Engineering Papers⌕ Search

SEARCH · Engineering Papers

Results for “PLUTONIUM PRODUCTION”

Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.

Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.

At least 19 records

MA Doping Analysis on Breeding Capability and Protected Plutonium Production of Large FBR

Spent fuel from LWR can be seen as long-live waste if it is not recycled or as a 'new fuel' resource if it is recycled into the reactors. Uranium and plutonium have been used for 'new fuel' resources from LWR spent fuel as MOX fuel type which is loaded into thermal reactor or fast reactor types. Other actinides from the spent fuel such as neptunium, americium and curium as minor actinide (MA) are considered to be loaded into the reactors for specific purposes, recently. Those purposes such as for increasing protected plutonium production and breeding capability for protected plutonium as well as in the same time those amount of MA can be reduced to a small quantity as a burner or transmutation purpose. Some investigations and scientific approaches are performed in order to increase a material ''barrier'' in plutonium isotope composition by increasing the even mass number of plutonium isotope such as Pu-238, Pu-240 and Pu-242 as plutonium protected composition. Higher material barrier which related to intrinsic properties of plutonium isotopes with even mass number (Pu-238, Pu-240 and Pu-242), are recognized because of their intense decay heat (DH) and high spontaneous fission neutron (SFN) rates. Those even number mass of plutonium isotope contribute to some criteria of plutonium characterization which will be adopted for present study such as IAEA, Pellaud and Kessler criteria (IAEA, 1972; Pellaud, 2002; and Kessler, 2007). The present paper intends to evaluate the breeding capability as a fuel sustainability index of the reactors and to analyze the composition of protected plutonium production of large power reactor based on the FaCT FBR as reference (Ohki, et al., 2008). Three dimensional FBR core configuration has been adopted which is based on the core optimization calculation of SRAC-CITATION code as reactor core analysis and JENDL-3.3 is adopted for nuclear data library. Some MA doping materials are loaded into the blanket regions which can be considered as breeding region for protected plutonium production. Breeding capability of the reactor can be increased effectively by increasing MA doping rate while criticality condition of the reactor is reduced by doping MA. Adopting MA cycle is also effective to increase the isotopic Pu-238 production in plutonium vector composition for denaturing purpose of plutonium.

21 SPECIFIC NUCLEAR REACTORS AND ASSOCIATED PLANTS↗

A Conversion Proposal for Iran's IR-40 Reactor with Reduced Plutonium Production

Our article examines possible modifications of Iran’s IR-40 (Arak) heavy-water reactor that would limit its plutonium production without compromising its usefulness for civilian purposes. The proposed modifications only involve the fuel composition, avoid changes to the fuel and core geometry, and therefore have the advantage of minimizing the overall complexity and cost of conversion as well as shortening the time period required to implement these modifications. The suggested changes would significantly reduce the reactor’s production of plutonium from 7–9 kilograms to less than 1 kilogram per year. This article also examines key safety parameters, medical isotope production rates, and uranium resource requirements for all modifications considered. Our analysis is relevant beyond the case of Iran’s Arak reactor and may provide some future guidance for converting other heavy-water reactors that continue to operate today.

98 NUCLEAR DISARMAMENT, SAFEGUARDS, AND PHYSICAL P↗

Interim Safe Storage of Plutonium Production Reactors at the US DOE Hanford Site - 13438

Nine plutonium production reactors located on DOE's Hanford Site are being placed into an Interim Safe Storage (ISS) period that extends to 2068. The Environmental Impact Statement (EIS) for ISS [1] was completed in 1993 and proposed a 75-year storage period that began when the EIS was finalized. Remote electronic monitoring of the temperature and water level alarms inside the safe storage enclosure (SSE) with visual inspection inside the SSE every 5 years are the only planned operational activities during this ISS period. At the end of the ISS period, the reactor cores will be removed intact and buried in a landfill on the Hanford Site. The ISS period allows for radioactive decay of isotopes, primarily Co-60 and Cs-137, to reduce the dose exposure during disposal of the reactor cores. Six of the nine reactors have been placed into ISS by having an SSE constructed around the reactor core. (authors)

