Engineering Papers⌕ Search

SEARCH · Engineering Papers

Results for “PPAs”

Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.

Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.

At least 19 records

Financing Solar PV at Government Sites with PPAs and Public Debt (Brochure)

Historically, state and local governmental agencies have employed one of two models to deploy solar photovoltaic (PV) projects: (1) self-ownership (financed through a variety of means) or (2) third-party ownership through a power purchase agreement (PPA). Morris County, New Jersey, administrators recently pioneered a way to combine many of the benefits of self-ownership and third-party PPAsthrough a bond-PPA hybrid, frequently referred to as the Morris Model. At the request of the Department of Energy?s Solar Market Transformation group, NREL examined the hybrid model. This fact sheet describes how the hybrid model works, assesses the model?s relative advantages and challenges as compared to self-ownership and the third-party PPA model, provides a quick guide to projectimplementation, and assesses the replicability of the model in other jurisdictions across the United States.

14 SOLAR ENERGY↗

Financing Solar PV at Government Sites with PPAs and Public Debt (Brochure)

Historically, state and local governmental agencies have employed one of two models to deploy solar photovoltaic (PV) projects: (1) self-ownership (financed through a variety of means) or (2) third-party ownership through a power purchase agreement (PPA). Morris County, New Jersey, administrators recently pioneered a way to combine many of the benefits of self-ownership and third-party PPAsthrough a bond-PPA hybrid, frequently referred to as the Morris Model. At the request of the Department of Energy's Solar Market Transformation group, NREL examined the hybrid model. This fact sheet describes how the hybrid model works, assesses the model's relative advantages and challenges as compared to self-ownership and the third-party PPA model, provides a quick guide to projectimplementation, and assesses the replicability of the model in other jurisdictions across the United States.

14 SOLAR ENERGY↗

Enhanced Proton Therapy: PPAS

The supplier adjusted the process for manufacturing the Short Head Pod section of the Modular Patient Support System in an attempt to eliminate the voids and discontinuities that prevented them from passing the shoot-through clinical requirements, critical to the use of these parts for patient treatment. The remanufactured unit, while an improvement over the previously supplied unit, it still was unable to meet the stringent shoot-through clinical requirements as tested by the LLUMC Medical Physics Laboratory. The vendor was unable to refine the process further, requiring the team to seek alternative solutions. A new replacement, the KVue system provided by Q-Fix, was evaluated by the LLUMC team and found to provide the desired functionality. The remaining funding from this grant was utilized to purchase components of this new system for patient immobilization on the robotic Precision Patient Alignment System.

99 GENERAL AND MISCELLANEOUS↗

Near-Term Electricity Requirement and Emission Implications for Sustainable Aviation Fuel Production with CO 2 -to-Fuels Technologies

Aviation contributed approximately 10% of the U.S. transportation sector's greenhouse gas (GHG) emissions and about 3% of the nation's total GHG production before the coronavirus disease (COVID-19) pandemic (EPA 2022). Unlike the ground transportation sector, which can be decarbonized by using batteries and hydrogen fuel cell powertrain technologies, the technical and economic challenges of aviation electrification open the opportunity for CO 2 utilization (CO2U) using clean power sources. The U.S. government set a goal to produce 3 billion gallons per year of sustainable aviation fuels (SAF) by 2030 and scale up the production to 35 billion gallons per year by 2050 (Bioenergy Technologies Office 2022). In this report, we examine three potential locations, in California, Iowa, and Louisiana, for SAF production using two production pathways that are expected to be available by 2030. We analyze the electricity cost to satisfy 10% of the SAF production potential for the select locations. Specifically, we consider (1) retail electricity cost from the default local utility in each location; (2) physical power purchase agreement (PPA) for renewable power and battery storage hybrid systems with preset prices; (3) financial PPA from a dedicated renewable plant; and (4) estimated real-time pricing (RTP) from the wholesale power market with utility delivery adders. Retail rates are available for the three potential locations; however, the developer should negotiate with the local utility in Iowa for new tariff riders, because the load of the proposed SAF plant (1.4 GW) is significantly higher than the current industrial tariff structure requirement (200 kW). The developers are not able to claim federal credits (i.e., the Inflation Reduction Act of 2022) when sourcing electricity from local utilities. Developers could consider prioritizing physical and financial PPAs as purchase options. While physical PPAs can be imported out of state, this structure imposes availability issues as developers must locate in the same electricity grid regions. Financial PPAs do not have the same location restrictions and provide the same cost savings as physical PPAs, but financial PPAs impose financial risks in the event of system curtailment and grid interruption. RTPs are available for customers in California with flexible load and hourly load management capability; however, utilities in our studied regions in Louisiana and Iowa only offer time-of-use and curtailment programs to incentivize lower energy usage in peak hours. These utilities do not currently offer RTP programs, and the developer may need to have further negotiations with the local utilities to access RTP programs. The results show that purchased electricity prices may range from 2.6 cents/kWh to 7.1 cents/kWh for the three studied plants.

