Engineering Papers⌕ Search

SEARCH · Engineering Papers

Results for “National Electric Code”

Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.

Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.

At least 19 records

National Electric Code Scope

Presentation on the issue of the limits of the scope of the National Electric Code and the likelihood that it will be resolved in the next cycle of its revision. Includes a timeline for public input.

17 WIND ENERGY↗

National Electric Code Status

This presentation provides a synopsis of changes impacting the small wind industry in the 2017 National Electric Code.

17 WIND ENERGY↗

Safety Related Concerns with Installation and Use of Switch-Rated Plug/Receptacle Combinations in Lieu of Metal-Enclosed Disconnect Switches

The manufacturers of Nationally Recognized Testing Laboratory (NRTL) listed, switch-rated, plug and receptacle combinations tout their convenience, reliability, efficiency, and compliance with both the National Fire Protection Association (NFPA) 70®, National Electric Code (NEC), and National Fire Protection Association 70E®, The Standard for Electrical Safety in the Workplace, as advantages to using these products in lieu of traditional metal-enclosed disconnect switches. The purpose of this paper is to raise awareness of several unintended consequences that can result when replacement involves high energy cord and plug connected equipment. This paper describes several possible issues in complying with the NFPA 70 Articles 110 and 400 and NFPA 70E Articles 110 and 130 that should be considered when using load rated plug/receptacle combinations. This paper is intended to address high energy circuits typically associated with 480 volt pin and sleeve type connections in applications where incident energy levels may exceed 1.2 calories/centimeter² (cal/cm²).

99 GENERAL AND MISCELLANEOUS↗

Characterizing peak electricity demand for U.S. households: an assessment of end-use loads and demand factors

Understanding household peak electricity demand is critical to evaluate the technical need for electrical infrastructure upgrades. This study characterizes peak loads for existing and new equipment using metered data from a convenience sample of 11,940 U.S. dwellings from four sources, including 911 from two sources with end-use metering. After standardized data cleaning and labeling, we derived descriptive statistics for key metrics, such as maximum demand and demand factors, and developed predictive models relating 60- to 15-min demand for the National Electrical Code (NEC). Mean 15-min maximum demand was 9.7 kW (median 9.0 kW; IQR 7.0–11.5 kW, 95% CI 9.6–9.8 kW), indicating spare capacity in 98% of homes with hypothetical 100 A panels. Maximum demand increased with floor area and number of high-demand loads. Dwelling maximum demand was driven by higher-power, longer-duration heating appliances and vehicle charging, while most user-operated appliances contributed little. Demand factors are used to account for how most devices contribute less than their rated power to maximum demand. Existing load mean demand factors (28%; median 10%; IQR 0–58%; CI 28–29%) were higher than those for new loads (21%; median 7%; IQR 0–35%; CI 20–21%), because new loads changed the timing and magnitude of maximum demand. New high-demand loads had higher than average demand factors (40–60%). Whole dwelling demand factors support the NEC's 40% assumption, but they challenge its conservative 100% treatment of new HVAC. We propose a data-driven 50% demand factor for new equipment, which would align with metered data, improve affordability, and modernize electrical codes.

Appliances↗

Competitiveness Improvement Project Informational Workshop

This presentation was given at the Competitiveness Improvement Project (CIP) Informational Workshop on December 6, 2017. Topics covered during the workshop include an overview of the CIP, past projects, scoring criteria, technical support opportunities, certification body requirements, standards applicable to distributed wind generators, information on the National Electric Code, certification testing requirements, test site requirements, National Environmental Policy Act, design review, levelized cost of energy, procurement/contracting, project management/deliverables, and outreach materials.

17 WIND ENERGY↗

Integration of Solar Training into Allied Professional Development Platforms - Final Technical Report

The Interstate Renewable Energy Council (IREC) designed the “Integration of Solar Training into Allied Professional Development Platforms” project to surmount barriers to the expansion of solar technology caused by gaps in knowledge impacting on-the-job performance of allied professionals. At project start, questionnaires deployed nationally indicated that only 9% of firefighters felt certain they could shut down a PV system to the extent possible, and only a third of code officials thought they could even discern the difference between a PV and solar thermal system. Therefore, the project objective was to measurably and significantly increase the number of code officials and fire service professionals with solar knowledge directly applicable to their job function. IREC identified specific gaps in current knowledge, and integrated research-proven adult learning principles and technology solutions to enable a cost-effect but impactful reach. The project design ensured that solar training is a continuing component of the targeted sector professional development toolkit. To this end, the key partners recruited and cultivated were existing, trusted training partners in the targeted sectors: International Code Council Solar Rating and Certification Corporation (ICC-SRCC), International Association of Electrical Inspectors (IAEI), International Association of Fire Fighters (IAFF) and National Association of State Fire Marshals (NASFM). During the project, IREC held 79 courses in 25 states that trained 4,156 people, offered a PV in the 2017 National Electric Code webinar attended by 787 people, developed on-line training for code officials with 2,298 on-line learners, and developed an on-line training for firefighters with 4,930 on-line learners. In addition, the project participated in 28 conferences and reached over 537,000 professionals with solar information.

