Engineering Papers⌕ Search

SEARCH · Engineering Papers

Results for “ORPC”

Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.

Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.

At least 19 records

Electrical Validation Testing for ORPC MHK Generator, Modification 6: ORPC SBV for MHK Generator System (CRADA Final Report)

For the U.S. Department of Energy’s (DOE) 2016 Small Business Voucher for Marine and Hydrokinetic (MHK) System, Second Round 2016, ORPC intends to work with the National Renewable Energy Laboratory (NREL) to perform dynamometer testing of the MHK generator systems and its associated controls and inverters. ORPC will provide the generator, variable frequency drives (VFD), controls, and inverter for this testing. NREL will utilize the NREL Energy Systems Integration Facility (ESIF) and dynamometer facilities at the National Wind Technology Center (NWTC) for this work. Modification 6: Additionally, NREL will conduct a feasibility study for implementing passive DC rectification at the turbine.

17 WIND ENERGY↗

ORPC RivGen Hydrokinetic Turbine Wake Characterization

Field measurements of mean flow and turbulence parameters at the Kvichak river prior to and after the deployment of ORPC's RivGen hydrokinetic turbine. Data description and turbine wake analysis are presented in the attached manuscript "Wake measurements from a hydrokinetic river turbine" by Guerra and Thomson (recently submitted to Renewable Energy). There are three data sets: NoTurbine (prior to deployment), Not_Operational_Turbine (turbine underwater, but not operational), and Operational_Turbine. The data has been quality controlled and organized into a three-dimensional grid using a local coordinate system described in the paper. All data sets are in Matlab format (.mat). Variables available in the data sets are: qx: X coordinate matrix (m) qy: Y coordinate matrix (m) z : z coordinate vector (m) lat : grid cell latitude (degrees) lon: grid cell longitude (degrees) U : velocity magnitude (m/s) Ux: x velocity (m/s) Vy: y velocity (m/s) W: vertical velocity (m/s) Pseudo_beam.b_i: pseudo-along beam velocities (i = 1 to 4) (m/s) (structure with raw data within each grid cell) beam5.b5: 5th-beam velocity (m/s) (structure with raw data within each grid cell) tke: turbulent kinetic energy (m2/s2) epsilon: TKE dissipation rate (m2/s3) Reynolds stresses: uu, vv, ww, uw, vw (m2/s2) Variables from the Not Operational Turbine data set are identified with _T Variables from the Operational Turbine data set are identified with _TO

16 TIDAL AND WAVE POWER↗

ORPC RivGen 2.0 at Igiugig, AK Operational Data 2019 and 2020

Information enclosed includes operational data from the ORPC RivGen 2.0 deployed at Igiugig, AK in 2019 and 2020. Flow velocities and device performance metrics are recorded along with a report detailing flow speed characterization where Igiugig river flow data is aggregated into a single flow velocity.

16 TIDAL AND WAVE POWER↗

Interactions of aquatic animals with the ORPC OCGen® in Cobscook Bay, Maine: Monitoring behavior change and assessing the probability of encounter with a deployed MHK device

