Engineering Papers⌕ Search

SEARCH · Engineering Papers

Results for “Nuclear Regulatory Commission”

Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.

Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.

At least 19 records

Vital area identification for U.S. Nuclear Regulatory Commission nuclear power reactor licensees and new reactor applicants.

U.S. Nuclear Regulatory Commission nuclear power plant licensees and new reactor applicants are required to provide protection of their plants against radiological sabotage, including the placement of vital equipment in vital areas. This document describes a systematic process for the identification of the minimum set of areas that must be designated as vital areas in order to ensure that all radiological sabotage scenarios are prevented. Vital area identification involves the use of logic models to systematically identify all of the malicious acts or combinations of malicious acts that could lead to radiological sabotage. The models available in the plant probabilistic risk assessment and other safety analyses provide a great deal of the information and basic model structure needed for the sabotage logic model. Once the sabotage logic model is developed, the events (or malicious acts) in the model are replaced with the areas in which the events can be accomplished. This sabotage area logic model is then analyzed to identify the target sets (combinations of areas the adversary must visit to cause radiological sabotage) and the candidate vital area sets (combinations of areas that must be protected against adversary access to prevent radiological sabotage). Any one of the candidate vital area sets can be selected for protection. Appropriate selection criteria will allow the licensee or new reactor applicant to minimize the impacts of vital area protection measures on plant safety, cost, operations, or other factors of concern.

21 SPECIFIC NUCLEAR REACTORS AND ASSOCIATED PLANTS↗

Summary of Nuclear Regulatory Commission Flood Barrier Testing Strategies Workshop

The United States Nuclear Regulatory Commission (NRC) and Idaho National Laboratory (INL) organized a half-day workshop on flood barrier testing strategies (FBTS) at NRC Headquarters in Rockville, MD, via a webinar as well, on March 12, 2020. The workshop was a public meeting attended by members of the public and staff from NRC, INL, and other agencies. The workshop served multiple objectives: (1) present preliminary research results from the FBTS research project conducted by INL for NRC, and (2) engage industry stakeholders and technical experts to provide inputs and insights on testing strategies. This letter report documents the materials presented, participant questions and answers, and summaries of an open discussion during this FBTS workshop.

99 GENERAL AND MISCELLANEOUS↗

Recommendations to Improve Nuclear Licensing: Update to INL/RPT-23-72206, Recommendations to Improve the Nuclear Regulatory Commission Reactor Licensing and Approval Process

In 2023, various stakeholders had asked for BEA’s thoughts and recommendations to improve the U.S. Nuclear Regulatory Commission’s (NRC) licensing review and approval process. This included an April 14, 2023 request from the House Committee on Energy and Commerce on “information and recommendations to improve the licensing review and approval process, . . . as well as the siting, licensing, construction, and oversight of advanced nuclear reactor technologies.” In response to these requests, BEA prepared and published INL/RPT-23-72206, Recommendations to Improve the Nuclear Regulatory Commission Reactor Licensing and Approval Process (2023 Report). The 2023 Report included 13 recommendations related to streamlining NRC hearings, expediting NRC safety and environmental reviews, otherwise improving NRC licensing, and providing financial benefits to new reactor projects. Many of these earlier recommendations were addressed through various legislative actions or changes made by the NRC. Section 2 of this report addresses the current status of those earlier recommendations. BEA recently received a new request from the House Committee on Energy and Commerce seeking any suggestions for additional areas to examine or potential reforms “that may assist in modernizing the licensing and regulatory process that affects civil nuclear deployment.” Additionally, the new Secretary of Energy has identified initial DOE actions to support unleashing the golden era of American energy dominance, including “Unleash Commercial Nuclear Power in the United States” and “Streamline Permitting and Identify Undue Burdens on American Energy.” Given these developments, BEA has prepared a new set of updated recommendations in this report. The recommendations include updated versions of recommendations from the 2023 Report which have not been fully adopted, as well as entirely new recommendations. This set of recommendations has a slightly broader focus with some recommendations focused on DOE authorizations and some recommendations related to nuclear licensing beyond new reactors. Each recommendation below also identifies whether the recommendation would require legislative action or could be addressed directly by the respective agency.

