Engineering Papers⌕ Search

SEARCH · Engineering Papers

Results for “Nuclear Licensing”

Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.

Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.

At least 19 records

Recommendations to Improve Nuclear Licensing: Update to INL/RPT-23-72206, Recommendations to Improve the Nuclear Regulatory Commission Reactor Licensing and Approval Process

In 2023, various stakeholders had asked for BEA’s thoughts and recommendations to improve the U.S. Nuclear Regulatory Commission’s (NRC) licensing review and approval process. This included an April 14, 2023 request from the House Committee on Energy and Commerce on “information and recommendations to improve the licensing review and approval process, . . . as well as the siting, licensing, construction, and oversight of advanced nuclear reactor technologies.” In response to these requests, BEA prepared and published INL/RPT-23-72206, Recommendations to Improve the Nuclear Regulatory Commission Reactor Licensing and Approval Process (2023 Report). The 2023 Report included 13 recommendations related to streamlining NRC hearings, expediting NRC safety and environmental reviews, otherwise improving NRC licensing, and providing financial benefits to new reactor projects. Many of these earlier recommendations were addressed through various legislative actions or changes made by the NRC. Section 2 of this report addresses the current status of those earlier recommendations. BEA recently received a new request from the House Committee on Energy and Commerce seeking any suggestions for additional areas to examine or potential reforms “that may assist in modernizing the licensing and regulatory process that affects civil nuclear deployment.” Additionally, the new Secretary of Energy has identified initial DOE actions to support unleashing the golden era of American energy dominance, including “Unleash Commercial Nuclear Power in the United States” and “Streamline Permitting and Identify Undue Burdens on American Energy.” Given these developments, BEA has prepared a new set of updated recommendations in this report. The recommendations include updated versions of recommendations from the 2023 Report which have not been fully adopted, as well as entirely new recommendations. This set of recommendations has a slightly broader focus with some recommendations focused on DOE authorizations and some recommendations related to nuclear licensing beyond new reactors. Each recommendation below also identifies whether the recommendation would require legislative action or could be addressed directly by the respective agency.

22 GENERAL STUDIES OF NUCLEAR REACTORS↗

Development of a Regulatory Strategy for Post Operational Clean Out Activities at Sellafield Limited Nuclear Licensed Site - 20273

The Thermal Oxide Reprocessing Plant (THORP) at the Sellafield nuclear licensed site carried out its final commercial shear of spent nuclear fuel in November 2018, since when the facility has undergone rundown prior to cessation of operations. The Magnox Reprocessing Facility (MRF) is also due to cease operating, around the end of 2020. Following the cessation of spent fuel reprocessing, the facilities and supporting infrastructure will transition into Post Operational Clean Out (POCO), which will become an increasingly significant portion of Sellafield Limited's (SL) activities. POCO is defined as the set of activities undertaken directly after a nuclear facility comes to the end of its operational life, in order to place the plant in a suitable state for the subsequent decommissioning steps. The decommissioning strategy at SL is for deferred dismantling of these facilities, which will be subject to a period of Surveillance and Maintenance (S and M) following completion of POCO. This paper outlines the development and implementation of a regulatory strategy for POCO activities at the Sellafield site by the Office for Nuclear Regulation (ONR), the independent nuclear safety, transport and security regulator in the United Kingdom. The paper also describes how this regulatory strategy is applied to nuclear installations undergoing transition into POCO and subsequent decommissioning. ONR works jointly with the Environment Agency, as the environmental regulators in England, to ensure that matters relevant to them have been duly considered. In developing a regulatory strategy, ONR has taken a site-wide approach, moving away from regulation on a facility-by-facility basis, to promote consistency, as well as maximising efficiency and effectiveness. The aim of this integrated approach was to prevent complications during future decommissioning and dismantling that have been experienced previously at similar facilities in France. The strategy recognised that once reprocessing operations are concluded, the hazard present will be reduced significantly, which provides the opportunity for ONR to consider how best to deliver a proportionate approach to regulatory interventions. Once POCO has been completed and the facility has transitioned into a period of S and M, the scale and frequency of ONR's interventions will reduce, commensurate with the safety case covering the remaining hazard and activities associated with maintaining the facility prior to final decommissioning. This approach allows ONR to consider risks holistically, considering the full life cycle of the facility and by taking due account of the interdependencies between facilities across the site. The strategy also aligns with existing regulation of high hazard and risk reduction activities, which remain ONR's top priority. As SL progresses with POCO activities in THORP and across the rest of the site, ONR will review its regulatory strategy to ensure that the intended safety benefits are realised. (authors)