Commercial viability of the marine hydrokinetic (MHK) energy industry is contingent on numerous and diverse factors. A major factor is the effects deployed devices have on animals. This factor is multi-faceted since it is dependent on the availability of appropriate scientific approaches to detect these effects. One of the animal groups with overlapping distributions of MHK devices are fishes. As such, individual fish behavior is likely to be influenced by the presence and operation of MHK devices. Depending on the scale of deployment there are implications for changes to essential fish habitat and effects that can be explored during deployment of a single device yet most changes are likely to be realized when multiple devices are deployed over large areas. It is not only important to document these effects and examine the need for mitigation, but also determine whether the methods involved can be used within the economic constraints of this nascent industry. The results presented in this report benefit the MHK industry by providing transferrable environmental monitoring approaches for MHK projects, specifically related to the interactions between static and dynamic tidal turbines and fish. In addition, some of the data can be used to generalize conditions (e.g., the temporal periodicity of fish presence in tidal regions and probability of fish encountering a device) at other MHK sites with similar physical conditions and fish assemblages. Ocean Renewable Power Company, LLC (ORPC) deployed and tested a prototype OCGen® tidal module in Cobscook Bay, Maine, in the summer of 2014. University of Maine researchers proposed an approach to inform other researchers, regulators, and industry members of the effects of this deployment on fish. While the approach was specifically applied to the OCGen® module, results are applicable to other pilot projects and inform future array deployments. Research funded under this grant allowed us to quantify fish presence as well as individual and group-level behavior changes in the presence of the deployed OCGen® module along with a bottom support frame from a previously deployed device (TidGen®). Specific objectives associated with fish behavior changes were (1) continuation of two long-term datasets: (a) stationary down-looking hydroacoustic dataset near an MHK device (group-level) and (b) stationary side-looking hydroacoustics near the bottom-support frame of a previously deployed MHK device (individual-level); (2) application of new processing methods to down-looking hydroacoustic datasets to improve fish species identification (group-level); and (3) development of an encounter probability model using data on fish abundance, vertical distribution, and behavior.

16 TIDAL AND WAVE POWER↗

Optimization of Fairing Geometry for ORPC Modular RivGen Power System: Cooperative Research and Development (Final Report)

The work will optimize the hydrodynamic performance and flow augmentation of Ocean Renewable Power Company's (ORPC) modular fairing for their cross-flow marine hydrokinetic (MHK) turbine, using a computational fluid dynamics study. The influence of the fairing cross-sectional shape and rotor-fairing spacing will be assessed, to maximize power production and minimize structural loads.

16 TIDAL AND WAVE POWER↗

Acoustic Monitoring of Beluga Whale Interactions with Cook Inlet Tidal Energy Project

Cook Inlet, Alaska is home to some of the greatest tidal energy resources in the U.S., as well as an endangered population of beluga whales (Delphinapterus leucas). Successfully permitting and operating a tidal power project in Cook Inlet requires a biological assessment of the potential and realized effects of the physical presence and sound footprint of tidal turbines on the distribution, relative abundance, and behavior of Cook Inlet beluga whales. ORPC Alaska, working with the Project Team—LGL Alaska Research Associates, University of Alaska Anchorage, TerraSond, and Greeneridge Science—undertook the following U.S. Department of Energy (DOE) study to characterize beluga whales in Cook Inlet – Acoustic Monitoring of Beluga Whale Interactions with the Cook Inlet Tidal Energy Project (Project). ORPC Alaska, LLC, is a wholly-owned subsidiary of Ocean Renewable Power Company, LLC, (collectively, ORPC). ORPC is a global leader in the development of hydrokinetic power systems and eco-conscious projects that harness the power of ocean and river currents to create clean, predictable renewable energy. ORPC is developing a tidal energy demonstration project in Cook Inlet at East Foreland where ORPC has a Federal Energy Regulatory Commission (FERC) preliminary permit (P-13821). The Project collected baseline data to characterize pre-deployment patterns of marine mammal distribution, relative abundance, and behavior in ORPC’s proposed deployment area at East Foreland. ORPC also completed work near Fire Island where ORPC held a FERC preliminary permit (P-12679) until March 6, 2013. Passive hydroacoustic devices (previously utilized with bowhead whales in the Beaufort Sea) were adapted for study of beluga whales to determine the relative abundance of beluga whale vocalizations within the proposed deployment areas. Hydroacoustic data collected during the Project were used to characterize the ambient acoustic environment of the project site pre-deployment to inform the FERC pilot project process. The Project compared results obtained from this method to results obtained from other passive hydrophone technologies and to visual observation techniques performed simultaneously. This Final Report makes recommendations on the best practice for future data collection, for ORPC’s work in Cook Inlet specifically, and for tidal power projects in general. This Project developed a marine mammal study design and compared technologies for hydroacoustic and visual data collection with potential for broad application to future tidal and hydrokinetic projects in other geographic areas. The data collected for this Project will support the environmental assessment of future Cook Inlet tidal energy projects, including ORPC’s East Foreland Tidal Energy Project and any tidal energy developments at Fire Island. The Project’s rigorous assessment of technology and methodologies will be invaluable to the hydrokinetic industry for developing projects in an environmentally sound and sustainable way for areas with high marine mammal activity or endangered populations. By combining several different sampling methods this Project will also contribute to the future preparation of a comprehensive biological assessment of ORPC’s projects in Cook Inlet.