07 ISOTOPE AND RADIATION SOURCES↗

Estimating Potential Tritium and Plutonium Production in North Korea’s Experimental Light Water Reactor

Our work explores North Korea's 100 MW-th Experimental Light Water Reactor (ELWR) and its potential contributions to the country's nuclear weapons program. Built at the Yongbyon Nuclear Research Center, the ELWR began operations in October 2023 and represents North Korea's first attempts at a light-water reactor using domestically-enriched, ceramic fuel. Our study examines possible configurations for energy, tritium, and tritium-plutonium co-production. Assuming a single-batch core, the ELWR can be used to annually produce 48-82 grams of tritium, which can supply 2-4 new boosted warheads each year, up to a maximum arsenal of 88-150 warheads total. Concurrent production of tritium and weapon-grade plutonium is also possible but requires reprocessing of spent ceramic fuel. Furthermore, these findings underscore how North Korea's nuclear capabilities may be advanced through the ELWR's dual-use potential.

11 NUCLEAR FUEL CYCLE AND FUEL MATERIALS↗

Dissolution of aerosol particles collected from nuclear facility plutonium production process

Here, a simple, robust analytical chemistry method has been developed to dissolve plutonium containing particles in a complex matrix. The aerosol particles collected on Marple cascade impactor substrates were shown to be dissolved completely with an acid mixture of 12 M HNO 3 and 0.1 M HF. A pressurized closed vessel acid digestion technique was utilized to heat the samples at 130 °C for 16 h to facilitate the digestion. The dissolution efficiency for plutonium particles was 99 %. The resulting particle digestate solution was suitable for trace elemental analysis and isotope composition determination, as well as radiochemistry measurements.

38 RADIATION CHEMISTRY, RADIOCHEMISTRY, AND NUCLEA↗

The legacy of weapons grade plutonium production: Health status of Hanford complex workers who manage the waste

The extent and etiology of health effects in workers who maintain underground storage tanks at the Hanford Nuclear Reservation (Hanford) have been subjects of controversy and concern for several decades. Hanford is a decommissioned nuclear production complex managed by the US Department of Energy in southeast Washington State. This integration-of-evidence review evaluates the relationship between exposure to vapors from mixed chemical and radioactive waste stored in underground storage tanks at Hanford and worker health. Hanford workers’ health information was gathered from technical reports, media reports, and published literature, including the systematic search of seven databases. This review describes the health status and health concerns of Hanford tank farm workers based on the integration of the available health effects data from disparate sources. In interviews with external groups, Hanford workers reported both irritant-type symptoms and diseases that they believe are attributable to tank farm vapors. However, the results of this integration-of-evidence review indicated that no pervasive pattern of occupational disease was identified that can be associated with exposure to tank farm vapors. Inhalation exposure to asbestos and beryllium is associated with lung disease from various types of nuclear industry work but not from work on tank farms. This review concluded that while irritant-type symptoms and isolated cases of occupational disease are plausible under certain conditions, the currently available data do not support a pervasive pattern of occupational disease associated with vapor exposure.

Cherry, Debra↗

Plutonium Production Reactor Progression Problems: Magnox Neutronics Benchmarks

The goal of this document is to provide a set of comprehensive benchmarking neutronics problems for gas-cooled, graphite-moderated reactors. The problems are designed to be representative problems that increase in complexity to test performance of various codes. For the simulation of the benchmarking problems, the Shift Monte Carlo code and MPACT deterministic code are chosen because of their state-of-the-art capabilities, which are optimized for various reactor designs. Because these codes have been developed primarily for light water reactor applications, their application to graphite-moderated, gas-cooled reactors has not been extensively explored. This report attempts to evaluate benchmarks for a Magnox-style reactor, one that is graphite-moderated and gas-cooled. Parameters that are calculated and presented in this benchmark include the eigenvalue, peaking factors, and isotope concentrations. Results show good agreement between Shift and MPACT, and demonstrate the capability of MPACT to model graphite-moderated systems well.

