Development of Methodologies for Technology Deployment for Advanced Outage Control Centers that Improve Outage Coordination, Problem Resolution and Outage Risk Management

This research effort is a part of the Light-Water Reactor Sustainability (LWRS) Program, which is a research and development (R&D) program sponsored by Department of Energy (DOE) and performed in close collaboration with industry R&D programs that provides the technical foundations for licensing and managing the long-term, safe, and economical operation of current nuclear power plants. The LWRS program serves to help the U.S. nuclear industry adopt new technologies and engineering solutions that facilitate the continued safe operation of the plants and extension of the current operating licenses. The long term viability of existing nuclear power plants in the U.S. will depend upon maintaining high capacity factors, avoiding nuclear safety issues and reducing operating costs. The slow progress in the construction on new nuclear power plants has placed in increased importance on maintaining the output of the current fleet of nuclear power plants. Recently expanded natural gas production has placed increased economic pressure on nuclear power plants due to lower cost competition. Until recently, power uprate projects had steadily increased the total output of the U.S. nuclear fleet. Errors made during power plant upgrade projects have now removed three nuclear power plants from the U.S. fleet and economic considerations have caused the permanent shutdown of a fourth plant. Additionally, several utilities have cancelled power uprate projects citing economic concerns. For the past several years net electrical generation from U.S. nuclear power plants has been declining. One of few remaining areas where significant improvements in plant capacity factors can be made is in minimizing the duration of refueling outages. Managing nuclear power plant outages is a complex and difficult task. Due to the large number of complex tasks and the uncertainty that accompanies them, outage durations routinely exceed the planned duration. The ability to complete an outage on or near schedule depends upon the performance of the outage management organization. During an outage, the outage control center (OCC) is the temporary command center for outage managers and provides several critical functions for the successful execution of the outage schedule. Essentially, the OCC functions to facilitate information inflow, assist outage management in processing information and to facilitate the dissemination of information to stakeholders. Currently, outage management activities primarily rely on telephone communication, face to face reports of status and periodic briefings in the OCC. Much of the information displayed in OCCs is static and out of date requiring an evaluation to determine if it is still valid. Several advanced communication and collaboration technologies have shown promise for facilitating the information flow into, across and out of the OCC. Additionally, advances in the areas of mobile worker technologies, computer based procedures and electronic work packages can be leveraged to improve the availability of real time status to outage managers.

99 GENERAL AND MISCELLANEOUS↗

Preventive Power Outage Estimation Based on a Novel Scenario Clustering Strategy

The increasing occurrence of extreme weather events is challenging power grid operation. For extreme weather events, the system operator is responsible for estimating the power outages and scheduling the restoration resources. This paper proposes an outage evaluation framework to identify the possible unserved load profiles, vulnerable areas, and mobile energy adequacy. The outputs of an outage prediction model tool are used to generate numerous faulted line scenarios. Next, each scenario's nodal unserved load profile is obtained by solving a three-phase restoration model that considers repair crews and mobile energy resources (MERs). Then, a novel scenario clustering strategy is developed to cluster the unserved load profiles into multiple representative profiles which the system operator can focus on. Finally, case studies on a distribution system evaluate the damage caused by an extreme weather event and verify the effectiveness of the proposed scenario clustering strategy.

MATHEMATICS AND COMPUTING,POWER TRANSMISSION AND D↗

Guidelines for Implementation of an Advanced Outage Control Center to Improve Outage Coordination, Problem Resolution, and Outage Risk Management

This research effort is a part of the Light-Water Reactor Sustainability (LWRS) Program, which is a research and development (R&D) program sponsored by Department of Energy (DOE) and performed in close collaboration with industry R&D programs that provide the technical foundations for licensing and managing the long-term, safe, and economical operation of current nuclear power plants. The LWRS program serves to help the U.S. nuclear industry adopt new technologies and engineering solutions that facilitate the continued safe operation of the plants and extension of the current operating licenses. The purpose of this research is to improve management of nuclear power plant (NPP) outages through the development of an advanced outage control center (AOCC) that is specifically designed to maximize the usefulness of communication and collaboration technologies for outage coordination and problem resolution activities. This technical report for industry implementation outlines methods and considerations for the establishment of an AOCC. This report provides a process for implementation of a change management plan, evaluation of current outage processes, the selection of technology, and guidance for the implementation of the selected technology. Methods are presented for both adoption of technologies within an existing OCC and for a complete OCC replacement, including human factors considerations for OCC design and setup.