22 GENERAL STUDIES OF NUCLEAR REACTORS↗

Oak Ridge National Laboratory Technical Input for the Nuclear Regulatory Commission Review of the 2017 Edition of ASME Section III, Division 5, ‘High Temperature Reactors’

To assist the Nuclear Regulatory Commission in its decision making on endorsement of the American Society for Mechanical Engineers Boiler and Pressure Vessel Code Section III, Division 5 (2017 Edition) for development of advanced non-light water reactors, the following Division 5 portions were reviewed: Article HBB-2000 Material; Article HCB-2000 Material; Article HGB-2000 Material; Mandatory Appendix HBB-I-14 Tables and Figures; and, Nonmandatory Appendix HBB-U Guidelines for Restricted Material Specifications to Improve Performance in Certain Service Applications. In addition to the 2017 Edition, the same parts of the 2019 Edition have also been reviewed as indicated in various sections of the report. This review was conducted by a collaboration of national laboratory and private sector participants with significant industrial experience, including some heavy lifting and deep diving from Clarus Consulting, LLC., all intended to achieve an objective, independent, and practical perspective. The report provides recommendations, descriptions of the evaluation methods, and the source references for the data used. To build confidence required for endorsement of the Code, this review was conducted as a verification and validation of the above Code contents. The objective of verification is to ensure that the Code is free of error – direct or implied; contains the information needed for its use, including proper coverage of the Code-specified materials for the intended application, and completeness and adequacy of references to other portions of the Code. The objective of validation is to authenticate that the Code tabulations and graphs represent design inputs consistent with what are determined using rules and methods specified by the Code. The authentication process used data that were assembled and/or generated independent of Code development, while the methods of analysis followed Code-specified methods where appropriate. The designated portions for this review cover the five alloys codified for high temperature reactor applications in Division 5, i.e. 316 SS, 304 SS, 800H, 2¼Cr-1Mo, and 9Cr-1Mo-V, regarding their general requirements, permitted specifications and design stress intensity values for pressure-retaining applications, deterioration in service, fatigue acceptance test, permissible weld materials, tensile and yield strength, expected minimum stress-to-rupture values (including for Alloy 718), weld stress rupture factors, permissible materials for bolting use, and restricted specifications in certain service applications. Additionally, stress intensity values for bolting materials including 316 SS, 304 SS and alloy 718 were reviewed. Analysis and discussion are also provided on contents outside of these designated Code portions where it was deemed relevant and necessary to develop a technically sound understanding of issues relating to the designated portions. Due to unavailability of sufficient test data on welds during the review period, the weld stress rupture factors in Tables HBB-I-10.14A to E, which cover a total of ten tables for the five alloys welded with twenty-eight different weld metals (some with similar properties), have been deferred to a future review effort. The review identified mainly two types of issues. The first type includes instances where the Code is found factually incomplete or incorrect, such as obsolete materials specifications listings, missing tabulation of stresses for bolting. Changes to the Code are recommended in these cases. The second type of issue includes instances where the Code tabulations and graphs are found to be less conservative than the review analysis results. In these cases, recommendations are made for further review and consideration where the difference in conservatism exceeds 10%, which is our threshold for questioning technical adequacy, meriting a risk assessment by the Nuclear Regulatory Commission and/or reactor designers. It is noted that this effort has been executed using all available data and established methods of analysis, including methods and criteria specified and used by the Code. As such, the findings that are presented in quantitative detail, in a format for convenient comparison with the Code, and with identification of where further review is recommended, should provide a sound technical basis for decisions about quantifying the implications of the reduced design margins and technical adequacy/inadequacy to form a basis for conditioning specific Code tabulation values on endorsement. Recommendations for specific changes to the Code, however, entail design conservatism considerations beyond the scope of this review effort, and are not made in this report.

22 GENERAL STUDIES OF NUCLEAR REACTORS↗

U.S. Nuclear Regulatory Commission Historical Perspectives of Very Low-Level Radioactive Waste - 18367

