Engineering Papers⌕ Search

SEARCH · Engineering Papers

Results for “Operations coordination plan”

Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.

Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.

At least 19 records

Impact of FERC Order 2222 on DER Participation Rules in US Electricity Markets

Electricity markets in the bulk grid are beginning to implement market mechanisms that support the procurement of flexible capabilities from wide range of technologies, including distributed energy resources (DERs). The flexibility of these resources will help counterbalance supply uncertainties from large-scale integration of variable renewable generation. To encourage development of distributed and aggregated market participants, FERC Order 2222 was issued in September 2020 to require each Independent System Operator (ISO) in the US to implement rules that enable broader participation from aggregations of DERs in the bulk market. The following paper first describes the generic design of ISO markets before introducing the new market participation rules that ISOs have proposed for compliance with Order 2222. The paper then describes how software performance issues may continue to affect the eligibility requirements and offer structures for DER aggregations participating in ISOs, noting that continued research on computational methods may help reduce burdens for DER integration. The prospects for transmission and distribution system coordination is second major issue discussed, which will require minor changes to existing processes in the short term. In the longer term, there is more opportunity for more wide-ranging reforms, such as the development of a Distribution System Operator (DSO) framework. Newly proposed market rules may affect how Transactive Energy Systems (TES) will help facilitate efficient formation of DER aggregations and operation of the individual DERs within an aggregation. Within the TES context, the challenge is to fully understand how resource eligibility and operational and planning coordination methods will affect the design and implementation of TES.

24 POWER TRANSMISSION AND DISTRIBUTION↗

Reliability and Resiliency in South Asia's Power Sector - Pathways for Research, Modeling, and Implementation

Reliability and resilience are the core principles of power system planning and operations around the world. Power systems in South Asia are transforming with increasing penetration of clean energy generation resources, emerging technologies, increasing electricity demand and electrification. At the same time, these power systems are facing challenges posed by extreme weather events and climate change. All these factors would add furthermore importance to the reliability and resilience of future power systems in South Asia. This has motivated us to better understand the country specific challenges and chalk out the pathways for research, modelling and implementation in South Asia. Our research, experience in the region and feedback from key stakeholders indicate following as the key areas where more work is needed to improve reliability and resilience of power systems in the region: Renewable energy Data for power system studies, New Tools and Studies, Resilience Planning, Resource Adequacy, Advanced RE Forecasting, Cybersecurity, Load Forecasting, and Coordinated Planning and Operations.

29 ENERGY PLANNING, POLICY, AND ECONOMY↗

Coordinated microgrid investment and planning process considering the system operator

Nowadays, a significant number of distribution systems are facing problems to accommodate more photovoltaic (PV) capacity, namely due to the overvoltages during the daylight periods. This has an impact on the private investments in distributed energy resources (DER), since it occurs exactly when the PV prices are becoming attractive, and the opportunity to an energy transition based on solar technologies is being wasted. In particular, this limitation of the networks is a barrier for larger consumers, such as commercial and public buildings, aiming at investing in PV capacity and start operating as microgrids connected to the MV network. To address this challenge, this paper presents a coordinated approach to the microgrid investment and planning problem, where the system operator and the microgrid owner collaborate to improve the voltage control capabilities of the distribution network, increasing the PV potential. The results prove that this collaboration has the benefit of increasing the value of the microgrid investments while improving the quality of service of the system and it should be considered in the future regulatory framework.

24 POWER TRANSMISSION AND DISTRIBUTION↗

Impact of Distributed Energy Resources on the Bulk Electric System: Combined Modeling of Transmission and Distribution Systems and Benchmark Case Studies

The high penetration of distributed energy resources (DERs) on modern distribution systems introduces intermittent power generation, stochastic system operating conditions, and bi-directional power flows that impact the system responses to various types of disturbances and may pose challenges to the operations and reliability of the Bulk Electric System (BES). In order to understand the impact of DERs on the planning and operation of the BES, the distribution system can no longer be represented as a single load at a node on the transmission system. At the same time, advanced control capabilities of DERs offer potential opportunities for improving BES reliability by transforming DERs from a passive “do no harm” resource to an active “support reliability” resource when applied in a planned and well-thought-out manner. This concept is often described as DER “flexibility.” With the persistent trend towards a high- penetration of DERs in distribution systems, regulators such as the North American Electric Reliability Corporation (NERC), planning coordinators and grid operators are in serious need of understanding the full-spectrum impact of DERs on the BES to ensure secure and reliable grid planning and operations.