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Integration of real-time measurements and atomistic modeling to license nuclear components

An improved testing and data gathering method is described herein with reference to testing a new fuel, as an exemplary component to be tested for licensure purposes. The method includes generally: generating models for the new system; making samples and getting them accepted for a reactor; and testing the samples in a test or commercial reactor until the exposure time is reached for the expected cycle length of the fuel at final use. The method is preferably done concurrent to submitting a license application for commercial use of the new component to the relevant government body to expedite license testing review.

11 NUCLEAR FUEL CYCLE AND FUEL MATERIALS↗

Conceptual Design of Engineering-Scale Molten Salt Spill Tests to Support Molten Salt Reactor Licensing

Nuclear accident progression analysis codes for reactor licensing must be validated using experimental data that was generated at a large enough scale so that the results are representative of full-scale accidents. This report describes a conceptual design of engineering-scale molten salt spill tests that will provide the necessary datasets to support molten salt reactor (MSR) licensing. Design considerations, salt compositions, test variables, processes to be quantified, and suitable measurement techniques are presented and discussed. Aspects of the conceptual engineering-scale molten salt spill test design presented in this report were made using insights from recent laboratory-scale molten salt spill tests conducted at Argonne. Additional input from model developers, MSR vendors, and technical experts will benefit the design of the proposed engineering-scale molten salt spill tests.

22 GENERAL STUDIES OF NUCLEAR REACTORS↗

Updates to a Preliminary Probabilistic Performance Assessment Model for Radiological and Chemical Contamination at the West Valley Site, New York - 20420

The New York State Energy Research and Development Authority (NYSERDA) is the owner of the Western New York Nuclear Service Center (WNYNSC), a 1,351-ha site located approximately 48 km south of Buffalo, New York. In 1962, Nuclear Fuel Services, Inc. (NFS) entered into agreements with the Atomic Energy Commission and New York State to construct the first commercial reprocessing plant of nuclear fuel in the United States at the WNYNSC. NFS built and operated the spent fuel reprocessing plant and waste disposal facilities, processing 640 Mg (640 metric tons) of spent nuclear fuel from 1966 to 1972 under an Atomic Energy Commission license. Nuclear fuel reprocessing operations halted in 1972 and never restarted, leaving behind radioactive and chemical wastes. The U.S. Department of Energy (DOE) was required to complete certain waste management activities under the West Valley Demonstration Project (WVDP) Act of 1980 including decommissioning of WVDP facilities. As collaborating agencies, NYSERDA and the DOE are tasked with making decisions about decommissioning and risk reduction for the West Valley Site. Neptune and Company, Inc. (Neptune) was contracted to develop a probabilistic performance assessment (PPA) model to assist the agencies in their decision making process for decommissioning the WVDP and WNYNSC. One important tool that is needed in order to inform the decision-making process is a science-based model of the West Valley Site that evaluates potential future consequences for human health and the environment. This forms the core of the spatial domain of the West Valley PPA Model. The PPA Model, developed using the GoldSim system modeling software, is a tool intended to provide support for decision making that evaluates uncertainty, in a manner that is transparent, defensible, and robust. The PPA Model includes contaminant transport and health effects components, and is organized around geographically-grouped contaminated facilities. These include the waste disposal areas licensed by the U.S. Nuclear Regulatory Commission and the State of New York, a waste tank farm for storage of high level radioactive waste resulting from reprocessing operations, and several areas contaminated with radioactive and chemical constituents. The PPA Model evaluates contaminant transport from these sources to points of exposure across the site and into receiving surface waters and sediments. Hypothetical people and wildlife could be exposed to contamination at these locations, and the effects of these exposures are evaluated. Contaminant transport processes to be evaluated in the PPA Model include groundwater and surface water transport, contaminant translocation by plants and animals, diffusion, and erosion. The evaluation of exposures to people in this preliminary model is limited to a resident farmer scenario, and ecological assessment is performed at the level of a screening analysis. The results of these preliminary evaluations inform future model developments. PPA Model results are subjected to sensitivity analysis in order to determine those pathways and parameters that are most significant in influencing the results. This information allows analysts and decision makers to focus on those aspects of Site behavior and processes. With this information, the decision makers can drive informed, defensible decisions regarding decommissioning of the Site. This paper includes an update of the information presented at WM2019 [1]. (authors)

