Engineering Papers⌕ Search

SEARCH · Engineering Papers

Results for “PERT METHOD”

Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.

Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.

At least 19 records

Nonlinear tunneling of optical soliton in 3 coupled NLS equation with symbolic computation

We investigated the soliton solution for N coupled nonlinear Schrödinger (CNLS) equations. These equations are coupled due to the cross-phase-modulation (CPM). Lax pair of this system is obtained via the Ablowitz–Kaup–Newell–Segur (AKNS) scheme and the corresponding Darboux transformation is constructed to derive the soliton solution. One and two soliton solutions are generated. Using two soliton solutions of 3 CNLS equation, nonlinear tunneling of soliton for both with and without exponential background has been discussed. Finally cascade compression of optical soliton through multi-nonlinear barrier has been discussed. The obtained results may have promising applications in all-optical devices based on optical solitons, study of soliton propagation in birefringence fiber systems and optical soliton with distributed dispersion and nonlinearity management. -- Highlights: •We consider the nonlinear tunneling of soliton in birefringence fiber. •3-coupled NLS (CNLS) equation with variable coefficients is considered. •Two soliton solutions are obtained via Darboux transformation using constructed Lax pair. •Soliton tunneling through dispersion barrier and well are investigated. •Finally, cascade compression of soliton has been achieved.

71 CLASSICAL AND QUANTUM MECHANICS, GENERAL PHYSIC↗

The use of Ixaru's method in locating the poles of the S-matrix in strictly finite-range potentials

Energies of the S-matrix poles are calculated by solving the radial Schroedinger equation numerically by using Ixaru's CPM(2) method. The trajectories of the poles in the complex wave number plane are determined for two nuclear potentials that are zero beyond finite distances. These are the Woods-Saxon form with cutoff and the Salamon-Vertse potential, which goes to zero smoothly at a finite distance. Properties of the trajectories are analyzed for real and complex values of the depths of the corresponding potentials.

73 NUCLEAR PHYSICS AND RADIATION PHYSICS↗

R-values

I'll try to keep this short and simple. R{sub LANL} = (beta cpm of X{sub exp} on system 'A')/ (beta cpm of {sup 99}Mo{sub exp} on system 'A')/ (beta cpm of X on system 'A', from thermal on {sup 235}U)/ (beta cpm of {sup 99}Mo on system 'A', from thermal on {sup 235}U). As I understand it, the above equation is the historical (as well as current) way of determining R-values using data from beta counting at LANL. The ratio in the denominator, a little 'r', is the 'baseline' or 'calibration' value for a specific beta detector. Over time, if the detector 'drifts' one would see a variation in this 'r' during a thermal calibration measurement. This baseline is what LANL likes to track to monitor specific detector performance - this is not relevant to LLNL where gamma detection is used for determining R-values. LANL states that uncertainty is only dependent upon the count statistics for the isotopes measured. If one tries to convert this to an atom basis, the uncertainties will increase due to the incorporation of the uncertainties in the nuclear data used to convert the cpm to atoms. LLNL switched to gamma detection methods in the 1970s thus replacing our beta counting effort. The equation below is how we have since determined R-values. The numerator ratios atom values of isotopes that are determined by measuring gamma cpm (usually? using several peaks per isotope) and then converting to particle decay in dpm using detector efficiency for each peak and the appropriate branch ratio for each gamma emission. Isotope decay is then converted to atoms using specific activity, mass or volume?, and Avogadro's number. The denominator is simply the ratio of published, cumulative fission product chain yields for isotopes produced in a thermal irradiation on 235U - values of England & Ryder are used by LLNL for the NTNF program. Uncertainties in LLNL R-values are dependent upon gamma counting statistics as well as the nuclear data for each isotope. R{sub LLNL} = (Atoms of X{sub exp})/(Atoms of {sup 99}Mo{sub exp})/(Cumulative Fission Chain Yield of X, from thermal on {sup 235}U)/(Cumulative Fission Chain Yield of {sup 99}Mo, from thermal on {sup 235}U). The next page tabulates fission chain yields and 'atoms per gram' amounts measured in a recent NTNF Thermal Calibration. The R-values in the table are calculated using the LLNL method of determining R. The measure of success is demonstrated by how close to 1.00 the R-value is when determined during a Thermal Calibration. A value of 1.00 is the desired value. In the example below, only four isotopes lie outside of 1.00 by more than 3 percent. These are the four isotopic measurements that obviously need to be improved.