24 POWER TRANSMISSION AND DISTRIBUTION↗

Joint Planning of EV Fast Charging Stations and Power Distribution Systems With Balanced Traffic Flow Assignment

To tackle the challenges introduced by the fast-growing charging demand of electric vehicles (EVs), the power distribution systems (PDSs) and fast charging stations (FCSs) of EVs should be planned and operated in a more coordinated fashion. However, existing planning approaches generally aim to minimize investment costs in PDSs while ignoring the risk of worsening traffic conditions. To overcome this research gap, this article integrates the interests of traffic networks into PDS and FCS joint planning model to mitigate negative impacts on traffic conditions caused by installing FCSs. First, a novel microscopic method that is different from traditional assignment methods is proposed to simulate the influences of FCSs on traffic flows and EV charging loads. Then, a multiobjective joint planning model is developed to minimize both the planning costs and unbalanced traffic flows. A new bilayer Benders decomposition algorithm is designed to solve the proposed joint planning model. Numerical results on two practical systems in China validate the feasibility of our microscopic method by comparing the simulated results with real data. Compared with existing approaches, it is also demonstrated that the proposed joint planning approach helps to balance traffic flow assignments and relieve traffic congestion.

bilayer expanded Benders decomposition↗

Guest Editorial

Energy Systems Integration (ESI) is the process of coordinating the operation and planning of energy systems across multiple pathways and/or geographical scales to deliver reliable, cost-effective energy services with minimal impact on the environment. Energy systems have evolved from individual systems with little or no dependencies into a complex set of integrated systems at scales that include customers, cities, and regions. This evolution has been driven by political, economic, and environmental objectives. As we try to meet the globally recognized imperative to reduce carbon emissions through the deployment of large renewable energy capacities while also maintaining reliability and competitiveness, flexible energy systems are required. This flexibility can be attained through integrating various systems: by physically linking energy vectors, namely electricity, heat, and fuels; by coordinating these vectors across other infrastructures, namely water, data, and transport; by institutionally coordinating energy markets; and, spatially, by increasing market footprint with granularity all the way down to the customer level. Smart grids and ESI are related, in particular, the coupling between electricity, consumers, data and transport. This special section focuses on the aspects of ESI where electricity is coupled to water, heat and fuels and where this coupling brings challenges and/or opportunities.

24 POWER TRANSMISSION AND DISTRIBUTION↗

Near-Term Operational Planning at the Hanford Tank Farms: Link to Execution - 17091

Washington River Protection Solutions, LLC uses an earned value management system to flow-down contractual requirements to operational activities. A Rolling Work Window Schedule Process is then used to plan and coordinate near-term operational activities at the Hanford tank farms for execution. This near-term operational planning process has been extended using a Multi-Year Operating Plan, underpinned with a dynamic simulation model, to better link execution of daily activities with mission objectives. (authors)

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Multicarrier Energy Systems: Shaping Our Energy Future

Multicarrier energy systems (MCESs) are characterized by strong coordination in operation and planning across multiple energy vectors and/or sectors to deliver reliable, cost-effective energy services to end users/customers with minimal impact on the environment. They have efficiency and flexibility benefits and are deployed in large and small scales on the supply and demand sides and at the network level but are more complex to control and manage. Here, MCESs are reviewed in the context of future low carbon energy systems based on electrification and very high variable renewable energy penetrations. Fully exploiting these systems requires some cost reductions, more sophisticated operations enabled by standardized communications and control capabilities detailed planning paradigms, and addressing their corresponding economic challenges. All these point toward the direction of analysis, markets, and technology research and development coupled with better policy and regulatory frameworks. One futuristic vision of a very low carbon energy system is proposed that illustrates potential pathways to an MCES-dominated energy future.

24 POWER TRANSMISSION AND DISTRIBUTION↗

Unlocking Flexibility: Energy Systems Integration [Guest Editorial]

The articles in this special section focus on energy systems integration (ESI). Electric power systems around the world are experiencing great changes, including the retirement of coal and nuclear plants along with a rapid increase in the use of natural gas turbines and variable renewable technologies such as wind and solar. There is also much more use of information and communications technologies to enhance the visibility and controllability of the grid. Flexibility of operation, the ability of a power system to respond to change in demand and supply, is critical to enable higher levels of variable generation. One way to unlock this potential flexibility is to tap into other energy domains. This concept of interconnecting energy domains is called ESI. ESI is the process of coordinating the operation and planning of energy systems across multiple pathways and/or geographical scales to deliver reliable, cost-effective energy services with minimal impact on the environment. Integrating energy domains adds flexibility to the electrical power system. ESI includes interactions among energy vectors and with other large-scale infrastructures including water, transport, and data and communications networks, which are an enabling technology for ESI.