The United States Nuclear Regulatory Commission (NRC), in Title 10 of the Code of Federal Regulations Part 61 (10 CFR Part 61), 'Licensing Requirements for Land Disposal of Radioactive Waste', provides licensing procedures, performance objectives, and technical requirements for the issuance of licenses for the land disposal of low-level radioactive waste. Low-level radioactive waste is divided into four categories based on its potential risk and need for isolation. Class A is the lowest category of low-level radioactive waste and poses the least risk. A large percentage of Class A low-level waste contains very low radionuclide concentrations and does not pose a significant health and safety risk. In the current regulatory framework, this waste, referred to as low-activity or very low-level waste, is managed in the same manner as much more hazardous waste. In 1986 and 1990, as a result of the Low-Level Radioactive Waste Policy Amendments Act of 1985, the NRC issued the Below Regulatory Concern (BRC) policy statement. This policy statement established an implementation plan regarding the expeditious handling of rulemaking petitions 'to exempt specific radioactive waste streams from regulation due to the presence of radionuclides in sufficiently low concentrations or quantities as to be below regulatory concern.' The BRC policy statement provided a consistent risk framework when considering regulatory exemption decisions, such as: (1) the release for unrestricted public use of lands and structures containing residual radioactivity; (2) the distribution of consumer products containing small amounts of radioactive material; (3) the disposal of very low-level radioactive waste at other than licensed disposal sites; and (4) the recycling of slightly contaminated equipment and materials. Due to concerns with the BRC policy that were raised by Congress, the States, the public, and others, Congress enacted the Energy Policy Act of 1992, which revoked the NRC's 1986 and 1990 BRC policy statements and led to the NRC's formal withdrawal of the BRC policy in 1993. Stakeholders raised concerns on NRC's potential deregulation of radioactive material. Additionally, in March 2005, the NRC staff proposed a rule to amend 10 CFR Part 20, 'Standards for Protection Against Radiation,' to include radiological criteria for controlling the disposition of solid materials with very small amounts of residual radioactivity. The NRC staff also proposed a limited disposition approach for the disposition of solid material, limiting the release of solid material meeting a 0.01 milli-Sievert per year (mSv/yr) [1 milli-rem (mrem/yr)] dose criterion, from licensed control. In June 2005, the Commission disapproved publication of the proposed rule and deferred the rulemaking until a later time, stating that the NRC's existing approach of reviewing specific cases on an individual basis was fully protective of public health and safety. This rulemaking effort was discontinued by the Commission in 2016. Recently, several nuclear power plant licensees have announced early decommissioning of their facilities. Some stakeholders have expressed concerns about the capacity and disposal costs associated with using the four existing low-level waste disposal sites for very low levels of radioactive waste (i.e., waste at the low end of the Class A category). A more risk-informed, performance based approach to waste disposal would allow more flexibility in managing this waste commensurate with its risk and hazard. A new approach would also allow the NRC to align with international standards for this type of waste. The NRC is presently conducting a scoping study to identify the actions the agency should take to strengthen its regulatory framework for very low-level waste disposal. The Very Low-Level Waste (VLLW) scoping study will consider divergent stakeholder comments; lessons learned from the BRC policy statements and the proposed rule on radiological criteria for controlling the disposition of solid materials; and best practices of other countries with respect to VLLW disposal. The NRC will also engage other government agencies to discuss regulatory options for VLLW. This paper offers a historical overview of past NRC initiatives to manage the lower end of Class A waste in a manner that is risk informed and performance based. It examines previous endeavors and discusses the regulatory challenges that arose. It also addresses lessons learned and introduces NRC's current effort regarding very low-level radioactive waste disposal. (authors)

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

U.S. Nuclear Regulatory Commission Extremely Low Probability of Rupture pilot study : xLPR framework model user's guide.

For the U.S. Nuclear Regulatory Commission (NRC) Extremely Low Probability of Rupture (xLPR) pilot study, Sandia National Laboratories (SNL) was tasked to develop and evaluate a probabilistic framework using a commercial software package for Version 1.0 of the xLPR Code. Version 1.0 of the xLPR code is focused assessing the probability of rupture due to primary water stress corrosion cracking in dissimilar metal welds in pressurizer surge nozzles. Future versions of this framework will expand the capabilities to other cracking mechanisms, and other piping systems for both pressurized water reactors and boiling water reactors. The goal of the pilot study project is to plan the xLPR framework transition from Version 1.0 to Version 2.0; hence the initial Version 1.0 framework and code development will be used to define the requirements for Version 2.0. The software documented in this report has been developed and tested solely for this purpose. This framework and demonstration problem will be used to evaluate the commercial software's capabilities and applicability for use in creating the final version of the xLPR framework. This report details the design, system requirements, and the steps necessary to use the commercial-code based xLPR framework developed by SNL.

21 SPECIFIC NUCLEAR REACTORS AND ASSOCIATED PLANTS↗

U.S. Department of Energy & Nuclear Regulatory Commission Advanced Fuel Cycle Research & Development Seminar Series FY 2007 & 2008

In fiscal year 2007, the Advanced Burner Reactor project initiated an educational seminar series for the Department of Energy (DOE) and Nuclear Regulatory Commission (NRC) personnel on various aspects of fast reactor fuel cycle closure technologies. This important work was initiated to inform DOE and NRC personnel on initial details of sodium-cooled fast reactor, separations, waste form, and safeguard technologies being considered for the Advanced Fuel Cycle Research and Development program, and to learn the important lesson from the licensing process for the Clinch River Breeder Reactor Plant that educating the NRC staff early in the regulatory process is very important and critical to a project success.

