery actions) on accident progression. In conclusion, by applying these methods to the LB-LOCA and SBO initiating events, we show how dynamic PRA methods can provide analysts with detailed and quantitative information on the safety impact of ATFs.

97 - MATHEMATICS AND COMPUTING↗

Risk Importance Ranking of Fire Data Parameters to Enhance Fire PRA Model Realism

Fire is historically and analytically a significant contributor to nuclear power plant risk. The level of fire risk and the methods, tools and data for modeling this risk is highly debated by experts. One area of debate is the input data used in fire modeling and how to deal with this data’s high uncertainty. This report outlines initial work performed for determining the key parameters causing this uncertainty and how it propagates into nuclear power plant models. This research paves the way for the development of methods to reduce fire data uncertainty used in modeling. The Nuclear Regulatory Commission has mandated that nuclear power plants perform fire risk modeling. However, there are several issues with the current risk modeling implementation that affect the results. Approved modeling methods can be overly conservative and often do not match plant experience. Also, the data used in the modeling can have high uncertainties and is influenced by expert judgement. To evaluate input data uncertainty, researchers performed an initial review of several fire experiments done at Sandia National Laboratories. Uncertainties for fire data can come from many sources, such as experiment design constraints, environmental conditions, or other plant-specific aspects. There are many different significant and insignificant parameters driving the uncertainty. Additionally, the uncertainty of the different input data used in the fire modeling could have a significant or insignificant effect on the entire plant risk. A four-step methodology was developed to perform Integrated Probabilistic Risk Assessment Importance Ranking. A demonstration case using these steps was set up and three of the four steps were completed in fiscal year (FY) 2019 and the fourth step done FY 2020. These steps are: 1. The qualitative analysis of potential sources was conducted with the following items identified for the demonstration. • Maximum heat release rate • Time to maximum heat release rate • Duration of max heat release rate • Time to decay • Thermal conductivity of concrete • Specific heat of concrete • Density of concrete • Cable jacket thickness 2. A quantitative characterization of dominant sources of uncertainty was performed. A list of distributions and determined values of the dominant sources is shown in Appendix A. 3. A quantitative screening of the potential sources of uncertainty using Morris Elementary Effects Analysis was completed. An experimental model using the physics-based fire modeling tool Fire Dynamics Simulator was developed and coupled with the Risk Analysis Virtual Environment. The Morris analysis identified at least two parameters that can be eliminated as significant contributors (specific heat of concrete and cable jacket thickness). 4. Global importance measure (Global IM) analysis to generate a comprehensive ranking based on their influence on the plant risk. In this research, a moment-independent Global IM is used since it can address (a) uncertainty in the input parameters of the fire model, (b) uncertainty in the risk outputs, and (c) non-linearity and interactions among input parameters in the fire model, more accurately than the correlation-based and variance-based global methods. The observations from the research showed that, depending on the initial and boundary conditions of the fire scenarios, fire-induced damage could have a very small probability and could be dominated by the tail of the uncertainty distribution; hence, the accuracy of the correlation-based and variance-based methods is questionable. The moment-independent Global IM analysis in this research provides a better understanding of how experimental uncertainty data affects industry’s plant models and where improvements in that data will have the largest benefit for improving fire modeling accuracy in causing core damage. Among the five unscreened parameters obtained from the Morris EE analysis, the Global IM analysis results for the case study indicated that max heat release rate and fire location are the most important parameters. The report also outlines benefits of using a unified computational platform that integrates the underlying simulations (e.g., a fire progression model), quantitative screening (using the Morris EE method), and the Global IM analysis. A unified platform can (i) facilitate the ranking of input parameters considering multiple key fire scenarios simultaneously, rather than considering one scenario at a time, (ii) contribute to more explicit and accurate treatment of dependencies at multiple levels of Fire PRA, (iii) facilitate the sampling-based uncertainty quantification for Fire PRA, and (iv) help generating both “industry-wide” and "plant-specific" ranking of uncertainty sources in Fire PRA. Future research should be done to include additional parameters such as detection/suppression or cable fire spread. Adding a PRA software such as SAPHIRE to the RAVEN platform would help with plant model integration and improve treatment of fire-induced dependency. The I-PRA risk importance ranking methodology offered in this report can provide valuable information for efficiently (a) enhancing the realism of Fire PRA for existing plants and (b) supporting the development of Dynamic Fire PRA for advanced reactors and new plants.