24 POWER TRANSMISSION AND DISTRIBUTION↗

Water & Energy Interdependencies Across Economic Sectors of the United States

The motivation of the Integrated Water Power Resilience Project is to identify and develop opportunities for improving resilience in the water and power sectors through coordinated planning, investment, and operations and thereby provide benefits to power and water utilities, consumers, and the environment. Water and power systems are interdependent, subject to many of the same natural and manmade hazards, and are critical for the well-being of communities and society. Because of the interconnectedness of water and power systems, there are substantial economic, social, and environmental benefits to co-managing the market sectors for resilience instead of managing them separately. To support this initiative and future research in this area, a county level water and energy flow dataset was developed to build, calculate, and visualize interconnections in water and energy between various sectors. This report presents county and regional water and energy visualizations across nine economic sectors of the United States: agriculture, commercial, electricity generation, industrial, mining, public water supply, residential, transportation, and wastewater treatment.

29 ENERGY PLANNING, POLICY, AND ECONOMY↗

Definition of Capabilities Needed for a Single Event Effects Test Facility

The Federal Aviation Administration (FAA) is contemplating new regulations mandating testing of the vulnerability of flight-critical avionics to single event effects (SEE). A limited number of high-energy neutron test facilities currently serve the SEE industrial and institutional research community. The FAA recognizes that existing facilities have insufficient test capacity to meet new demand from such mandates; it desires more flexible irradiation capabilities to test complete, large systems and would like capabilities to address greater concerns for thermal neutrons. For this reason, the FAA funded this study by Spallation Neutron Source (SNS) staff with the ultimate aim of developing options for SEE test facilities using high-energy neutrons at the SNS complex. After an investigation of current SEE test practices and assessment of future testing requirements, three concepts were identified covering a range of test functionality, neutron flux levels, and fidelity to the atmospheric neutron spectrum. The costs and times required to complete each facility were also estimated. SEE testing is generally performed by accelerating the event rate to a point where the effects are still dominated by single events and double event causes of failures are negligible. In practice, acceleration factors of as high as 10 6 are applicable for component testing, whereas for systems testing acceleration factors of 10 4 seem to be the upper limit. It is strongly desirable that the irradiation facility be tunable over a large range of high-energy neutron fluxes of 10 2 - 10 4 n/cm²/s for systems testing and from 10 4 - 10 7 n/cm²/s for components testing. The most capable, most flexible, and highest-test-capacity option is a new stand-alone target station named the High-Energy neutron Test Station (HETS). It is also the most expensive option, with a cost to complete of approximately $100 million. Dual test enclosures would allow for simultaneous testing activity effectively doubling overall test capacity per HETS operating hour. Using about 1 kilowatt (kW) of proton power extracted from the accelerator before injection in the accumulator ring, its operation would be unnoticeable by neutron scattering users at the SNS target station. The H beam laser stripping technique would allow for control of beam power on the HETS target independent from power delivered to the SNS. Large systems with frontal areas of up to 1 x 2 m² could be accommodated with integral high-energy flux values (above 10 megaelectron-volt, or MeV) to at most 10 4 n/cm²/s; components could also be tested with flux levels to at most 10 7 n/cm²/s on beam sizes of up to 0.2 x 0.2 m². Selectable moderating material and neutron filters would allow tailoring of the neutron spectrum to user demands; charged particle deflectors could be switched to allow or deflect protons, pions, and muons. It is estimated that HETS would take 5 years to complete after award of contract, including engineering design and construction. Commissioning would take at least another 6 months. Interference with SNS principal operations was not considered in the construction time estimate; connection of the proton transport line and tunnel from the accelerator high energy beam transport (HEBT) and construction around existing site utilities would require careful planning and coordination with beam operations at the SNS. A high-energy (HE) neutron test facility using an available beam line on the SNS target station is a technically and financially attractive option. Inspired by the new ChipIR instrument on the ISIS TS 2 spallation source in the UK, a similar facility could be placed on an unused beam line in the SNS instrument hall [e.g., on beam line 8 (both A and B channels would be needed) or on beam line 10]. The performance would approach that of an HETS (~80%), but it would be operationally more limited, with only a single user at a time. Space is more limited, so the maximum system size would be about half of that in an HETS. Flexibility to tailor the spectrum would be somewhat more limited. While this concept was not as fully developed and characterized, preliminary work indicates very high HE flux levels should be possible, with ample thermal neutrons as well. Flux control would be more difficult than at HETS because proton power on target be whatever the SNS was operating at for neutron scattering. Neutron attenuation devices would have to be employed with as-yet undetermined control resolution. However, no new buildings would be needed, and the necessary utilities are already present in the SNS Experiment Hall. The estimated cost for a beam line option is around $15 million; the time to complete would be 3 years after award of contract, plus at least 6 months for commissioning. Interference of construction activities with SNS operations should be negligible. This option would require negotiation with the Department of Energy Basic Energy Sciences (BES) office -- the primary stakeholder of SNS -- for an application outside the usual scope of neutron scattering sciences. Furthermore, these presently open beam lines are highly desirable locations for proposed neutron scattering instruments and obtaining one of them for an SEE test facility will come only with persuasive and timely arguments to SNS leadership and the DOE BES. The third option is a tunnel extension/target cave facility providing the most basic system-level irradiation capability with minimal flexibility. Again not as well developed a concept as HETS, it would use a laser-stripping technique like an HETS, redirecting protons to a tunnel similar to the initial HETS proton transport tunnel. Indeed, this concept is intended to be upgradable to a full HETS facility. Only a small fraction of a watt of proton power would be used in this basic configuration, though. An uncooled target and primitive shielding arrangement would provide beam on modestly sized systems that must be placed in close proximity to the target. The neutron fluence would be less uniform over the system than with the HETS or the beam line option. A data acquisition room and support area would be located on the ground level; access to the target cave would be via elevator and/or stairway. As a result of the required excavation, new tunnel construction, shielding, data acquisition building, utilities, and other items, the estimated cost is $30 million. The time to complete is expected be more than 3 years; here again construction interference with SNS operations has not been accounted for, but it could have a significant impact.