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Distribution Development for Residual Inventory at the New York West Valley Site - 20400

The New York State Energy Research and Development Authority (NYSERDA) is the owner of the Western New York Nuclear Service Center (WNYNSC), a 1,351 ha site located approximately 48 km south of Buffalo, New York. In 1962, Nuclear Fuel Services, Inc. (NFS) entered into Agreements with the Atomic Energy Commission and New York State to construct the first commercial reprocessing plant of nuclear fuel in the United States. NFS, a private company, built and operated the spent fuel reprocessing plant and waste disposal facilities, processing 640 Mg of spent nuclear fuel from 1966 to 1972 under an Atomic Energy Commission license. Nuclear fuel reprocessing operations ended in 1972 and never reopened, leaving behind radioactive and chemical wastes. Operations led to contamination in a number of facilities and locations. Some of that contamination has migrated from waste disposal zones to other layers, formations, and features on and off the WNYNSC. Phase I decommissioning activities are ongoing and involve the removal of a number of areas and structures that have been associated with contamination. The purpose of this work is to outline the approach for characterizing contamination not associated with disposed wastes, contaminated structures, or specific releases. In this work, the term, residual radiological activity, is used to describe environmental contamination that exists subsequent to the completion of Phase I decommissioning activities, that is not associated with disposed wastes, contaminated structures, or specific releases. Contamination from the Site was quantified relative to data that characterize the concentrations of radionuclides that exist in background. Background concentrations are those present in the area but having no influence from Site related activities. The existence of residual radiological activity that is elevated relative to background has the potential to contribute to future risks to human health and the environment. As a consequence, the residual inventory information is used to inform the West Valley Probabilistic Performance Assessment (PPA) model to characterize potential future risks to human health and the environment. The centralized West Valley Data Management System (DMS) was the source of information for the data assembled in this analysis. The DMS is a fairly large compilation consisting of thousands of records from investigation studies, with sample dates ranging from 1990 to present. Samples from monitoring wells, boreholes, geoprobe studies, surface water, surface soils, storm water outfalls, ventilation stack filters, plant and animal tissues, and more are included in the DMS. Results are typically reported in units of activity per unit volume. For the purpose of the analyses presented here, all results were converted into consistent units of pCi per unit volume. Since 1990, data have been collected from various locations across the WNYNSC at different times with varying frequency over the course of several decades. As a consequence, a number of potential issues can arise with respect to the assembly of a dataset that is deemed adequate for the characterization of residual radiological activity. These issues were assessed and resolved to the extent possible through careful consideration of the properties of the distributions. The intent was to use data which characterize the current state of the Site. Radionuclides can be designated to one of several groups depending on their origin. In this work the groups considered were 1) Naturally Occurring Radioactive Material (NORM), 2) fallout, and 3) Other (including power plant, medical research, etc). This grouping is a useful construct with respect to the interpretation of fixed laboratory results. For example, NORM radionuclides that exist within a decay chain should have approximately equivalent distributions of concentrations if they are representative of background conditions. Insights such as these can be used as a check to identify sample results that need to be further investigated or omitted due to issues associated with reported results from fixed laboratory analyses. This type of analysis provided a foundation for the assessment of the adequacy of sample results for use in subsequent components of an assessment. The general process for the assessment of residual radiological contamination at the Site consists of a sequence of several steps. First, for each analyte, several statistical tests were performed to assess the weight of evidence against the null hypothesis that the mean of the distribution of concentrations was equal to zero. If the mean of the distribution of concentrations for a given radionuclide was not found to be greater than zero, then it was removed from consideration as a component of the residual radiological contamination. If there was significant evidence to reject the hypothesis of the mean being equal to zero, the second step was to compare the distribution of the data from the Site to that of the corresponding background. A suite of tests was used to compare the distributions of the site and background data. The results of these tests were collectively used to determine if site data are elevated relative to background. The third step was to develop distributions using a Bayesian framework to characterize the distribution of mean of the increment present above background for each of the radionuclides. The Bayesian model implemented allowed for the comparison of site-specific records to background concentrations to better approximate contamination attributed to the Site. A final screening step was employed for radionuclides that exceed background. This screening step compared 95% upper confidence limits (UCLs) from the increment distribution developed in the previous step to the risk screening levels. This approach yields a list of analytes that were determined to be elevated relative to background.