38 RADIATION CHEMISTRY, RADIOCHEMISTRY, AND NUCLEA↗

SU-E-T-77: A Statistical Approach to Manage Quality for Pre-Treatment Verification in IMRT/VMAT

Objective: The study presents the application of a simple concept of statistical process control (SPC) for pre-treatment quality assurance procedure analysis for planar dose measurements performed using 2D-array and a-Si electronic portal imaging device (a-Si EPID). Method: A total of 195 patients of four different anatomical sites: brain (n1=45), head & neck (n2=45), thorax (n3=50) and pelvis (n4=55) were selected for the study. Pre-treatment quality assurance for the clinically acceptable IMRT/VMAT plans was measured with 2D array and a-Si EPID of the accelerator. After the γ-analysis, control charts and the quality index Cpm was evaluated for each cohort. Results: Mean and σ of γ ( 3%/3 mm) were EPID γ %≤1= 99.9% ± 1.15% and array γ %<1 = 99.6% ± 1.06%. Among all plans γ max was consistently lower than for 2D array as compared to a-Si EPID. Fig.1 presents the X-bar control charts for every cohort. Cpm values for a-Si EPID were found to be higher than array, detailed results are presented in table 1. Conclusion: Present study demonstrates the significance of control charts used for quality management purposes in newer radiotherapy clinics. Also, provides a pictorial overview of the clinic performance for the advanced radiotherapy techniques.Higher Cpm values for EPID indicate its higher efficiency than array based measurements.

60 APPLIED LIFE SCIENCES↗

Analytical and numerical aspects in solving the controlled 3D Gross-Pitaevskii equation

The results of recently developed investigations, that have been carried out within the framework of the controlling potential method (CPM), are reviewed. This method allows one to decompose a three dimensional (3D) Gross-Pitaevskii equation (GPE) into the pair of coupled Schroedinger-type equations. Under suitable mathematical conditions, the solutions of the 3D controlled GPE can be constructed from the solutions of a 2D linear Schroedinger equation (the transverse component of the GPE) coupled with a 1D nonlinear Schroedinger equation (the longitudinal component of the GPE). Such decomposition allows one to cast the solutions in the form of the product of the solutions of the transverse and the longitudinal components of the GPE. The coupling between these two equations is the functional of both the transverse and the longitudinal profiles. It is shown that the CPM can be used to obtain a new class of three-dimensional solitary waves solutions of the GPE, which governs the dynamics of Bose-Einstein condensates. By imposing an external controlling potential, the desired time-dependent shape of the localized BECs is obtained. The stability of the exact solutions was checked with direct simulations of the time -dependent, three-dimensional GPE. Our simulations show that the localized condensates are stable with respect to perturbed initial conditions.

71 CLASSICAL AND QUANTUM MECHANICS, GENERAL PHYSIC↗

SU-D-BRC-02: Application of Six Sigma Approach to Improve the Efficiency of Patient-Specific QA in Proton Therapy

Purpose: To show how the Six Sigma DMAIC (Define-Measure-Analyze-Improve-Control) can be used for improving and optimizing the efficiency of patient-specific QA process by designing site-specific range tolerances. Methods: The Six Sigma tools (process flow diagram, cause and effect, capability analysis, Pareto chart, and control chart) were utilized to determine the steps that need focus for improving the patient-specific QA process. The patient-specific range QA plans were selected according to 7 treatment site groups, a total of 1437 cases. The process capability index, Cpm was used to guide the tolerance design of patient site-specific range. We also analyzed the financial impact of this project. Results: Our results suggested that the patient range measurements were non-capable at the current tolerance level of ±1 mm in clinical proton plans. The optimized tolerances were calculated for treatment sites. Control charts for the patient QA time were constructed to compare QA time before and after the new tolerances were implemented. It is found that overall processing time was decreased by 24.3% after establishing new site-specific range tolerances. The QA failure for whole process in proton therapy would lead up to a 46% increase in total cost. This result can also predict how costs are affected by changes in adopting the tolerance design. Conclusion: We often believe that the quality and performance of proton therapy can easily be improved by merely tightening some or all of its tolerance requirements. This can become costly, however, and it is not necessarily a guarantee of better performance. The tolerance design is not a task to be undertaken without careful thought. The Six Sigma DMAIC can be used to improve the QA process by setting optimized tolerances. When tolerance design is optimized, the quality is reasonably balanced with time and cost demands.