16 TIDAL AND WAVE POWER↗

Power Take-off System for Marine Renewable Devices

The Power Take-off (PTO) System for Marine Renewable Devices (Project) envisioned the design, manufacture and testing of a generator that would ultimately be suitable for fully flooded seawater operation. This would require a generator design and bearing system capable of operating in the presence of seawater without corrosion. The original generator concept design focused on a switched reluctance electromagnetic design for the generator with the understanding that the switched reluctance design would be more robust and tolerant of a seawater medium. A trade study was conducted to prove that hypothesis, but the results of the study indicated that there was no benefit to adopting a switched reluctance design over a more conventional synchronous permanent magnet design. In addition, the novelty of the switched reluctance design added more technical risk to the Project than was warranted. ORPC’s cost of energy analyses pointed to reliability as being the most critical factor for achieving Project systems performance advancement (SPA) metrics. Consequently, the choice of a permanent magnet (PM) machine design over a potentially less reliable switched reluctance design was necessary to achieve the Project results. As a result, ORPC determined that a PM design was a more appropriate design to achieve the Project goals and ORPC selected a highly qualified PM generator firm for the design, manufacture and factory testing of the generator. The factory acceptance test (FAT) of the generator took place on March 20-22, 2017 and all tests were successfully passed. Developing a design for a driveline as part of the PTO system required a full understanding of the loads and operating conditions expected. Detailed analyses for developing turbine loads and subsequent definition of bearing specifications were performed using various analytical methods. Two candidate bearing designs were proposed as part of the Project. After initial design work had been completed, ORPC designed a representative full-scale driveline to validate the detailed design of the advanced driveline components. Full-scale components were manufactured, instrumented and tested, simulating actual system parameters. This full-scale bearing test was conducted at the University of Maine Advanced Structures and Composites Laboratory. The purpose of this test was to characterize the frictional losses associated with bearings and test the suitability and functionality of some commercially available shaft couplings and expansion bushings in cross-flow turbine drivelines. In parallel with component testing and dynamometer testing of the PTO system, ORPC performed design work to demonstrate how the advanced PTO system will be integrated with all ORPC turbine generator units (TGUs). The work would focus primarily on the TidGen® TGU and assess how the advanced PTO would be integrated into TidGen® 001 or other units, then field-deployed and tested in an open water environment under actual operational conditions. In addition to the benefits provided to the MHK industry in general, and ORPC in particular, the Project provided benefits to the general public, including the following: • Increased general awareness of the potential for generation of electricity from ocean energy resources • Demonstrated continuing advancements in the commercialization of MHK technologies, making them more likely to contribute to the electricity generation supply in America in the coming years • Continued awareness of the local economic benefits from the MHK industry through job creation and local spending • Confirmation of a path to improvements in availability, power-to-weight ratio (PWR) and reduction in levelized cost of energy (LCOE). All Project tasks were completed, and the Project objectives were accomplished. All project milestones and deliverables were met. The designs, methodologies, practices, testing, data, analysis and lessons learned from the Project are a step forward in the development of the U.S. MHK industry and provide a sound basis for ultimate commercialization of ORPC’s power systems. Based on the what was learned and demonstrated during the Project, ORPC has determined that the ORPC power systems have the potential of accelerating the commercialization of tidal and ocean current MHK power systems.

