Engineering PapersSearch

SEARCH · Engineering Papers

Results for “PARACHUTING”

Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.

Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.

At least 19 records

Evaluation of Drogue Parachute Damping Effects Utilizing the Apollo Legacy Parachute Model

Drogue parachute damping is required to dampen the Orion Multi Purpose Crew Vehicle (MPCV) crew module (CM) oscillations prior to deployment of the main parachutes. During the Apollo program, drogue parachute damping was modeled on the premise that the drogue parachute force vector aligns with the resultant velocity of the parachute attach point on the CM. Equivalent Cm(sub q) and Cm(sub alpha) equations for drogue parachute damping resulting from the Apollo legacy parachute damping model premise have recently been developed. The MPCV computer simulations ANTARES and Osiris have implemented high fidelity two-body parachute damping models. However, high-fidelity model-based damping motion predictions do not match the damping observed during wind tunnel and full-scale free-flight oscillatory motion. This paper will present the methodology for comparing and contrasting the Apollo legacy parachute damping model with full-scale free-flight oscillatory motion. The analysis shows an agreement between the Apollo legacy parachute damping model and full-scale free-flight oscillatory motion.

Currin, Kelly M.

Advanced Supersonic Parachute Inflation Research Experiment 2 (ASPIRE2) Flight Mechanics and Parachute Performance

The Advanced Supersonic Parachute Inflation Re-search Experiment-2 (ASPIRE2) program consists of a sounding rocket flight test to be launched at Wallops Flight Facility (WFF) in 2025. This effort seeks to qualify the supersonic parachute for the Sample Retrieval Lander (SRL) under the Mars Sample Return (MSR) program, building off the successes of its predecessor program, ASPIRE, which launched in both 2017 and 2018. The conops for the ASPIRE2 mission are shown in Figure 1 relative to its predecessor. While the ASPIRE pro-gram qualified a 21.5 m diameter disk-gap band parachute deployed at Mach 1.7, the SRL parachute will be increased to 24 m in diameter and target a Mach 2.1 parachute deployment condition, the largest diameter supersonic parachute deployed at the highest Mach number to date. These requirements are driven by the increased landing mass of the sample retrieval lander, which is roughly a 50% increase over that of the Mars2020 entry vehicle. These changes necessitate ASPIRE2 to certify the parachute performance under similar deployment conditions. This work will cover the 6-DoF para-chute model implementation and flight mechanics performance for the ASPIRE2 campaign and discuss how these results will impact the design of the test article. The ASPIRE2 trajectory is simulated using a multi-body flight dynamics tool, Program to Optimize Simulated Trajectories II (POST2). This work will summarize both the flight mechanics and parachute modeling (from payload separation until splashdown) and performance for this mission. Various design trades will be assessed such as para-chute tuning parameters as well as vehicle center of gravity location.

Evan Roelke

Reconstruction of the Advanced Supersonic Parachute Inflation Research Experiment Sounding Rocket Flight Tests with Strengthened Disk-Gap-Band Parachute

The Advanced Supersonic Parachute Inflation Research and Experiments project is a flight test program for development of supersonic parachutes for future use at Mars. The flight tests are a risk-reduction program for the Mars 2020 mission. The flight tests involve two Disk-Gap- Band parachute designs to be tested at relevant Mach number and dynamic pressure regimes for the Mars 2020 entry capsule. The first of these parachutes is a built-to-print design that was successfully employed by the Mars Science Laboratory lander at Mars in August 2012, and the second is a design that is strengthened in material properties and construction methods but has the same geometry as that used by Mars Science Laboratory. The first flight test of the built-to-print parachute took place on October 4, 2017 at NASA's Wallops Flight Facility. The parachute test was successful. The second and third flight tests took place on March 31st and September 7th 2018, respectively, and successfully tested the strengthened parachute design. This paper describes the instrumentation, data analysis techniques, and atmospheric and trajectory reconstruction results from the second and third flight tests.

Karlgaard, Christopher D.

Flight tests of Viking parachute system in three Mach number regimes. 2: Parachute test results

Tests of the Viking 16.15-meter nominal-diameter disk-gap-band parachute were conducted at Mach number and dynamic pressure conditions which bracketed the range postulated for the Viking '75 mission to Mars. Parachutes were deployed at supersonic, transonic, and subsonic speeds behind a simulated Viking entry capsule. All parachutes successfully deployed, inflated, and exhibited sufficient drag and stability for mission requirements. Basic parachute data including loads, drag coefficients, pull-off angles, and canopy area ratios are presented. Trajectory reconstruction and onboard camera data methods were combined to yield continuous histories of both parachute and test-vehicle angular motions which are presented for the period from parachute deployment through steady inflation.

Bendura, R. J.