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Quantifying the impact of climate change on erosion - 20397

The New York State Energy Research and Development Authority (NYSERDA) is the owner of the Western New York Nuclear Service Center (WNYNSC), a 1,351-ha (3,338-ac) site located approximately 48 km (30 mi) south of Buffalo, New York. In 1962, Nuclear Fuel Services, Inc. (NFS) entered into Agreements with the Atomic Energy Commission and New York State to construct the first commercial reprocessing plant of nuclear fuel in the United States. NFS, a private company, built and operated the spent fuel reprocessing plant and waste disposal facilities, processing 640 Mg (metric tons, or 705 short tons) of spent nuclear fuel from 1966 to 1972 under an Atomic Energy Commission license. Nuclear fuel reprocessing operations ended in 1972 and never reopened, leaving behind radioactive and chemical wastes. Erosion can play an important role in the fate and transport of waste at sites where disposal of long-lived waste is anticipated. The statistical characterization of key processes related to erosion is essential to the understanding of site stability through time. One of the key processes governing erosion is extreme precipitation and it is critical that trends in the distribution of extreme precipitation events through time be represented. The evidence of climate change is increasingly well documented and projected impacts on extreme precipitation events should be incorporated in performance assessment studies when relevant. Not evaluating future climate states in a performance assessment is contradictory to good modeling practice. Specifically, excluding climate change limits development of modeling information that could aid in effective decision making. The current climate literature provides both observational evidence and climate model projections of climate trends and/or climate change in the late 20. and early 21. centuries for North America and the northeast United States. In this work, this information was used to assess the impacts of potential changes in climate on erosion processes. The goal was to understand how projections of future climate relate to the performance of the WNYNSC through time. In the first stage of this work multi-temporal historical aerial images were analyzed in conjunction with orthophotography and Lidar data to develop probability distributions for variables representing important erosion processes. The information from these analyses was then used in conjunction with simulated data from the West Valley Erosion Working Group (EWG). Analysis of EWG simulations provides estimates for the change in erosion rates through time that is driven by changes in climate. The time-varying rates of erosion change were applied to the historical aerial imagery data in order to inform time-varying rates of erosion that are driven by changes in climate. Ultimately, this process resulted in the identification of locations for features like gully heads using both the Lidar dataset and projection of the estimated location from the historical aerial photo under consideration back to the Lidar dataset. The distance between the estimate of the location from the historical image and that of the Lidar dataset was the estimated distance the feature has moved. This distance was then divided by the number of years between the Lidar dataset and the year of the historical aerial image of interest to get a rate of movement through time. This was done for several dozen points on each historical aerial image. The analyses from the EWG were used to characterize the relative impact of climate change on the erosion rates. This relative impact was quantified by comparing the LEM based estimates of erosion that were derived using historical climate data with LEM based estimates of erosion that were derived using projections of future climate. The relative increase in the erosion rates was then applied to the historical estimates of erosion derived from the analysis of the historical aerial imagery. This approach was used since the LEM-based estimated of the historical erosion rates from the past century have a bias towards underestimating erosion. This underestimation is hypothesized to be a consequence of an inability of the LEMs to account for the impacts of land-use change (i.e. deforestation) which had been shown to significantly increase erosion in similar Northern hardwood forest ecosystems. In summary, gully head retreat rate and gully widening rate were characterized using statistical probability distributions from the historical aerial image analysis. Simulated data from the EWG was used to estimate the climatically-driven changes in erosion rates through time. The changes through time from the EWG were applied to the gully head retreat rate and gully widening rate characterized using the historical aerial image analysis. This information can be used to inform PPA models to project future risks from a given site. (authors)