11 NUCLEAR FUEL CYCLE AND FUEL MATERIALS↗

A Comparison of the U.S. Nuclear Regulatory Commission Technical Evaluation for the Zion and La Crosse License Termination Plans with a Focus on Release Criteria

Zion Nuclear Power Station (ZNPS) and the La Crosse Boiling Water Reactor (LACBWR) sites are both undergoing decommissioning. Although these two sites are different in terms of size, design, and operational history, the approach for defining release criteria for decommissioning at each site is similar. ZNPS consists of two (Units 1 and 2) Pressurized Water Reactors (PWR), each approximately 1100 MWe. ZNPS is located near the city of Zion in northeast Illinois on the west shore of Lake Michigan. The two units were operated from 1973 to 1998. LACBWR was an AEC Demonstration Reactor (50 MWe) which operated from 1967 to 1987. The LACBWR site is in Vernon County, Wisconsin and is shared with an operational fossil plant. EnergySolutions is managing the decommissioning of both these sites under the separate entities ZionSolutions and LaCrosseSolutions. The U.S. Nuclear Regulatory Commission (NRC) transferred the Zion Facility Operating License from Exelon Generation Company, LLC (Exelon) to ZionSolutions on September 1, 2010. A similar license transfer from Dairyland Power Cooperative to LaCrosseSolutions is planned for the second quarter of 2016. On December 19, 2014, ZionSolutions submitted the ZNPS License Termination Plan (LTP). It is expected that the LTP for the La Crosse BWR will be submitted to the NRC in early 2016. (authors)

21 SPECIFIC NUCLEAR REACTORS AND ASSOCIATED PLANTS↗

Recommendations to Improve the Nuclear Regulatory Commission Reactor Licensing and Approval Process

Due to the urgency around climate change and associated goals for clean energy transition, and Battelle Energy Alliance's (BEA) and Idaho National Laboratory's (INL) role as the nation's nuclear energy laboratory, numerous stakeholders have asked for BEA’s thoughts and recommendations to reduce the time and costs associated with licensing new reactors at the U.S. Nuclear Regulatory Commission (NRC). As an M&O contractor for an FFRDC, BEA is a long-term partner with the Government in seeking to achieve clean energy goals, yet has a level of independence needed to appropriately evaluate this topic. The views herein are informed by extensive BEA experience supporting nuclear energy endeavors including ongoing discussions with current and former regulators, applicants, and licensees. With this background in mind, the United States benefits from having an agency such as the NRC, which is viewed internationally as the leader in nuclear safety licensing and regulation. Nonetheless, while acknowledging the important nuclear safety role satisfied by the NRC, it is apparent that one of the most significant time and resource intensive activities for new reactor developers is the NRC licensing process. The time and cost to obtain NRC licenses add significant financial stress for new reactor projects and may result in abandonment of projects or failure to even begin new projects. The challenge is particularly acute for advanced reactors which may raise unique or new regulatory questions and may be smaller in size, resulting in a much higher proportional impact from regulatory and cost challenges. This situation presents a particularly troublesome risk for the nation given the urgency in which utilities are working to transition to clean, non-carbon-emitting energy sources like nuclear energy. Reforms to the NRC licensing process have the potential to greatly increase certainty and support the successful progress of new reactors. The NRC can retain its world-class nuclear safety reputation while becoming a world leader for regulatory efficiency and a critical enabler to the clean energy transition. This report describes potential NRC reforms, focusing on those with a statutory connection. Recognizing the potential tradeoffs with any proposed changes, the report attempts to highlight those considerations in the analysis of the reforms. The recommendations are presented as a set of options for consideration. Unless noted, they are independent options, offering stakeholders the option to select a subset for further consideration. Although difficult to calculate precise time improvements for some of the changes, the reforms have the potential for substantial improvements, perhaps even by a factor of two.

29 ENERGY PLANNING, POLICY, AND ECONOMY↗

Independent Verification and Validation Of SAPHIRE 8 Risk Management Project Number: N6423 U.S. Nuclear Regulatory Commission

This report provides an evaluation of the risk management. Risk management is intended to ensure a methodology for conducting risk management planning, identification, analysis, responses, and monitoring and control activities associated with the SAPHIRE project work, and to meet the contractual commitments prepared by the sponsor; the Nuclear Regulatory Commission.