46 INSTRUMENTATION RELATED TO NUCLEAR SCIENCE AND ↗

Interregional Transmission Operational Coordination

This presentation will discuss challenges and opportunities on interregional coordination in the areas of interchange transaction, congestion management, reserve sharing and deliverability across multi-stage operational processes. It will then provide an overview of the interregional transmission operational coordination (IRTOC) project that currently focuses on congestion management, including Inter-regional transmission coordination in real time operations and operational planning, HVDC optimization (intra- and interregional), ancillary service deliverability (intra- and interregional). In addition, it will discuss the Sienna-Decomposition tool development to systematically study interregional coordination methods.

congestion management↗

Cyber Conservative Operations

In an era of increasingly sophisticated and pervasive cyber threats, robust cyber resilience strategies are more critical than ever. This paper introduces the concept of Cyber Conservative Operations, a proactive approach designed to assist critical infrastructure owners and operators in managing risk and maintaining resilience in the face of imminent, yet not occurring, cyber events. By leveraging the principles of Cyber-Informed Engineering (CIE) and the energy sector’s practice of conservative operations, Cyber Conservative Operations offer a framework for planning and executing coordinated active defense and resilience-oriented actions ahead of cyber events. This approach aims to minimize the consequences of digitally-enabled hazards and ensure swift recovery from anticipated cyber threats. Cyber Conservative Operations enhance the ability of owners and operators to execute pre-planned defense and resilience actions, thereby reducing the impact of digitally-enabled hazards. These operations are crucial for addressing impacts that cannot be precisely quantified or forecasted and for preparing organizations for rapid recovery from imminent digital threats. The paper begins with a discussion of conservative operations as applied to the bulk power system (BPS), a current mechanism allowing BPS entities to enact defensive operating plans to mitigate impending grid unreliability. Building on this model, we present a concept for implementing cyber conservative operations at asset owner facilities. The paper concludes with two case studies of cyber conservative operations drawn from high-profile cyber events, illustrating the practical application and benefits of this proactive approach.