21 SPECIFIC NUCLEAR REACTORS AND ASSOCIATED PLANTS↗

Plutonium Pit Production - Savannah River Site (Plutonium Pit Production Mission)

The Savannah River Site (SRS) has been providing strategic materials to maintain the U.S. nuclear deterrent for 70 years. Establishing plutonium pit production capabilities at SRS will leverage existing infrastructure at the site and optimize use of the talented workforce in the region to meet validated national security requirements. This new mission will require a large skilled workforce for decades to come. Savannah River Nuclear Solutions LLC, the management and operating (M&O) partner at SRS, has established teams for both the transition of the Mixed Oxide (MOX) Fuel Fabrication Facility and the development of the proposed Savannah River Plutonium Processing Facility (SRPPF). In addition, NNSA remains committed to safely and securely removing surplus plutonium from South Carolina in a timely and cost-effective manner by using the dilute and dispose method.

Source record↗

Plutonium Pit Production

A plutonium pit is a key component of a nuclear weapon. During the Cold War, the United States produced approximately 1,000 pits per year at the Rocky Flats Plant in Colorado. Rocky Flats was closed in 1992 and today the United States does not have the capability to manufacture new pits at the rate needed to maintain the nuclear deterrent. A delay in revitalizing this capability will eventually necessitate a larger, more expensive recapitalization effort in the future.

Source record↗

Deployment of the HFIRCON transport and depletion tool for plutonium-238 production studies

Irradiation of {sup 237}Np-bearing targets in Oak Ridge National Laboratory's (ORNL) High Flux Isotope Reactor (HFIR) results in the efficient production of {sup 238}Pu, which, in the form of heat source PuO{sub 2}, is used as a reliable power source for deep-space and planetary NASA missions. A technology demonstration subproject was initiated at ORNL in 2011 to develop and implement the technology required to establish a {sup 238}Pu supply chain. A systematic progression of NpO{sub 2}/Al cermet (20 vol.% NpO{sub 2}) activities to date has successfully demonstrated target fabrication, irradiation, and chemical recovery processes. Recent program tasks have included the development of the HFIRCON transport and depletion tool for efficient reactor physics analyses and the evaluation of increased NpO{sub 2} loadings (i.e., beyond 20 vol.%) and NpN-based targets. This paper documents the deployment of the HFIRCON code to assess various Np concentrations in NpO{sub 2}- and NpN-based targets in HFIR's inner small vertical experiment facilities. Results indicate that {sup 238}Pu production and quality can be enhanced with increased Np loadings; however, target conversion rates are reduced. The results recorded in this paper, thermal and material balance evaluations, and testing requirement planning will be used to determine whether increased NpO{sub 2} loadings or NpN-based targets will be further considered. (authors)

