The Molten Chloride Reactor Experiment (MCRE) will be the first reactor featuring a fast-spectrum molten chloride circulating nuclear fuel system in the world. Planning for equipment removal and disposal (ERD) of MCRE has identified several technology gaps due to the unique environment of this nuclear experiment. Some of the gaps arise from the application of existing disassembly and/or sizing methods to novel material forms or in novel configurations. Others arise from unknown material behavior. This paper summarizes proposed test plans for ERD validation experiments to address these complicated or unknown equipment removal procedures. At the Waste Management Symposia in 2024, the Idaho National Laboratory (INL) MCRE ERD team presented the challenges associated with hosting multiple nuclear experiments in series with only brief transition periods between systems. Such difficulties include higher dose rates, the presence of radioisotopes infrequently encountered in reactor decommissioning and radioactive waste management, lack of intrinsic remote-operations infrastructure in the test bed, space constraints in the test bed, and contamination minimization requirements. To address these challenges, remote or semi-remote technologies are planned to be implemented in a non-hot cell environment with limited space availability. The team also discussed how a systems engineering approach is being used for conceptual development and design of equipment removal systems to address these challenges. For example, to reduce constraints for the removal of more difficult components, non-activated, noncontaminated elements are planned to be taken out first where possible. Still, there are complexities associated with the remaining components. In this work, the operational framework for MCRE ERD was reviewed for technical gaps and open questions, and test plans were drafted to address these areas. The tests plans were written for the following categories: vision systems, pipe cutting, drill/grout/filler, flush salt, and miscellaneous, with the miscellaneous group consisting of tests like techniques for removing bearings and reflector bricks. The test plans explore material, infrastructure, and staffing requirements needed for test execution. The test plans additionally focus on the evaluation of success. Determining the outcome of a test is imperative - as these explorative actions have the potential to rearrange or re-scope planned ERD activities. Success criteria identified thus far include required tool output, required area(s), debris production and mitigation, and repeatability. Test plans are an essential aspect of the systems engineering approach to MCRE ERD. They are used as the beginning steps in defining use cases for the ERD system. Performance of the validation tests is expected to begin in the summer of 2025 and will take approximately 9 to 12 months to complete. Execution of these plans will be expedited by specifying test needs ahead of time, facilitating efficient interactions with any subcontractors tasked with running the requested tests. Evaluating the outcomes of these tests will inform MCRE ERD procedures and timing and will also identify additional technical constraints for the MCRE ERD System. This upfront process optimization effort will help the project save time and resources at the end of the experiment.
21 - SPECIFIC NUCLEAR REACTORS AND ASSOCIATED PLAN↗