Engineering Papers⌕ Search

SEARCH · Engineering Papers

Results for “PARTICLE BOOSTERS”

Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.

Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.

At least 19 records

Project X and a Muon Facility at Fermilab

An integrated program is described, starting with muon experiments in the Booster era, continuing with a 2 MW target station, a 4 GeV Neutrino Factory and a 3 TeV Muon Collider, all driven by Project X. This idea provides an integrated approach to the Intensity and Energy Frontiers at Fermilab.

43 PARTICLE ACCELERATORS↗

The HIE-ISOLDE project

The HIE-ISOLDE project is a major staged upgrade of the existing ISOLDE facility. It includes an energy increase of the REX post-accelerator up to 5.5 MeV/u with a future option of going to 10 MeV/u, as well as an upgrade of the REX low energy stage capacity. The beam quality will be improved e.g. with the installation of a RFQ cooler and a new Resonant Laser Ionization System. The driver intensity will be increased, at first from a faster cycling of the PS Booster and later from the new Linac-4.

43 PARTICLE ACCELERATORS↗

Comments on Injector Proton Beam Study in Run 2014

During the entire period of injector proton study in run 2014, it seems that the beam transverse emittance out of Booster is larger than that in run 2013. The emittance measured at the BtA transfer line and also the transmission from Booster late to AGS late are presented for this argument. In addition to this problem, it seems that the multiturn Booster injection, which defines the transverse emittance, needs more attention. Moreover, for high intensity operations, the space charge effect may be already relevant in RHIC polarized proton runs. With the RHIC proton intensity improvement in the next several years, higher Booster input intensity is needed, therefore, the space charge effect at the Booster injection and early ramp may become a new limiting factor.

43 PARTICLE ACCELERATORS↗

Tuning the operational parameters of the first microtron stage

The Laboratorio do Acelerador Linear is building a racetrack microtron electron accelerator. It has two acceleration stages: the booster and the main microtron. The aim of this work is to optimize the operation parameters of the booster stage by means of simulation tools. The accelerator admittances were determined successfuly and the results are presented. The injection beam has been characterized previously, and the available data were used to match the transverse beam emittances of the injector to the transverse beam admittances of the booster. Preliminary results showed that the simulations have a good agreement with the working parameters.

43 PARTICLE ACCELERATORS↗

Accelerator/Experiment Operations - FY 2015

This Technical Memorandum summarizes the Fermilab accelerator and experiment operations for FY 2015. It is one of a series of annual publications intended to gather information in one place. In this case, the information concerns the FY 2015 NOvA, MINOS+ and MINERvA experiments using the Main Injector Neutrino Beam (NuMI), the activities in the SciBooNE Hall using the Booster Neutrino Beam (BNB), and the SeaQuest experiment and Meson Test Beam (MTest) activities in the 120 GeV external Switchyard beam (SY120).

43 PARTICLE ACCELERATORS↗

Ionization Cooling for Muon Experiments

Possible application for muon experiments such as mu2e is discussed of the initial part of the ionization cooling channel originally developed for muon collider. It is shown that with the FNAL Booster as the proton driver the mu2e sensitivity can be increased by two orders of magnitude compared to the presently considered experiment.

43 PARTICLE ACCELERATORS↗

Longitudinal emittance measurements in the Booster and AGS during the 2014 RHIC gold run

This note describes longitudinal emittance measurements that were made in the Booster and AGS during the 2014 RHIC Gold run. It also contains an overview of the longitudinal aspects of their setup during this run. Each bunch intended for RHIC is composed of beam from 4 Booster cycles, and there are two of them per AGS cycle. For each of the 8 Booster cycles required to produce the 2 bunches in the AGS, a beam pulse from EVIS is injected into the Booster and captured in four h=4 buckets. Then those bunches are accelerated to a porch where they are merged into 2 bunches and then into 1 bunch.

43 PARTICLE ACCELERATORS↗

Polarization Issues in Run 2008

The RHIC proton beam polarization has a strong dependence on intensity in Run 2008, whereas the dependence is almost absent in Run 2006. Meanwhile, the RHIC beam transverse emittance also has a dependence on intensity in Run 2008, but little in Run 2006. Using the emittance measurement at the AGS IPM and the BtA multiwires, the source of this difference between 2006 and 2008 runs is traced to the Booster. It is found that at least the degree of the vertical scraping in the Booster is different in 2006 and 2008. The effect of this scraping for the RHIC beam emittance and polarization is studied.

43 PARTICLE ACCELERATORS↗

FY2014 Parameters for Helions and Gold Ions in Booster, AGS, and RHIC

The nominal parameters for helions (helion is the bound state of two protons and one neutron, the nucleus of a helium-3 atom) and gold ions in Booster, AGS, and RHIC are given for the FY2014 running period. The parameters are found using various formulas to derive mass, helion anomalous g-factor, kinetic parameters, RF parameters, ring parameters, etc..

43 PARTICLE ACCELERATORS↗

Design of 3 GeV booster ring lattice

The aim of this study is to design of a 3 GeV booster ring for the 3 GeV storage ring. Electrons are needed to be accelerated to 3.0 GeV from 0.15 GeV energy. In this frame, we studied on two options for booster ring; a compact booster and the booster that shares the same tunnel with the storage ring. The lattice type has been chosen FODO for both options, lattice parameters are calculated, sextupole magnets are used to decrease dynamic aperture problem and dynamic aperture calculations are also made with considering of the necessary conditions. After designing and calculating of the parameters, these designs have been compared with each other. In addition to this comparison, these booster design parameters have been compared with some world centers design parameters and the reliability of the booster design is seen. Beam optics, OPA and Elegant simulation programs have been used in the study calculations.