02 PETROLEUM↗

Using Power Purchase Agreements for Solar Deployment at Universities

More than 60 universities have used solar power purchase agreements (PPAs) to deploy more than 100 megawatts of solar PV on campuses around the country. This webinar is intended for university financial planners and other stakeholders who are assessing the financial aspects of deploying solar. The speakers will provide an overview of how universities are using PPAs and key PPA components. In addition, they will discuss the process of using PPAs, why PPAs make sense for campus solar deployment, and the benefits and challenges for universities. Tools and other resources will be shared to help universities interested in using PPAs for campus solar deployment.

14 SOLAR ENERGY↗

Archaeal Inorganic Pyrophosphatase Displays Robust Activity under High-Salt Conditions and in Organic Solvents

Soluble inorganic pyrophosphatases (PPAs) that hydrolyze inorganic pyrophosphate (PP i ) to orthophosphate (P i ) are commonly used to accelerate and detect biosynthetic reactions that generate PP i as a by-product. Current PPAs are inactivated by high salt concentrations and organic solvents, which limits the extent of their use. Here we report a class A type PPA of the haloarchaeon Haloferax volcanii (HvPPA) that is thermostable and displays robust PP i -hydrolyzing activity under conditions of 25% (vol/vol) organic solvent and salt concentrations from 25 mM to 3 M. HvPPA was purified to homogeneity as a homohexamer by a rapid two-step method and was found to display non-Michaelis-Menten kinetics with a V max of 465 U · mg –1 for PP i hydrolysis (optimal at 42°C and pH 8.5) and Hill coefficients that indicated cooperative binding to PP i and Mg 2+ . Similarly to other class A type PPAs, HvPPA was inhibited by sodium fluoride; however, hierarchical clustering and three-dimensional (3D) homology modeling revealed HvPPA to be distinct in structure from characterized PPAs. In particular, HvPPA was highly negative in surface charge, which explained its extreme resistance to organic solvents. To demonstrate that HvPPA could drive thermodynamically unfavorable reactions to completion under conditions of reduced water activity, a novel coupled assay was developed; HvPPA hydrolyzed the PP i by-product generated in 2 M NaCl by UbaA (a “salt-loving” noncanonical E1 enzyme that adenylates ubiquitin-like proteins in the presence of ATP). Altogether, we demonstrate HvPPA to be useful for hydrolyzing PP i under conditions of reduced water activity that are a hurdle to current PPA-based technologies.