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Assessment of Near-Term Fuel Screening and Qualification Needs for Nuclear Thermal Propulsion Systems

Nuclear thermal propulsion (NTP) is an in-space propulsion technology capable of both high specific impulse (850–1000 s) and thrust (44–1112 kN), which can help reduce trip times for crewed missions beyond low Earth orbit. NTP technology has been demonstrated during historic programs. Over 20 ground test reactor experiments were performed, which demonstrated the prototypic reactor operations, during the Nuclear Engine for Rocket Vehicle Application (NERVA)/Rover program (1955–1972). Although historical programs have shown that NTP is a viable in-space propulsion technology, developing NTP in modern programs is contingent on the development and qualification of ultrahigh-temperature nuclear fuel technologies that can withstand engine operating conditions. In historical NTP development programs such as NERVA/Rover, prototypic reactor/engine schemes were ground tested to assess the overall system feasibility and to qualify the reactor fuel forms for eventual flight systems. Although this approach is effective to verify fuel performance under prototypic conditions, relying solely on full-scale NTP reactor tests as the pathway for verifying or qualifying fuel is inefficient and cost prohibitive today. Additionally, modern nuclear licensing requirements state that before test reactor approval, reactor components and fuel elements should be qualified via non-nuclear (out-of-pile) and nuclear (in-pile) testing under representative operating conditions. Using this methodology, fuel matures as production scale fabrication methods are established, and as produced fuel performance is demonstrated. Here, this paper provides an overview of historical approaches to NTP fuel performance maturation, including fuel screening and qualification needs, and provides insight for establishing an efficient testing paradigm that can be implemented to rapidly and affordably develop NTP fuel forms for eventual qualification.

42 ENGINEERING↗

The TRANSCEND University Consortium: An Overview - 20106

The UK government is committed to nuclear energy having an important role in delivering a secure, low-carbon and affordable energy future. Projections indicate that between now and 2035, ∼14 GW of new nuclear generating capacity may be built. Successful delivery of this strategy recognises the need for research and development, skills development and international collaboration as key enablers. One key area is the decommissioning and clean-up of all civil nuclear licensed sites and the implementation of geological disposal of highly active wastes, with a central component being a joined-up approach to nuclear R and D across government, industry and academia which benefits the UK economy and ensures the security of supply. Essential to public acceptance of this strategy remains a demonstrable ability to safely manage and dispose of waste, with acceptance directly linked to having scientifically robust routes for its safe clean-up and disposal. There therefore remains an ongoing need for further research in the areas of decommissioning, immobilisation and management of nuclear waste, and there is significant government and stakeholder support for such research. Given the needs of both new nuclear power generation and legacy wastes, there is a requirement to develop innovative approaches to waste management and decommissioning. Following on from earlier, highly successful projects supported by UK Research and Innovation's Energy Programme, the work of the TRANSCEND (Transformative Science and Engineering for Nuclear Decommissioning) consortium is part of the response to these needs, providing support to a strong and internationally leading group of researchers in this key technology area. The consortium is a collaboration between 11 universities, supported by 8 key industry partners, with a total funding of UK Pounds 9.5 M from the UK Engineering and Physical Research Council, the universities and key project partners. The research being carried out is multidisciplinary and covers both fundamental and applied topics, with 40 research projects clustered in four technical themes: integrated waste management; site decommissioning and remediation; spent fuels; and nuclear materials. Key aims of the consortium are to extend and further develop a relevant academic skill base in the UK associated with the needs of nuclear waste management and decommissioning, to train the next generation of UK researchers, equipping them with skills and experiences relevant to nuclear waste management and decommissioning issues, and to carry out cutting-edge research that has the potential to provide new and innovative pathways to better management of both legacy and future nuclear wastes. (authors)