A Hybrid Parachute Simulation Environment for the Orion Parachute Development Project

A parachute simulation environment (PSE) has been developed that aims to take advantage of legacy parachute simulation codes and modern object-oriented programming techniques. This hybrid simulation environment provides the parachute analyst with a natural and intuitive way to construct simulation tasks while preserving the pedigree and authority of established parachute simulations. NASA currently employs four simulation tools for developing and analyzing air-drop tests performed by the CEV Parachute Assembly System (CPAS) Project. These tools were developed at different times, in different languages, and with different capabilities in mind. As a result, each tool has a distinct interface and set of inputs and outputs. However, regardless of the simulation code that is most appropriate for the type of test, engineers typically perform similar tasks for each drop test such as prediction of loads, assessment of altitude, and sequencing of disreefs or cut-aways. An object-oriented approach to simulation configuration allows the analyst to choose models of real physical test articles (parachutes, vehicles, etc.) and sequence them to achieve the desired test conditions. Once configured, these objects are translated into traditional input lists and processed by the legacy simulation codes. This approach minimizes the number of sim inputs that the engineer must track while configuring an input file. An object oriented approach to simulation output allows a common set of post-processing functions to perform routine tasks such as plotting and timeline generation with minimal sensitivity to the simulation that generated the data. Flight test data may also be translated into the common output class to simplify test reconstruction and analysis.

Moore, James W.

An Airborne Parachute Compartment Test Bed for the Orion Parachute Test Program

The test program developing parachutes for the Orion/MPCV includes drop tests with parachutes deployed from an Orion-like parachute compartment at a wide range of dynamic pressures. Aircraft and altitude constraints precluded the use of an Orion boilerplate capsule for several test points. Therefore, a dart-shaped test vehicle with a hi-fidelity mock-up of the Orion parachute compartment has been developed. The available aircraft options imposed constraints on the test vehicle development and concept of operations. Delivery of this test vehicle to the desired velocity, altitude, and orientation required for the test is a di cult problem involving multiple engineering disciplines. This paper describes the development of the test technique. The engineering challenges include extraction from an aircraft, reposition of the extraction parachute, and mid-air separation of two vehicles, neither of which has an active attitude control system. The desired separation behavior is achieved by precisely controlling the release point using on-board monitoring of the motion. The design of the test vehicle is also described. The trajectory simulations and other analyses used to develop this technique and predict the behavior of the test vehicle are reviewed in detail. The application of the technique on several successful drop tests is summarized.

Moore, James W.

Advanced Supersonic Parachute Inflation Research Experiment-2 (ASPIRE2) Parachute Modeling and Flight Mechanics Performance

The Advanced Supersonic Parachute Inflation Research Experiment-2 (ASPIRE2) program is designed to test and qualify the supersonic parachute for the Mars entry, descent, and landing stage of the Mars Sample Return campaign. The ASPIRE2 test was planned for early 2026 and would have involved testing the parachute at deployments of Mach 2.1 and higher load conditions than previous Mars missions. The ASPIRE2 simulation builds upon a previous test framework from the ASPIRE tests in 2017-2018 used to qualify the Mars 2020 parachute, but due to new requirements, the modeling and simulation for ASPIRE2 has needed development and characterization of different sensitivities. This paper looks at the mission design as of mid-2024 and presents the trade space for qualifying the parachute in a dynamic environment.

Evan Roelke

Advanced Supersonic Parachute Inflation Research Experiment-2 (ASPIRE2) Parachute Modeling and Flight Mechanics Performance

The Advanced Supersonic Parachute Inflation Research Experiment-2 (ASPIRE2) program is designed to test and qualify the supersonic parachute for the Mars entry, descent, and landing stage of the Mars Sample Return campaign. The ASPIRE2 test was planned for early 2026 and would have involved testing the parachute at deployments of Mach 2.1 and higher load conditions than previous Mars missions. The ASPIRE2 simulation builds upon a previous test framework from the ASPIRE tests in 2017-2018 used to qualify the Mars 2020 parachute, but due to new requirements, the modeling and simulation for ASPIRE2 has needed development and characterization of different sensitivities. This paper looks at the mission design as of mid-2024 and presents the trade space for qualifying the parachute in a dynamic environment.

Evan Roelke

Unitary Wind Tunnel Tests of 30-Degree Conical Ribbon Parachute and a Rotofoil Parachute Towed in the Wake of a Conical Nosed Cylindrical Body

Multiple wind tunnel test trials were conducted on a 30 degree conical ribbon parachute with porosities of 30, 27, and 24 percent. Variables were Mach number, dynamic pressure, towline length, and coefficient of drag. A Rotofoil parachute having a porosity of approximately 24 percent was tested, but failed after about 30 seconds of operation at a Mach number of 1.8 All of the parachutes had a nominal diameter and shroud line length of 10 inches. Drag coefficients were based on the area of a circle having a diameter two-thirds of the nominal parachute diameter.

