Engineering Papers⌕ Search

SEARCH · Engineering Papers

Results for “New England”

Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.

Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.

At least 19 records

Challenges to retail demand response program participation in ISO New England wholesale markets: Technical assistance provided to the New England Conference of Public Utilities Commissioners

Berkeley Lab provided technical assistance to the New England Conference of Public Utilities Commissioners on challenges that participants in retail demand response programs face to accessing ISO-NE wholesale markets. This report summarizes findings from the technical assistance and includes actions that New England regulators can take to address the challenges to wholesale market access.

29 ENERGY PLANNING, POLICY, AND ECONOMY↗

Envisioning an Ecologically Sustainable Campus At New England College

Appropriation funding for our project Ecologically Sustainable Campus - New England College (NH). 67.09. supported five environmental initiatives: (1) a wood pellet boiler for our Science Building, (2) solar hot water panels and systems for five campus buildings, (3) campus-wide energy lighting efficiency project, (4) new efficiency boiler system in Colby Residence Hall, and (5) energy efficient lighting system for the new artificial athletic turf field. (1) New England College purchased and installed a new wood pellet boiler in the Science Building. This new boiler serves as the primary heating source for this building. Our boiler was purchased through New England Wood Pellet, LLC, located in Jaffrey, New Hampshire. The boiler selected was a Swebo, P500. 300KW wood pellet boiler. The primary goals, objectives, and outcomes of this initiative include the installation of a wood pellet boiler system that is environmentally friendly, highly efficient, and represents a sustainable and renewable resource for New England College. This project was completed on December 15, 2010. (2) New England College purchased and installed solar hot water panels and systems for the Science Building, the Simon Center (student center), the H. Raymond Danforth Library, Gilmore Dining Hall, and Bridges Gymnasium. The College worked with Granite State Plumbing & Heating, LLC, located in Weare, New Hampshire on this project. The solar panels are manufactured by Heat Transfer; the product is Heat Transfer 30-tube collector panels (Evacuated Tube Type) with stainless steel hardware. The interior equipment includes Super Stor Ultra stainless steel super insulated storage tank, Taco 009 Bronze circulator pump, Solar Relay Control Pack, and a Taco Thermal Expansion Tank. The primary goals, objectives, and outcomes of this initiative will allow the College to utilize the sun as an energy resource. These solar hot water panels and systems will alleviate our dependency on fossil fuel as our primary fuel resource and provide a reliable energy source that supplies the hot water needs for sanitation, dishwashing at our dining facilities, and shower facilities for our athletes. This project initiative was completed on June 30, 2010. (3) New England College has completed energy efficiency lighting projects throughout campus, which included upgrades and new systems throughout our buildings. This project also installed efficiency controls for the Lee Clement Arena and refrigeration equipment in the Gilmore Dining Hall. The College worked with Atlantic Energy Solutions, located in Foxboro, Massachusetts on our 50/50 energy efficiency lighting project and campus-wide audit. The actual implementation of the project was completed by D. Poole Electrical Services, located in Center Barnstead, New Hampshire. The primary goals, objectives, and outcomes of this initiative were to install energy efficient lighting systems throughout our campus buildings, which ultimately will provide New England College with a more efficient way to manage and control its energy use. This project initiative was completed on February 15, 2010. (4) New England College purchased and installed a high efficiency and clean burning system for the Colby Residence Hall, which is the primary housing for our freshman. We purchased and installed two Buderus Boilers, model number G515/10 with two Riello Burners, model number RL 38/2. The College worked with Granite State Plumbing & Heating, LLS, located in Weare, New Hampshire on the installation of this high efficiency and clean burning system for the Colby Residence Hall. The primary goals, objectives, and outcomes for this initiative included the installation of a designed system of two boilers to provide redundancy for backup measures. This new system will provide New England College the flexibility to utilize just one smaller boiler to provide heat and hot water during non-peak periods thus continued reduction in energy use and our carbon footprint. This project initiative was completed on September 18, 2009. (5) New England College purchased and installed energy efficient lighting for our new artificial athletic turf field. The College selected Light-Structure Green lighting systems and worked with Musco Lighting, located in Oskaloosa. Iowa. The primary goals, objectives, and outcomes of this initiative were to install innovative lighting systems that significantly reduce energy costs and provide a high level of efficiency, resulting in overall utility savings to the College. This lighting technology combines the energy efficient equipment along with a focused lighting objective (field playing surface) to reduce the number of lighting heads needed to illuminate the playing surface to NCAA standards while reducing energy consumption by 50%. This project was completed on October 15, 2009.