60 APPLIED LIFE SCIENCES↗

Latest Developments in PM Systems and Methods and their Application to WM Projects - 20364

How do you improve on an industry that is well established yet often misses the mark on key metrics demonstrating effective planning and execution of project scope, schedule and budget? With the increased complexity of DOE projects relative to either poorly kept records of what wastes are stored or the lack of specific knowledge relative to the waste concentrations/quantities, this is a question continually asked and investigated by many. In fact, in 2017, the GAO's report to Congress indicated that although the DOE has made some progress on its monitoring effectiveness and demonstrating progress criteria, these goals were not met and there needs to be more improvement and monitoring. This paper will offer some insights into the latest developments in project management methodologies and the possible application of these to waste management projects. Traditional data generated via a project schedule that utilizes critical path methodology (CPM) and additional earned value management (EVM) data needs to be accurate and enable the project manager to better understand the probability of project success. Although this data has readily been available on most large-scale projects, success as measured by various stakeholder groups including the client, project team, regulators, etc. is less than optimal. Therefore, an urgent need exists to explore how traditional project data (CPM and EVM) coupled with new methodologies allows for better planning and execution by the project team. Many new approaches/methodologies can even be used to predict the success of options prior to full implementation on the actual project. Three approaches/methodologies will be discussed: - Artificial Intelligence; - Change Management; - Blend of Traditional Management (Gantt chart) and Agile Methodologies. As market forces change, so will the direction of project management. The days of 'one size fits all' are no longer valid. A combination of predictive and adaptive approaches in the management of projects is essential to enable execution of project deliverables on time, under budget, and within the contractual scope. This paper is intended to provide the reader with insight to the close relationship of project management trends and business management trends, and to provoke critical thinking about what it means to align project management strategy with an environment of non-stop innovation. (authors)

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

UCAC3 PROPER MOTION SURVEY. I. DISCOVERY OF NEW PROPER MOTION STARS IN UCAC3 WITH 0.''40 yr{sup -1} > {mu} {>=} 0.''18 yr{sup -1} BETWEEN DECLINATIONS -90{sup 0} AND -47{sup 0}

This paper presents 442 new proper motion stellar systems in the southern sky between declinations -90{sup 0} and -47{sup 0} with 0.''40 yr{sup -1} > {mu} {>=} 0.''18 yr{sup -1}. These systems constitute a 25.3% increase in new systems for the same region of the sky covered by previous SuperCOSMOS RECONS (SCR) searches that used Schmidt plates as the primary source of discovery. Among the new systems are 25 multiples, plus an additional 7 new common proper motion (CPM) companions to previously known primaries. All stars have been discovered using the third U.S. Naval Observatory (USNO) CCD Astrograph Catalog (UCAC3). A comparison of the UCAC3 proper motions to those from the Hipparcos, Tycho-2, Southern Proper Motion (SPM4), and SuperCOSMOS efforts is presented and shows that UCAC3 provides similar values and precision to the first three surveys. The comparison between UCAC3 and SuperCOSMOS indicates that proper motions in R.A. are systematically shifted in the SuperCOSMOS data but are consistent in decl. data, while overall showing a significantly higher scatter. Distance estimates are derived for stars having SuperCOSMOS Sky Survey B{sub J} , R{sub 59F}, and I{sub IVN} plate magnitudes and Two-Micron All Sky Survey infrared photometry. We find 15 systems estimated to be within 25 pc, including UPM 1710-5300 our closest new discovery estimated at 13.5 pc. Such new discoveries suggest that more nearby stars are yet to be found in these slower proper motion regimes, indicating that more work is needed to develop a complete map of the solar neighborhood.