99 GENERAL AND MISCELLANEOUS↗

Independent Verification and Validation Of SAPHIRE 8 Software Quality Assurance Plan Project Number: N6423 U.S. Nuclear Regulatory Commission

This report provides an evaluation of the Software Quality Assurance Plan. The Software Quality Assurance Plan is intended to ensure all actions necessary for the software life cycle; verification and validation activities; documentation and deliverables; project management; configuration management, nonconformance reporting and corrective action; and quality assessment and improvement have been planned and a systematic pattern of all actions necessary to provide adequate confidence that a software product conforms to established technical requirements; and to meet the contractual commitments prepared by the sponsor; the Nuclear Regulatory Commission.

99 GENERAL AND MISCELLANEOUS↗

Independent Verification and Validation Of SAPHIRE 8 Software Quality Assurance Plan Project Number: N6423 U.S. Nuclear Regulatory Commission

This report provides an evaluation of the Software Quality Assurance Plan. The Software Quality Assurance Plan is intended to ensure all actions necessary for the software life cycle; verification and validation activities; documentation and deliverables; project management; configuration management, nonconformance reporting and corrective action; and quality assessment and improvement have been planned and a systematic pattern of all actions necessary to provide adequate confidence that a software product conforms to established technical requirements; and to meet the contractual commitments prepared by the sponsor; the Nuclear Regulatory Commission.

99 GENERAL AND MISCELLANEOUS↗

A Facilitator's Perspective on Government Public Meetings on the Environmental and Energy Issues: The U.S. Nuclear Regulatory Commission Example - 20428

Many Federal, and State agencies, are required by policy or regulation, to hold a public meeting on a proposed regulatory action. These may be on a specific licensing issue or they may be to obtain public advice on generic issues, such as a proposed rulemaking or policy issue. Environmental or energy issues may often involve emotional behavior on the part of the public, and sometimes anger or protests. Consequently, trained facilitators are often used to 'facilitate' the meeting to reduce the tension and to help the meeting run smoothly. The United States Nuclear Regulatory Commission ('NRC') has had considerable experience with public meetings, emotional behavior by the public, and the use of facilitators. This paper will describe the history of the NRC with public meetings and public engagement, the issues that raise concerns by certain segments of the public, and how a facilitator will attempt to reduce the concern and anxiety at the meeting and to run a fair and constructive meeting. (authors)

22 GENERAL STUDIES OF NUCLEAR REACTORS↗

USING TECHNOLOGY TO SUPPORT PROACTIVE MANAGEMENT OF MATERIALS DEGRADATION FOR THE U.S. NUCLEAR REGULATORY COMMISSION

The majority of the U.S. reactor fleet is applying for license renewal to extend the operating life from the current 40 years to 60 years, and there is now active interest in extending the operating life to beyond 60 years. Many plants are also applying for increases in power rating and both of these changes increases the need for an improved understanding of materials degradation. Many materials degrade over time and much is known about the degradation of materials under normal environmental conditions; however, less is known about the characteristics of materials degradation when the environment is subject to higher than normal radiological conditions over extended periods of time. Significant efforts are being made by industrial, academic and regulatory groups worldwide to identify, classify and mitigate potential problems arising from degradation of components in this context. From a regulatory perspective, the U.S. Nuclear Regulatory Commission (USNRC) is very interested in being able to identify ways to insure their licensees proactively manage the identification of materials degradation and the mitigation of its effects. To date, the USNRC has consolidated “generic” programs for mitigating aging issues in the two volume Generic Aging Lessons Learned (GALL) Report (NUREG-1801) [1][2], and have encouraged applicants for license renewal to use these programs where applicable in their plant when applying for renew of their reactor’s license. The USNRC has also published a comprehensive report entitled Expert Panel Report on Proactive Materials Degradation (NUREG/CR-6923) [3] that inventories the types of degradation mechanisms that could exist in each component of a Light Water Reactor (LWR) and each degradation mechanism is assessed regarding how much is known about mitigating its effects. Since the number of plant designs and materials used varies greatly within the U.S. fleet, there are many variations to implementing aging management programs (AMPs), requiring significant dialogs between the Licensee and the USNRC. These discussions are part of the licensing basis and as such are documented with up to multi-hundred page responses that are loosely coupled through the USNRC Agency-wide Document Access and Management System (ADAMS), which serves as an electronic records repository for the USNRC . These discussions have supported revisions to the GALL, including the revision that is being prepared as this paper is being written. The USNRC has sought the help of the Pacific Northwest National Laboratory to improve the staff’s ability to navigate the significant numbers of documents that are generated in this process and to provide a forum for regulators, licensees and researchers to share knowledge in the efforts to improve the cyclic process for defining, applying, validating and re-defining AMPs. Work to date in this area is publicly accessible and this paper will describe that work and outline a potential path forward. The presenter will also demonstrate the capabilities of the PMMD information tools (http://pmmd.pnl.gov).