09 BIOMASS FUELS↗

NASA New England Outreach Center

The NASA New England Outreach Center in Nashua, New Hampshire was established to serve as a catalyst for heightening regional business awareness of NASA procurement, technology and commercialization opportunities. Emphasis is placed on small business participation, with the highest priority given to small disadvantaged businesses, women-owned businesses, HUBZone businesses, service disabled veteran owned businesses, and historically black colleges and universities and minority institutions. The Center assists firms and organizations to understand NASA requirements and to develop strategies to capture NASA related procurement and technology opportunities. The establishment of the NASA Outreach Center serves to stimulate business in a historically underserved area. NASA direct business awards have traditionally been highly present in the West, Midwest, South, and Southeast areas of the United States. The Center guides and assists businesses and organizations in the northeast to target opportunities within NASA and its prime contractors and capture business and technology opportunities. The Center employs an array of technology access, one-on-one meetings, seminars, site visits, and targeted conferences to acquaint Northeast firms and organizations with representatives from NASA and its prime contractors to learn about and discuss opportunities to do business and access the inventory of NASA technology. This stimulus of interaction also provides firms and organizations the opportunity to propose the use of their developed technology and ideas for current and future requirements at NASA. The Center provides a complement to the NASA Northeast Regional Technology Transfer Center in developing prospects for commercialization of NASA technology. In addition, the Center responds to local requests for assistance and NASA material and documents, and is available to address immediate concerns and needs in assessing opportunities, timely support to interact with NASA Centers on a local level, and develop easy access to information. The Center acts in the manner of a "NASA Center or Field Office" with direction from NASA Headquarters, Code K.

Source record↗

Massachusetts and New England SAF Study [Slides]

The Massachusetts Port Authority established a project to assess feedstock availability to produce SAF near 10 New England airports. A techno-economic analysis was conducted to determine renewable fuels and SAF that could be produced from these feedstocks. The resource assessment found municipal solid waste, woody biomass, and food waste were most abundant. The techno-economic analysis found that potential fuel production varied widely based on location, feedstock, and technology production pathway. An assessment of infrastructure readiness to handle SAF was conducted. It was determined that SAF produced outside of New England should be blended in other regions with more capacity and flexibility and delivered to New England as Jet A is today. For SAF produced in New England, there are terminals that have existing infrastructure to receive, blend, and distribute SAF/Jet A blends.

33 ADVANCED PROPULSION SYSTEMS↗

Massachusetts and New England Sustainable Aviation Fuel Study

The Massachusetts Port Authority established a project to assess feedstock availability to produce SAF near 10 New England airports. A techno-economic analysis was conducted to determine renewable fuels and SAF that could be produced from these feedstocks. The resource assessment found municipal solid waste, woody biomass, and food waste were most abundant. The techno-economic analysis found that potential fuel production varied widely based on location, feedstock, and technology production pathway ranging from 1 to 369 million gallons of gasoline equivalent per year. An assessment of infrastructure readiness to handle SAF was conducted. It was determined that SAF produced outside of New England should be blended in other regions with more capacity and flexibility and delivered to New England as Jet A is today. For SAF produced in New England, there are terminals that have existing infrastructure to receive, blend, and distribute SAF/Jet A blends.