79 ASTRONOMY AND ASTROPHYSICS↗

WIDE COMPANIONS TO HIPPARCOS STARS WITHIN 67 pc OF THE SUN

A catalog of common-proper-motion (CPM) companions to stars within 67 pc of the Sun is constructed based on the SUPERBLINK proper-motion survey. It contains 1392 CPM pairs with angular separations 30'' < {rho} < 1800'', relative proper motion between the two components less than 25 mas yr{sup -1}, and magnitudes and colors of the secondaries consistent with those of dwarfs in the (M{sub V} , V - J) diagram. In addition, we list 21 candidate white dwarf CPM companions with separations under 300'', about half of which should be physical. We estimate a 0.31 fraction of pairs with red dwarf companions to be physical systems (about 425 objects), while the rest (mostly wide pairs) are chance alignments. For each candidate companion, the probability of a physical association is evaluated. The distribution of projected separations s of the physical pairs between 2 kAU and 64 kAU follows f(s){proportional_to}s {sup -1.5}, which decreases faster than Oepik's law. We find that solar-mass dwarfs have no less than 4.4% {+-} 0.3% companions with separations larger than 2 kAU, or 3.8% {+-} 0.3% per decade of orbital separation in the 2-16 kAU range. The distribution of mass ratio of those wide companions is approximately uniform in the 0.1 < q < 1.0 range, although we observe a dip at q {approx_equal} 0.5 which, if confirmed, could be evidence of bimodal distribution of companion masses. New physical CPM companions to two exoplanet host stars are discovered.

79 ASTRONOMY AND ASTROPHYSICS↗

G 112-29 (=NLTT 18149): A VERY WIDE COMPANION TO GJ 282 AB WITH A COMMON PROPER MOTION, COMMON PARALLAX, COMMON RADIAL VELOCITY, AND COMMON AGE

We have made a search for common proper motion (CPM) companions to the wide binaries in the solar vicinity. We found that the binary GJ 282AB has a very distant CPM companion (NLTT 18149) at a separation s = 1.{sup 0}09. Improved spectral types and radial velocities are obtained, and ages determined for the three components. The Hipparcos trigonometric parallaxes and the new radial velocities and ages turn out to be very similar for the three stars, and provide strong evidence that they form a physical system. At a projected separation of 55,733 AU from GJ 282AB, NLTT 18149 ranks among the widest physical companions known.

79 ASTRONOMY AND ASTROPHYSICS↗

Relationship between defect density and charge carrier transport in amorphous and microcrystalline silicon

The influence of dangling-bond defects and the position of the Fermi level on the charge carrier transport properties in undoped and phosphorous doped thin-film silicon with structure compositions all the way from highly crystalline to amorphous is investigated. The dangling-bond density is varied reproducibly over several orders of magnitude by electron bombardment and subsequent annealing. The defects are investigated by electron-spin-resonance and photoconductivity spectroscopies. Comparing intrinsic amorphous and microcrystalline silicon, it is found that the relationship between defect density and photoconductivity is different in both undoped materials, while a similar strong influence of the position of the Fermi level on photoconductivity via the charge carrier lifetime is found in the doped materials. The latter allows a quantitative determination of the value of the transport gap energy in microcrystalline silicon. The photoconductivity in intrinsic microcrystalline silicon is, on one hand, considerably less affected by the bombardment but, on the other hand, does not generally recover with annealing of the defects and is independent from the spin density which itself can be annealed back to the as-deposited level. For amorphous silicon and material prepared close to the crystalline growth regime, the results for nonequilibrium transport fit perfectly to a recombination model based on direct capture into neutral dangling bonds over a wide range of defect densities. For the heterogeneous microcrystalline silicon, this model fails completely. The application of photoconductivity spectroscopy in the constant photocurrent mode (CPM) is explored for the entire structure composition range over a wide variation in defect densities. For amorphous silicon previously reported linear correlation between the spin density and the subgap absorption is confirmed for defect densities below 10{sup 18} cm{sup -3}. Beyond this defect level, a sublinear relation is found i.e., not all spin-detected defects are also visible in the CPM spectra. Finally, the evaluation of CPM spectra in defect-rich microcrystalline silicon shows complete absence of any correlation between spin-detected defects and subband gap absorption determined from CPM: a result which casts considerable doubt on the usefulness of this technique for the determination of defect densities in microcrystalline silicon. The result can be related to the inhomogeneous structure of microcrystalline silicon with its consequences on transport and recombination processes.