WIND TUNNEL TESTS

The Effects of Parachute System Mass and Suspension-Line Elastic Properties on the LADT #3 Viking Parachute Inflation Load

Analytical calculations have considered the effects of 1) varying parachute system mass, 2) suspension-line damping, and 3) alternate suspension-line force-elongation data on the canopy force history. Results indicate the canopy force on the LADT #3 parachute did not substantially exceed the recorded vehicle force reading and that the above factors can have significant effects on the canopy force history. Analytical calculations have considered the effects of i) varying parachute system mass, 2) suspension line damping, and 3) different suspension-line force-elongation data on the canopy force history. Based on the results of this study the following conclusions are drawn: Specifically, 1. At the LADT #3 failure time of 1.70 seconds, the canopy force ranged anywhere from 15.7% below to 2.4% above the vehicle force depending upon the model and data used. Therefore, the canopy force did not substantially exceed the recorded vehicle force reading. 2. At a predicted full inflation time of 1.80 seconds the canopy force would be greater than the vehicle force by from 1.1% to 10.6%, again depending upon the model and data used. Generally, 3. At low altitudes, enclosed and apparent air mass can significantly effect the canopy force calculated and should, therefore, not be neglected. 4. The canopy force calculations are sensitive to decelerator physical properties. In this case changes in the damping and/or force-elongation characteristics produced significant changes in the canopy force histories. Accurate prediction of canopy force histories requires accurate inputs in these areas.

Talay, Theodore A.

Parachute Compartment Drop Test Vehicle for Testing the Crew Exploration Vehicle's Parachute Assembly System

Though getting astronauts safely into orbit and beyond has long been one of NASA?s chief goals, their safe return has always been equally as important. The Crew Exploration Vehicle?s (CEV) Parachute Assembly System (CPAS) is designed to safely return astronauts to Earth on the next-generation manned spacecraft Orion. As one means for validating this system?s requirements and testing its functionality, a test article known as the Parachute Compartment Drop Test Vehicle (PC-DTV) will carry a fully-loaded yet truncated CPAS Parachute Compartment (PC) in a series of drop tests. Two aerodynamic profiles for the PC-DTV currently exist, though both share the same interior structure, and both have an Orion-representative weight of 20,800 lbf. Two extraction methods have been developed as well. The first (Cradle Monorail System 2 - CMS2) uses a sliding rail technique to release the PC-DTV midair, and the second (Modified DTV Sled; MDS) features a much less constrained separation method though slightly more complex. The decision as to which aerodynamic profile and extraction method to use is still not finalized. Additional CFD and stress analysis must be undertaken in order to determine the more desirable options, though at present the "boat tail" profile and the CMS2 extraction method seem to be the favored options in their respective categories. Fabrication of the PC-DTV and the selected extraction sled is set to begin in early October 2010 with an anticipated first drop test in mid-March 2011.

Lubey, Daniel P.

ENRE 655 Class Project. Development of the Initial Main Parachute Failure Probability for the Constellation Program (CxP) Orion Crew Exploration Vehicle (CEV) Parachute Assembly System (CPAS)

Loss of Crew (LOC) and Loss of Mission (LOM) are two key requirements the Constellation Program (CxP) measure against. To date, one of the top risk drivers for both LOC and LOM has been Orion's Crew Exploration Vehicle (CEV) Parachute Assembly System (CPAS). Even though the Orion CPAS is one of the top risk drivers of CxP, it has been very difficult to obtain any relevant data to accurately quantify the risk. At first glance, it would seem that a parachute system would be very reliable given the track record of Apollo and Soyuz. Given the success of those two programs, the amount of data is considered to be statistically insignificant. However, due to CxP having LOC/LOM as key design requirements, it was necessary for Orion to generate a valid prior to begin the Risk Informed Design process. To do so, the Safety & Mission Assurance (S&MA) Space Shuttle & Exploration Analysis Section generated an initial failure probability for Orion to use in preparation for the Orion Systems Requirements Review (SRR).

Fuqua, Bryan C.

Summary of the Advanced Supersonic Parachute Inflation Research Experiment (ASPIRE) Sounding Rocket Tests with a Disk-Gap-Band Parachute

This paper will present an overview of all three ASPIRE flights. First, the Test Architecture that was used for all three ASPIRE flights will be presented. This will be broken down into an explanation of the Concept of Operations (CONOPS),the parachute test articles, the data sources used, and the process that was used to reconstruct the flight trajectories and parachute performance. Next, the performance and results for all three ASPIRE flights will be presented in the order of the phases of flight. Lastly this paper will discuss the Conclusions and Lessons Learned from those results and from the ASPIRE project as a whole.

Tynis, Jake A.

High-Speed Schlieren Movies of the Flow About Reefed Parachute Models Towed at Supersonic Speeds Behind a Conical Body (4.875 Inches in Diameter). Drag Values Based on the Unreefed Diameter of 1.73 F. Porosity of Unreefed Parachute is 28 Percent.

Flexible parachute models reefed to one-eighth, one-fourth, one-third, and four tenths of its diameter were towed at speeds of Mach 1.80, 2.00, 2.20 and 2.87. Towline lengths tested were 23.40, 24.38, 26.81, and 29.25 inches. High-speed Schlieren movies of the flow are shown.

SCHLIEREN PHOTOGRAPHY