29 ENERGY PLANNING, POLICY, AND ECONOMY↗

New England Wind Forum: A Wind Powering America Project, Volume 1, Issue 4 -- May 2008 (Newsletter)

The New England Wind Forum electronic newsletter summarizes the latest news in wind energy development activity, markets, education, and policy in the New England region. It also features an interview with a key figure influencing New England's wind energy development. Volume 1, Issue 4 features an interview with Brian Fairbank, president and CEO of Jiminy Peak Mountain Resort.

17 WIND ENERGY↗

New England Wind Forum: A Wind Powering America Project, Newsletter #5 -- January 2010, Wind and Hydropower Technologies Program (WHTP)

Wind Powering America program launched the New England Wind Forum (NEWF) in 2005 to provide a single comprehensive source of up-to-date, Web-based information on a broad array of wind energy issues pertaining to New England. The NEWF newsletter provides New England stakeholders with updates on wind energy development in the region. In addition to regional updates, Issue #5 offers an interview with Angus King, former governor of Maine and co-founder of Independence Wind.

17 WIND ENERGY↗

New England Wind Energy Education Project (NEWEEP) (Final Technical Report)

Project objective is to develop and disseminate accurate, objective information on critical wind energy issues impacting market acceptance of hundreds of land-based projects and vast off-shore wind developments proposed in the 6-state New England region, thereby accelerating the pace of wind installation from today's 140 MW towards the region's 20% by 2030 goals of 12,500 MW. Methodology: This objective will be accomplished by accumulating, developing, assembling timely, accurate, objective and detailed information representing the 'state of the knowledge' on critical wind energy issues impacting market acceptance, and widely disseminating such information. The target audience includes state agencies and local governments; utilities and grid operators; wind developers; agricultural and environmental groups and other NGOs; research organizations; host communities and the general public, particularly those in communities with planned or operating wind projects. Information will be disseminated through: (a) a series of topic-specific web conference briefings; (b) a one-day NEWEEP conference, back-to-back with a Utility Wind Interest Group one-day regional conference organized for this project; (c) posting briefing and conference materials on the New England Wind Forum (NEWF) web site and featuring the content on NEWF electronic newsletters distributed to an opt-in list of currently over 5000 individuals; (d) through interaction with and participation in Wind Powering America (WPA) state Wind Working Group meetings and WPA's annual All-States Summit, and (e) through the networks of project collaborators. Sustainable Energy Advantage, LLC (lead) and the National Renewable Energy Laboratory will staff the project, directed by an independent Steering Committee composed of a collaborative regional and national network of organizations. Major Participants - the Steering Committee: In addition to the applicants, the initial collaborators committing to form a Steering Committee consists of the Massachusetts Renewable Energy Trust; Maine Public Utilities Commission; New Hampshire office of Energy & Planning, the Connecticut Clean Energy Fund;, ISO New England; Utility Wind Interest Group; University of Massachusetts Wind Energy Center; Renewable Energy New England (a new partnership between the renewable energy industry and environmental public interest groups), and Lawrence Berkeley National Laboratory (conditionally). The Steering Committee will: (1) identify and prioritize topics of greatest interest or concern where detailed, objective and accurate information will advance the dialogue in the region; (2) identify critical outreach venues, influencers and experts; (3) direct and coordinate project staff; (4) assist project staff in planning briefings and conferences described below; (5) identify topics needing additional research or technical assistance and (6) identify and recruit additional steering committee members. Impacts/Benefits/Outcomes: By cutting through the clutter of competing and conflicting information on critical issues, this project is intended to encourage the market's acceptance of appropriately-sited wind energy generation.

14 SOLAR ENERGY↗

How many offshore wind turbines does New England need?

The proliferation of countries and regions with 100% clean or renewable energy targets necessitates an analysis to determine the number of generating units and storage needed to meet real-time electricity demand on the electric grid. The coastal areas of New England have the capacity to produce a large percentage of the region's energy needs with offshore wind turbines. Here we model offshore wind turbine power production data using MERRA-2 reanalysis and lidar wind speed data sets. We compare this power production to the New England hourly grid demand over the course of one year. 2,000 10 MW offshore wind turbines could satisfy New England's grid demand for about 37% of the year. When combined with 55 GWh of storage, 2,000 turbines could satisfy grid demand for about 72% of the year.