22 GENERAL STUDIES OF NUCLEAR REACTORS↗

OVERVIEW OF THE U.S. DEPARTMENT OF ENERGY AND NUCLEAR REGULATORY COMMISSION PERFORMANCE ASSESSMENT APPROACHES: CEMENTITIOUS BARRIERS PARTNERSHIP

Engineered barriers including cementitious barriers are used at sites disposing or contaminated with low-level radioactive waste to enhance performance of the natural environment with respect to controlling the potential spread of contaminants. Drivers for using cementitious barriers include: high radionuclide inventory, radionuclide characteristics (e.g., long half-live, high mobility due to chemical form/speciation, waste matrix properties, shallow water table, and humid climate that provides water for leaching the waste). This document comprises the first in a series of reports being prepared for the Cementitious Barriers Partnership. The document is divided into two parts which provide a summary of: (1) existing experience in the assessment of performance of cementitious materials used for radioactive waste management and disposal and (2) sensitivity and uncertainty analysis approaches that have been applied for assessments. Each chapter is organized into five parts: Introduction, Regulatory Considerations, Specific Examples, Summary of Modeling Approaches and Conclusions and Needs. The objective of the report is to provide perspective on the state of the practice for conducting assessments for facilities involving cementitious barriers and to identify opportunities for improvements to the existing approaches. Examples are provided in two contexts: (1) performance assessments conducted for waste disposal facilities and (2) performance assessment-like analyses (e.g., risk assessments) conducted under other regulatory regimes. The introductory sections of each section provide a perspective on the purpose of performance assessments and different roles of cementitious materials for radioactive waste management. Significant experience with assessments of cementitious materials associated with radioactive waste disposal concepts exists in the US Department of Energy Complex and the commercial nuclear sector. Recently, the desire to close legacy facilities has created a need to assess the behavior of cementitious materials for applications in environmental remediation and decontamination and decommissioning (D&D) applications. The ability to assess the use and benefits of cementitious materials for these applications can significantly affect decisions related to cleanup activities. For example the need for costly remedial actions may not be necessary if existing or new cementitious barriers were adequately represented. The sections dealing with regulatory considerations include summaries of the different regulations that are relevant for various applications involving cementitious materials. A summary of regulatory guidance and/or policies pertaining to performance assessment of cementitious materials and sensitivity and uncertainty analyses is also provided in the following chapters. Numerous examples of specific applications are provided in each report. The examples are organized into traditional waste disposal applications (performance assessments), applications related to environmental remediation and D&D, and reactor and spent fuel related assessments. Sections that discuss specific facilities or sites contain: (1) descriptions of the role of the cementitious barriers or sensitivity/uncertainty analysis, (2) parameter assumptions and conceptual models, and (3) a relative discussion of the significance in the context of the assessment. Examples from both the U.S. Department of Energy Sites and the U.S. Nuclear Regulatory Commission are provided to illustrate the variety of applications and approaches that have been used. In many cases, minimal credit was taken for cementitious barriers. However, in some of those cases, benefits of being able to take credit for barriers were identified. The examples included: (1) disposal facilities (vaults, trenches, tank closures, cementitious waste forms and containers, etc.), (2) environmental remediation (old disposal facilities), (3) reactor and large structure decommissioning, and (4) spent fuel pools. These examples were selected to provide a perspective on the various needs, capabilities to model cementitious barriers, and use of sensitivity and uncertainty analysis and were not intended to include all cementitious barriers used in all low-level waste related PAs. The summary section in each report/chapter provides an overview of important considerations for the examples and compares and contrasts the different approaches that have been used. For example, specific time dependent physical processes (changes in hydraulic conductivity) and chemical processes (partitioning coefficients, and solubility coefficients) are identified and compared. The summary section also identifies key needs for future assessments. The Cementitious Barriers Partnership was established to address the key needs related to the use of cementitious barriers - waste forms, containment structures, physical stabilization fill materials.

11 NUCLEAR FUEL CYCLE AND FUEL MATERIALS↗