14 SOLAR ENERGY↗

Characterizing electrical panel capacity, breaker space, and loads in U.S. single-family homes

Electrical panels distribute electricity to appliances, equipment, and other building loads and maintain safety by preventing overloads of branch circuits, feeders, and utility service wires connecting homes to the grid. Load calculations in the National Electrical Code (NEC) determine the capacity of installed electrical panels in the United States, which are rated in amps (A). Circuit breakers within electrical panels affect the magnitude and number of loads that panels can serve. In home retrofits and renovations, existing electrical panels may not accommodate new electrical loads, either due to insufficient electrical capacity or a lack of available breaker spaces. Homes with these panel constraints may need to replace existing panels with new panels that have greater capacity and breaker space.

24 POWER TRANSMISSION AND DISTRIBUTION↗

Solar/Photovoltaic DC Systems: Information for Electrical Workers and Firefighters

Solar photovoltaic (PV) systems are common and continue to gain popularity. This article helps electrical workers and firefighters understand basic operating principles and hazards of PV dc arrays. The effects of solar radiation and temperature on power output are discussed including; PV-module testing standards; methods for calculating the number of modules in a PV string; some National Electrical Code (NEC) guidelines that are aimed toward improving array safety; dc-array commissioning, periodic maintenance, and testing; arc-flash-hazard potential ways firefighters can work safely around PV arrays; potential risks posed by moonlight and other light sources; some unique dc-system hazards. We also present statistics on PV dc-array electrical incidents and injuries.

14 SOLAR ENERGY↗

Barriers to Balcony Solar and Plug-In Distributed Energy Resources in the United States

Plug-in distributed energy resources (DERs), such as balcony solar, backfeed power to the home through a standard plug. These systems may represent the future of residential solar and storage, particularly as recent net metering policies have reduced the economic appeal of rooftop solar. While plug-in DERs have seen widespread success in Europe, their U.S. market is stagnant. This paper reviews the technical, interconnection, and regulatory barriers hindering the adoption of plug-in DERs. We first discuss the technical barriers, which include touch safety, breaker masking, and bidirectional ground-fault circuit interrupters. We then examine utility perspectives on plug-in DERs and strategies for navigating interconnection challenges. Finally, we discuss regulatory hurdles related to UL standards and the National Electrical Code.

Gerber, Daniel L. (ORCID:0000000219720679)↗

EVI-LOCATE: One Stop Solution for Estimating Cost of Installing EV Charging Stations

EVI-LOCATE (Electric Vehicle Infrastructure-Locally Optimized Cost Assessment Tool and Estimator) is a site assessment tool to estimate costs to install EV charging stations. EVI-LOCATE enables users to generate site-specific, user-specific, and location-specific EV charging station installation designs and cost estimates. The tool integrates National Electrical Code, deep-learning pixel classification algorithm, and component-level costs to estimate the costs.

ADVANCED PROPULSION SYSTEMS,ENERGY PLANNING, POLIC↗

SolarAPP+ Pilot Analysis: Performance and Impact of Instant, Online Solar Permitting

The National Renewable Energy Laboratory (NREL) led a collaborative effort to develop the Solar Automated Permit Processing Plus (SolarAPP+), a no-cost solar permitting software solution to address residential solar photovoltaic (PV) permitting resource constraints and streamline solar adoption processes among authorities having jurisdiction (AHJs). The SolarAPP+ is an online portal that automates permit plan review, enabling an instant permit approval process for code-compliant residential PV systems. Based on national model building, electrical, and fire codes, the SolarAPP+ automatically performs a compliance check of permit inputs against code requirements and produces an inspection checklist that can be used to verify installation practices, workmanship, and adherence to the approved design. NREL conducted a two-phase pilot with five participating AHJs and 16 solar contractors, spanning from November 2020 through December 2021, evaluating the ability of SolarAPP+ to deliver instant permits and its impact on four critical areas within each AHJ: permit review timelines; solar adoption timelines; AHJ time saved; and inspection results. The pilot confirmed that SolarAPP+ reduced permit review times to less than one day, reduced solar adoption timelines by an average of 12 days, saved an estimated 2,067 staff hours, and had comparable inspection results to those found in traditional permitting. The pilot further identified key lessons for improving SolarAPP+, including ways to streamline SolarAPP+ adoption, development of training resources, and expansion of supported products.