97 MATHEMATICS AND COMPUTING↗

Integrating static PRA information with risk informed safety margin characterization (RISMC) simulation methods

The overall objective of the project was to develop a computationally feasible and user-friendly mechanized process to integrate traditional probabilistic risk assessment (PRA) and dynamic PRA (DPRA) results. Starting with the systematic identification of items in an existing PRA that need dynamic augmentation, the project used a generic 4-loop pressurized reactor (PWR) and 3-loop PWR as example plants. Station blackout (SBO) and large break loss of coolant accident SBLOCA) were selected as the example initiating events. Using the traditional event-tree (ET)/fault-tree (FT) methodology augmented by dynamic evet tree approach, the potential consequences of the initiating events were simulated with RELAP-3D and MELCOR/RASCAL codes to cover Level 1 through Level 3 of PRA. RAVEN and ADAPT software were used to generate Level 1 simulations with RELAP-3D and Level 2/3 simulations with MELCOR (Level 2)/RASCAL (Level 3), respectively. Example branching conditions (BCs) for SBO included AC power recovery time, valve repair failure time, reactor coolant pump leak time/break size and emergency power supply duration to a total of 9. Example BCs for LOCA included off-site power recovery time, diesel generator power recovery time, auxiliary feed water system operation time, safety relief valve failure to open upon demand, reactor coolant pump seal break time and size to a total of 21. Each RELAP-3D simulation (9,587 scenarios) was labelled OK or Core Damage based on the maximum allowed peak clad temperature (2,100oF). Each MELCOR simulation (4610 scenarios) was labeled as Bin over 10rem or Bin 0-10rem based on the dose at the site boundary. The scenarios were clustered based on the criteria above using the mean shift methodology. Classical PRA (CPRA) and DPRA results were compared to identify the ET sequences that need DPRA augmentation. Several approaches were proposed for the incorporation of these sequences into CPRA using clustering with the mean shift methodology, restructuring the CPRA ETs by adding new BCs/sequences, and using the concept of a limit surface. Procedures for decision making regarding the possible consequences of an initiating event (e.g. core damage or not, site evacuation or not) were developed using a convolutional neural network (CNN), a recurrent neural network (RNN) and a transformer neural network (TNN). The project has led to two PhD degrees, three archival journal papers and five refereed conference proceedings.

21 SPECIFIC NUCLEAR REACTORS AND ASSOCIATED PLANTS↗

Limitations of traditional tools for beyond design basis external hazard PRA

Probabilistic risk assessment (PRA) is being used increasingly by the nuclear industry for safety during normal operations as well as for the protection against external hazards. Computation of total risk in an external hazard PRA is dependent on hazard assessment, fragility assessment, and systems analysis. A systems analysis for propagation of component fragilities is conducted using event and fault trees. The event and fault trees for an actual power plant can be fairly large in size, which imposes computational challenges. Hence, certain assumptions are employed for computational efficiency. These assumptions typically represent the conditions imposed during the design basis (DB) scenario. The traditional PRA tools based on these assumptions are also widely applied to perform risk assessment in the context of beyond design basis (BDB) scenarios. However, some of these assumptions may not be valid for certain BDB scenarios. In addition, the probability of dependent failures also increases in BDB scenarios due to common cause failures (CCF) which usually results from design modifications, human errors, etc. In this manuscript, a simple and a relatively more complex illustrative examples are used to show the limitation of these assumptions in the numerical quantification of risk for the case of BDB conditions. Case studies with CCF events across multiple fault trees are also presented to illustrate the effect of these assumptions when traditional approach is used in BDB risk assessment. It is shown that the assumptions are valid for the case of DB conditions but may lead to excessively conservative risk estimates in the case of BDB conditions. Finally, a Bayesian network based top-down algorithm is proposed as an alternative tool for accurate numerical quantification of total risk in systems analysis.

73 NUCLEAR PHYSICS AND RADIATION PHYSICS↗

Integrated Fire Probabilistic Risk Assessment (PRA) Modeling in Support of Operational Efficiency (Final Report)

To improve the realism of Fire PRA associated with fire progression and damage modeling or manual suppression, previous research by the Socio-Technical Risk Analysis (SoTeRiA) Research Laboratory at the University of Illinois at Urbana-Champaign focused on the development of an Integrated PRA (I-PRA) methodological framework for fire risk analysis in NPPs.