16 TIDAL AND WAVE POWER↗

TidGen Power System Commercialization Project

ORPC Maine, LLC, a wholly-owned subsidiary of Ocean Renewable Power Company, LLC (collectively ORPC), submits this Final Technical Report for the TidGen® Power System Commercialization Project (Project), partially funded by the U.S. Department of Energy (DE-EE0003647). The Project was built and operated in compliance with the Federal Energy Regulatory Commission (FERC) pilot project license (P-12711) and other permits and approvals needed for the Project. This report documents the methodologies, activities and results of the various phases of the Project, including design, engineering, procurement, assembly, installation, operation, licensing, environmental monitoring, retrieval, maintenance and repair. The Project represents a significant achievement for the renewable energy portfolio of the U.S. in general, and for the U.S. marine hydrokinetic (MHK) industry in particular. The stated Project goal was to advance, demonstrate and accelerate deployment and commercialization of ORPC’s tidal-current based hydrokinetic power generation system, including the energy extraction and conversion technology, associated power electronics, and interconnection equipment capable of reliably delivering electricity to the domestic power grid. ORPC achieved this goal by designing, building and operating the TidGen® Power System in 2012 and becoming the first federally licensed hydrokinetic tidal energy project to deliver electricity to a power grid under a power purchase agreement in North America. Located in Cobscook Bay between Eastport and Lubec, Maine, the TidGen® Power System was connected to the Bangor Hydro Electric utility grid at an on-shore station in North Lubec on September 13, 2012. ORPC obtained a FERC pilot project license for the Project on February 12, 2012 and the first Maine Department of Environmental Protection General Permit issued for a tidal energy project on January 31, 2012. In addition, ORPC entered into a 20-year agreement with Bangor Hydro Electric Company on January 1, 2013 for up to 5 megawatts at a price of $215/MWh, escalating at 2.0% per year.

16 TIDAL AND WAVE POWER↗

Feasibility of Tidal and Ocean Current Energy in False Pass, Aleutian Islands, Alaska final report

The Aleutian Pribilof Islands Association was awarded a U.S. Department of Energy Tribal Energy Program grant (DE-EE0005624) for the Feasibility of Tidal and Ocean Current Energy in False Pass, Aleutian Islands, Alaska (Project). The goal of the Project was to perform a feasibility study to determine if a tidal energy project would be a viable means to generate electricity and heat to meet long-term fossil fuel use reduction goals, specifically to produce at least 30% of the electrical and heating needs of the tribally-owned buildings in False Pass. The Project Team included the Aleut Region organizations comprised of the Aleutian Pribilof Island Association (APIA), and Aleutian Pribilof Island Community Development Association (APICDA); the University of Alaska Anchorage, ORPC Alaska a wholly-owned subsidiary of Ocean Renewable Power Company (ORPC), City of False Pass, Benthic GeoScience, and the National Renewable Energy Laboratory (NREL). The following Project objectives were completed: collected existing bathymetric, tidal, and ocean current data to develop a basic model of current circulation at False Pass, measured current velocities at two sites for a full lunar cycle to establish the viability of the current resource, collected data on transmission infrastructure, electrical loads, and electrical generation at False Pass, performed economic analysis based on current costs of energy and amount of energy anticipated from and costs associated with the tidal energy project conceptual design and scoped environmental issues. Utilizing circulation modeling, the Project Team identified two target sites with strong potential for robust tidal energy resources in Isanotski Strait and another nearer the City of False Pass. In addition, the Project Team completed a survey of the electrical infrastructure, which identified likely sites of interconnection and clarified required transmission distances from the tidal energy resources. Based on resource and electrical data, the Project Team developed a conceptual tidal energy project design utilizing ORPC’s TidGen® Power System. While the Project Team has not committed to ORPC technology for future development of a False Pass project, this conceptual design was critical to informing the Project’s economic analysis. The results showed that power from a tidal energy project could be provided to the City of False at a rate at or below the cost of diesel generated electricity and sold to commercial customers at rates competitive with current market rates, providing a stable, flat priced, environmentally sound alternative to the diesel generation currently utilized for energy in the community. The Project Team concluded that with additional grants and private investment a tidal energy project at False Pass is well-positioned to be the first tidal energy project to be developed in Alaska, and the first tidal energy project to be interconnected to an isolated micro grid in the world. A viable project will be a model for similar projects in coastal Alaska.