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Emergency Planning Considerations for Advanced Nuclear Power Reactors

The purpose of this scoping study is to develop an approach for establishing emergency planning requirements for advanced nuclear power reactors and other new reactor technologies. The approach considers existing emergency planning requirements and guidance. More specifically the study focuses on establishing criteria and process to determine the size of the plume and ingestion exposure pathway emergency planning zone. The review of emergency planning in place for existing licensed nuclear facilities provides insight and informs the suggested process for establishing this Emergency Planning Zone (EPZ) process.

22 GENERAL STUDIES OF NUCLEAR REACTORS↗

Evaluation of AI-Enabled Digital Documented Safety Analysis: A Case Study

Safety basis documentation development and review under U.S. Department of Energy (DOE) authorization have emerged as critical constraint throttling deployment of advanced nuclear reactors, with traditional processes demanding extraordinary resource investment that delays the delivery of these technologies. Traditional Documented Safety Analysis (DSA) processes rely on static documents with limited traceability [U.S. DOE]. The regulatory review and engagement processes are similarly constrained, often requiring significant effort and extensive manual verification. The scale of this challenge is exemplified by the U.S. Nuclear Regulatory Commission (NRC) review of the NuScale application, which required over 250,000 staff hours and the evaluation of approximately two million pages of documentation [Bergman 2021]. The volume and complexity of information within nuclear licensing applications or authorization reviews demands innovative approaches to document generation and data management.

22 - GENERAL STUDIES OF NUCLEAR REACTORS↗

The new ITER baseline, research plan and open R&D issues

A new baseline (NB) has been proposed by the ITER Project to ensure a robust achievement of the Projects’ goals, in view of past challenges including delays incurred due to the Covid-19 pandemic, technical challenges in completing first-of-a-kind components and in nuclear licensing. The NB includes modifications to the configuration of the ITER device and its ancillaries (e.g. change from beryllium to tungsten as first wall material, modification of the heating and current drive mix, etc.) as well as additional testing of components (e.g. toroidal field coils) or phased installation (start with inertially cooled first wall before later installation of the final actively water-cooled components) to minimise operational risks. In the NB, the ITER research plan (IRP) will be divided into three main phases: (a) start of research operation, with 40 MW of ECH and 10 MW of ICH, which will focus on the demonstration of 15 MA operation in L-mode, commissioning of all required systems, including disruption mitigation, and the demonstration of H-mode plasma operation in deuterium; (b) DT-1, with 60–67 MW of ECH, 33 MW of neutral beam injection (NBI) and 10–20 MW of ICH, which will demonstrate robust operation in high confinement H-mode plasmas in DT up to Q ⩾ 10 and for burn durations of 300–500 s within an accumulated neutron fluence of ∼1% of the ITER machine’s lifetime total, and; (c) DT-2, with up to 67 MW of ECH, up to 49.5 MW of NBI and up to 20 MW of ICH, with the ITER tokamak and ancillaries in their final configuration to demonstrate routine operation in DT plasmas at high Q and the Q ⩾ 5 long-pulse and steady-state scenarios to the final neutron fluence and to perform R&D on nuclear fusion reactor issues. The logic, physics basis, modelling and experimental evaluations carried out to support the NB and the associated IRP are described. These include the impact of the tungsten wall on plasma scenarios and associated risk mitigation measures, as well as the optimisation of the tokamak components and ancillaries to minimise Project risks. Open R&D issues related to these evaluations and mitigation measures are also described together with experimental, modelling and validation activities required to address them.