22 GENERAL STUDIES OF NUCLEAR REACTORS↗

Dynamic PRA-Based Estimation of PWR Coping Time Using a Surrogate Model for Accident Tolerant Fuel

In this study, we propose an interpolation-based response surface surrogate methodology to manage a large number of scenarios in dynamic probabilistic risk assessment. It adopts the shape Dynamic Time Warping algorithm to cluster the interpolation neighborhood from time series sample data. The interpolation method was adapted from Taylor Kriging to allow a reduced-order model of the Taylor series. In order to demonstrate its applicability to complex issues in risk assessment for nuclear engineering, an example risk response surface to estimate emergency core cooling system (ECCS) criteria for triplex silicon carbide (SiC) accident-tolerant fuel was constructed. The response surface was exploited to estimate the cumulative failure probability of the fuel cladding structure due to the uncertainties in operator actions and safety systems. The functional failures were assessed based on a combination of individual layer failures computed by coupling Risk Analysis Virtual Environment software with a pressurized water reactor 1000-MW(electric) RELAP5 model and the in-house fuel performance assessment module. Results showed that SiC cladding failure probability spiked less than 1 min after a large-break loss-of- coolant accident whenever the current ECCS criteria for Zircaloy-4 (Zr-4) cladding was used. However, it still provides an increased safety margin of three orders of magnitude compared to Zr-4. This positive margin could be utilized to relax active ECCS requirements by allowing deviations of up to 450 s in its actuation time. The proposed surrogate methodology generated a response surface of SiC cladding failure probability reasonably well, with a significant savings of computation time. This methodology is expected to be useful in the analysis of system response with complex uncertainty sources.

22 GENERAL STUDIES OF NUCLEAR REACTORS↗

Probabilistic Risk Assessment Research Needs and Activities

Probabilistic risk assessments (PRAs) have benefitted the safe operation of the U.S. reactor fleet over many decades. Risk insights from these PRAs have provided information from many different perspectives, from what is most important to maintain at a facility to a better understanding of how to address new information regarding safety issues. The methods and tools that have supported the creation and enhancement of PRA models were established through multiple decades of research, from the 1970s starting with the WASH-1400 Reactor Safety Study through comprehensive plant-specific models in use today. Because PRA models are being used to support such a diverse array of plant decisions, they are now being applied to analyze an increasing number and diverse set of aspects of the plant, which are well beyond the initial efforts envisioned in the 1970s. These demands on PRA methods and tools have led to challenges in terms of further expansion of the use of PRA and raised the potential for future research into how to address these challenges to ensure continued nuclear safety. In addition to the PRA needs, the domain of computer science has led to advances in computational approaches that may serve to help nuclear power plant PRA applications. These newer technologies have great potential to improve the effectiveness and economics of PRA and are being considered for exploration of potential benefits to the PRA and nuclear-power communities.

97 MATHEMATICS AND COMPUTING↗

Enhancement of Industry Legacy Probabilistic Risk Assessment Methods and Tools

Probabilistic risk assessments (PRAs) are integral to nuclear power plant (NPP) operations, having tremendously benefitted the safety of the U.S. reactor fleet for decades. Insights obtained from the models have provided perspectives on a variety of applications, both at the plant and for the regulator. While these models are very useful, they are now being asked to represent and analyze aspects of the plant that were never envisioned by the initial PRA practitioners. Furthermore, heightened demands on the PRA models have led to increased computing power requirements. Additionally, as the complexity of the PRA models increased, the difficulty experienced by non-PRA experts in trying to understand these models, grasp the insights they provide, and effectively use that information has become problematic. The need for research to address key issues regarding PRA tools and methods has never been greater. Although the nuclear power industry has largely been well-served by these tools and methods, the underlying science is dated, remaining mostly unchanged for over two decades. Three areas were identified as most beneficial to address to maintain and improve the usefulness of the current practice legacy PRA tools: improvement in quantification speed, increased ability to efficiently model multi-hazard models, and improvement in modeling human action dependency in PRA. This report provides the outcomes from the FY2021 research into these three areas, identifying potential technical gaps and solutions, and charting the next steps forward to address current PRA challenges.