29 ENERGY PLANNING, POLICY, AND ECONOMY↗

Review of Technical Requirements for Inverter-Based Resources in Chile

This document compares the technical requirements in the grid code of Chile (NTSyCS) against the EirGrid (Ireland transmission system operator) and National Grid Electricity System Operator (NESO) grid codes and the Institute of Electrical and Electronics Engineers (IEEE) 2800-2022 standard for conventional inverter technology at the transmission and subtransmission levels in the process of being adopted by system operators in the U.S. The document is intended to be a guide and reference for future updates of the NTSyCS, considering the local system requirements and present improvements in inverter-based resource (IBR) technology. In light of the findings of the aforementioned comparative review, this document proposes and describes the requirements for conventional IBRs that could be incorporated and updated into the Chilean grid code. The document is structured around the main grid challenges posed by the transition to an IBR-dominated grid and conventional IBRs capabilities to help address them. This document does not provide guidance on how this specification should be implemented (e.g., through a mandate or market solution).

24 POWER TRANSMISSION AND DISTRIBUTION↗

Electric Vehicle Supply Equipment and Considerations for a Reasonable Rate of Return

This white paper identifies the following recommendations for states as they consider issues related to electric vehicle supply equipment program income under the National Electric Vehicle Infrastructure program and other programs covered by National Electric Vehicle Infrastructure Standards and Requirements in the U.S. Code of Federal Regulations (23 CFR 680): 1. Conduct value analysis for better outcomes 2. Promote pricing transparency

33 ADVANCED PROPULSION SYSTEMS↗

Building Energy Codes and Grid-Interactive Efficient Buildings: How building energy codes can enable a more dynamic and energy-efficient built environment

This report considers the role of national model codes to promote grid-interactive efficient buildings (GEBs) as part of the modernization of the U.S. electricity grid. It introduces GEBs, describes their ability to support a clean, resilient grid, and considers challenges and approaches for incorporating GEB measures into national model energy codes and standards. Desirable traits of GEB include being low energy, low peaking, and responsive to grid needs, and minimizing the curtailment of renewable energy resources. In addition, the future grid incurs a time and locational value on these types of building services. Accounting for these considerations in future code development requires a continuation and expansion of code-minimum energy efficiency requirements and inclusion of demand responsive and load flexibility measures while ensuring annual use and cost reductions. Also, efforts to include GEB measures in codes will be limited until they are fully developed into an American National Standards Institute (ANSI)-approved standard. Then it would be straightforward to address GEB measures through points or packages and/or scoring requirements. Otherwise, the building code would have to describe each specific grid responsive strategy. This document reviews topics pertinent to considering codes in this context. Specifically, the study presents the status and direction of current building energy codes, the future smart grid, low-energy buildings, and grid-integrated buildings. The report concludes with recommendations for future code development activities to support low-energy, grid-interactive buildings in order to provide added value to building owners, the grid, and society.

24 POWER TRANSMISSION AND DISTRIBUTION↗

Demand Response in Residential Energy Code: Technical Brief

As buildings account for over 75% of U.S. electricity use, effectively managing their loads can greatly facilitate the transition towards a clean, reliable grid. Grid-interactive efficient buildings (GEBs) combine efficiency and demand flexibility with smart technologies and communication to provide occupant comfort and productivity while serving the grid as a distributed energy resource (DER). In turn, GEBs can play a key role in ensuring access to an affordable, reliable, sustainable, and modern U.S. electric power system. Their national adoption could provide $\$$100-200 billion in U.S. electric power system cost savings over the next two decades. The associated reduction in CO 2 emissions is estimated at 6% per year by 2030 (DOE 2021). Building codes represent standard design practice in the construction industry and continually evolve to include advanced technologies and innovative practices. Historically, national model energy codes establish minimum efficiency requirements for new construction (ICC 2020). Expanding codes to support GEB capabilities is a pivotal step towards realizing demand flexibility in support of a clean grid by addressing capabilities to improve interoperability between smart building systems, the grid, and renewable energy resources. Realizing GEBs requires buildings with automated demand response (DR) capabilities that enable standardized communication with or control of, subject to explicit consumer consent, energy smart appliances or home energy management systems. This is achieved through direct or indirect (i.e., via an aggregator) communication between appliances and the electric grid. Energy codes can also support DR communication standardization and advance the deployment of building-integrated DERs such as energy storage, generation, and electric vehicles (EVs). Incorporating automated DR capabilities in energy codes provides many benefits to the consumers. Specifically, it aligns building electric load demand with intermittent renewable energy source availability, decreases peak load on the electric grid, allows buildings to respond to utility price signals, supports electrical network reliability and market growth of products and processes aligned with clean economic growth. The incorporation of DR into the model residential energy codes was considered for both the 2021 and 2024 International Energy Conservation Code (IECC) code development cycles. The approved DR measures in the 2021 cycle were removed in response to appeals (ICC 2020). Updated language was presented for consideration again for the 2024 IECC, where it was negotiated and again approved, and again removed in response to appeals (ICC 2024). This resulted in many sections, including sections on demand responsive controls, being moved to the credits options or an appendix as a voluntary application. This technical brief updates the proposed DR components such that they can be considered by states and local governments for direct incorporation into their codes, as well as for future IECC energy code development. The proposal refinements are intended to support consistency in approach and provide a degree of certainty for building owners, designers, contractors, manufacturers, and building and fire safety professionals. The scope of this technical brief includes three strategies for DR in residential buildings: 1) smart thermostats with demand-responsive control, 2) electric water heating incorporating demand-responsive controls and communication and 3) grid Integrated solar and energy storage systems.