ITER↗

Recommendations to Improve the Nuclear Regulatory Commission Reactor Licensing and Approval Process

Due to the urgency around climate change and associated goals for clean energy transition, and Battelle Energy Alliance's (BEA) and Idaho National Laboratory's (INL) role as the nation's nuclear energy laboratory, numerous stakeholders have asked for BEA’s thoughts and recommendations to reduce the time and costs associated with licensing new reactors at the U.S. Nuclear Regulatory Commission (NRC). As an M&O contractor for an FFRDC, BEA is a long-term partner with the Government in seeking to achieve clean energy goals, yet has a level of independence needed to appropriately evaluate this topic. The views herein are informed by extensive BEA experience supporting nuclear energy endeavors including ongoing discussions with current and former regulators, applicants, and licensees. With this background in mind, the United States benefits from having an agency such as the NRC, which is viewed internationally as the leader in nuclear safety licensing and regulation. Nonetheless, while acknowledging the important nuclear safety role satisfied by the NRC, it is apparent that one of the most significant time and resource intensive activities for new reactor developers is the NRC licensing process. The time and cost to obtain NRC licenses add significant financial stress for new reactor projects and may result in abandonment of projects or failure to even begin new projects. The challenge is particularly acute for advanced reactors which may raise unique or new regulatory questions and may be smaller in size, resulting in a much higher proportional impact from regulatory and cost challenges. This situation presents a particularly troublesome risk for the nation given the urgency in which utilities are working to transition to clean, non-carbon-emitting energy sources like nuclear energy. Reforms to the NRC licensing process have the potential to greatly increase certainty and support the successful progress of new reactors. The NRC can retain its world-class nuclear safety reputation while becoming a world leader for regulatory efficiency and a critical enabler to the clean energy transition. This report describes potential NRC reforms, focusing on those with a statutory connection. Recognizing the potential tradeoffs with any proposed changes, the report attempts to highlight those considerations in the analysis of the reforms. The recommendations are presented as a set of options for consideration. Unless noted, they are independent options, offering stakeholders the option to select a subset for further consideration. Although difficult to calculate precise time improvements for some of the changes, the reforms have the potential for substantial improvements, perhaps even by a factor of two.

29 ENERGY PLANNING, POLICY, AND ECONOMY↗

Digital Safety Analysis for Small Modular Nuclear Reactors (SMRs)

The licensing process for any nuclear installation generally requires the review and approval of numerous documents by a regulatory body. Alternate approaches are needed where similar nuclear installations are planned to be built and operated at multiple sites around the world. Such is the case for the deployment of small modular nuclear reactors (SMRs) under development by multiple enterprises in multiple countries. As a use case for this paper, the authors propose an alternative to the Documented Safety Analysis (DSA) required by the United States Department of Energy (DOE) for the licensing of its nuclear installations. The DSA is a DOE construct that requires the review and approval of numerous documents. It includes an in-depth description of hazards, safe boundaries, and hazard controls.

Microreactors↗

Summary of Methodology for Mitigating Risks Associated with Licensing and Qualifying AM Nuclear Materials

The US Department of Energy’s Advanced Materials and Manufacturing Technologies (AMMT) program focuses on accelerating the development, qualification, demonstration, and deployment of advanced materials and manufacturing technologies to enable reliable and economical nuclear energy. Laser powder bed fusion (LPBF) is one of the most popular additive manufacturing (AM) processes for fabricating components with intrinsically complex geometries. LPBF was extensively explored for nuclear applications under the previous Transformational Challenge Reactor program. Additionally, Oak Ridge National Laboratory developed and licensed the Peregrine software and larger digital platform that couples machine learning and in situ data collection during AM to detect anomalies and any evolved defects. The digital platform will be critical to (1) the qualification of AM components for nuclear applications that link location-specific data to macroscopic properties and (2) predict final component performance. Current in situ process monitoring tools are valuable for observing the formation of stochastic flaws, but additional data are needed to predict the resulting microstructures and associated material performance. Rapid cooling rates and large thermal gradients have caused large heterogeneities in the microstructure, which cause anisotropy in mechanical performance. The AMMT program is evaluating the best approaches for addressing these heterogeneities and their effect on component performance using a combination of multiscale modeling, enhanced in situ process monitoring, and high throughput experimental testing. This report summarizes strategies for mitigating the risks associated with qualifying AM components, including developing new sensing capabilities for in situ process monitoring and characterizing melt pool solidification and residual stresses to inform multiscale modeling efforts.

22 GENERAL STUDIES OF NUCLEAR REACTORS↗