42 ENGINEERING↗

Solutions for Enhanced Legacy Probabilistic Risk Assessment Tools and Methodologies: Improving Efficiency of Model Development and Processing via Innovative Human Reliability Dependency Analysis

Probabilistic risk assessments (PRAs) are integral to nuclear power plant (NPP) operations, having tremendously benefitted the safety of the U.S. reactor fleet for decades. Insights obtained from the models have provided perspectives on a variety of applications, both at the plant and for the regulator. While these models are very useful, they are now being asked to represent and analyze aspects of the plant that were never envisioned by the initial PRA practitioners. Furthermore, heightened demands on the PRA models have led to increased computing power requirements. Additionally, as the complexity of the PRA models increased, the difficulty experienced by non-PRA experts in trying to understand these models, grasp the insights they provide, and effectively use that information has become problematic. The need for research to address key issues regarding PRA tools and methods has never been greater. Although the nuclear power industry has largely been well-served by these tools and methods, the underlying science is dated, remaining mostly unchanged for over two decades. Three areas were identified as most beneficial to address to maintain and improve the usefulness of the current practice legacy PRA tools: improved quantification speed, increased ability to efficiently model multi-hazard models, and improved modeling human action dependency in PRA. This report is focused on the third critical area, improvements in dependency analysis of human actions conducted as part of a typical human reliability assessment.

22 GENERAL STUDIES OF NUCLEAR REACTORS↗

Advancing Multi-Hazard Risk and Safety Considerations for Aging Nuclear Facilities (Revision 1)

This project will demonstrate a multi-hazard time-dependent probabilistic risk assessment (PRA) approach for nuclear facilities considering aging-related deterioration of structures. A generic pressurized water reactor (PWR) reactor subjected to seismic mainshock-aftershock sequences considering the aging of the containment structure will be used as a case study to demonstrate the multi-hazard PRA approach. Using advanced modeling and simulation, seismic mainshock-aftershock fragility functions will be simulated for the containment structure considering aging effects. A multi-hazard PRA model for a generic PWR reactor will be built to quantify the multi-hazard core damage frequency (CDF) and large early release frequency (LERF) with explicit time-dependent modeling of event sequences. To date, the cascading impacts of multi-hazards are not adequately accounted for in the PRA models for nuclear facilities. In addition, for both initial and periodic evaluation of facilities to withstand natural phenomena hazards (NPH), deterioration of the SSCs due to aging and other effects is not adequately considered. By advancing multi-hazard considerations accounting for aging effects, this project will contribute to improved understanding of the safety of aging nuclear facilities. Project outcomes such as the multi-hazard CDF and LERF will also allow facility owners to optimize upgrade and retrofit protocols. This project is divided into two components: (1) advanced modeling and simulations; and (2) multi-hazard PRA. For the first component, Idaho National Laboratory’s (INL) Multi-hazard Analysis for STOchastic time-DOmaiN phenomena (MASTODON) and BlackBear codes will be used to simulate the seismic response and damage of a containment structure under cascading mainshock-aftershock sequences with aging effects. Uncertainties related to the seismic inputs, material parameters, and environmental factors such as temperature and humidity will be identified and propagated to the fragility functions. These fragility functions, which consider aging effects, will be time dependent. The second component will take the fragility information from the first component to build a multi-hazard time-dependent PRA model starting from a generic PWR model to evaluate the multi-hazard CDF and LERF and characterize the associated consequences. For this component, OpenPRA Web Application and SAPHIRE code will be used. Events such as the Fukushima Daiichi accident have highlighted the importance of considering the cascading impacts of multi-hazards for PRA. Moreover, many of the reactors in the current nuclear fleet in the United States (US) are already operating well beyond their initially planned design life, and applications for further extensions to operating licenses are being considered. Therefore, considering multi-hazard effects and aging deterioration in the NPH risk assessment process will contribute to the safety of both existing and future nuclear facilities. Outcomes of this project will thus directly benefit the standards DOE-STD-1020-16 and DOE-HDBK-1224-18.

22 GENERAL STUDIES OF NUCLEAR REACTORS↗

A framework to implement human reliability analysis during early design stages of advanced reactors