99 GENERAL AND MISCELLANEOUS↗

Development of Improved Graphical Displays for an Advanced Outage Control Center, Employing Human Factors Principles for Outage Schedule Management

The long-term viability of existing nuclear power plants in the United States (U.S.) is dependent upon a number of factors, including maintaining high capacity factors, maintaining nuclear safety, and reducing operating costs, particularly those associated with refueling outages. Refueling outages typically take 20-30 days, and for existing light water NPPs in the U.S., the reactor cannot be in operation during the outage. Furthermore, given that many NPPs generate between $1-1.5 million/day in revenue when in operation, there is considerable interest in shortening the length of refueling outages. Yet refueling outages are highly complex operations, involving multiple concurrent and dependent activities that are somewhat challenging to coordinate; therefore, finding ways to improve refueling outage performance, while maintaining nuclear safety has proven to be difficult. The Advanced Outage Control Center (AOCC) project is a research and development (R&D) demonstration activity under the LWRS Program. LWRS is an R&D program that works closely with industry R&D programs to establish technical foundations for the licensing and managing of long-term, safe, and economical operation of current fleet of NPPs. As such, the LWRS Advanced Outage Control Center project has the goal of improving the management of commercial NPP refueling outages. To accomplish this goal, INL is developing an advanced outage control center (OCC) that is specifically designed to maximize the usefulness of communication and collaboration technologies for outage coordination and problem resolution activities. The overall focus is on developing an AOCC with the following capabilities that enables plant and OCC staff to; Collaborate in real-time to address emergent issues; Effectively communicate outage status to all workers involved in the outage; Effectively communicate discovered conditions in the field to the OCC; Provide real-time work status; Provide automatic pending support notifications; Provide real-time requirements monitoring; Maximize their collective situational awareness to improve decision-making; and Leverage macro data to better support resource allocation. INL has partnered with several commercial NPP utilities to develop a number of advanced outage management technologies. These outage management technologies have focused on both collaborative technologies for control centers and developing mobile technologies for NPP field workers. This report describes recent efforts made in developing a suite of outage technologies to support more effective schedule management. Currently, a master outage schedule is created months in advance using the plant’s existing scheduling software (e.g., Primavera P6). Typically, during the outage, the latest version of the schedule is printed at the beginning of each shift. INL and its partners are developing technologies that will have capabilities such as Automatic Schedule Updating, Automatic Pending Support Notifications, and the ability to allocate and schedule outage support task resources on a sub-hour basis (e.g., outage Micro-Scheduling). The remaining sections of this report describe in more detail the scheduling challenges that occur during outages, how the outage scheduling technologies INL is developing helps address those challenges, and the latest developments on this task (e.g., work accomplished to date and the path forward)

21 SPECIFIC NUCLEAR REACTORS AND ASSOCIATED PLANTS↗

Tools And Methods to Analyze Plant Outage Schedule and Assist Schedulers in Improving Outage Resilience

Refueling outages of nuclear power plants (NPPs) are considered one of the most critical phases throughout the plant lifetime. In such instances, tens of thousands of activities (e.g., maintenance, surveillance) are performed in a short amount of time (typically 2-3 weeks unless major backfitting or modernization projects are carried out) by a large number of crews (e.g., electricians, mechanics) that are hired as contractors. As a consequence, a plant outage can be expensive not only in terms of costs (e.g., contractor labor, material), but also in terms of loss generation since the plant is taken off the grid during the full outage duration (an indicative metric is about 1.2M$/day of loss of revenue). Thus, there is a continuous need to decrease the economic impact of outages on plant finances. This can be done by: decreasing the frequency of plant outages (e.g., from 18 to 24 months), reducing the time to complete the outage, and reducing the risk of outage delays. The Optimization of Outage Activities project under the Risk Informed Systems Analysis Pathway (RISA) sponsored by Department of Energy (DOE) Light Water Reactor Sustainability (LWRS) Program focuses on developing tools and methods to support NPPs with outage schedule optimization. The developed tools and methods are designed to analyze plant outage schedule with the goal of identify critical elements in the schedule that might pose a high risk of delays. These methods and tools can be considered resource-centric in the sense that they address outage challenges as a resource optimization problem. In this context, resources are either time and crews; outage delays occurs when either (or both) resources are insufficient to complete the set of tasks assigned at a specific time instant of the outage. This report provides details on how plant resources (time and crews) can be allocated in such a way that delays are minimized. In this respect, two classes of methods have been developed: the first one focuses on the time resource and how variability of the time to complete outage tasks may impact outage delays. The second one integrates available resources to assess when dailies activities should be performed such that the risk of outage delays are minimized.