21 SPECIFIC NUCLEAR REACTORS AND ASSOCIATED PLANTS↗

Tank Farms and Waste Feed Delivery - 12507

The mission of the Department of Energy's Office of River Protection (ORP) is to safely retrieve and treat the 56 million gallons of Hanford's tank waste and close the Tank Farms to protect the Columbia River. Our discussion of the Tank Farms and Waste Feed Delivery will cover progress made to date with Base and Recovery Act funding in reducing the risk posed by tank waste and in preparing for the initiation of waste treatment at Hanford. The millions of gallons of waste are a by-product of decades of plutonium production. After irradiated fuel rods were taken from the nuclear reactors to the processing facilities at Hanford they were exposed to a series of chemicals designed to dissolve away the rod, which enabled workers to retrieve the plutonium. Once those chemicals were exposed to the fuel rods they became radioactive and extremely hot. They also couldn't be used in this process more than once. Because the chemicals are caustic and extremely hazardous to humans and the environment, underground storage tanks were built to hold these chemicals until a more permanent solution could be found. The underground storage tanks range in capacity from 55,000 gallons to more than 1 million gallons. The tanks were constructed with carbon steel and reinforced concrete. There are eighteen groups of tanks, called 'tank farms', some having as few as two tanks and others up to sixteen tanks. Between 1943 and 1964, 149 single-shell tanks were built at Hanford in the 200 West and East Areas. Heat generated by the waste and the composition of the waste caused an estimated 67 of these single-shell tanks to leak into the ground. Washington River Protection Solutions is the prime contractor responsible for the safe management of this waste. WRPS' mission is to reduce the risk to the environment that is posed by the waste. All of the pumpable liquids have been removed from the single-shell tanks and transferred to the double-shell tanks. What remains in the single-shell tanks are solid and semi-solid wastes. Known as salt-cakes, they have the consistency of wet beach sand. Some of the waste resembles small broken ice, or whitish crystals. Because the original pumps inside the tanks were designed to remove only liquid waste, other methods have been developed to reach the remaining waste. Access to the tank waste is through long, typically skinny pipes, called risers, extending out of the tanks. It is through these pipes that crews are forced to send machines and devices into the tanks that are used to break up the waste or push it toward a pump. These pipes range in size from just a few inches to just over a foot in diameter because they were never intended to be used in this manner. As part of the agreement regulating Hanford cleanup, crews must remove at least 99% of the material in every tank on the site, or at least as much waste that can be removed based on available technology. To date, seven single-shell tanks have been emptied, and work is underway in another 10 tanks in preparation for additional retrieval activities. Two barriers have been installed over single-shell tanks to prevent the intrusion of surface water down to the tanks, with additional barriers planned for the future. Single and double-shell tank integrity analyses are ongoing. Because the volume of the waste generated through plutonium production exceeded the capacity of the single-shell tanks, between 1968 and 1986 Hanford engineers built 28 double-shell tanks. These tanks were studied and made with a second shell to surround the carbon steel and reinforced concrete. The double-shell tanks have not leaked any of their waste. (authors)

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Initial Testing of Mediated Electrochemical Oxidation for Inclusion in the Plutonium-238 Production Program

Oak Ridge National Laboratory is currently restarting the United States’ capability to produce kilogram quantities of 238Pu annually for space power applications. This involves the purification of 238Pu from neutron-irradiated 237Np targets and conversion to heat-source plutonium oxide product for shipment to Los Alamos National Laboratory. Dissolution of the plutonium oxide product material is required to obtain an isotopic assay and impurity analysis of the product material. In addition, any off-specification product will need to be dissolved for re-purification. An electrochemical method that produces highly oxidizing ions in solution is currently being investigated as a rapid method for dissolving these plutonium oxide samples.

Myhre, Kristian↗

Determination of filter pore size for use in HB line phase II production of plutonium oxide

H-Canyon and HB-Line are tasked with the production of plutonium oxide (PuO 2 ) from a feed of plutonium (Pu) metal. The PuO 2 will provide feed material for the Mixed Oxide (MOX) Fuel Fabrication Facility. After dissolution of the Pu metal in H-Canyon, plans are to transfer the solution to HB-Line for purification by anion exchange. Anion exchange will be followed by plutonium(IV) oxalate precipitation, filtration, and calcination to form PuO 2 . The filtrate solutions, remaining after precipitation, contain low levels of Pu ions, oxalate ions, and may include solids. These solutions are transferred to H-Canyon for disposition. To mitigate the criticality concern of Pu solids in a Canyon tank, past processes have used oxalate destruction or have pre-filled the Canyon tank with a neutron poison. The installation of a filter on the process lines from the HB-Line filtrate tanks to H-Canyon Tank 9.6 is proposed to remove plutonium oxalate solids. This report describes SRNL’s efforts to determine the appropriate pore size for the filters needed to perform this function. Information provided in this report aids in developing the control strategies for solids in the process.