Nuclear power plants require human actions throughout their lifecycle from design, construction, operation, and decommissioning. However, for advanced reactors (e.g., Generation IV), the reliance on human intervention in safety-related actions is expected to be reduced or completely replaced by automated actions. The Probabilistic Risk Assessment (PRA) Standard for Advanced Non-LWR Nuclear Power Plants requires that the impacts of all operator actions are captured and incorporated in the risk of the modeled plant. Moreover, the Modernization of Technical Requirements for Licensing Advanced Reactors requires human reliability analysis (HRA) to be included throughout all design and PRA development stages. However, due to the lack of details during the early design stages, HRA is often postponed until the design is mature enough. Conducting HRA in later design stages, though it may be adequate in capturing pre-, at-, and post-initiators comes short of informing the design itself in the iterative design lifecycle. Hence, this paper presents a framework to include HRA during the design's early stages, pre-conceptual or conceptual. The proposed framework provides a process for the removal of operator actions that do not contribute to the risk and the identification of all key operator actions that are critical to the safety of the design. The results of this framework are then used to inform the design of those safety-related operator actions to update the design further. Then, using information from the updated design, this framework can be reapplied to investigate the impact of the design update on human reliability. The PRA model of the X-energy's pre-conceptual Xe-100 high-temperature gas-cooled pebble-bed reactor (HTGR-PB) design is used to demonstrate the approach. In the pre-conceptual Xe-100 PRA model, also called Phase 0 PRA model, human actions were considered an integral part of analyzing the plant response to different initiating events. Hence, in this paper, all possible human actions in the Xe-100 PRA model are identified, analyzed, and removed to emulate a design relying only on the available automated control systems. The preliminary results of this assessment show how safe the Xe-100 design is even without crediting any human actions. The results also list necessary sequences in which operator actions are critical to the risk profile of the design.

22 GENERAL STUDIES OF NUCLEAR REACTORS↗

A systematic decision-making methodology to formalize the selection of degree of realism in screening analysis of probabilistic risk assessment

In the nuclear power domain, Probabilistic Risk Assessment (PRA) is used to inform decision-making for Nuclear Power Plants (NPPs). Recently, there has been an increase in the utilization of modeling and simulation (M&S) to support the estimation of PRA inputs. Risk analysts should carefully select the PRA items that require M&S and their degree of realism (DoR) with consideration of the required resources. To support this selection, this article formulates a systematic decision-making approach for the DoR selection. The DoR selection is made based on two predictive decision-making attributes: the predicted differences in safety risk estimate (ΔSaRi) and the cost of analysis (ΔCAN). This research also develops and quantifies causal models to estimate ΔSaRi and ΔCAN. The causal model-based prediction of ΔSaRi and ΔCAN helps reduce the trial-and-error nature of the DoR selection in the PRA screening analysis and provides insights for DoR selection and the gradual refinements of PRA realism. This approach is demonstrated for a case study on fire PRA of NPPs, where an adequate DoR is selected from two fire models: an engineering correlation and a zone model.

Alkhatib, Sari [Department of Nuclear, Plasma, and↗

Expansion of Hazards and Probabilistic Risk Assessments of a Light-Water Reactor Coupled with Electrolysis Hydrogen Production Plants

This report builds upon the body of work sponsored by the Department of Energy (DOE) Light-Water Reactor Sustainability (LWRS) Flexible Power Operation and Generation (FPOG) program that presented generic probabilistic risk assessments (PRAs) for the addition of a heat extraction system (HES) to light-water reactors to support the co-location of a high temperature hydrogen electrolysis facility (HTEF). Probabilistic and deterministic hazards assessments and risk analyses are leveraged throughout this report. Several improvements and new analyses are included in this report. First, higher amounts of detail in the specifications of the generic HTEFs are used to produce scaled results for a 100, 500, and 1000 MW nominal hydrogen production facility. An additional hazard assessment of 1000 kg of hydrogen storage is performed. The facility hazards and footprint are assessed to determine the safe distance required for placement near the nuclear power plant (NPP). Second, specific designs for corresponding HESs for the different levels of support required by the HTEFs are analyzed in the PRA model. Third, a hazards analysis of the specified HTEFs leads not only to effects of the quantified risk assessment for the NPP, but also qualitative hazards assessment for the community. Finally, a seismic analysis and a high winds analysis have each been added to the PRA. The results investigate the applicability of the potential licensing approaches which do not require a full United States (U.S.) Nuclear Regulatory Commission (NRC) licensing review. The PRAs are generic and include listed assumptions. The HTEF design built for this project has further eliminated many conservative assumptions from the prior PRAs in this series. The PRA results indicate that the 10 CFR 50.59 licensing approach is justified due to the minimal increase in initiating event frequencies for all design basis accidents, with none exceeding 7.7%. The PRA results for core damage frequency and large early release frequency support the use of NRC Regulation Guide 1.174 as further risk information that supports a change without a full licensing amendment review. The hazard analyses and PRA confirm the need for engineered blast barriers of storage tanks and the common production header leaving the HTEF. The hazards analyses and PRA also confirm with high confidence that using the assumptions of design in this report that the safety case for licensing an HES addition and an HTEF sited with its unprotected high-pressure stage components 187 meters from the NPP’s transmission towers (the most fragile structure, system, and component) is strong.