17 WIND ENERGY↗

Structural and Functional Analysis of Surface Proteins from an A(H3N8) Influenza Virus Isolated from New England Harbor Seals

In late 2011, an A(H3N8) influenza virus infection resulted in the deaths of 162 New England harbor seals. Virus sequence analysis and virus receptor binding studies highlighted potential markers responsible for mammalian adaptation and a mixed receptor binding preference. Here, we present a detailed structural and biochemical analysis of the surface antigens of the virus. Results obtained with recombinant proteins for both the hemagglutinin and neuraminidase indicate a true avian receptor binding preference. Although the detection of this virus in new species highlights an increased potential for cross-species transmission, our results indicate that the A(H3N8) virus currently poses a low risk to humans. Cross-species transmission of zoonotic influenza viruses increases public health concerns. Here, we report a molecular and structural study of the major surface proteins from an A(H3N8) influenza virus isolated from New England harbor seals. Furthermore, the results improve our understanding of these viruses as they evolve and provide important information to aid ongoing risk assessment analyses as these zoonotic influenza viruses continue to circulate and adapt to new hosts.

59 BASIC BIOLOGICAL SCIENCES↗

New England Aqua Ventus I: 100% Hull Design (Final Technical Report)

This report serves as the final technical report for the US Department of Energy (DOE) award DE-EE0006713 (Award 6713). The project is titled “New England Aqua Ventus I Offshore Wind Advanced Technology Demonstration Project 100% Front-End Engineering and Design (FEED)”. The New England Aqua Ventus I (NEAV) project demonstrates a unique prestressed concrete semi-submersible floating hull technology, called VolturnUS. The technology is applicable to harness nearly 60% of the US offshore wind resource within 50 miles of the coast. The hull will be demonstrated at full-scale with a commercial scale wind turbine connected to the grid in the Northeast US off Monhegan Island, Maine for 20 years.

17 WIND ENERGY↗

ISO New England Dual Fuel Capabilities to Limit Natural Gas and Electricity Interdependencies

Since 2000, natural gas has seen tremendous growth as a fuel source for electricity generation in the United States (U.S.) with annual installations exceeding 20 GW in all but four years. It also accounts for an increasingly significant share of the nation’s electricity generation, growing from around 15 percent in the early part of the 2000s to between 26 and 29 percent in the last three years. (1) Increasing reliance on natural gas has led to concerns that an extreme weather event – which may cause curtailments in gas delivery – or a natural gas infrastructure failure could lead to local or regional electric reliability issues. (2) These concerns stem from differences in delivery methods of natural gas to electric generating units (EGUs) contrasted with the fuel delivery and storage methods for traditional baseload power systems (i.e. coal and nuclear units).1 (3) Although it seems that there is an abundance of natural gas in a post-shale gas world, infrastructure limitations and differences in electric and natural gas markets persist that differentiate natural gas-fired generators from traditional baseload power generators. Such concerns can be partially mitigated by modifying natural gas EGUs for operation on secondary fuels and installing on-site fuel storage for the secondary fuel, thus ensuring continuity of operation in the case of a gas delivery problem.2 This report examines technical, regulatory, and market issues associated with operating power plants primarily fueled with natural gas, on a secondary fuel, such as fuel oil or liquefied natural gas (LNG). In addition, a regional case study was completed to identify the current and near-term potential for dual fuel operation in New England, along with a market impact analysis of potential cost savings during an extreme weather event. The New England Independent System Operator (ISO-NE) was selected as the study area based on a preponderance of natural gas-fired generators contributing to the regional generating capacity mix (nearly 50 percent natural gas), limited natural gas supply infrastructure, and the potential for natural gas delivery disruptions due to cold weather events, exacerbated by the lack of bulk natural gas storage in the region.

03 NATURAL GAS↗