2021 IECC↗

EVSE DERMS Controls [SWR-26-010]

An MQTT (Message Queuing Telemetry Transport) and OCPP (Open Charge Point Protocol) based remote smart charging controller framework for AC Electric Vehicle Supply Equipments (EVSEs). The code in this repo allows for the National Laboratory of the Rockies (NLR) controls to interface with the real Distributed Energy Resource Management System (DERMS) and EVSEs in NLR's ESIF Optimization and Control Laboratory (OCL). Different charge management algorithms can be tested to determine which power allocation method is most effective with the overall goal of demonstrating clear and well documented test results as well as providing functional control algorithms which could be utilized to provide effective smart charge management (SCM) at EV charging stations. Different power allocation methods are programmed in lab_demo_controller.py and include allocation based on first come first served, equal sharing, state of charge (SOC), priority factors, and behind the meter control methods.

Panossian, Nadia [National Laboratory of the Rocki↗

Standardized Protocol for Real-Time APIs as Required by Title 23 CFR 680.116(c)

Improving the ability of drivers to easily locate working and available chargers is key to improving the public charging experience. Electric vehicle charging providers who are recipients of federal funds through the National Electric Vehicle Infrastructure (NEVI) Formula Program, Charging and Fueling Infrastructure (CFI) Discretionary Grant Program, and other funding programs as identified under Title 23 of the U.S. Code must deploy and maintain an application programming interface (API) to access information about charging stations they operate.1 This includes information about individual charging ports, pricing, and availability in accordance with the Federal Highway Administration’s National Electric Vehicle Infrastructure Standards and Requirements, 23 CFR 680.116(c), herein referred to as the minimum standards (Federal Highway Administration 2023). Specifically outlined in the minimum standards, states and other designated recipients are required to ensure that charging station information including location, connector type, power level, real-time status, and real-time price to charge are available free of charge to third-party software developers through an API. These requirements are intended to enable effective communication with consumers about available charging stations and help consumers make informed decisions about trip planning, including when and where to charge. This document provides a standardized protocol for how to structure data, data update frequency, and practices for making the data required to be shared via API usable for improving public transparency and the customer experience. These are recommendations only and do not modify the Federal Highway Administration’s minimum standards in any way.

33 ADVANCED PROPULSION SYSTEMS↗

Considerations for Developing a Regulatory Roadmap for Distributed Energy Resource (DER) Integration in Colombia

The USAID-NREL Partnership in Colombia, in conjunction with SURE and USEA, selected four action plan teams from the Young Professionals Leadership Program to receive tailored NREL technical assistance to support action plan implementation. The four plans selected represent various aspects associated with planning for the efficient integration of DERs, including electric mobility, residential and commercial energy applications, distributed generation modeling, and regulatory considerations. In response to national grid modernization, decentralization, digitalization, and electrification trends, CREG is looking to update Colombia's electric distribution code, with an emphasis on the integration of electric vehicles and charging stations, but also energy storage systems, non-conventional sources of renewable energy, and other distributed energy resources (DERs). CREG aims to establish the general steps that must be carried out to update the distribution code for the integration of DERs, with a view to the design and development of new markets. The objective of the TA provided to CREG was to support them in identifying and outlining the general processes and approaches to consider when updating Colombia's distribution code for the integration of electric vehicles, distributed renewable energy systems, and energy storage systems, with a view to the design and development of new markets.

24 POWER TRANSMISSION AND DISTRIBUTION↗