08 HYDROGEN↗

Advancing Multi-Hazard Risk and Safety Considerations for Aging Nuclear Facilities

While probabilistic risk assessment (PRA) of nuclear facilities is expected to include internal and external hazards for a risk-informed and performance-based design, the current state of practice treats each hazard independently. However, such an independent treatment of hazards may not account for the correlations between different hazards and their response of and damage to the structures, systems, and components (SSCs) in a plant resulting in underestimating the overall risk. This project proposes to advance the multi-hazard PRA of nuclear facilities to more adequately evaluate concurrent hazards and contribute to an increased safety of nuclear plants. A framework for multi-hazard PRA will be developed by identifying concurrent hazard events (both internal and external) and event sequences that include interdependencies through the response of SSCs. An example application of the multi-hazard PRA framework will be demonstrated by considering a generic pressurized water reactor (PWR) subjected to seismic and internal flooding hazards. Computational models for the response of components will be developed to generated multi-hazard fragility surfaces under seismic and flooding loads. A PRA model consisting of event and fault trees will also be developed to quantify the multi-hazard risk profile and compare it with the independent hazard risk profile. Overall, by advancing the multi-hazard PRA of nuclear facilities, this project enhances nuclear safety and reduces costs by mitigating unforeseen consequences caused by correlations between concurrent hazards.

97 - MATHEMATICS AND COMPUTING↗

Applying AI/ML Techniques to U.S. Nuclear Operating Experience Program

Idaho National Laboratory (INL) has provided technical assistance to the U.S. Nuclear Regulatory Commission (NRC) in reliability and risk analysis including the operating experience (OpE) program since the 1980s. The U.S. nuclear OpE program provides input parameters to the NRC Standardized Plant Analysis Risk models and the industry probabilistic risk assessment (PRA) models. While earlier PRA focuses were on at-power, internal event analysis, the risks from external hazards and during low power shutdown (LPSD) operation could be significant and the needs to develop LPSD PRA and external hazards PRA are on the rise. One issue in developing LPSD PRA is the reasonable estimation of shutdown initiative event (SDIE) frequencies. INL has developed and is maintaining an SDIE database for the NRC. However, this database is based on the reviewing of Licensee Event Reports (LERs), which is believed to be only a subset of “actual” shutdown initiating events occurred in the industry. This paper investigates a new approach to identify and characterize shutdown initiating events from the Institute of Nuclear Power Operations (INPO) industry database using machine learning techniques. The main process in this approach is to find out the relationship between key words in event descriptions and the SDIE categories as in the NRC SDIE database. The relationship can then be applied to the INPO database and search for SDIEs.

99 GENERAL AND MISCELLANEOUS↗

Risk-Informed Approach for Regulatory Approval of Microreactor Transport

Pacific Northwest National Laboratory (PNNL) is addressing the challenges associated with safe transport of microreactors including the development and evaluation of regulatory options. PNNL developed a risk-informed regulatory framework for the licensing of the transportation of microreactors in which irradiated nuclear fuel is part microreactor transportation package. The framework lays out a viable regulatory pathway, including decision points for regulatory options and the supporting technical evaluations for those options in phases from near to long term. A microreactor and its contents will likely not be able to meet all the federal regulatory requirements as a Type B or fissile material transportation package under 10 CFR Part 71 (“Packaging and Transportation of Radioactive Material”). However, the regulatory framework developed by PNNL lays out a viable risk-informed licensing options that are safe and feasible. Risk assessment such as probabilistic risk assessment (PRA) can be used to show comparable safety to that provided by a Type B or fissile material package for surface transport. The framework includes guidance on applicable regulations and discusses historical precedence in using risk information for transportation licensing. The framework includes guidance for performing a microreactor transportation PRA, use and development of risk evaluation criteria, and factors such of defense-in-depth and safety margin concepts. Key advantages of using the approach are (1) increasing the likelihood of successfully obtaining regulatory transportation package approval, (2) informing the design on the relative risk significance of microreactor containment and shielding, and (3) informing the need for transportation compensatory measures. This paper focuses on two primary elements of the framework which are development of a transportation PRA for microreactor packages and development of the risk acceptance guidelines to assess the results of the PRA for regulatory decision-making.

microreactor, micro nuclear power plant, MNPP, ris↗