36 MATERIALS SCIENCE↗

Scientific Solutions to Nuclear Waste Environmental Challenges

The Hidden Cost of Nuclear Weapons The Cold War arms race drove an intense plutonium production program in the U.S. This campaign produced approximately 100 tons of plutonium over 40 years. The epicenter of plutonium production in the United States was the Hanford site, a 586 square mile reservation owned by the Department of Energy and located on the Colombia River in Southeastern Washington. Plutonium synthesis relied on nuclear reactors to convert uranium to plutonium within the reactor fuel rods. After a sufficient amount of conversion occurred, the rods were removed from the reactor and allowed to cool. They were then dissolved in an acid bath and chemically processed to separate and purify plutonium from the rest of the constituents in the used reactor fuel. The acidic waste was then neutralized using sodium hydroxide and the resulting mixture of liquids and precipitates (small insoluble particles) was stored in huge underground waste tanks. The byproducts of the U.S. plutonium production campaign include over 53 million gallons of high-level radioactive waste stored in 177 large underground tanks at Hanford and another 34 million gallons stored at the Savannah River Site in South Carolina. This legacy nuclear waste represents one of the largest environmental clean-up challenges facing the world today. The nuclear waste in the Hanford tanks is a mixture of liquids and precipitates that have settled into sludge. Some of these tanks are now over 60 years old and a small number of them are leaking radioactive waste into the ground and contaminating the environment. The solution to this nuclear waste challenge is to convert the mixture of solids and liquids into a durable material that won't disperse into the environment and create hazards to the biosphere. What makes this difficult is the fact that the radioactive half-lives of some of the radionuclides in the waste are thousands to millions of years long. (The half-life of a radioactive substance is the amount of time it takes for one-half of the material to undergo radioactive decay.) In general, the ideal material would need to be durable for approximately 10 half-lives to allow the activity to decay to negligible levels. However, the potential health effects of each radionuclide vary depending on what type of radiation is emitted, the energy of that emission, and the susceptibility for the human body to accumulate and concentrate that particular element. Consequently, actual standards tend to be based on limiting the dose (energy deposited per unit mass) that is introduced into the environment. The Environmental Protection Agency (EPA) has the responsibility to establish standards for nuclear waste disposal to protect the health and safety of the public. For example, the Energy Policy Act of 1992 directed the EPA to establish radiation protection standards for the Yucca Mountain geologic repository for nuclear wastes. The standards for Yucca Mountain were promulgated in 2008, and limit the dose to 15 millirem per year for the first 10,000 years, and 100 milirem per year between 10,000 years and 1 million years (40 CFR Part 197; http://www.epa.gov/radiation/yucca/2008factsheet.html). So, the challenge is two-fold: (1) develop a material (a waste form) that is capable of immobilizing the waste over geologic time scales, and (2) develop a process to convert the radioactive sludge in the tanks into this durable waste form material. Glass: Hard, durable, inert, and with infinite chemical versatility Molten glass is a powerful solvent liquid, which can be designed to dissolve almost anything. When solidified, it can be one of the most chemically inert substances known to man. Nature's most famous analogue to glass is obsidian, a vitreous product of volcanic activity; formations over 17 million years old have been found. Archaeologists have found man-made glass specimens that are five thousand years old.

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

River Corridor Closure at DOE's Hanford Site - 12503

The discussion of Hanford's River Corridor will cover work that has already been completed plus the work remaining to be done. This includes the buildings, waste sites, and groundwater plumes in the 300 Area; large-scale burial ground remediation in the 600 Area; plutonium production reactor dismantling and 'cocooning' along the river; preservation of the world's first full-scale plutonium production reactor; removal of more than 14 million tons of contaminated soil and debris along the Columbia River shoreline and throughout the River Corridor; and the excavation of buried waste sites in the river shore area. It also includes operating an EPA-permitted low-level waste disposal facility in the central portion of the site. At the completions of cleanup in 2015, Hanford's River Corridor will be the largest closure project ever completed by the Department of Energy. Cleanup of the River Corridor has been one of Hanford's top priorities since the early 1990's. This urgency has been due to the proximity of hundreds of waste sites to the Columbia River. In addition, removal of the sludge from K West Basin, near the river, remains a high priority. This 220-square-mile area of the Hanford Site sits on the edge of the last free-flowing stretch of the Columbia River. The River Corridor portion of the Hanford Site includes the 100 and 300 Areas along the south shore of the Columbia River. The 100 Areas contain nine retired plutonium production reactors. These areas are also the location of numerous support facilities and solid and liquid waste disposal sites that have contaminated groundwater and soil. The 300 Area, located just north of the city of Richland, contains fuel fabrication facilities, nuclear research and development facilities, and their associated solid and liquid waste disposal sites that have contaminated groundwater and soil. In order to ensure that cleanup actions address all threats to human health and the environment, the River Corridor includes the adjacent areas that extend from the 100 Area and 300 Area to the Central Plateau. For sites in the River Corridor, remedial actions are expected to restore groundwater to drinking water standards and ensure that aquatic life in the Columbia River is protected by achieving ambient water quality standards. It is intended that these objectives be achieved, unless technically impracticable, within a reasonable timeframe. In those instances where remedial action objectives are not achievable in a reasonable time frame, or are determined to be technically impracticable, programs are being implemented to contain the plume, prevent exposure to contaminated groundwater, and evaluate further risk reduction opportunities as new technologies become available. River Corridor cleanup work also removes potential sources of contamination, which are close to the Columbia River, and places them on the Central Plateau for final disposal. The intent is to shrink the footprint of active cleanup to within the 75-square- mile area of the Central Plateau by removing excess facilities and remediating waste sites. Cleanup actions are supporting anticipated future land uses consistent with the Hanford Reach National Monument, where applicable, and the Hanford Comprehensive Land- Use Plan (DOE 1999). The River Corridor has been divided into six geographic decision areas to achieve source and groundwater remedy decisions. These decisions will provide comprehensive coverage for all areas within the River Corridor and will incorporate ongoing interim action cleanup activities. Cleanup levels will be achieved in order to support anticipated future land uses of conservation and preservation for most of this area and industrial use for the 300 Area. At the conclusion of cleanup actions, the federal government will implement long-term stewardship activities to ensure protection of human health and the environment. (authors)