42 - ENGINEERING↗

A Case Study in NREL DERMS Asset Management Implementation

The National Renewable Energy Laboratory (NREL) and Smarter Grid Solutions (SGS) plan to present a case study on their implementation of SGS' Strata Grid Distributed Energy Resource Management System at NREL's Energy Systems Integration Facility (ESIF). The ESIF is one of the nation's premier energy systems integration laboratory facilities focused on development and deployment of clean energy technologies and resilient delivery systems. NREL looked for a DERMS to install at the ESIF that is capable of replicating real world scenarios to control and monitor distributed devices from small residential scale to the grid substation level. The DERMS system demonstrates the use cases of beneficial operation and coordination of modern grid devices, leverage DERs for improved grid planning and operation, demand-side management and customer engagement through bidirectional communication with utilities and energy market operations. The presentation will cover the delivery strategy of NREL and SGS, how the use cases help NREL's research, and NREL and SGS plan to expand the system and use cases.

ARIES↗

Managing the Electricity-Gas Interface: Current Environment and Emerging Solutions

Natural gas generators are now the largest producers of electricity in the United States and the largest single end-use consumer of natural gas. Natural gas markets, which first developed to meet commercial and residential heating demands during winter months, are now entwined with electricity markets, which developed when natural gas provided a much lower fraction of total fuel supply for the electricity market. More coordination, both in daily operations and long-term planning, is required to ensure the continued supply of reliable electricity and natural gas. This report provides an overview of the evolution and current state of electricity and natural gas markets in the United States and summarizes the ways in which the two industries interact. The report describes areas warranting greater coordination between the natural gas and electricity industries. This report also discusses the current state of natural gas and electricity models and the need for integrated models that include dynamic simulations of pipeline operations, especially when large amounts of variable generation exists in the electrical system. It outlines current modeling work being done to better simulate operations and planning of both systems.

54 ENVIRONMENTAL SCIENCES↗

Distribution System Parameter and Topology Estimation Applied to Resolve Low-Voltage Circuits on Three Real Distribution Feeders

Accurate distribution secondary low-voltage circuit models are needed to enhance overall distribution system operations and planning, including effective monitoring and coordination of distributed energy resources located in the secondary circuits. We present a full-scale demonstration across three real feeders of a computationally efficient approach for estimating the secondary circuit topologies and parameters using historical voltage and power measurements provided by smart meters. The method is validated against several secondary configurations, and compares favorably to satellite imagery and the utility secondary model. Feeder-wide results show how much parameters can vary from simple assumptions. In conclusion, model sensitivities are tested, demonstrating only modest amounts of data and resolutions of data measurements are needed for accurate parameter and topology results.

42 ENGINEERING↗

ARM Radar Science Recommendations from 2017 6th ARM Radar Workshop

The U.S. Department of Energy (DOE) Atmospheric Radiation Measurement (ARM) Climate Research Facility’s radar organization was formed to provide an integrated approach to meet the scientific objectives of ARM. The radar organization consists of two groups: Radar Science and Radar Engineering and Operations. The two groups work closely for planning, coordination, and communications to produce high-quality observations and products from the ARM radar network, which consists of complex radars deployed in very challenging environments. In addition, scanning cloud radars are relatively new in the community, with very limited products that are mature enough to be applied for modeling studies. The Radar Science Group and Radar Engineering and Operations Group meet regularly along with researchers and users from the community in a workshop. The overarching objective of the workshop is to maximize the usage of ARM radar data for improving our understanding of processes and, ultimately improving representation of clouds and precipitation in models. The 6th DOE ARM Radar Engineering and Radar Science Workshop was held October 24-26, 2017, at Stony Brook University. Approximately 40 participants were present; a detailed list of participants is listed in Section 5. This report documents recommendations made by members of the science community who attended the workshop. Their recommendations appear italicized in the report. ARM management will consider these recommendations in their future planning and prioritization activities. The topics addressed during the workshop are contained in the agenda (Section 4). Significant action items, recommendations, and comments that came out of the meeting are contained in Section 3. The content in Section 3 presents a path through important discussions that were pursued during the Workshop.

Southern Great Plains, North Slope of Alaska, East↗

CFO Role in Cost Estimating & Budget Overview: GAO Review [Slides]

CFO works very closely with project controls to ensure correct rates and factors are being used. CFO automates where possible (e.g. upload from Work Package Generator to Oracle) to avoid data entry and errors. Consistent assumptions are made across program areas where possible. Weapons Program Planning & Integration Team coordinates all budget planning activities in PADWP office. Operating under uncertain budget conditions has resulted in close scrutiny of all costs and estimates.

99 GENERAL AND MISCELLANEOUS↗