59 BASIC BIOLOGICAL SCIENCES↗

Nine Canyon Long-Duration Energy Storage: A Feasibility Study

The Nine Canyon Long Duration Energy Storage (LDES) Feasibility Study explores the technical and economic viability of deploying advanced energy storage technologies at Energy Northwest's (EN) Nine Canyon (9C) Wind Project site in Benton County, Washington. Supported by the Washington State Department of Commerce and the U.S. Department of Energy’s Office of Electricity under its LDES Voucher Program, the study represents a collaborative effort between EN, Pacific Northwest National Laboratory (PNNL), and ARES North America. At the core of this effort is the development of a generalized techno-economic modeling framework and evaluation tool designed to assess the value proposition of LDES projects across a variety of contexts. The modeling tool is technology-agnostic and accommodates user-defined parameters such as rated power, energy duration, round-trip efficiency, capital and operational costs, and dispatch constraints. It also integrates economic inputs, including market prices, energy revenue structures, and financing parameters to evaluate performance through key metrics. The tool provides utilities with a transparent, adaptable platform to support decision-making, investment prioritization, and portfolio planning for various storage technologies. To guide scenario design and interpretation, the study first surveyed the LDES technology landscape, including lithium-ion batteries, flow batteries, non-hydro gravity storage, and thermo-mechanical systems, comparing cost trajectories, technical performance, safety and hazards, materials sourcing and recyclability, and spatial/siting considerations. This literature-grounded review highlights technology trade-offs and reinforces the need to align technology choice with site characteristics, use cases, and project objectives. A companion chapter examines ownership structures (EN ownership, third-party ownership, shared models) and offtake options (energy marketing, capacity/energy PPAs, time-of-use PPAs, block-delivery PPAs, and tolling), where PPAs (power purchase agreements) represent contractual arrangements for buying and selling electricity. The chapter also highlights implications for risk allocation, capital access, operational control, and revenue certainty. The study also evaluates supervisory control and data acquisition (SCADA) and transmission interconnection pathways, options include upgrading the existing SCADA or deploying a dedicated LDES controller, with attention to protection schemes, data telemetry, cybersecurity, and regulatory coordination with BPA. In addition, an ARES-specific geotechnical and hydrology assessment presented in the appendix screens multiple corridors for slope stability, bearing capacity, cut-and-fill magnitude, and stormwater behavior.

25 ENERGY STORAGE↗

A Review of Pump Package Assembly Anomalies and Demonstration to Gain Motor Controller Replacement Capability

The International Space Station (ISS) generates heat within the US modules from systems used to operate the station, maintain crew health, and conduct science experiments in the orbiting laboratory. The Internal Thermal Control System (ITCS) collects this heat in water loops and transfers it to the external ammonia system for rejection to space. The ITCS uses six Pump Package Assemblies (PPA) as the motive force to circulate the water within the Lab, Node 2, and Node 3 (Node 1 is parasitic to the Lab and Node 3 ITCS loops). In the life of ISS, 3 PPAs have had to be replaced and 2 PPAs are currently showing signs of degradation. The first PPA to fail in 2003 was due to early coolant chemistry issues; the remaining pump failures and current pump degradations are determined to be related to the Pump/Fan Motor Controller (PFMC), with their individual signatures all being unique to this point. The PFMC of one of the failed PPAs was returned and testing confirmed its sub-components to be the root cause of the PPA failure. Due to the relative size and weight of the standalone PFMC in comparison to the integrated assembly, it is desired, from a launch and on-orbit stowage perspective, to replace the PFMC component of the degraded PPA instead of the entire PPA. The PPA was not designed for this capability, so on the ground demonstrations are planned using crew tools to show that the PFMC can be replaced on-orbit while maintaining full functionality. This paper will focus on the signatures of the two most recent PPA failures and the two PPAs showing signs of degradation, in addition to presenting the findings from the PFMC demonstration effort.

Aaron Rodriguez↗

A Review of Pump Package Assembly Anomalies and Demonstration to Gain Motor Controller Replacement Capability

The International Space Station (ISS) generates heat within the US modules from systems used to operate the station, maintain crew health, and conduct science experiments in the orbiting laboratory. The Internal Thermal Control System (ITCS) collects this heat in water loops and transfers it to the external ammonia system for rejection to space. The ITCS uses six Pump Package Assemblies (PPA) as the motive force to circulate the water within the Lab, Node 2, and Node 3 (Node 1 is parasitic to the Lab and Node 3 ITCS loops). In the life of ISS, 3 PPAs have had to be replaced and 2 PPAs are currently showing signs of degradation. The first PPA to fail in 2003 was due to early coolant chemistry issues; the remaining pump failures and current pump degradations are determined to be related to the Pump/Fan Motor Controller (PFMC), with their individual signatures all being unique to this point. The PFMC of one of the failed PPAs was returned and testing confirmed its sub-components to be the root cause of the PPA failure. Due to the relative size and weight of the standalone PFMC in comparison to the integrated assembly, it is desired, from a launch and on-orbit stowage perspective, to replace the PFMC component of the degraded PPA instead of the entire PPA. The PPA was not designed for this capability, so on the ground demonstrations are planned using crew tools to show that the PFMC can be replaced on-orbit while maintaining full functionality. This paper will focus on the signatures of the two most recent PPA failures and the two PPAs showing signs of degradation, in addition to presenting the findings from the PFMC demonstration effort.