71 CLASSICAL AND QUANTUM MECHANICS, GENERAL PHYSIC↗

An overview of Booster and AGS polarized proton operation during Run 15

This note is an overview of the Booster and AGS for the 2015 Polarized Proton RHIC run from an operations perspective. There are some notable differences between this and previous runs. In particular, the polarized source intensity was expected to be, and was, higher this year than in previous RHIC runs. The hope was to make use of this higher input intensity by allowing the beam to be scraped down more in the Booster to provide a brighter and smaller beam for the AGS and RHIC. The RHIC intensity requirements were also higher this run than in previous runs, which caused additional challenges because the AGS polarization and emittance are normally intensity dependent.

43 PARTICLE ACCELERATORS↗

Implications of a 20-Hz Booster cycle-rate for Slip-stacking

We examine the potential impacts to slip-stacking from a change of the Booster cycle-rate from 15- to 20-Hz. We find that changing the Booster cycle-rate to 20-Hz would greatly increase the slip-stacking bucket area, while potentially requiring greater usage of the Recycler momentum aperture and additional power dissipation in the RF cavities. In particular, the losses from RF interference can be reduced by a factor of 4-10 (depending on Booster beam longitudinal parameters). We discuss the aspect ratio and beam emittance requirements for efficient slip-stacking in both cycle-rate cases. Using a different injection scheme can eliminate the need for greater momentum aperture in the Recycler.

43 PARTICLE ACCELERATORS↗

FY2014 Parameters for Gold Ions in Booster, AGS, and RHIC

The nominal parameters for gold ions in Booster, AGS, and RHIC are given for the FY2014 running period. The parameters are worked out using various formulas to derive mass, kinetic parameters, RF parameters, ring parameters, etc.. The ''standard setup'', ''medium-energy'', and ''low-energy'' parameters are summarized in separate sections.

43 PARTICLE ACCELERATORS↗

RHIC Proton Luminosity and Polarization Improvement

The RHIC proton beam polarization can be improved by raising the Booster scraping, which also helps to reduce the RHIC transverse emittance, and therefore to improve the luminosity. By doing this, the beam-beam effect would be enhanced. Currently, the RHIC working point is constrained between 2/3 and 7/10, the 2/3 resonance would affect intensity and luminosity lifetime, and the working point close to 7/10 would enhance polarization decay in store. Run 2013 shows that average polarization decay is merely 1.8% in 8 hours, and most fills have the luminosity lifetime better than 14 hours, which is not a problem. Therefore, even without beam-beam correction, there is room to improve for RHIC polarization and luminosity. The key to push the Booster scraping is to raise the Booster input intensity; for that, two approaches can be used. The first is to extend the LINAC tank 9 pulse width, which has been successfully applied in run 2006. The second is to raise the source temperature, which has been successfully applied in run 2006 and run 2012.

43 PARTICLE ACCELERATORS↗

Early Beam Injection Scheme for the Fermilab Booster: A Path for Intensity Upgrade

Over the past decade, Fermilab has focused efforts on the intensity frontier physics and is committed to increase the average beam power delivered to the neutrino and muon programs substantially. Many upgrades to the existing injector accelerators, namely, the current 400 MeV LINAC and the Booster, are in progress under the Proton Improvement Plan (PIP). Proton Improvement Plan-II (PIP-II) proposes to replace the existing 400 MeV LINAC by a new 800 MeV LINAC, as an injector to the Booster which will increase Booster output power by nearly a factor of two from the PIP design value by the end of its completion. In any case, the Fermilab Booster is going to play a very significant role for nearly next two decades. In this context, I have developed and investigated a new beam injection scheme called "early injection scheme" (EIS) for the Booster with the goal to significantly increase the beam intensity output from the Booster thereby increasing the beam power to the HEP experiments even before PIP-II era. The scheme, if implemented, will also help improve the slip-stacking efficiency in the MI/RR. Here I present results from recent simulations, beam studies, current status and future plans for the new scheme.

43 PARTICLE ACCELERATORS↗

Electron Cooling Study for MEIC

Electron cooling of the ion beams is one critical R&D to achieve high luminosities in JLab's MEIC proposal. In the present MEIC design, a multi-staged cooling scheme is adapted, which includes DC electron cooling in the booster ring and bunched beam electron cooling in the collider ring at both the injection energy and the collision energy. We explored the feasibility of using both magnetized and non-magnetized electron beam for cooling, and concluded that a magnetized electron beam is necessary. Electron cooling simulation results for the newly updated MEIC design is also presented.

43 PARTICLE ACCELERATORS↗

RF System Requirements for a Medium-Energy Electron-Ion Collider (MEIC) at JLab

JLab is studying options for a medium energy electron-ion collider that could fit on the JLab site and use CEBAF as a full-energy electron injector. A new ion source, linac and booster would be required, together with collider storage rings for the ions and electrons. In order to achieve the maximum luminosity these will be high-current storage rings with many bunches. We present the high-level RF system requirements for the storage rings, ion booster ring and high-energy ion beam cooling system, and describe the technology options under consideration to meet them. We also present options for staging that might reduce the initial capital cost while providing a smooth upgrade path to a higher final energy. The technologies under consideration may also be useful for other proposed storage ring colliders or ultimate light sources.

43 PARTICLE ACCELERATORS↗