97 MATHEMATICS AND COMPUTING↗

Advanced Outage and Control Center: Strategies for Nuclear Plant Outage Work Status Capabilities

The research effort is a part of the Light Water Reactor Sustainability (LWRS) Program. LWRS is a research and development program sponsored by the Department of Energy, performed in close collaboration with industry to provide the technical foundations for licensing and managing the long-term, safe and economical operation of current nuclear power plants. The LWRS Program serves to help the US nuclear industry adopt new technologies and engineering solutions that facilitate the continued safe operation of the plants and extension of the current operating licenses. The Outage Control Center (OCC) Pilot Project was directed at carrying out the applied research for development and pilot of technology designed to enhance safe outage and maintenance operations, improve human performance and reliability, increase overall operational efficiency, and improve plant status control. Plant outage management is a high priority concern for the nuclear industry from cost and safety perspectives. Unfortunately, many of the underlying technologies supporting outage control are the same as those used in the 1980’s. They depend heavily upon large teams of staff, multiple work and coordination locations, and manual administrative actions that require large amounts of paper. Previous work in human reliability analysis suggests that many repetitive tasks, including paper work tasks, may have a failure rate of 1.0E-3 or higher (Gertman, 1996). With between 10,000 and 45,000 subtasks being performed during an outage (Gomes, 1996), the opportunity for human error of some consequence is a realistic concern. Although a number of factors exist that can make these errors recoverable, reducing and effectively coordinating the sheer number of tasks to be performed, particularly those that are error prone, has the potential to enhance outage efficiency and safety. Additionally, outage management requires precise coordination of work groups that do not always share similar objectives. Outage managers are concerned with schedule and cost, union workers are concerned with performing work that is commensurate with their trade, and support functions (safety, quality assurance, and radiological controls, etc.) are concerned with performing the work within the plants controls and procedures. Approaches to outage management should be designed to increase the active participation of work groups and managers in making decisions that closed the gap between competing objectives and the potential for error and process inefficiency.

22 GENERAL STUDIES OF NUCLEAR REACTORS↗

Outage Forecast-Based Preventative Scheduling Model for Distribution System Resilience Enhancement

Distribution system resilience enhancement is an important topic to ensure customers have access to power supply during extreme events. In fact, certain weather-related extreme events can be predicted ahead of time. Therefore, it is important to investigate how to predict grid outages using extreme weather forecasts, and how outage predictions can be incorporated into distribution system resilience enhancement. In this paper, a preventative scheduling model for distribution systems is proposed. The model targets at allocating resources, especially mobile responsive resources such as mobile backup generators and mobile energy storage systems, to prepare for an extreme event in the day-ahead context. To achieve efficient resource allocation and scheduling, a machine learning-based outage prediction module is developed to predict vulnerable or risky segments of the distribution system based on historical operating records and extreme weather event forecast. By integrating the outage prediction results into the scheduling model, optimal resource allocation can be derived to help distribution systems prepare for an upcoming event and improve resilience performance. A real distribution feeder in North Carolina, U.S. is used in the case study to validate the proposed approach.

distributed energy resources↗

Benchmark Report on Key Outage Attributes: An Analysis of Outage Improvement Opportunities and Priorities

Advanced Outage Control Center (AOCC), is a multi-year pilot project targeted at Nuclear Power Plant (NPP) outage improvement. The purpose of this pilot project is to improve management of NPP outages through the development of an AOCC that is specifically designed to maximize the usefulness of communication and collaboration technologies for outage coordination and problem resolution activities. This report documents the results of a benchmarking effort to evaluate the transferability of technologies demonstrated at Idaho National Laboratory and the primary pilot project partner, Palo Verde Nuclear Generating Station. The initial assumption for this pilot project was that NPPs generally do not take advantage of advanced technology to support outage management activities. Several researchers involved in this pilot project have commercial NPP experience and believed that very little technology has been applied towards outage communication and collaboration. To verify that the technology options researched and demonstrated through this pilot project would in fact have broad application for the US commercial nuclear fleet, and to look for additional outage management best practices, LWRS program researchers visited several additional nuclear facilities.