Aaron Rodriguez↗

Utility-Scale Solar: Empirical Trends in Project Technology, Cost, Performance, and PPA Pricing in the United States – 2018 Edition

The utility-scale solar sector has led the overall U.S. solar market in terms of installed capacity since 2012. In 2017, the utility-scale sector accounted for nearly 60% of all new solar capacity, and is expected to maintain its market-leading position for at least another six years. Two-thirds of all states, representing all regions of the country, are now home to one or more utility-scale solar projects. This report—the sixth in an ongoing annual series—provides in-depth data-driven analysis of the utility-scale solar project fleet in the United States. Drawing on empirical project-level data from a wide range of sources, this report analyzes technology trends, installed project prices, operating costs, capacity factors, power purchase agreement ("PPA") prices, the levelized cost of solar energy (LCOE), and the market value of solar. Given its current preeminence in the market, utility-scale PV also dominates much of this report, though data from CPV and CSP projects are also presented where appropriate. Highlights from this year's edition include: -Installation and Technology Trends: The use of solar trackers dominated 2017 installations with nearly 80% of all new capacity. In a reflection of the ongoing geographic expansion of the market beyond California and the high-insolation Southwest, the median insolation level at newly built project sites declined again in 2017. While new fixed-tilt projects are now seen predominantly in less-sunny regions, tracking projects are increasingly pushing into these same regions. The median inverter loading ratio grew to 1.32 in 2017, allowing the inverters to operate closer to full capacity for a greater percentage of the day. -Installed Prices: Median installed PV project prices have steadily fallen by two-thirds since the 2007-2009 period, to $2.0/WAC (or $1.6/WDC) for projects completed in 2017. The lowest 20th percentile of projects within our 2017 sample were priced at or below $1.8/WAC, with the lowest-priced projects around $0.9/WAC. Overall price dispersion across the entire sample has decreased steadily every year since 2013; similarly, price variation across regions decreased in 2017. -Operation and Maintenance ("O&M") Costs: PV O&M costs were in the neighborhood of $16/kWAC-year, or $8/MWh, in 2017. These numbers include only those costs incurred to directly operate and maintain the generating plant. -Capacity Factors: The cumulative net AC capacity factors of individual projects vary widely, from 14.3% to 35.2%, with a sample median of 26.3%. This project-level variation is based on a number of factors, including the strength of the solar resource at the project site, whether the array is mounted at a fixed tilt or on a tracking mechanism, the inverter loading ratio, degradation, and curtailment. Changes in at least the first three of these factors drove mean capacity factors higher from 2010-vintage to 2013-vintage projects, where they've remained fairly steady among more-recent project vintages as an ongoing increase in the prevalence of tracking has been offset by a build-out of lower resource sites. -PPA Prices and LCOE: Driven by lower installed project prices and improving capacity factors, levelized PPA prices for utility-scale PV have fallen dramatically over time, by $20-$30/MWh per year on average from 2006 through 2012, with a smaller price decline of ~$10/MWh per year evident from 2013 through 2016. Most recent PPAs in our sample—including many outside of California and the Southwest—are priced at or below $40/MWh levelized (in real 2017 dollars), with a few priced as aggressively as ~$20/MWh. The median LCOE among operational PV projects in our sample has followed PPA prices lower, suggesting a relatively competitive market for PPAs. -Solar's Wholesale Energy Market Value: Falling PPA prices have been offset to some degree by a decline in the wholesale energy market value of solar within higher-penetration markets like California, where solar earned just 79% of the average price across all hours within CAISO's real-time wholesale energy market in 2017 (down from 125% back in 2012). In other markets with less solar penetration, however, solar's hourly generation profile still earns more than the average wholesale price (e.g., 127% in ERCOT, 112% in PJM). -Solar+Storage: Adding battery storage is one way to at least partially restore the value of solar, and three recent PV+storage PPAs in Nevada (each using 4-hour batteries sized at 25% of PV nameplate capacity) suggest that the incremental PPA price adder for storage has fallen to ~$5/MWh, down from ~$15/MWh just a year ago for a similarly configured project. As PV plus battery storage becomes more cost-effective, a number of developers are regularly offering it as a viable upgrade to standalone PV. At the end of 2017, there were at least 188.5 GW of utility-scale solar power capacity within the interconnection queues across the nation. The 2017 growth within these queues is widely distributed across all regions of the country, but is most pronounced in the up-and-coming Midwest region, which accounts for 27% of the 99.2 GW of new queue capacity. The widening geographic distribution is as clear of a sign as any that the utility-scale market is maturing and expanding outside of its traditional high-insolation comfort zones.