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Thermal Safety Analyses for the Production of Plutonium-238 at the High Flux Isotope Reactor

There has been a considerable effort over the previous few years to demonstrate and optimize the production of plutonium-238 ( 238 Pu) at the High Flux Isotope Reactor (HFIR). This effort has involved resources from multiple divisions and facilities at the Oak Ridge National Laboratory (ORNL) to demonstrate the fabrication, irradiation, and chemical processing of targets containing neptunium-237 ( 237 Np) dioxide (NpO 2 )/aluminum (Al) cermet pellets. A critical preliminary step to irradiation at the HFIR is to demonstrate the safety of the target under irradiation via documented experiment safety analyses. The steady-state thermal safety analyses of the target are simulated in a finite element model with the COMSOL Multiphysics code that determines, among other crucial parameters, the limiting maximum temperature in the target. Safety analysis efforts for this model discussed in the present report include: (1) initial modeling of single and reduced-length pellet capsules in order to generate an experimental knowledge base that incorporate initial non-linear contact heat transfer and fission gas equations, (2) modeling efforts for prototypical designs of partially loaded and fully loaded targets using limited available knowledge of fabrication and irradiation characteristics, and (3) the most recent and comprehensive modeling effort of a fully coupled thermo-mechanical approach over the entire fully loaded target domain incorporating burn-up dependent irradiation behavior and measured target and pellet properties, hereafter referred to as the production model. These models are used to conservatively determine several important steady-state parameters including target stresses and temperatures, the limiting condition of which is the maximum temperature with respect to the melting point. The single pellet model results provide a basis for the safety of the irradiations, followed by parametric analyses in the initial prototypical designs that were necessary due to the limiting fabrication and irradiation data available. The calculated parameters in the final production target model are the most accurate and comprehensive, while still conservative. Over 210 permutations in irradiation time and position were evaluated, and are supported by the most recent inputs and highest fidelity methodology. The results of these analyses show that the models presented in this report provide a robust and reliable basis for previous, current and future experiment safety analyses. In addition, they reveal an evolving knowledge of the steady-state behavior of the NpO 2 /Al pellets under irradiation for a variety of target encapsulations and potential conditions.

22 GENERAL STUDIES OF NUCLEAR REACTORS↗

Process Development for Plutonium-238 Production at Oak Ridge National Laboratory

The third chemical processing campaign conducted at Oak Ridge National Laboratory (ORNL) with irradiated neptunium oxide–aluminum cermet targets produced plutonium-238 oxide product meeting purity specifications for space power applications. This is a major step for the Plutonium-238 Supply Program toward reestablishing production. This summary highlights results to date and presents focus areas of current activities to improve process efficiency and to increase production rate.

DePaoli, David↗