75 CONDENSED MATTER PHYSICS, SUPERCONDUCTIVITY AND↗

Guide for SDEC Set up

The instrument has four collection vials that must be filled with ethylene glycol before operation. Each of the four vials should be labeled 1 through 4 and the empty weights recorded. Fill each vial with 80 mL of ethylene glycol and record the weight again. In order for the instrument to operate properly, the collection vials should always have less than 160 mL of total liquid in them. After completing a sample run, remove the collection vials, use a transfer pipette to remove any liquid that might still be on the air paddler, wipe off any condensation from the exterior of the collection vial and record weight. From the instrument, record the ending volume and the time of operation. The solution mixed in the scintillation vial will be 2 ml of a 95% to 50% ethylene glycol to water mixture. To determine the efficiency of counting at all of these concentrations, a series of vials should be set up that consist of 18 ml of Ultima Gold LLT cocktail mixed with standard, regular deionized water and ethylene glycol. The efficiency curve should be counted in the 'Low Level' count mode with the Luminescence Correction ON and the Color Quench Correction ON. Once the tSIE values are determined, chart the cpm against the tSIE numbers and find the best fit for the data. The resulting equation is to be used to converting tSIE values from the collection vials to efficiency. To determine the background cpm value of the ethylene glycol, count a 2 ml sample of ethylene glycol with 18 ml of Ultima Gold for 100 minutes. To determine the total activity of the sample, take two 2 ml aliquots of sample from the first vial and place in separate scintillation vials. Record the weight of each aliquot. Determine the percentage of total sample each aliquot represents by dividing the aliquot weight by the total solution weight from the vial. Also, determine the percentage of ethylene glycol in the sample by dividing the initial solution weight by the final solution weight and multiplying by 100. Add 18 ml of Ultima Gold to each vial and proceed to count for 100 minutes in a 'Low Level' count mode. Before performing a calculation on the dpm value of each aliquot, a subtraction should be made for the background count rate of the ethylene glycol. Based on the background cpm, multiply the background cpm value by the percentage of ethylene glycol in the collection vial. Once the background value is subtracted, calculate the dpm value of the sample based on the tSIE conversion to efficiency. This will produce a dpm value. To convert this to a total activity of the sample, divide the aliquot dpm value by the decimal percentage of total sample the aliquot represents. This gives the total activity of the sample solution. Take the average of both aliquots as a final result. To convert the total activity from the solution in vial one to activity in air, an empirical formula is used to convert activity/gram from vial one to total activity introduced into the system. After calculation the final result for the vial, divide the total by the mass of the sample in vial one. This gives dpm/g (labeled C{sub m}). To convert this to total dpm measured, C = (128.59 * Cm + 10.837)/V Where: C = Tritium concentration in air (dpm/m{sup 3}) C{sub m} = measured tritium concentration from vial 1 (dpm/g) V = Volume of air sampled through instrument (m{sup 3}). C is the final value of tritium concentration in air.

37 INORGANIC, ORGANIC, PHYSICAL, AND ANALYTICAL CH↗

Final Status Survey Report for Corrective Action Unit 117 - Pluto Disassembly Facility, Building 2201, Nevada National Security Site, Nevada