14 SOLAR ENERGY↗

Value Accrual to Customers, Installers, and Financiers in Third-Party Owned Solar PV Markets

Beyond the Federal Investment Tax Credit, the two primary financial incentives provided by residential solar photovoltaic (PV) systems are electricity bill savings and state and local government incentives. Using transaction-level data on third-party owned systems from 2012-2015, we estimate how value associated with these incentives are passed along the installer-financier-consumer supply chain in the third-party owned market. Our analysis finds evidence of financial incentive pass-through to system prices and customer payments with respect to both types of incentives. Moreover, we document differences in the levels of pass-through for different contract types: total pass-through to customer payments for both types of incentives is greater for PPAs than for UFOs. We find some evidence that pass-through rates to customer payments for PPAs change with market concentration. Finally, we illustrate that the magnitude of estimated pass-through changes for PPAs if we account for simultaneity between system prices and customer payments.

14 SOLAR ENERGY↗

Non-Power Purchase Agreement (PPA) Options for Financing Solar Deployment at Universities

Financing solar using power purchase agreements (PPAs) has facilitated solar deployment of more than 100 megawatts (MW) at universities--as compared to 50 MW facilitated by financing models not using PPAs. This brochure, which overviews existing financing models and funding mechanisms available for solar procurement, focuses on non-PPA financing models. For more information on solar deployment at universities using PPAs, refer to Using Power Purchase Agreements for Solar Deployment at Universities.

14 SOLAR ENERGY↗

Challenges to Evaluating Ecological Risks in Performance Assessments - 18424

Performance assessments (PAs), whether probabilistic or deterministic, have largely focused on evaluating human health effects of radionuclides. In the past, it was asserted that protecting human health would automatically protect the environment. This blanket assertion has been questioned, so tools and methodologies to directly estimate non-human biota dose have been developed and made available since the early 2000's. For example, the Biota Dose Assessment Committee (BDAC) guidance led to the development of the RESRAD-BIOTA (RESRAD stands for Residual Radioactive materials) software to implement this guidance. The BDAC was a US Department of Energy (DOE) led working group with members from academia and consultancies in addition to DOE technical staff. Parallel efforts have been in place in Europe with the development of the ERICA tool (Environmental Risk from Ionising Contaminants: Assessment and Management). More recently, interpretation of the requirements of US Department of Energy (DOE) Order O458.1 have led some waste management facilities to include ecological risks in addition to human health effects in their PAs. We have recently developed methodologies to assess ecological risks within probabilistic PAs (PPAs) for two Federal facilities. One of the challenges in applying the non-human biota assessment models to PPAs is that ecological risk assessments following US Environmental Protection Agency (EPA) or DOE guidance start with protective screening assessments before moving into more site-specific ecological risk assessments. Conservative assumptions bias the screening assessments and greatly overestimate the risks posed by contaminants. However, although the screens are biased they can be useful in ruling out model spatial domain areas or types of biota from requiring further assessment. In some cases, the results of the screen could entirely rule out ecological risks from further assessment. For a more refined and unbiased estimate of dose to non-human biota, one would typically conduct site-specific studies to better define exposure through the food web or adverse effects based on eco-toxicity studies of environmental, and generally weathered, contaminant mixtures. However, for PPAs that consider future site conditions after the loss of institutional control, such site-specific studies are not possible. Rather, site-specific future ecological risk models use probabilistic inputs that result in a distribution of population doses or exposures and calculate the distribution of possible adverse effects to ecological populations. This approach considers both radionuclide and chemical inventory. For both Federal facilities, the model spatial domains include riparian and aquatic environments located downstream of the waste management site. These riparian and aquatic environments represent linear exposure elements for some wildlife populations and require special consideration of exposures to individuals and to populations along such spatial domains. At a minimum, wildlife foraging should be focused along the axis of such water bodies. Another challenge is how to incorporate ecologically relevant spatial scales into models that have contaminant transport as the primary focus. Riparian and aquatic environments also have threatened and endangered (T and E) species, which necessitate greater levels of protection given their rarity. A final challenge for conducting ecological risk assessments is how to evaluate T and E species in the future. This might be addressed by evaluating potential for impacts on individuals of feeding guilds with species that are currently threatened or endangered. We also have to consider how ecological populations might change as a result of climate change. It is a more difficult problem to predict what species might become rare in the future, and how to best assess future populations of threatened or endangered species. (authors)