99 GENERAL AND MISCELLANEOUS↗

How individual traces and interactive timelines could support outage execution - Toward an outage historian concept

In the context of a project that is designing innovative ICT-based solutions for the organizational concept of outage management, we focus on the informational process of the OCR (Outage Control Room) underlying the execution of the outages. Informational process are based on structured and unstructured documents that have a key role in the collaborative processes and management of the outage. We especially track the structured and unstructured documents, electronically or not, from creation to sharing. Our analysis allows us to consider that the individual traces produced by an individual participant with a specific role could be multi-purpose and support sharing between participants without creating duplication of work. The ultimate goal is to be able to generate an outage historian, that is not just focused on highly structured information, which could be useful to improve the continuity of information between participants. We study the implementation of this approach through web technologies and social media tools to address this issue. We also investigate the issue of data access through interactive visualization timelines coupled with other modality's to assist users in the navigation and exploration of the proposed historian. (authors)

22 GENERAL STUDIES OF NUCLEAR REACTORS↗

EAGLE-I Power Outage Data 2025

The provided EAGLE-I historic dataset includes power outage information at the county level for 2025 at 15-minute intervals collected by the EAGLE-I program at ORNL. The data has been collected from utility's public outage maps using an ETL process. The dataset details FIPS code, county name, state name, total number of customers without power, and a date/timestamp. For detailed metadata, refer to the linked metadata DOI.

EAGLE-I↗

Survey of Tools for Risk Assessment of Cascading Outages

Cascading failure can cause large blackouts, and a variety of methods are emerging to study this challenging topic. In parts 1 and 2 of this paper, the IEEE task force on cascading failure seeks to consolidate and review the progress of the field towards methods and tools of assessing the risk of cascading failure. Part 2 summarizes and discusses the state of the art in the available cascading failure modeling tools. The discussion integrates industry and research perspectives from a variety of institutions. Strengths, weaknesses, and gaps in current approaches are indicated.

29 ENERGY PLANNING, POLICY, AND ECONOMY↗

Enhancing Building Resilience: Maintaining Energy Efficiency and Thermal Comfort During Power Outages in Cold Climates

The increasing frequency and intensity of extreme weather events, such as heatwaves and cold snaps, present significant challenges to building energy performance and occupant comfort. Highly correlated with climate events are widespread long duration power interruptions that may affect thousands of buildings and millions of customers. This study evaluates the impact of building energy performance and occupant thermal comfort in medium-sized office buildings in a cold climate region. Using energy models representing pre-1980 and 2019 vintages, simulations were conducted to assess energy performance under typical weather conditions and occupant thermal comfort during power interrupted extreme cold snap and heatwave climate events under both current 2020s and future 2050s weather conditions. The results show a projected 33% increase in cooling energy demand and a 19% reduction in heating energy by 2050. Findings reveal that older buildings are more susceptible to cold discomfort during cold snaps, while modern airtight buildings are more vulnerable to overheating during heatwaves. Various passive energy efficiency measures, such as improved infiltration control, thermal windows, solar-controlled windows, and cool envelopes, were evaluated for their ability to mitigate thermal discomforts. Solar controlled windows and weatherstripping contribute to reducing cold thermal discomfort by 21% during a power-interrupted cold snap. Solar-controlled windows were found to reduce hot thermal discomfort by 34% during a future power-interrupted heatwave. The study highlights the importance of targeted retrofitting strategies to enhance thermal resilience, especially during power outages, to ensure occupant safety and comfort during extreme climate events.

32 ENERGY CONSERVATION, CONSUMPTION, AND UTILIZATI↗

AGGREGATE: dAta-driven modelinG preservinG contRollable dEr for outaGe mAnagemenT and rEsiliency (Report for Task 11 & 12: Components and Capabilities of the Resiliency Driven Outage Management and Feeder Restoration System (Deliverable D8))

This report provides progress update for the development of a outage management, feeder restoration, and restoration action feasibility check modules as part of the AGGREGATE project. Details for integration with controllability module, data driven situational awareness of network and distributed energy resources as well cyber security plan for these modules integrated with GE ADMS are also presented in the report. These three modules for outage management, feeder restoration, and restoration action feasibility check modules are developed in MATLAB and validated with a modified IEEE 123-node feeder. Results demonstrate ability of these new modules to improve the restoration process post-disaster to enhance the system resilience.

42 ENGINEERING↗