16 TIDAL AND WAVE POWER↗

Advanced Energy Harvesting Control Schemes for Marine Renewable Energy Devices

The Advanced Energy Harvesting Control Schemes for Marine Renewable Energy Devices (Project) investigated, analyzed and modeled advanced turbine control schemes with the objective of increasing the energy harvested by hydrokinetic turbines in turbulent flow. Ocean Renewable Power Company (ORPC) implemented and validated a feedforward controller to increase power capture; and applied and tested the controls on ORPC’s RivGen® Power Systems in Igiugig, Alaska. Assessments of performance improvements were made for the RivGen® in the Igiugig environment and for ORPC’s TidGen® Power System in a reference tidal environment. Annualized Energy Production (AEP) and Levelized Cost of Energy (LCOE) improvements associated with implementation of the recommended control methodology were made for the TidGen® Power System in the DOE reference tidal environment. System Performance Advancement (SPA) goals were selected for the project. SPA targets were to improve Power to Weight Ratio (PWR) and system Availability, with the intention of reducing Levelized Cost of Electricity (LCOE). This project focused primarily reducing in PWR. Reductions in PWR of 25.5% were achieved. Reductions of 20.3% in LCOE were achieved. This project evaluated four types of controllers which were tested in simulation, emulation, a laboratory flume, and the field. The adaptive Kω2 controller performs similarly to the non-adaptive version of the same controller and may be useful in tidal channels where the mean velocity is continually evolving. Trends in simulation were largely verified through experiments, which also provided the opportunity to test assumptions about turbine responsiveness and control resilience to varying scales of turbulence. Laboratory experiments provided an essential stepping stone between simulation and implementation on a field-scale turbine. Experiments also demonstrated that using “energy loss” as a metric to differentiate between well-designed controllers operating at an optimal tip-speed ratio set-point is difficult, which anticipated the outcome from field experiments. The clear message is that the feedforward Kω2 controller out-performs the feedback controllers in almost all aspects and modes of evaluation. The controllers proved a substantial improvement over the baseline performance of the TidGen® turbine, in terms of energy capture. The effects of noise-contaminated angular velocity signals were investigated and validated by simulation as an explanation for the performance limitations observed for TidGen® turbine operations in Eastport, Maine. Measurements of loads performed as part of the laboratory testing indicate that there are limited differences in average axial thrust force between control architectures. This suggests that none of the control strategies are likely to substantially affect loads on the turbine support structure. Velocity measurements during the ORPC RivGen® turbine deployment at Igiugig, Alaska, in 2014 were used to assess the variability of the river flow. Results suggest that the river flow is approximately steady, in the mean sense, at any particular location in the river, with random turbulent fluctuations that are around 10% of the mean flow. The mean flow in the center channel of the river is 2.5 m/s, with reductions near the riverbanks and in the shallows. Spectral analysis and lagged correlation results indicate that temporal fluctuations at a given point are dominated by large scale fluctuations, such that measurements at the turbine location are just as useful for inflow control implementation as upstream measurements. At this site, and likely at many other river sites, flow is generally steady at a given location, but flow varies dramatically between locations, particularly laterally across the river. The primary result is that a lateral change in position of a few meters results in changes to flow speed that far exceed the turbulence fluctuations at any given location. The turbulence is dominated by long time scales. Following final system tests, the RivGen® device was submerged and each evaluated controller was tested across a range of gain/set point values and filter configurations for a minimum of 5 minutes, with longer runs attempted for well-performing cases. In addition to testing controllers during the 2015 deployment season, LGL Alaska Research Associates Inc. (LGL) performed a fish monitoring study in compliance with Alaska Department of Fish and Game fisheries habitat permit for the project. During the season, LGL reviewed 10% of 179 one-hour blocks of footage (6 minutes on the hour) and documented a total of over 1200 fish in the vicinity of the RivGen® device, including over 800 salmon smolt and over 350 adult salmon. No evidence of adverse effects including passage delay by upstream migrating salmon was noted. This is an important result for future deployments and has a direct impact on commercial system designs.