This document contains the process knowledge, radiological data and subsequent statistical methodology and analysis to support approval for the radiological release of Corrective Action Unit (CAU) 117 – Pluto Disassembly Facility, Building 2201 located in Area 26 of the Nevada National Security Site (NNSS). Preparations for release of the building began in 2009 and followed the methodology described in the Multi-Agency Radiation Survey and Site Investigation Manual (MARSSIM). MARSSIM is the DOE approved process for release of Real Property (buildings and landmasses) to a set of established criteria or authorized limits. The pre-approved authorized limits for surface contamination values and corresponding assumptions were established by DOE O 5400.5. The release criteria coincide with the acceptance criteria of the U10C landfill permit. The U10C landfill is the proposed location to dispose of the radiologically non-impacted, or “clean,” building rubble following demolition. However, other disposition options that include the building and/or waste remaining at the NNSS may be considered providing that the same release limits apply. The Final Status Survey was designed following MARSSIM guidance by reviewing historical documentation and radiological survey data. Following this review a formal radiological characterization survey was performed in two phases. The characterization revealed multiple areas of residual radioactivity above the release criteria. These locations were remediated (decontaminated) and then the surface activity was verified to be less than the release criteria. Once remediation efforts had been successfully completed, a Final Status Survey Plan (10-015, “Final Status Survey Plan for Corrective Action Unit 117 – Pluto Disassembly Facility, Building 2201”) was developed and implemented to complete the final step in the MARSSIM process, the Final Status Survey. The Final Status Survey Plan consisted of categorizing each individual room into one of three categories: Class 1, Class 2 or Class 3 (a fourth category is a “Non-Impacted Class” which in the case of Building 2201 only pertained to exterior surfaces of the building.) The majority of the rooms were determined to fall in the less restrictive Class 3 category, however, Rooms 102, 104, 106, and 107 were identified as containing Class 1 and 2 areas. Building 2201 was divided into “survey units” and surveyed following the requirements of the Final Status Survey Plan for each particular class. As each survey unit was completed and documented, the survey results were evaluated. Each sample (static measurement) with units of counts per minute (cpm) was corrected for the appropriate background and converted to a value with units of dpm/100 cm2. With a surface contamination value in the appropriate units, it was compared to the surface contamination limits, or in this case the derived concentration guideline level (DCGLw). The appropriate statistical test (sign test) was then performed. If the survey unit was statistically determined to be below the DCGLw, then the survey unit passed and the null hypothesis (that the survey unit is above limits) was rejected. If the survey unit was equal to or below the critical value in the sign test, the null hypothesis was not rejected. This process was performed for all survey units within Building 2201. A total of thirty-three “Class 1,” four “Class 2,” and one “Class 3” survey units were developed, surveyed, and evaluated. All survey units successfully passed the statistical test. Building 2201 meets the release criteria commensurate with the Waste Acceptance Criteria (for radiological purposes) of the U10C landfill permit residing within NNSS boundaries. Based on the thorough statistical sampling and scanning of the building’s interior, Building 2201 may be considered radiologically “clean,” or free of contamination.

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Validation of Nuclear Data Sensitivity Calculations by the MCNP PERT Card [Poster]

This work validates a method of estimating sensitivities that utilized the MCNP PERT card and tallies. The agreement of the PERT card and Brute Force results proves the validity of calculating nuclear data sensitivities by use of the MCNP PERT card, especially at higher energies. The overall agreement will be easier to understand once an uncertainty analysis is completed.

73 NUCLEAR PHYSICS AND RADIATION PHYSICS↗

Assessing the social sustainability contribution of an infrastructure project under conditions of uncertainty

Assessing the viability of a public infrastructure includes economic, technical and environmental aspects; however, on many occasions, the social aspects are not always adequately considered. This article proposes a procedure to estimate the social sustainability of infrastructure projects under conditions of uncertainty, based on a multicriteria deterministic method. The variability of the method inputs is contributed by the decision-makers. Uncertain inputs are treated through uniform and beta PERT distributions. The Monte Carlo method is used to propagate uncertainty in the method. A case study of a road infrastructure improvement in El Salvador is used to illustrate this treatment. The main results determine the variability of the short and long-term social improvement indices by infrastructure and the probability of the position in the prioritization of the alternatives. The proposed mechanism improves the reliability of the decision making early in infrastructure projects, taking their social contribution into account. The results can complement environmental and economic sustainability assessments. - Highlights: •Estimate the social sustainability of infrastructure projects under conditions of uncertainty •The method uses multicriteria and Monte Carlo techniques and beta PERT distributions •Determines variability of the short and long term social improvement •Determines probability in the prioritization of alternatives •Improves reliability of decision making considering the social contribution.

22 GENERAL STUDIES OF NUCLEAR REACTORS↗