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Hybrid Power Purchase Agreements for Flexible 24/7 Energy Delivery – A Comprehensive Review of Current Practices and Research Pathways

Power Purchase Agreements (PPAs) are becoming increasingly preferred among large energy consumers, such as data centers, to secure cost-effective energy and meet accelerating demand growth. Traditionally, variable renewable energy (VRE)-based PPAs operate on a pay-as-produced basis, balancing supply and demand for a relatively longer duration (e.g., annually). However, the focus is shifting toward matching supply and demand on an hourly basis to fully meet energy needs. This shift requires the integration of flexible energy resources, such as hydropower, thermal generation, and energy storage, to complement VRE sources like wind and solar, forming the foundation for 24/7 PPA. This work contributes by: (i) reviewing emerging market trends and current practices in PPA procurement, supported by data on PPA prices and technology portfolios; (ii) synthesizing the existing literature on modeling approaches for contract pricing, quantities, hybrid resource procurement, and risk management in 24/7 PPA design, while identifying key research gaps; and (iii) proposing an integrated 24/7 PPA design framework along with two contracting mechanisms from the perspectives of both PPA providers and consumers. The proposed framework highlights critical modeling challenges, risk-allocation issues, and future research opportunities for 24/7 PPA design.

24/7↗

UV Spectra of Amino Acid Immobilized at Nanoparticles Formation through Nanosphere Lithography (NSL) by Plasma Treatment

The modifying of nanospheres structures by plasma treatments to the fabricated nanoparticles arrays by Nanosphere Lithography (NSL) techniques to create Periodic Particles Arrays (PPAs) with different size, shape and orientation. Spectra of amino acid that immobilized to the nanoparticles arrays under Ultra Violet (UV) spectrums were studied. The PPAs with different sizes, shapes and orientation were fabricated by plasma treatment of 5 sec, 7 sec and 10 sec to the Polystyrene Nanosphere (PSN). Plasma treatment will effect to the PSN including etching part of the PSN to produce a much bigger channel to the single layer template of the PSN. Metal was deposited at interstitial sites between of the polymer balls and later removed by dissolving them in organic solvent, leaving a hexagonal pattern of metal structures at the interstitial sites. The nanoparticles immobilized with the standard amino acid, which later investigated under UV spectrums. The spectrums shows the possibilities use as biosensor devices.

77 NANOSCIENCE AND NANOTECHNOLOGY↗

Model results and data for Nontechnical Barriers to Geothermal Development

Data included in this submission support the analysis conducted for the report "Nontechnical Barriers to Geothermal Development" which is linked bellow. These data include information about the power purchase agreements (PPAs) analyzed for the report, inputs and model results for the pro forma economic analysis, and outputs from the regression analysis conducted on PPAs comparing geothermal and other power generation technologies.

15 GEOTHERMAL ENERGY↗

Status and Trends in the U.S. Voluntary Green Power Market (2014 Data)

NREL's annual report on green power markets summarizes status and trends in the voluntary demand for renewable energy. U.S. green power markets have become more complex over time as state-level policies have enabled more avenues for green power purchases. In recent years, community solar, community choice aggregation (CCA), and voluntary power purchase agreements (PPAs) have significantly increased the number of U.S. voluntary green power customers. The community solar model has grown rapidly with 90 projects in 25 states by 2015. Renewable energy sales in CCAs declined slightly in 2014 in response to less favorable economic conditions in Illinois. At the same time, several California CCAs continued to grow, and many more communities are planning to pursue green power through aggregation. Voluntary green power purchasing through bi-lateral PPAs took off in 2014 due to several large-scale agreements signed by information and communication technology firms. Traditional green power options, such as utility green pricing programs and voluntary RECs markets, also grew in 2014. Current trends suggest strong continued growth in U.S. voluntary green power markets.

29 ENERGY PLANNING, POLICY, AND ECONOMY↗