16 TIDAL AND WAVE POWER↗

Tidal Energy Site Characterization East Forelands Alaska

During the summer field season in 2012, Benthic GeoScience Inc. (Benthic) mobilized under contract with Ocean Renewable Power Company (ORPC) in order to conduct precise geospatial measurements of the seafloor accomplishing a preliminary Site Characterization Study for the ORPC East Forelands Tidal Energy Power Project. This study included a high-density bathymetric survey, acoustic reflective intensity imagery, and an assessment of the physical character of the ORPC East Forelands Tidal Energy Power Project environment. The Multibeam Echosounder (MBES) survey included a large area surrounding the East Forelands of Cook Inlet in the vicinity of Nikiski, Alaska. Included in this submission are the report for the East Forelands Site Characterization Study and the accompanying data from the survey as described below. The digital deliverables from this effort include: - Comprehensive Site Characterization Report (Format: PDF, Ver. 1.1, March 2013) - Comprehensive 3D Fledermaus Presentation (Format: SCENE, Ver. 1.1, March 2013) - Bathymetric Surface (Format: ASCVer. 1, March 2013) - Slope Gradient Surface (Format: ASCVer. 1, March 2013) - Comprehensive Acoustic Intensity Image (Format: TIF/TWFVer. 1, March 2013) - Geologic Seafloor Interpretation Surface (Format: ASCVer. 1.0, March 2013) - Comprehensive Google Earth Presentation (Format: KMZVer. 1.1, March 2013)

16 TIDAL AND WAVE POWER↗

Power Take-off System for Marine Renewable Devices, CRADA Number CRD-14-566

Ocean Renewable Power Company (ORPC) proposes a project to develop and test innovative second-generation power take-off (PTO) components for the U.S. Department of Energy's 2013 FOA: Marine and Hydrokinetic System Performance Advancement, Topic Area 2 (Project). Innovative PTO components will include new and improved designs for bearings, couplings and a subsea electrical generator. Specific project objectives include the following: (1) Develop components for an advanced PTO suitable for MHK devices; (2) Bench test these components; (3) Assess the component and system performance benefits; (4) Perform a system integration study to integrate these components into an ORPC hydrokinetic turbine. National Renewable Energy Laboratory (NREL) will participate on the ORPC lead team to review design of the generator and will provide guidance on the design. Based on inputs from the project team, NREL will also provide an economic analysis of the impacts of the proposed system performance advancements.

17 WIND ENERGY↗

NREL and Sandia National Laboratories (SNL) Support of Ocean Renewable Power Company's TidGen™ Power System Technology Readiness Advancement Initiative Project

This document summarizes the tasks identified for National Laboratory technical support of Ocean Renewable Power Corporation (ORPC) DOE grant awarded under the FY10 Industry Solicitation DE-FOA-0000293: Technology Readiness Advancement Initiative. The system ORPC will deploy in Cobscook Bay, ME is known as the TidGen™ Power System. The Turbine Generator Unit (TGU) each have a rated capacity of 150 to 175 kW, and they are mounted on bottom support frames and connected to an onshore substation using an underwater power and control cable. This system is designed for tidal energy applications in water depths from 60 to 150 feet. In funding provided separately by DOE, National Laboratory partners NREL and SNL will provide in-kind resources and technical expertise to help ensure that industry projects meet DOE WWPP (Wind and Water Power Program) objectives by reducing risk to these high value projects.

24 POWER TRANSMISSION AND DISTRIBUTION↗

Igiugig Site Visit Report

The National Renewable Energy Laboratory (NREL) team conducted a site visit during January 23-25, 2019 with the Igiugig Village Council (IVC) and other stakeholders to assist the community of Igiugig in refining their long-term energy strategy. The agenda included a tour of the village, data collection, presentations, long-term visioning exercises, identification of energy scenarios, and a school presentation. Participants in the site visit activities spanned a range of local, regional, government, and industry participation. There were 24 attendees at the all-day community workshop on Thursday, January 24th, with participants from the IVC, NREL, Bristol Bay Native Association (BBNA), Bristol Bay Native Corporation (BBNC), Lake and Peninsula Borough, Alaska Energy Authority, Intergrid, ORPC, Deer Stone Consulting, the Southwest Alaska Municipal Conference, and University of Alaska Fairbanks - Alaska Center for Energy and Power. Igiugig is a well-organized rural Alaskan community, with a leadership team that appears to have broad community support. The use of consensus-based decision making is one tangible example of how the leadership team actively invokes and promotes community-focused thinking. The NREL team observed anecdotal evidence of how this approach seems to be strengthening the community: active participation in the visioning exercise, a student hosted fund-raiser dinner at the school, a clean and organized landfill, and well-maintained roads and buildings. Igiugig has wind, solar, and river hydrokinetic resources readily available within the community. Wind has shown to be a promising resource in the region, and has been integrated into microgrids around the state, but the community has had mixed success with wind technologies: some devices failed quickly and others continue to operate. The economics of solar energy are improving in Alaska, and economical solar projects are being installed around the state. Considering that economic activity in Igiugig peaks during the summer sport fishing season, solar could prove to be a valuable supplement to the electrical system. Igiugig has been a test site for two different river hydrokinetic devices, and they have began a third project to operate ORPC's RivGen device, which is delivering valuable device performance data, operations and maintenance experience, and design refinement information. Already, this device has made over 7-million revolutions, and delivered over 8 MWh of power to the community. Igiugig's river resource is fairly unique because it is available year-round and has the potential to provide reliable base-load power for months at a time. A preliminary investigation of this diverse resource mix suggests that Igiugig could achieve very high levels (70% or more) of annual renewable generation contributions. A critical step in pursuing this path is identifying the mix of energy assets (generation and storage) that best meets the community's budget, needs, and goals. The assets that a community installs early in their grid-modernization initiative can constrain the options that are economical at later stages, which may lead to sub-optimal solutions. This is where technical and economic analysis of potential scenarios (i.e., distinct mixes of energy assets) can be useful in identifying the most promising pathways so that a community can make informed and strategic decisions about the assets they install. These analyses are most accurate and informative when they are based on actual technology performance and cost data. As the RivGen project continues to operate and generate this data, we will be better prepared to evaluate the technology's long-term viability and to identify research areas that would improve it. Igiugig's energy projects are at the cutting edge of two intersecting technology areas: 1) deploying an operational river hydrokinetic turbine, and 2) integrating renewable energy sources to achieve very high percent renewables. If these projects are successful, the lessons learned and technologies developed could be valuable for other microgrids around the world. Igiugig's unique resource mix make it an ideal location for this work, and the community's organizational strength make it an ideal partner in this ground-breaking work. Ongoing support for technical assistance to manage and address technical challenges along the way will maximize the probability of project success.

13 HYDRO ENERGY↗

RivGen Controller Performance Raw Data, Igiugig, AK

Contains raw data for operations of Ocean Renewable Power Company (ORPC) RivGen Power System in Igiugig 2015 in Matlab data file format. Two data files capture the data and timestamps for data, including power in, voltage, rotation rate, and velocity. Location, Description, Format, Column 1, Date and time, MM/DD/YYYY, hh:mm:ss, Column 2, DC voltage (after DC filter), VDC, Column 3, DC current into inverters, IDC, Column 4, DC current into secondary resistive load, IDC, Column 5, Power into inverters, kW, Column 6, Power into secondary load, kW, Column 7, Frequency of single phase AC voltage from generator, Hz, Column 8, rotation rate of generator/turbine (rested at 1.1 when stationary), rad/s, Column 9, Velocity Algorithm 2, m/s, Column 10, Velocity Algorithm 3, m/s, Column 11, Rcodes for secondary load, see document "SL Controller PLC Memory", Column 12, Voltage measured between phase A and B, Vll,

16 TIDAL AND WAVE POWER↗

RivGen Wake Data, Igiugig, AK

Turbulence data collected in from a SWIFT drifter repeatedly released over the ORPC RivGen turbine

16 TIDAL AND WAVE POWER↗